Why Oxy Combustion ? Nitrogen CPU Oxygen Air Separation CO2 Keiji Makino Japan Coal Energy Center CO2 Because, Oxy Combustion is : Simple concept Low cost Combination of approved technology Independent from fuel characteristics Small water consumption Low NOx, Low SOx New plants/Modification plants …So and so But Big ASU and Big cost of oxygen production Courtesy IHI CO2 Capture from Coal-fired Power Plant 1. Pre-combustion Coal (C,H,O,N,S,Ash) Gasifier CO shift N2 Gas Refining Air (N2、O2) O2 CO, H2 ASU CO2 sequestration 2 CO2, H2 Compression/Cooling 2. Post-combustion CO2 Storage Boiler Coal (C,H,O,N,S,Ash) Air (N2、O2) HRSG GT H Flue gas treatment CO2 sequestration CO2 N2,H2O,O2 Compression/Cooling CO2 Storage 3. Oxyfuel Coal (C,H,O,N,S,Ash) Boiler N2 Flue gas treatment N2,O2 Air (N2、O2) CO2 Storage O2 Oxygen production Compression/Cooling Exhaust gas recirculation (CO2,・・・ ) H2O,SO2 Courtesy IHI 4 Courtesy IHI GHG Reduction(450 Scenario) From WEO2011 6 CO2 injection equipment Courtesy JCOAL 7 Courtesy IHI Oxyfuel Project in the world Courtesy Callide Project 9 KEPCO/KOSEP - Yongdong (PC - 100MWe) FutureGen2 - Illinois (PC - 100MWe) Endesa/CIUDEN - El Bierzo (CFB - 300MWe) - ??? Alstom Hitachi Babcock IHI Alstom / AL CIUDEN CIUDEN Schwarze Pumpe Schwarze Pumpe Callide Lacq El Bierzo CFB Facility El Bierzo PC Facility 2008 2010 2011 2009 2011 2011 30MWth 30MWth 30MWe 30MWth 30MWth 20MWth Lignite Lignite Coal Gas/Oil? Coal Coal China: 3 Oxyfuel Projects – in progress UK: Drax Power Plant Oxyfuel 2009 – Lacq – World’s first 30MWt retrofitted Oxy-NG boiler 2008 World’s FIRST 30 MWt full chain demonstration at Schwarze Pumpe Pilot Plant 2011 – Callide – World’s first 30MWe retrofitted Oxy-coal power plant Target : “Commercialised by 2020” By 2014-2018 Demonstration of 50– 300MWe full scale power plant. 2011 – CIUDEN – World’s first 30MWt Oxy-CFB Pilot Plant 2007 2003 - 2005 B&W CEDF (30MWt) large scale burner testing started Vattenfall (ENCAP ++) 1998 – 2001 CS Energy / IHI Callide Project CANMET 1990 - 1995 US DOE Project / B&W / Air Liquide 1980’s EC Joule Thermie Project - IFRF / Doosan Babcock / Int’l Combustion NEDO / IHI / Jcoal Project ANL/Battelle/EERC completed the first industrial scale pilot plant Updated by S. Santos (01/12/10) First large scale 35MWt Oxy-Coal Burner Retrofit Test done by International Combustion By the end of 2010/2011, Users (i.e. Power Plant Operators) will have 6 burner manufacturers fully demonstrating “Utility Size Large Scale Burners” which should give a high level of confidence toward demonstration B&W Alstom Doosan Babcock CEDF Alstom CE DBEL - MBTF 2008 30MWth Coal 2010 15MWth Coal 2009 40MWth Coal Courtesy IEAGHG For the discussion:We are on the Oxyfuel Ship. If the Ship will sink, we will sink together! This course is very good place to get information about Oxyfuel technology.
© Copyright 2026 Paperzz