Slides

Richard White, David Gate
Rail BIM Summit
EAMS Group
Richard White
David Gate
Director, Strategic Consulting
[email protected]
Head of BIM & IoT Consulting
[email protected]
CAPEX
CDE
Create/Acquire
EAM
OPEX
Commission
Plan/Design
Whole Life
Asset
Management
Operate/
Use/
Maintain
Where is this
new BIM
Technology
taking us?
Modify/Replace/Enhance
Dispose/Demolish
Or Decommission
Richard White
David Gate
Rail BIM Summit
Where is the new BIM Technology taking us?
Agenda
1.
Where we are today
• BIM EAM basic integration – BIM Level 2
2. Where we should be
• Short term – BIM Level “2a”
3. Where we could be
• Long term – BIM “Level 3”
EAMS Group
Rail BIM Summit
EAMS Group
1. Where we are today – CDE & EAM
CDE(s)
Pain Points
- Handover
- Common
information models
between EAM & BIM
- Linear models
- Managing brown
field sites – new
assets not yet
handed over
alongside existing
assets – safety issue
Project
Project
Archive
As-Is
As-Built
EAM
OPEX
(operate and maintain)
Example Data Incl.
• Project Costs
• Project Plans
• Design Models
• Construction Models
• Decision Processes
• Sign Offs
Example Data Incl.
• As Delivered Models
• As Delivered Drawings
• As Delivered GIS Information
• As Delivered Asset Register
• As Delivered Asset Information
Example Data Incl.
• Asset Register
• Asset Information
• Work Management
Rail BIM Summit
EAMS Group
1. Where we are today – Integrated CDE & EAM
EAMS Group Industry Solutions
Project
As-Built
As-Is
EAM
integration
OPEX
(operate and maintain)
Example Data Incl.
•
Project Costs
•
Project Plans
•
Design Models
•
Construction Models
•
Decision Processes
•
Sign Offs
Example Data Incl.
•
As Delivered Models
•
As Delivered Drawings
•
As Delivered GIS Information
•
As Delivered Asset Register
•
As Delivered Asset Information
&
•
As Is Models
•
As Is Drawings
Example Data Incl.
•
Asset Register
•
Asset Information
•
Work Management
Rail BIM Summit
EAMS Group
1. Where we are today
EAMS Group Industry Solution Demonstration
Models courtesy of DLR Ltd and Crossrail Ltd
Rail BIM Summit
EAMS Group
1. Where we are today – Integrated CDE & EAM
EAMS Group Industry Solutions
The Key Features:
 Common definition of asset across lifecycle –
unique Id provides link
 Automatic Asset Register population from COBie,
CDE or other sources
 Links to CDE for continuous As-Is updates within
CDE
 3D Viewers from Autodesk, Bentley and SVSi
(IFC)
 Bentley partnership globally unique to EAMS
Group
The Business Benefits:
 Advanced visibility to Maintainer of assets
on the ground – safety improvement
 Operate and Maintain hit the ground running
 No need for costly surveys at handover
 Provide accurate and up to date drawings
and models to the workforce
 Provides asset register modification tracking
and automatic workflow for model and
drawing updates
Rail BIM Summit
EAMS Group
2. Where we should be
BIM Level “2a”
Project
As-Built
As-Is
EAM
integration
OPEX
(operate and maintain)
Example Additional Data Incl.
• Whole life cost models (WLCM)
• Linear models
• Maintenance models (RBM,
RCM, Prevent)
• PRAMS models
Example Additional Data Incl.
• As Delivered WLCM
• As Delivered Linear models
• As Delivered Maintenance model
• As Delivered PRAMS model
Example Data Incl.
• Asset Condition measuring points (IoT)
• “System” models (Linear)
Rail BIM Summit
EAMS Group
Demos available
3. Where we could be
BIM Level 3
At Project Initiation
Project
Information
Management
Customer
Information Apps
IoT/SCADA data
stream handlers
Predictive
analytics engines
GIS
Specialist
Degradation
modelling
EAM
Information Hub
CAD/3D tools
Enterprise Safety
Management
System
Enterprise HR
Management
Solution
Enterprise
Financial Solution
Enterprise Asset
Management
Solution
System
Performance
Simulators
Cognitive analytics
engines
Rail BIM Summit
EAMS Group
4. Summary
 Automating rich asset information handover is possible now, and yields benefits for
the Project (time, cost)
 Near term, additional value will come from explicitly modelling and handing over
the “design parameters” eg. Assumed maintenance regime leading to maintenance
team sizing opportunity
 Longer term, full scale benefits will come from simulation of the System to consider
Whole Life Cost (& Safety?) Management – years off design, millions off cost
 The future includes an eco-system of best of breed systems throughout life
 Asset owners will become Information Hub owners – implications for franchising,
governance?
Rail BIM Summit
EAMS Group
4. Summary
 Automating rich asset information handover is possible now, and yields benefits for
the Project (time, cost)
 Near term, additional value will come from explicitly modelling and handing over
the “design parameters” eg. Assumed maintenance regime leading to maintenance
team sizing opportunity
 Longer term, full scale benefits will come from simulation of the System to consider
Whole Life Cost (& Safety?) Management – years off design, millions off cost
 The future includes an eco-system of best of breed systems throughout life
 Asset owners will become Information Hub owners – implications for franchising,
governance?