Water Supply and Sanitation Sector Project (RRP LAO 45301-002) NONREVENUE WATER REDUCTION PROGRAM A. Introduction 1. The Water Supply and Sanitation Sector Project (the Project) will assist participating provincial water utilities, called provincial nam papas (PNPs) to reduce nonrevenue water (NRW) in five existing provincial capital water supply systems by implementing an intense, comprehensive NRW program to reduce and sustain NRW at economic levels. It will also support a sector approach to NRW management which is outlined in Table 1. The Water Supply Regulatory Committee (WSRC) Annual PNP Performance Reports highlight excessive energy use and high nonrevenue water as key issues that adversely affect the PNPs’ technical and financial performance. The program will assist in reducing the NRW backlog, but it will not lead to sustainable levels of NRW unless NRW management becomes part of the normal day-to-day activities of the water utility. This Appendix outlines the proposed approach to the NRW program based on a review and analysis completed during project preparation.1 B. Situational Analysis 2. The high level of water loss or “nonrevenue water” (NRW) in distribution networks is one of the major challenges facing the Lao water sector. A high level of NRW is often the main reason that a water utility is unable to improve its performance, especially for those with water supply systems that have unsatisfied demand and limited coverage. A high rate of NRW is also a cause of poor energy efficiency because part of the energy used in the production and distribution processes is embedded in the lost water. Reducing NRW is important to overall efficiency and financial sustainability, because it provides additional revenues and reduces costs. 3. In 2011, NRW for the Lao People’s Democratic Republic’s (the Lao PDR) 16 PNPs was running at levels of about 28%2 on average—well above the Water Supply Regulatory Office’s (WASRO) target service levels (15% to 20% when systems are pressurized) and substantially above levels necessary for PNP financial sustainability. The precise figures are unknown because of the lack of meter calibration and testing and, in some cases, the lack of bulk meters. The main contributors to sector NRW3 are the water supply systems in the large provincial capitals that were developed 15 to 40 years ago. Some of these systems were developed using poor quality pipe materials and inadequate design and construction standards. NRW varies widely between PNPs, ranging from 17% to 58%.4 However, these figures do not provide a true reflection of the real state of NRW, because many of the older systems experience low pressures and intermittent supply. While such conditions can result in low NRW, they are often associated with a high risk of contamination of water supply by groundwater entering leaky pipes. As water supply systems are improved, pressures will increase and NRW (real [physical] loss component) will rise proportionately unless measures are taken to control leakage in the distribution network. 4. Total NRW for all 16 PNPs was estimated at 11.63 million m3 per year in 20115 or 28% of overall water production. If current NRW levels for the 16 PNPs could be reduced to around 20%, an additional 3.3 million m3/year of PNP piped water would be available to customers, sufficient to 1 2 3 4 5 Appendix is based on the TA 8150-LAO consultant draft final report, May 2013. Water Supply Division. Water Supply Investment Plan. Water supply sector data for 2011 listed in February 2013. Vientiane: Department of Housing and Urban Planning, Ministry of Public Works and Transport. The Vientiane Capital water supply system is a major contributor to sector NRW. It has not been included. See footnote 1. Water Supply Division data indicates that the volume of NRW for the 16 PNPs increased by 25% between 2009 and 2011. 2 supply an extra 76,000 people (assuming consumption of 120 liters per capita per day)6 and generate an additional $1.25 million/year in PNP revenues7. Assuming an average NRW reduction cost of $500 per m3/day it is broadly estimated that a total investment of around $5.3 million8 would be required to reduce NRW by one third of present levels for the 16 PNPs. The investment needed to reduce NRW to economic and sustainable levels is substantial and is beyond the financial capacity of the PNPs at present. However, expanding water networks without addressing water losses will lead to a cycle of waste and inefficiency. 5. NRW management is one of the most complex and difficult tasks of a water supply utility and requires coordinated inputs from managerial, technical and commercial departments. The 16 PNPs manage around 72 separate small town water supply systems of varying sizes, ages and conditions. None of the PNPs has an active NRW management program. Few if any of the PNPs undertake NRW audits, energy audits or calibration of bulk meters which are essential for NRW monitoring and water treatment plant process control. PNPs often undertake passive NRW measures such as fixing visible leaks and pipeline breaks which represent less than 5% of real (physical) losses; the other 95% are hidden below ground. C. Proposed Approach 6. A common approach is needed to enable all PNPs to improve NRW through an incremental approach involving five time-bound steps as shown in the Table. Each PNP can follow some or all of these steps depending on its particular situation and with the support of ADB or other development partners. These include: (i) Raising awareness on the importance of NRW reduction and management; (ii) Conducting a study and audit of the NRW situation for each participating PNP; (iii) Preparing financial and economic models to determine priority NRW options; (iv) Implementing real (physical) loss reduction actions such as leakage; and apparent (commercial) loss reduction actions such as metering losses and water theft; and (v) Sustaining maintenance activities and continuing further training in NRW. 7. Some steps of the NRW program have been piloted for Luang Namtha PNP. While the broad steps are applicable to all PNPs; the specific actions should be reviewed and adjusted to suit the local situation for each PNP. D. Implementation and Timing 8. The NRW program will need to start immediately with awareness raising activities once the Project is approved. Awareness raising activities will be intensified for the respective PNP once the two subprojects are confirmed for feasibility study (at subproject screening). 