Primary Data Center in Turin CSI can offer 2 modern data centers: the main one in Turin and the secondary one in Vercelli. Turin data center is located within CSI-Piemonte premises of Corso Unione Sovietica 216. Since 1978, when it was opened, it has been hosting all the computing platforms more and more advanced from time to time: starting from the big mainframes IBM and Hitachi in the eighties and nineties to the Cray super computer (1991), to the SUN E-15 and E-25 k, till the current HP BL460C and BL660C with blade technology and Intel G9 processors. Today the data center is divided in 4 large areas within a security ring: YELLOW AREA (high density) and BLUE AREA (medium density) with servers, storage and tape library; ORANGE AREA for network equipment and an enclosed area dedicated to connectivity providers (carrier room); VIOLET AREA currently under renovation for PA infrastructure co-location. In 2015 CSI Piemonte data centers were awarded the ISO/IEC 27001:2013 certification on Facility Management service security. SERVICES • • • • 1,800 application services and 11,000 monitored objects 180,000 emails/day 450 DBMS instances (Oracle, PostegreSQL, SQL Server, MySql, etc..) 2,100 Weblogic application environments (250 test and development) and 1,200 JBOSSenvironments • 192,500 jobsets run each day (batch installation unit) • Management of over 1,200 switches and routers, 150 firewalls and 500 WiFi access points • Cloud (vCloud, OpenStack) and co-location services DATA CENTER • 1,000 sq/m in the Server Room • 210 racks • 717 physical servers and 2,748 virtual servers • 10 Gb Internet bandwidth • 2,1 PB of available Storage • 200TB data saved/day (Networker, Simpana, Veeam, Bacula, Rman, Snapshot technologies) • 1,100 backup LTO4/5 tapes per year, for a total of 1062.2 TB saved (StorageTek tape-library) TECHNICAL SYSTEMS Total area 1,500 sq/m Power consumption 5.6 GWh/year (3.25 GWh/year for IT equipment) 2 independent Power Supplies (1,600 kW) High reliability power and conditioning systems: compliant with Tier III standard (Uptime Institute) Power system main components: 3 electric generators (1850, 1000 and 600 kVA), 3 UPS (1100, 420 and 420 kVA), 3 accumulator groups - 204 elements each Conditioning system main components: 3 cooling systems (2400 kW total power) Control and security systems: REI 120 Fireproof enclosing, inert gas fire extinction, smoke detectors (3 typologies) and anti-flooding. Movable security cameras, 24 hours surveillance, controlled access (mantrap doors) Energy efficiency 1,7 PUE CSI PIEMONTE POWER PLANT LINEA A G.E. 1800 KVA #2 G.E. 600 + 1100 KVA Power Center Quadro emergenza Quadro emergenza UPS 1100 KVA Batterie Batterie Utenze singola alimentazione LINEA B Power Center UPS 420 KVA UPS 420 KVA Batterie Quadro generale di distribuzione (A) #90 ATS Quadro generale di distribuzione (B) #8 quadri di sistema Utenze doppia alimentazione #8 quadri di sistema Secondary Data Center in Vercelli (disaster recovery) • 145 sq/m 90 km away from the main site • electrical redundancy and energy efficiency (Free Cooling) • 200 TB di Storage • 10 Gb Internet bandwidth • WI-PIE ring connection • 24 hours a day remote control from Turin and on-site security • Easy to reach
© Copyright 2026 Paperzz