Appendix G - Endeavour Energy

Endeavour Energy 2015/16 Initial Pricing Proposal
Appendix G
Ancillary Network Services
ANCILLARY NETWORK SERVICES
2015/16 Fees
Fee Type
Administration Fee
Fee Type
Fee Category
Subdivision - URD - Underground - Number of lots - 1-5
Subdivision - URD - Underground - Number of lots - 6-10
Subdivision - URD - Underground - Number of lots - 11- 40
Subdivision - URD - Underground - Number of lots - 41 +
Subdivision - Non Urban - Underground - Number of lots - 1-5
Subdivision - Non Urban - Underground - Number of lots - 6-10
Subdivision - Non Urban - Underground - Number of lots - 11-40
Subdivision - Non Urban - Underground - Number of lots - 41 +
Subdivision - Non Urban - Overhead - Number of poles - 1-5
Subdivision - Non Urban - Overhead - Number of poles - 6-10
Subdivision - Non Urban - Overhead - Number of poles - 11 +
Subdivision - Industrial / Commercial - Per Hour
Driver
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Hour
Fee Type
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Quote
Excluding GST
$368.83
$461.04
$645.46
$737.67
$276.63
$368.83
$461.04
$553.25
$368.83
$461.04
$829.88
$92.21
Including GST
$405.71
$507.14
$710.01
$811.44
$304.29
$405.71
$507.14
$608.58
$405.71
$507.14
$912.87
$101.43
Connection of Load - URD - Per Hour
Connection of Load - Industrial / Commercial - Per Hour
Connection of Load - Non Urban - Underground - Per Hour
Connection of Load - Non Urban - Overhead - Number of poles - 1-5
Connection of Load - Non Urban - Overhead - Number of poles - 6-10
Connection of Load - Non Urban - Overhead - Number of poles - 11 +
Per Hour
Per Hour
Per Hour
Per Job
Per Job
Per Job
Quote
Quote
Quote
Fee
Fee
Fee
$92.21
$92.21
$92.21
$368.83
$553.25
$737.67
$101.43
$101.43
$101.43
$405.71
$608.58
$811.44
Asset Relocation - Per Hour
Public Lighting - Per Hour
Per Hour
Per Hour
Quote
Quote
$92.21
$92.21
$101.43
$101.43
Fee Category
Subdivision - URD - Underground - Number of lots - 1-5
Subdivision - URD - Underground - Number of lots - 6-10
Subdivision - URD - Underground - Number of lots - 11-40
Subdivision - URD - Underground - Number of lots - 41 +
Subdivision - Non Urban - Per Hour
Subdivision - Industrial / Commercial - Per Hour
Driver
Per Job
Per Job
Per Job
Per Job
Per Hour
Per Hour
Fee Type
Fee
Fee
Fee
Fee
Quote
Quote
Excluding GST
$443.58
$591.44
$1,035.00
$1,330.72
$147.86
$147.86
Including GST
$487.94
$650.58
$1,138.50
$1,463.79
$162.65
$162.65
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
Asset Relocation - Engineer - Per Hour
Asset Relocation - Designer - Per Hour
Public Lighting - Engineer - Per Hour
Public Lighting - Designer - Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Quote
Quote
Quote
Quote
$147.86
$147.86
$147.86
$147.86
$162.65
$162.65
$162.65
$162.65
Fee Category
Subdivision - URD - Underground - Number of lots - 1-5
Subdivision - URD - Underground - Number of lots - 6-10
Subdivision - URD - Underground - Number of lots - 11-40
Subdivision - URD - Underground - Number of lots - 41 +
Subdivision - Non Urban - Underground - Number of lots - 1-5
Subdivision - Non Urban - Underground - Number of lots - 6-10
Subdivision - Non Urban - Underground - Number of lots - 11-40
Subdivision - Non Urban - Underground - Number of lots - 41 +
Subdivision - Non Urban - Overhead - Number of poles - 1-5
Subdivision - Non Urban - Overhead - Number of poles - 6-10
Subdivision - Non Urban - Overhead - Number of poles - 11 +