9. Each participating PNP will need to establish leak detection teams to check all pipes, valves and meters, and update the asset register. The detection teams will be linked closely to other related departments such as metering, billing and collection, etc. to ensure that all aspects 6 7 8 3 if NRW is reduced from 28% to 20%, the additional amount of water available is 8*11.63/28 = 3.32 million m . This represents sufficient water to supply 3.32*1000000*1000/(120*365 = 76,000 people). 3 Based on a typical water tariff of $0.38/m . 3 3 3 NRW reduction = one third of 11.6 million m /year = 10,500m /dayx$500/m /day = $5.3 million. 3 of NRW are addressed. The Project will support the establishment and training of PNP staff in leak detection and other related areas. 10. Following completion of the NRW program, ongoing annual audits and NRW reduction work will be undertaken by external NRW and metering experts to sustain low levels of NRW. The reliance on external experts will help address the risk posed by low absorptive capacities of PNPs and the complexity of the task. 11. The project design will also provide business opportunities for Nam Papa Nakhoneluang (NPN) and private contractors to develop their skills and receive training on NRW work. They will also be encouraged to form associations or joint ventures with international experts to provide continuous technical and management support and expertise. This will enhance sustainability and retention of NRW skills in the Lao PDR. E. Contributing to Sustainable NRW Services 12. NPN would be an appropriate resource for supplying NRW experts. ADB is currently supporting ccapacity development activities of NPN in leak detection and NRW management through an ADB-funded twinning partnership with Phnom Penh Water Supply Authority in Cambodia. The twinning is expected to be augmented to include a training of trainers (TOTs) program for the NPN in NRW reduction; this would provide NPN skills for training and assisting other PNPs further in improving NRW reduction actions for a specific PNP. 13. The Project could help support the establishment of an Efficiency and Audit Business Unit in NPN subject to the agreement between NPN and the Department of Housing and Urban Planning in the Ministry of Public Works and Transport. The ongoing role of this Business Unit would be to provide specialized services for annual NRW audits, regular energy audits, and annual meter calibration and meter testing for PNPs. NPN already has an experienced metering section and relevant hardware including a portable ultrasonic meter for measuring flows in large pipes, a portable calibration meter for testing customer meters, pressure gauges and associated tools. NPN services were tested during project preparation for Luang Namtha PNP. 14. The Project will provide training and work experience for concerned NPN staff during project implementation. The NPN staff will be seconded to the PIA consultants, work within the PNP leak detection teams and also assist the project implementation assistance consultants to undertake energy audits. The NPN’s existing metering team would assist with meter calibration and testing. The cost of annual audits and meter calibrations would be factored into the tariff calculations of the PNPs that participate in the Project, to ensure that the benefits of the investments in NRW reduction and energy management are sustained. Regular audits and meter calibration will a precondition for inclusion in any subsequent ADB-funded projects. 15. This proposed initiative aims to: (i) develop expertise in NRW reduction and energy management in Lao PDR, and provide PNPs with cost effective contract services in these key areas; (ii) institutionalize NRW audits, energy audits and meter calibration for the PNPs, and; (iii) assist the PNPs to identify necessary improvements and their cost-effectiveness. The findings of the audits would feed into WSRC’s Annual Performance Reviews and into PNP Corporate Plans. It is envisioned that the project implementation assistance consultants would subcontract the initial engagement of NPN. PNPs would need to conduct subsequent annual audits through individual contracts with PWA. 4 Table: Proposed Approach to NRW Reduction Step Description Actions Process Timing 1 Awareness Raising on NRW National workshops; Provincial workshops. PNP workshops, staff training and raising awareness. ADB (WSSP), JICA and NORAD funded capacity development and corporate planning activities. Project start to end 2 Study and audit of NRW Undertake bulk flow measurements; Undertake field surveys and investigations to confirm the magnitude and sources of NRW; Prepare water balance for each system; Prepare asset register; Update water supply system records & drawings; Undertake asset condition assessments ADB (WSSP), JICA and NORAD funded capacity development and corporate planning activities. After subproject screening Identify options for NRW reduction and assess financial and economic costs and benefits. Prioritize the options based on cost effectiveness, time for implementation and implementation cost. Obtain PNP management and Board support and commitment for the NRW reduction measures. ADB (WSSP), JICA and NORAD funded capacity development and corporate planning activities. Feasibility 3 Prepare financial and economic models 4a Implement apparent (commercial) loss reduction Prepare and implement apparent (commercial) loss reduction measures including: Improve customer registration; Undertake surveys of unauthorized connections; Improve meter management; Enforce disconnection policy; Improve customer relations and complaints register; Improve leak repair register and response times; Raise customer awareness of NRW through messages on water bills and meetings; Provide staff incentives for NRW reduction. ADB (WSSP), JICA and NORAD funded capacity development and corporate planning activities. Feasibility 4b Implement real (physical) loss reduction Undertake comprehensive, intense leak detection, repair and replacement program, including: Develop computer hydraulic model of the network; Establish, equipment and train permanent leak detection and repair teams; Install meters and valves; Create physical hydraulic zones; Manage pressures; Undertake leak detection, repair or replace pipes, valves and meters zone by zone. ADB WSSP. Other sources of funds, including PNPs’ internally generated funds. Feasibility PNP action and PNP’s Ongoing Undertake active leak detection by PNP staff; internally generated Implement annual audits and training of PNP staff funds. by leak detection experts. Establish and train zone caretakers. ADB=Asian Development Bank, JICA=Japan International Cooperation Agency, NORAD=Norwegian Agency for Development Cooperation, NRW=nonrevenue water, PNP=provincial nam papa (provincial water utility), WSSP=water supply and sanitation sector project. Source: Asian Development Bank. 5 Maintenance and Training
© Copyright 2026 Paperzz