BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on concerns related to water supply of wards 24 – 27 and 34 Greater Tzaneen LM, Mopani District 04 NOVEMBER 2015, PARLIAMENT, Room S12A 1 Presentation outline Water Services – District Overview MOPANI Provision of water supply to wards 24 – 27 and 34 2 Water Services – District Overview MOPANI 3 Background • The five wards falls under Ritavi II / Tours and Thabina Regional Water Schemes • They get their water from 3 Water Treatment Works with a total capacity of 40Ml/day and currently producing 38Ml/day as well as 108 boreholes. Water Resource • • • • Thabina Dam which is 41.2% full Tours Dam which is 53% full Groot Letaba River Ground Water augmentation Current supply status Ward Population Names of Villages Water supply no. 24 Intervention 14 752 Muhlava/ Sasekani/ • Zangoma/ Petanenge 25 9 473 • Ntsako / Bonn • Water treatment works. interruptions are The plant has the capacity to Bulk water no longer reaches reservoirs due to illegal connections Mulati Tours / Masona Areas with water area of supply Sedan 11 767 Supplied from Nkowa Nkowa produce enough water for is Mafarana Bourdeux 26 Current • Supplied from Tours Water Hoveni Treatment Works which has Rhulani enough capacity for all the Solani villages. Nyanyukani Hweetsi / Sebela • Huge no of illegal connection currently serviced by 9 water tankers Current supply status Ward Population Names of Villages Current status Current Intervention 22 472 Makhubidung • Supplied from Tours Areas with water Mokgapeng Water Treatment Works interruptions are Shoromoni which has enough currently serviced by 9 Ezekhaya / Shilubane capacity for all the water tankers Matshilapata villages. no. 27 Serotutung • Hospitalview Huge number of illegal connection Mineview Senkwana Malekeke 34 18 900 Khopo • Lephepane Thabina (Mogoboya) Rasebalane Topanama • Supplied from Thabina Areas with water Water Treatment Works interruptions are Huge number of illegal currently serviced by 9 connections water tankers District profile Municipality Population Ward Current No. Current No. s Villages Urban Areas GGM 244 217 30 93 1 GLM 212 701 29 80 3 GTM 390 095 34 125 5 BPM 150 637 18 23 4 MLM 94 857 14 33 3 1 092 507 125 354 16 MDM TOTAL • Mopani District Municipality depends largely on the Letaba, and the Olifant River systems as well as ground water augmentation • The Letaba catchment is over stressed. • There are five large dams, namely, Ebenezer, Tzaneen, Magoebaskloof, Nsami, Middle letaba which supply water across municipalities in Mopani. 9 • Mopani DM has nine Regional Water Schemes with 24 Water Treatment Works (WTW) with a total design of 234.42 Ml/d and currently producing 202, 08 Ml/d. • Out of 24 WTW, 23 are operational and 1 not operational namely o Metz Package Plant – Alternative supply from mountain spring 10 BULK WATER PROVISION # PLANT Municipality 1 GIYANI WATER WORKS MIDDLE LETABA WATER WORKS MUYEXE WATER WORKS ZAVA WATER WORKS Greater Giyani 36.7 B Greater Giyani 36 B 39 638 Insufficient Greater Giyani 1.08 D 3 228 Adequate Greater Giyani 0.3 D 4 821 Adequate MAPUVE WATER WORKS TZANEEN WATER WORKS LETSITELE WATER WORKS NKAMBAKO WATER WORKS SEMARELA WATER WORKS THABINA WATER WORKS Greater Giyani 4 C 15 196 Adequate Greater Tzaneen Greater Tzaneen Greater Tzaneen Greater Tzaneen Greater Tzaneen 6 C 14 571 Insufficient 1.8 C 12 C 1 E 9 C GEORGE VALLEY WATER WORKS Greater Tzaneen 9 C 2 3 4 5 6 7 8 9 10 11 MEGALIT ER CLASS Population Capacity Supplied 185 077 Adequate 406 Adequate 99 152 Insufficient Part of Insufficient Thapane 75 384 Reached the capacity of both the plant and the dam 423 Adequate BULK WATER PROVISION # PLANT Municipality 12 THAPANE WATER WORKS TOURS WATER WORKS Greater Tzaneen Greater 4 Tzaneen Greater 24 Tzaneen Greater Letaba 12 13 14 MEGALIT CLA ER SS 4.5 C Population Deficit 113 192 Insufficient C 52 216 Being upgraded C 99 676 Insufficient C 71 519 Insufficient Greater Letaba 5.5 C 11 994 16 NKOWANKOWA WATER WORKS MODJADJI WATER WORKS POLITSI WATER WORKS 17 KURATA WATER WORKS Greater Letaba - - 1 664 To be upgraded in the current financial year Insufficient 18 PHALABORWA WATER WORKS NONDWENI WATER WORKS THE OAKS WATER WORKS Mametja/Sekororo Water Works BaPhalaborwa BaPhalaborwa Maruleng 76 B 151 952 Adequate 4.7 D 21 581 Adequate 1 D 19 304 Insufficient Maruleng 15 C 94 857 Under construction 15 19 20 21 HOT SPOTS Municipality Community Challenge Intervention Required Progress to date Greater Tzaneen Relela Insufficient water from Thapane Water Works Upgrading of the water treatment plant; TR submitted to DWS for additional abstraction Illegal connections along the bulk pipelines Replacement of the existing PVC pipe with steel pipe; Lack of reticulation infrastructure at village extensions Provision of internal water reticulation Insufficient water from Nkowankowa Water Works Review allocated quota and upgrade Illegal connections along the bulk pipelines Uprooting of the illegal connection along the bulk pipeline Municipality team is on site for the uprooting of the illegal connections Vandalised booster pump station Repair of booster pump stations Contractor appointed Lack of reticulation infrastructure at village extensions Provision of internal water reticulation Awaiting the