Subdivision - Industrial / Commercial - Underground - Number of lots - 1-10
Subdivision - Industrial / Commercial - Underground - Number of lots - 11-40
Subdivision - Industrial / Commercial - Underground - Number of lots - 41 +
Subdivision - Industrial / Commercial - Overhead - Number of poles - 1-5
Subdivision - Industrial / Commercial - Overhead - Number of poles - 6-10
Subdivision - Industrial / Commercial - Overhead - Number of poles - 11 +
Driver
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Fee Type
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Excluding GST
$295.72
$443.58
$739.28
$887.14
$147.86
$443.58
$591.44
$591.44
$295.72
$443.58
$739.28
$443.58
$591.44
$887.14
$295.72
$443.58
$739.28
Including GST
$325.29
$487.94
$813.21
$975.85
$162.65
$487.94
$650.58
$650.58
$325.29
$487.94
$813.21
$487.94
$650.58
$975.85
$325.29
$487.94
$813.21
Connection of Load - Industrial / Commercial - <= 200A/Phase (LV)
Connection of Load - Industrial / Commercial - <= 700A/Phase (LV)
Connection of Load - Industrial / Commercial - > 700A/Phase (LV)
Connection of Load - Industrial / Commercial - HV Customer
Connection of Load - Industrial / Commercial - Transmission
Connection of Load - Multi-Dwelling - <= 5 units
Connection of Load - Multi-Dwelling - <= 20 units
Connection of Load - Multi-Dwelling - <= 40 units
Connection of Load - Multi-Dwelling - > 40 units
Connection of Load - Non Urban - Underground - Per Hour
Connection of Load - Non Urban - Underground - Number of poles - 1-5
Connection of Load - Non Urban - Underground - Number of poles - 6-10
Connection of Load - Non Urban - Underground - Number of poles - 11 +
Connection of Load - Indoor Substation - Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Job
Per Job
Per Job
Per Hour
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Quote
Fee
Fee
Fee
Quote
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$147.86
$295.72
$443.58
$739.28
$147.86
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$162.65
$325.29
$487.94
$813.21
$162.65
Asset Relocation - Engineer - Per Hour
Asset Relocation - Designer - Per Hour
Public Lighting - Engineer - Per Hour
Public Lighting - Designer - Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Quote
Quote
Quote
Quote
$147.86
$147.86
$147.86
$147.86
$162.65
$162.65
$162.65
$162.65
Connection of Load - Industrial / Commercial - <= 200A/Phase (LV)
Connection of Load - Industrial / Commercial - <= 700A/Phase (LV)
Connection of Load - Industrial / Commercial - > 700A/Phase (LV)
Connection of Load - Industrial / Commercial - HV Customer
Connection of Load - Industrial / Commercial - Transmission
Connection of Load - Multi-Dwelling - <= 5 units
Connection of Load - Multi-Dwelling - <= 20 units
Connection of Load - Multi-Dwelling - <= 40 units
Connection of Load - Multi-Dwelling - > 40 units
Design Information Fee
Connection of Load - Non Urban - I&C - <= 200A/Phase (LV)
Connection of Load - Non Urban - I&C - <= 700A/Phase (LV)
Connection of Load - Non Urban - I&C - > 700A/Phase (LV)
Connection of Load - Non Urban - I&C - HV Customer
Connection of Load - Non Urban - I&C - Transmission
Connection of Load - Non Urban - Multi-Dwelling - <= 5 units
Connection of Load - Non Urban - Multi-Dwelling - <= 20 units
Connection of Load - Non Urban - Multi-Dwelling - <= 40 units
Connection of Load - Non Urban - Multi-Dwelling - > 40 units
