Richard White, David Gate Rail BIM Summit EAMS Group Richard White David Gate Director, Strategic Consulting [email protected] Head of BIM & IoT Consulting [email protected] CAPEX CDE Create/Acquire EAM OPEX Commission Plan/Design Whole Life Asset Management Operate/ Use/ Maintain Where is this new BIM Technology taking us? Modify/Replace/Enhance Dispose/Demolish Or Decommission Richard White David Gate Rail BIM Summit Where is the new BIM Technology taking us? Agenda 1. Where we are today • BIM EAM basic integration – BIM Level 2 2. Where we should be • Short term – BIM Level “2a” 3. Where we could be • Long term – BIM “Level 3” EAMS Group Rail BIM Summit EAMS Group 1. Where we are today – CDE & EAM CDE(s) Pain Points - Handover - Common information models between EAM & BIM - Linear models - Managing brown field sites – new assets not yet handed over alongside existing assets – safety issue Project Project Archive As-Is As-Built EAM OPEX (operate and maintain) Example Data Incl. • Project Costs • Project Plans • Design Models • Construction Models • Decision Processes • Sign Offs Example Data Incl. • As Delivered Models • As Delivered Drawings • As Delivered GIS Information • As Delivered Asset Register • As Delivered Asset Information Example Data Incl. • Asset Register • Asset Information • Work Management Rail BIM Summit EAMS Group 1. Where we are today – Integrated CDE & EAM EAMS Group Industry Solutions Project As-Built As-Is EAM integration OPEX (operate and maintain) Example Data Incl. • Project Costs • Project Plans • Design Models • Construction Models • Decision Processes • Sign Offs Example Data Incl. • As Delivered Models • As Delivered Drawings • As Delivered GIS Information • As Delivered Asset Register • As Delivered Asset Information & • As Is Models • As Is Drawings Example Data Incl. • Asset Register • Asset Information • Work Management Rail BIM Summit EAMS Group 1. Where we are today EAMS Group Industry Solution Demonstration Models courtesy of DLR Ltd and Crossrail Ltd Rail BIM Summit EAMS Group 1. Where we are today – Integrated CDE & EAM EAMS Group Industry Solutions The Key Features: Common definition of asset across lifecycle – unique Id provides link Automatic Asset Register population from COBie, CDE or other sources Links to CDE for continuous As-Is updates within CDE 3D Viewers from Autodesk, Bentley and SVSi (IFC) Bentley partnership globally unique to EAMS Group The Business Benefits: Advanced visibility to Maintainer of assets on the ground – safety improvement Operate and Maintain hit the ground running No need for costly surveys at handover Provide accurate and up to date drawings and models to the workforce Provides asset register modification tracking and automatic workflow for model and drawing updates Rail BIM Summit EAMS Group 2. Where we should be BIM Level “2a” Project As-Built As-Is EAM integration OPEX (operate and maintain) Example Additional Data Incl. • Whole life cost models (WLCM) • Linear models • Maintenance models (RBM, RCM, Prevent) • PRAMS models Example Additional Data Incl. • As Delivered WLCM • As Delivered Linear models • As Delivered Maintenance model • As Delivered PRAMS model Example Data Incl. • Asset Condition measuring points (IoT) • “System” models (Linear) Rail BIM Summit EAMS Group Demos available 3. Where we could be BIM Level 3 At Project Initiation Project Information Management Customer Information Apps IoT/SCADA data stream handlers Predictive analytics engines GIS Specialist Degradation modelling EAM Information Hub CAD/3D tools Enterprise Safety Management System Enterprise HR Management Solution Enterprise Financial Solution Enterprise Asset Management Solution System Performance Simulators Cognitive analytics engines Rail BIM Summit EAMS Group 4. Summary Automating rich asset information handover is possible now, and yields benefits for the Project (time, cost) Near term, additional value will come from explicitly modelling and handing over the “design parameters” eg. Assumed maintenance regime leading to maintenance team sizing opportunity Longer term, full scale benefits will come from simulation of the System to consider Whole Life Cost (& Safety?) Management – years off design, millions off cost The future includes an eco-system of best of breed systems throughout life Asset owners will become Information Hub owners – implications for franchising, governance? Rail BIM Summit EAMS Group 4. Summary Automating rich asset information handover is possible now, and yields benefits for the Project (time, cost) Near term, additional value will come from explicitly modelling and handing over the “design parameters” eg. Assumed maintenance regime leading to maintenance team sizing opportunity Longer term, full scale benefits will come from simulation of the System to consider Whole Life Cost (& Safety?) Management – years off design, millions off cost The future includes an eco-system of best of breed systems throughout life Asset owners will become Information Hub owners – implications for franchising, governance? Thank You Questions?
© Copyright 2026 Paperzz