How to measure the energy when voltage and current are no longer analogue values ? Use sampled values according IEC61850 for today's AC- and future HVDC-transmission EUW 2013 © Landis+Gyr | 16. October 2013 J.Widmer 1. Future challenges for the Transmission Grid Limitations in today’s transmission system The challenge Construction of new routes for transmission lines in Europe often not possible. With HVDC, new possibilities to connect renewable generation to the existing transmission network. New solution with HVDC expands the capacity of existing transmission lines Use of 16.7 Hz for wind parks is in discussion Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer 3 How to integrate metering into IEC 61850 solutions? Close the gap Utilities introduce a new standard - IEC 61850 - for substation communication and automation in interconnected grids and integrated electric power systems. IEC 61850 is a future-proof design standard delivering customer benefits, such as optimized installation, lower engineering costs and interoperability of the components Up to now, metering has been the missing link in providing complete IEC 61850 solutions for substations. E880 is the solution for IEC61850 based substations using sampled values for voltage and current Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer 4 2. The solution How to measure energy when voltage and current are no longer analogue values? Today with conventional VT/CT Connection Box Control Protection Voltage A/D Billing Meter Connection Box Control Protection A/D Billing System ZMQ 200 With non-conventional VT/CT A/D Sampled values Control Protection Merging unit IEC 61850-9-2 LE Ethernet Billing Meter ZMQ 800 Billing System A/D One fibre per phase Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer 6 The new high end metering solution for IEC 61850 based substations E880 is the high precision meter for non-conventional VT / CT (NCIT) and IEC 61850 based substations Generation, transmission, substation and grid connected industrial consumers „Use sampled values for voltage and current Class 0.2S active, Class 0.5 reactive according to IEC standards for conventional meters „For all networks, voltages and currents NCIT = Non Conventional Instrument Transformers Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer 7 Accurate billing in new generation substations E880 key features Use of sampled values according to the IEC 61850-9-2 standard Full compatibility with the customer’s existing data acquisition system Full compatibility (housing and connections for outputs) with the existing E850 grid meter family for conventional instrument transformers „Three independent communications channels „Use of widely accepted DLMS communication protocol for billing data readout Input of sampled values: Optical (fibre) or Ethernet (RJ45) possible New grid meter technology E880 is new system component for IEC 61850 based substations that enables energy measurement and billing functions in one device. Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer 8 Seamless integration in existing E850 systems Benefit: Provide the worldwide successfully introduced functionality of the proven E850 For metering values processing Display Communication Storage of the values in profiles Rack-mount housing for existing panels with a wide range of connection possibilities Tools (MAP110) Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer 9 Investment protection Full compatibility with the customer’s existing data acquisition system Use of the widely accepted DLMS communication protocol Same modular communication units as used in E850 (PSTN, Ethernet, GPRS) Use of the proven MAP tools for parameterization E880 connects the IEC 61850 based «substation world» with the DLMS based «metering world» Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer 10 Future-proof solution Use of sampled values for billing and diagnostics in new generation IEC 61850based substations A single meter family serves all application for conventional and non-conventional instrument transformers Smooth integration of sampled values based metering in existing substations Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer 11 Cost efficiency No converter for sampled values needed. Interim solutions with optical fibre as input and conventional 100V, 5 A as output Full compatibility (housing and connections for outputs) with the existing E850 grid meter family Use proven and widely accepted ESSAILEC connector system for all outputs Input for sampled values adaptable to the substation environment: - Optical with fibre (100 base FX) - Electrical Ethernet with RJ45 (10 base TX) cover all needs Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer 12 3. References E880 worldwide projects and running installations Operational installations in substations from all important European suppliers Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer Customer project in operation 220 kV 1500 A Operative installation Pilot installation Meter ZMQ202 Meter ZMQ 202 CT with 4 cores Control Meter ZMQ802 Existing BKW meter read-out system Protection A Protection B Fault recorder NCIT samples for U and I 80 samples /20ms Merging Unit 1 Protection A Merging Unit 2 Protection B Source: BKW/FMB, Bern NCIT = Non Conventional Instrument Transformer Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer 15 Sensors for voltage and current (Examples) Varity of solutions are available on the market and in operation Source: ALSTOM Grid Source: ABB review special report p14 Source: ABB FOCS Source: ABB Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer Source: arteche COPEL Brazil 16 4. Conclusion Summary With E880 grid meter you get: Powerful multi-functional processing system from proven E850 that exceeds the industry requirements No additional investment in metering system integration Possibility for future change of communication channels Seamless integration in existing Investment protection Futureproof solution Cost efficiency Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer New protocol and engineering standard IEC 61850 supports futureproof substation design Same housing and connections for outputs can be used for both meters (E850 and E880) Easy installation in existing substation 18 E880: Metering for renewable energy production However you transmit renewable energy to the network 50 Hz 60 Hz HVDC 16.7 Hz Landis+Gyr provides you with the metering solution E880, the meter for sampled values according IEC 61850-9-2 with sensors from our partners and substations providers Sampled values for AC and HVDC-metering in substations | © Landis+Gyr | 16. October 2013 J.Widmer 19 Thank you for your attention Enjoy Utility week
© Copyright 2026 Paperzz