Connection of Load - Non Urban - Single Residential - Per Hour
Fee Type
Design Certification Fee
Driver
Fee Type
Excluding GST
Including GST
Driver
Per Hour
Per Hour
Per Hour
Fee Type
Quote
Quote
Quote
Excluding GST
$147.86
$147.86
$147.86
Including GST
$162.65
$162.65
$162.65
Per Hour
Per Hour
Per Hour
Quote
Quote
Quote
$147.86
$147.86
$147.86
$162.65
$162.65
$162.65
Other - Asset Relocation - Engineer - Per Hour
Other - Asset Relocation - Designer - Per Hour
Other - Public Lighting - Engineer - Per Hour
Other - Public Lighting - Designer - Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Quote
Quote
Quote
Quote
$147.86
$147.86
$147.86
$147.86
$162.65
$162.65
$162.65
$162.65
Fee Category
Subdivision - Industrial & Commercial - Per Request
Subdivision - Non Urban - Per Request
Subdivision - URD - Per Request
Subdivision - Industrial & Commercial - per hour for early notification of arrangement
Subdivision - Non Urban - per hour for early notification of arrangement
Subdivision - URD - per hour for early notification of arrangement
Driver
Per Job
Per Job
Per Job
Per Hour
Per Hour
Per Hour
Fee Type
Fee
Fee
Fee
Quote
Quote
Quote
Excluding GST
$184.42
$184.42
$184.42
$92.21
$92.21
$92.21
Including GST
$202.86
$202.86
$202.86
$101.43
$101.43
$101.43
Driver
Per Job
Per Job
Per Job
Per Hour
Per Hour
Per Hour
Fee Type
Fee
Fee
Fee
Quote
Quote
Quote
Excluding GST
$184.42
$276.63
$184.42
$92.21
$92.21
$92.21
Including GST
$202.86
$304.29
$202.86
$101.43
$101.43
$101.43
Fee Category
Subdivision - URD - Underground - Per Lot (1 - 10) - Grade A
Subdivision - URD - Underground - Per Lot (11 - 50) - Grade A
Subdivision - URD - Underground - Per Lot (51 +) - Grade A
Subdivision - URD - Underground - Per Lot (1 - 10) - Grade B
Subdivision - URD - Underground - Per Lot (11 - 50) - Grade B
Subdivision - URD - Underground - Per Lot (51 +) - Grade B
Subdivision - URD - Underground - Per Lot (1 - 10) - Grade C
Subdivision - URD - Underground - Per Lot (11 - 50) - Grade C
Subdivision - URD - Underground - Per Lot (51 +) - Grade C
Subdivision - URD - Underground - Per hour
Subdivision - Non Urban - Underground - Per Lot (1 - 10) - Grade A
Subdivision - Non Urban - Underground - Per Lot (11 - 50) - Grade A
Subdivision - Non Urban - Underground - Per Lot (51+) - Grade A
Subdivision - Non Urban - Underground - Per Lot (1 - 10) - Grade B
Subdivision - Non Urban - Underground - Per Lot (11 - 50) - Grade B
Subdivision - Non Urban - Underground - Per Lot (51+) - Grade B
Subdivision - Non Urban - Underground - Per Lot (1 - 10) - Grade C
Subdivision - Non Urban - Underground - Per Lot (11 - 50) - Grade C
Subdivision - Non Urban - Underground - Per Lot (51+) - Grade C
Subdivision - Non Urban - Overhead - Per Pole (1 - 5) - Grade A
Subdivision - Non Urban - Overhead - Per Pole (6 - 10) - Grade A
Subdivision - Non Urban - Overhead - Per Pole (11 +) - Grade A
Subdivision - Non Urban - Overhead - Per Pole Sub - Grade A
Subdivision - Non Urban - Overhead - Per Pole (1 - 5) - Grade B
Subdivision - Non Urban - Overhead - Per Pole (6 - 10) - Grade B
Subdivision - Non Urban - Overhead - Per Pole (11 +) - Grade B
Subdivision - Non Urban - Overhead - Per Pole Sub - Grade B
Subdivision - Non Urban - Overhead - Per Pole (1 - 5) - Grade C
Subdivision - Non Urban - Overhead - Per Pole (6 - 10) - Grade C
Subdivision - Non Urban - Overhead - Per Pole (11 +) - Grade C
Subdivision - Non Urban - Overhead - Per Pole Sub - Grade C
Subdivision - Industrial & Commercial - Overhead - Per Pole (1 - 5) - Grade A
Subdivision - Industrial & Commercial - Overhead - Per Pole (6 - 10) - Grade A
Subdivision - Industrial & Commercial - Overhead - Per Pole (11 +) - Grade A
Subdivision - Industrial & Commercial - Overhead - Per Pole Sub - Grade A
Subdivision - Industrial & Commercial - Overhead - Per Pole (1 - 5) - Grade B
Subdivision - Industrial & Commercial - Overhead - Per Pole (6 - 10) - Grade B
Subdivision - Industrial & Commercial - Overhead - Per Pole (11 +) - Grade B
Subdivision - Industrial & Commercial - Overhead - Per Pole Sub - Grade B
Subdivision - Industrial & Commercial - Overhead - Per Pole (1 - 5) - Grade C
Subdivision - Industrial & Commercial - Overhead - Per Pole (6 - 10) - Grade C
Subdivision - Industrial & Commercial - Overhead - Per Pole (11 +) - Grade C
Subdivision - Industrial & Commercial - Overhead - Per Pole Sub - Grade C
Subdivision - Industrial & Commercial - Underground - Per Lot (1 - 10) - Grade A
Subdivision - Industrial & Commercial - Underground - Per Lot (11 - 50) - Grade A
Subdivision - Industrial & Commercial - Underground - Per Lot (51+) - Grade A
Subdivision - Industrial & Commercial - Underground - Per Lot (1 - 10) - Grade B
Subdivision - Industrial & Commercial - Underground - Per Lot (11 - 50) - Grade B
Subdivision - Industrial & Commercial - Underground - Per Lot (51+) - Grade B
Subdivision - Industrial & Commercial - Underground - Per Lot (1 - 10) - Grade C
Subdivision - Industrial & Commercial - Underground - Per Lot (11 - 50) - Grade C
Subdivision - Industrial & Commercial - Underground - Per Lot (51+) - Grade C
Driver
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Hour
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Fee Type
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Quote
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Excluding GST
$73.93
$44.35
$14.78
$170.04
$103.50
$59.14
$369.65
$207.00
$96.11
$147.86
$73.93
$44.35
$14.78
$177.43
$96.11
$59.14
$377.04
$221.79
$103.50
$88.72
$73.93
$59.14
$502.72
$177.43
$147.86
$96.11
$1,035.01
$295.72
$273.54
$207.00
$1,256.81
$88.72
$73.93
$59.14
$517.51
$162.64
$147.86
$103.50
$1,035.01
$325.29
$294.24
$221.79
$1,301.16
$73.93
$73.93
$73.93
$177.43
$177.43
$177.43
$369.65
$369.65
$369.65
Including GST
$81.32
$48.79
$16.26
$187.04
$113.85
$65.05
$406.62
$227.70
$105.72
$162.65
$81.32
$48.79
$16.26
$195.17
$105.72
$65.05
$414.74
$243.97
$113.85
$97.59
$81.32
$65.05
$552.99
$195.17
$162.65
$105.72
$1,138.51
$325.29
$300.89
$227.70
$1,382.49
$97.59
$81.32
$65.05
$569.26
$178.90
$162.65
$113.85
$1,138.51
$357.82
$323.66
$243.97
$1,431.28
$81.32
$81.32
$81.32
$195.17
$195.17
$195.17
$406.62
$406.62
$406.62
Connection of Load - URD - Underground - Inspector - Per hour
Connection of Load - URD - Underground - Engineer - Per hour
Connection of Load - Non Urban - Underground - Inspector - Per hour
Connection of Load - Non Urban - Underground - Engineer - Per hour
Connection of Load - Non Urban - Overhead - Per Pole (1 - 5) - Grade A
Connection of Load - Non Urban - Overhead - Per Pole (1 - 5) - Grade B
Connection of Load - Non Urban - Overhead - Per Pole (1 - 5) - Grade C
Connection of Load - Non Urban - Overhead - Per Pole (6 - 10) - Grade A
Connection of Load - Non Urban - Overhead - Per Pole (6 - 10) - Grade B
Connection of Load - Non Urban - Overhead - Per Pole (6 - 10) - Grade C
Connection of Load - Non Urban - Overhead - Per Pole (11 +) - Grade A
Connection of Load - Non Urban - Overhead - Per Pole (11 +) - Grade B
Per Hour
Per Hour
Per Hour
Per Hour
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Quote
Quote
Quote
Quote
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
$147.86
$147.86
$147.86
$147.86
$88.72
$177.43
$325.29
$73.93
$147.86
$294.24
$59.14
$103.50
$162.65
$162.65
$162.65
$162.65
$97.59
$195.17
$357.82
$81.32
$162.65
$323.66
$65.05
$113.85
Fee Type
Fee Category
Fee Type
Fee Category
Subdivision - Industrial & Commercial - Per Hour
Subdivision - Non Urban - Per Hour
Subdivision - URD - Per Hour
Connection of Load - Industrial & Commercial - Per Hour
Connection of Load - Non Urban - Per Hour
Design Re-certification
Connection of Load - URD - Per Hour
Fee
Fee Type
Notification of
Arrangement
Fee Type
Fee Category
Connection of Load - Industrial & Commercial - Per Request
Connection of Load - Non Urban - Per Request
Connection of Load - URD - Per Request
Compliance Certificate Connection of Load - Industrial & Commercial - per hour for early compliance certificate
Connection of Load - Non Urban - per hour for early compliance certificate
Connection of Load - URD - per hour for early compliance certificate
Fee Type
Inspection Fee
Fee Category
Connection of Load - Non Urban - Overhead - Per Pole (11 +) - Grade C
Connection of Load - Non Urban - Overhead - Per Pole Sub - Grade A
Connection of Load - Non Urban - Overhead - Per Pole Sub - Grade B
Connection of Load - Non Urban - Overhead - Per Pole Sub - Grade C
Connection of Load - Industrial & Commercial - Underground - Inspector - Per hour
Connection of Load - Industrial & Commercial - Underground - Engineer - Per hour
Connection of Load - Industrial & Commercial - Overhead - Per Pole (1 - 5) - Grade A
Connection of Load - Industrial & Commercial - Overhead - Per Pole (1 - 5) - Grade B
Connection of Load - Industrial & Commercial - Overhead - Per Pole (1 - 5) - Grade C
Connection of Load - Industrial & Commercial - Overhead - Per Pole (6 - 10) - Grade A
Connection of Load - Industrial & Commercial - Overhead - Per Pole (6 - 10) - Grade B
Connection of Load - Industrial & Commercial - Overhead - Per Pole (6 - 10) - Grade C
Connection of Load - Industrial & Commercial - Overhead - Per Pole (11+) - Grade A
Connection of Load - Industrial & Commercial - Overhead - Per Pole (11+) - Grade B
Connection of Load - Industrial & Commercial - Overhead - Per Pole (11+) - Grade C
Connection of Load - Industrial & Commercial - Overhead - Per Pole Sub - Grade A
Connection of Load - Industrial & Commercial - Overhead - Per Pole Sub - Grade B
Connection of Load - Industrial & Commercial - Overhead - Per Pole Sub - Grade C
Driver
Per Job
Per Job
Per Job
Per Job
Per Hour
Per Hour
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Fee Type
Fee
Fee
Fee
Fee
Quote
Quote
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Excluding GST
$221.79
$502.72
$1,035.01
$1,256.81
$147.86
$147.86
$88.72
$170.04
$325.29
$73.93
$147.86
$294.24
$59.14
$103.50
$221.79
$517.51
$1,035.01
$1,301.16
Including GST
$243.97
$552.99
$1,138.51
$1,382.49
$162.65
$162.65
$97.59
$187.04
$357.82
$81.32
$162.65
$323.66
$65.05
$113.85
$243.97
$569.26
$1,138.51
$1,431.28
Asset Relocation - Underground - Inspector - Per hour
Asset Relocation - Underground - Engineer - Per hour
Public Lighting - Underground - Inspector - Per hour
Public Lighting - Underground - Engineer - Per hour
Per Hour
Per Hour
Per Hour
Per Hour
Quote
Quote
Quote
Quote
$147.86
$147.86
$147.86
$147.86
$162.65
$162.65
$162.65
$162.65
Fee Category
Administration Fee
Overtime Hours Rate
Access Permits
Driver
Fee Type
Excluding GST
$49.29
$73.94
$2,461.88
Including GST
$54.22
$81.33
$2,708.07
Fee Category
Driver
Fee Type
Excluding GST
Including GST
Reinspection Fee (Level
Reinspection Fee (Level 1 & Level 2 work)
1 & Level 2 work)
Per Hour
Quote
$147.86
$162.65
Driver
Per NOSW
Per NOSW
Per NOSW
Fee Type
Fee
Fee
Fee
Excluding GST
$51.75
$88.72
$295.72
Including GST
$56.93
$97.59
$325.29
Driver
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Fee Type
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Excluding GST
$148.12
$306.21
$296.24
$612.42
$259.20
$535.87
$518.41
$1,071.74
Including GST
$162.93
$336.83
$325.86
$673.66
$285.12
$589.46
$570.25
$1,178.91
Driver
Per Lot
Per AA or ATW
Per AA or ATW
Per AA or ATW
Per AA or ATW
Per AA or ATW
Fee Type
Fee
Fee
Fee
Fee
Fee
Fee
Excluding GST
$56.85
$2,461.88
$2,461.88
$2,461.88
$2,461.88
$2,461.88
Including GST
$62.54
$2,708.07
$2,708.07
$2,708.07
$2,708.07
$2,708.07
Driver
Per Lot
Per Substation
Per Substation
Per Substation
Per Substation
Per Substation
Fee Type
Fee
Fee
Fee
Fee
Fee
Fee
Excluding GST
$59.56
$1,727.38
$1,727.38
$1,727.38
$1,727.38
$1,727.38
Including GST
$65.52
$1,900.12
$1,900.12
$1,900.12
$1,900.12
$1,900.12
Fee Type
Fee Type
Inspection of works
outside normal working
hours
Fee Type
Fee Type
Inspection of service
work (Level 2 work)
Fee Category
Per NOSW - A Grade
Per NOSW - B Grade
Per NOSW - C Grade
Fee Type
Fee Category
Normal Time - 1 x Visit - Open / Close - 1 hour - Per Job
Normal Time - 1 x Visit - Open / Isolate & CSO to close - 1 hour - Per Job
Normal Time - 2 x Visit - Open / Close & no isolation - 2 hours - Per Job
Provision of Access Fee Normal Time - 2 x Visit - Open / Isolate / Close - 2 hours - Per Job
Overtime - 1 x Visit - Open / Close - 1 hour - Per Job
(Standby)
Overtime - 1 x Visit - Open / Isolate & CSO to close - 1 hour - Per Job
Overtime - 2 x Visit - Open / Close & no isolation - 2 hours - Per Job
Overtime - 2 x Visit - Open / Isolate / Close - 2 hours - Per Job
Fee Type
Access Permits
Fee Category
Subdivision - URD - Per Lot
All Other - Industrial & Commercial
All Other - Non Urban
All Other - URD
All Other - Asset Relocation
All Other - Public Lighting
Fee Type
Fee Category
Subdivision - URD - Per Lot
All Other - Industrial & Commercial - Per Substation
All Other - Non Urban - Per Substation
Substation Commission
All Other - URD - Per Substation
Fee
All Other - Asset Relocation - Per Substation
All Other - Public Lighting - Per Substation
Fee Type
Excluded Distribution
Services
Fee Category
Cost of excluded distribution services for interruption avoidance measures for
contestable work planned electricity supply interruptions
Install & remove HV live line links - One set
Install & remove HV live line links - Each additional set
Break & remake HV bonds - One set
Break & remake HV bonds - Each additional set
Break & remake LV bonds - One set
Break & remake LV bonds - Each additional set
Install & remove LV live line links - One set
Install & remove LV live line links - Each additional set
Connect & disconnect generator to LV OH mains - One generator
Connect & disconnect generator to LV OH mains - Each additional generator
Connect & disconnect generator to a padmount / indoor substation - One generator
Connect & disconnect generator to a padmount / indoor substation - Each additional gen
Driver
Fee Type
Excluding GST
Including GST
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
Fee
$4,279.05
$2,738.43
$3,318.01
$1,834.44
$2,051.04
$964.75
$2,024.85
$938.56
$1,974.99
$888.70
$1,974.99
$888.70
$4,706.96
$3,012.27
$3,649.81
$2,017.88
$2,256.14
$1,061.23
$2,227.34
$1,032.42
$2,172.49
$977.57
$2,172.49
$977.57
Cost of excluded distribution services to terminate cable at zone substations and first
joint out from the zone substation
Zone substation access and supervision for installation of cable(s) for one feeder
Protection setting
Testing cable prior to commissioning
11kV Zone substation circuit breaker cable termination
22kV Zone substation circuit breaker cable termination
11kV Padmount/Indoor substation cable termination
22kV Padmount/Indoor substation cable termination
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Per Job
Fee
Fee
Fee
Fee
Fee
Fee
Fee
$3,169.89
$4,125.56
$4,683.29
$3,720.94
$3,850.12
$4,014.61
$4,818.39
$3,486.88
$4,538.12
$5,151.62
$4,093.03
$4,235.13
$4,416.07
$5,300.23
Fee Type
Fee Type
Authorisation
Fee Category
11kV Pole top termination (UGOH) and bonding to OH
22kV Pole top termination (UGOH) and bonding to OH
11kV Straight through joint
22kV Straight through joint
Driver
Per Job
Per Job
Per Job
Per Job
Fee Type
Fee
Fee
Fee
Fee
Excluding GST
$4,712.55
$5,249.65
$3,955.71
$4,119.63
Traffic Control
Traffic Management to install & remove, break & remake, connect & disconnect excluded
distribution services
Traffic Management to test, terminate and joint excluded distribution services
Per Job
Fee
$3,863.25
$4,249.58
Per Job
Fee
$3,541.77
$3,895.95
Driver
Per Authorisation
Per Authorisation
Fee Type
Fee
Fee
Excluding GST
$389.44
$433.88
Including GST
$428.38
$477.27
Driver
Per NMI
Fee Type
Fee
Excluding GST
$37.15
Including GST
$40.87
Fee Category
Authorisation - Renewal
Authorisation - New
Fee Type
Fee Category
Site Establishment Fee Site Establishment
Fee Type
Conveyancing
Information
Fee Type
Planning Studies
Fee Type
Connection Offer
Service
Fee Category
Supply of conveyancing information
Fee Category
Carrying out planning studies and analysis relating to distribution (including sub transmission and
dual function assets) connection applications - (Simple Jobs)
Carrying out planning studies and analysis relating to distribution (including sub transmission and
dual function assets) connection applications - (Complex Jobs)
Fee Category
Connection Offer Service (Basic)
Connection Offer Service (Standard)
Fee Type
Fee Category
Customer Interface coCustomer Interface co-ordination for contestable works
ordination
Fee Type
Fee Category
Investigation, review & Investigation, review & implementation of remedial actions associated with ASP's connection
work
implementation of
Fee Type
Preliminary Enquiry
Service
Fee Category
Preliminary Enquiry Service (Simple Jobs)
Preliminary Enquiry Service (Complex Jobs)
Fee Type
Services involved in
obtaining deeds of
agreement
Fee Category
Fee Type
Off Peak Conversions
Fee Type
Clearance to Work
Fee Type
Rectification Works
Fee Type
Meter Test Fee
Fee Type
Reconnections /
Disconnections
Fee Type
Special Meter Reads
Including GST
$5,183.81
$5,774.62
$4,351.28
$4,531.59
Driver
Fee Type
Excluding GST
Including GST
Per Inquiry
Fee
$61.37
$61.37
Driver
Fee Type
Excluding GST
Including GST
Per Hour
Quote
$183.80
$202.18
Per Hour
Quote
$218.42
$240.26
Driver
Per Job
Per Job
Fee Type
Fee
Fee
Excluding GST
$24.65
$237.14
Including GST
$27.12
$260.85
Driver
Fee Type
Excluding GST
Including GST
Per Hour
Quote
$183.80
$202.18
Driver
Fee Type
Excluding GST
Including GST
Per Hour
Quote
$147.86
$162.65
Driver
Per Hour
Per Hour
Fee Type
Quote
Quote
Excluding GST
$92.21
$218.42
Including GST
$101.43
$240.26
Driver
Fee Type
Excluding GST
Including GST
Services involved in obtaining deeds of agreement in relation to property rights associated with
contestable connections work
Per Hour
Quote
$147.86
$162.65
Fee Category
Off Peak Conversions
Driver
Per Job
Fee Type
Fee
Excluding GST
$115.44
Including GST
$126.98
Fee Category
Clearance to Work
Driver
Per Job
Fee Type
Fee
Excluding GST
$2,051.55
Including GST
$2,256.71
Driver
Per Hour
Per Tiger Tail
Per Hour
Per Job
Per Hour
Fee Type
Quote
Quote
Quote
Fee
Quote
Excluding GST
$138.53
$5.01
$138.53
$554.11
$138.53
Including GST
$152.38
$5.51
$152.38
$609.52
$152.38
Driver
Per Job
Fee Type
Fee
Excluding GST
$415.58
Including GST
$457.14
Driver
Per Disco
Per Disco
Per Visit
Per Reco
Per Disco
Per Visit
Fee Type
Fee
Fee
Fee
Fee
Fee
Fee
Excluding GST
$171.55
$261.82
$56.97
$64.33
$432.74
$197.49
Including GST
$188.71
$288.00
$62.67
$70.76
$476.01
$217.24
Driver
Per Job
Fee Type
Fee
Excluding GST
$34.63
Including GST
$38.09
Fee Category
Fitting of Tiger Tails (Labour)
Fitting of Tiger Tails (Material) - Weekly Hire
High Load Escorts - Per Hour
Rectification of illegal connections
Provision of service crew / additional crew (Additional person per crew)
Fee Category
Meter Test Fee - Per Request
Fee Category
Disconnections (Meter Box) - Includes Reconnection
Disconnections (Meter Load Tail) - Includes Reconnection
Reconnections / Disconnections (Site Visit))
Reconnections outside normal business hours
Disconnections (Pole Top / Pillar Box) - Includes Reconnection
Disconnections at Pole Top / Pillar Box - Site Visit
Fee Category
Special Meter Reads
Fee Type
Fee Category
Move In / Move Out Meter
Move In / Move Out Meter Reads
Reads
Driver
Fee Type
Excluding GST
Including GST
Per Job
Fee
$34.63
$38.09
Fee Type
Recovery of debt
collection costs
Fee Category
Driver
Fee Type
Excluding GST
Including GST
Recovery of debt collection costs - dishonoured transactions
Per Job
Fee
$16.59
$18.25
Fee Type
Type 5-7 Non Standard
Meter data Services
Fee Category
Driver
Fee Type
Excluding GST
Including GST
Type 5-7 Non Standard Meter data Services
Per Job
Fee
$16.43
$18.07
Driver
Fee Type
Excluding GST
Including GST
Fee Category
Driver
Fee Type
Excluding GST
Including GST
Franchise CT Meter Install
Per Job
Fee
$518.41
$570.25
Fee Category
Services provided in relation to a Retailer of Last Resort (ROLR) event
Driver
Per Job
Fee Type
Quote
Excluding GST
Quote Basis
Including GST
Quote Basis
Excluding GST
$92.21
$147.86
$183.80
$138.53
$218.42
Including GST
$101.43
$162.65
$202.18
$152.38
$240.26
Fee Type
Fee Category
Fee Type
Franchise CT Meter
Install
Fee Type
ROLR
Maximum hourly labour rates (including on-costs and overhead) for quoted services ($2015-16)
Classification
Admin
Technical specialist
EO 7/Engineer
Field worker R4
Senior Engineer
AER Final decision maximum labour rate - includes on-cost and overhead
Per Hour
Quote
Per Hour
Quote
Per Hour
Quote
Per Hour
Quote
Per Hour
Quote