approval of the MWIG BP (Sasekani &Zangoma) Petanenge, Muhlava, Sasekani, Co-Op Awaiting the approval of the MWIG BP HOT SPOTS Municipality Community Challenge Intervention Required Progress to date Greater Tzaneen Tickyline Insufficient internal water reticulation infrastructure Extend reticulation to cover extension Technical report finalised and is being assessed. Insufficient bulk water supply Extension of the Nkambako bulk pipeline Designs are complete. This is part of DWS Phase 2 Intervention project Greater Letaba Hlohlokwe, Taulome and Mamanyowa Four boreholes have been drilled, tested and equipped and there is supply of water Kgapane Insufficient bulk water supply Extension of Politsi WTW by LNW Licence for additional water has been granted to LNW. Designs for extension for the plant are complete. Contract advertised. Utilization of ground water LNW is exploring a possibility of augmenting the system with ground water Major projects under implementation • MAMETJA SEKORORO RWS – CONSTRUCTION OF 15ML WATER TREATMENT WORKS AT THE OAKS • UPGRADING OF WATER RETICULATION IN MARULENG • HOEDSPRUIT BULK WATER SUPPLY • KAMPERSRUS BULK WATER SUPPLY • KAMPERSRUS SEWAGE PLANT • THABINA WATER PROJECT • LEPHEPANE WATER PROJECT • TOURS WTW • UPGRADING OF WATER RETICULATION IN BPM Provision of water supply to wards 24 – 27 and 34 Greater Tzaneen Local Municipality 16 STATUS OF WATER SUPPLY: BULK WATER: WARD 24 Community Name Population Water Supply Scheme Challenge Planned Intervention Timefram e Progress Muhlava Headkraal 1 768 Nkowankow Damaged Contractor to a pipeline during reinstate the road construction pipeline 30 No progress November 2015 Sasekani 5 616 Nkowankow Partially receiving a water due to illegal connection and the reticulation is vandalized Removal of illegal connections along the bulk pipeline 30 Booster pump November station repaired. 2015 Contractor busy reinstating the rising main. Petanenge 5 228 Nkowankow No bulk supply. a Eskom to replace the stolen cable Zangoma 2 202 Nkowankow No bulk supply Eskom to a as it is dependent replace the on Petanenge stolen cable booster pump station Power supply cable stolen on Thursday, 29 October 2015 immediately after replaced. STATUS OF WATER SUPPLY: BOREHOLES: WARD 24 Transformer, motor and cables stolen and power supply Refurbishment of the borehole and application for electricity connection 1 Outlet pipe broken Replacement of the pipe Non Operational Planned Intervention Operational Muhlava Headkraal Challenge No. of Boreholes Communit y Name 5 2 2 Timefram e Progress Application has been made with Eskom and replacement of stolen equipment has been reported 6 Nov Maintenance team is on site Sasekani 2 1 1 Vandalized immediately after completion Refurbishment of the borehole Reported to Eskom for the replacement of the stolen cables. Petanenge 9 5 1 Motor stolen Replacement of the motor 15 Nov Procurement for a contractor is underway 1 Collapsed Re-drilling 30 Nov Procurement for a contractor is underway STATUS OF WATER SUPPLY: BOREHOLES: WARD 24 Zangoma Timefram e Progress Motor stolen Replacement of the motor 15 Nov Procurement for a contractor is underway 1 Collapsed Re-drilling 30 Nov Procurement for a contractor is underway 1 Mechanical fault Loose drive shafts/rods 7 Nov Receiving attention from internal maintenance team 1 Diesel engine stolen Replacement of engine 14 Nov Receiving attention from internal maintenance team 1 Motor stolen Replacement of the motor 15 Nov Procurement for a contractor is underway Non Operational Planned Intervention Operational Petanenge Challenge No. of Boreholes Communit y Name 5 5 2 4 2 STATUS OF WATER SUPPLY: BULK WATER: WARD 25 Communit y Name Population Water Supply Scheme Bonn 3 542 Mafarana Mulati Challenge Planned Intervention Timeframe Progress Nkowankowa Booster pump station at Coop is totally vandalized. Illegal between Coop and Gabaza Refurbishment of the booster pump station Dependent on the availability of water at Co-op reservoir Removal of illegal connections between Dan and Sasekani 2 808 Nkowankowa AC Pipeline via Mafarana to Bonn damaged during road construction Contractor to December be appointed to 2015 reinstate the pipeline as part of disruption of existing services Procurement of a service provider is underway 2 830 Nkowankowa Booster pump station at Sedan vandalized Refurbishment of the booster pump station Removal of illegal connections between Dan and Sasekani Dependent on the availability of water at Co-op reservoir STATUS OF WATER SUPPLY: BULK WATER: WARD 25 Commun ity Name Populatio Water n Supply Scheme Ntsako 1 166 Sedan 2 041 Challenge Planned Intervention Timeframe Progress Nkowanko Booster pump station at wa Coop is totally vandalized. Illegal between Co-op and Gabaza Refurbishment of the booster pump station Dependent on the availability of water at Coop reservoir Removal of illegal connections between Dan and Sasekani Nkowanko Booster pump station at wa Coop is totally vandalized. Illegal between Co-op and Gabaza Refurbishment of the booster pump station Dependent on the availability of water at Coop reservoir Removal of illegal connections between Dan and Sasekani STATUS OF WATER SUPPLY: BOREHOLES: WARD 25 Mafarana Timefra Progress me Motor, panel and/or cables stolen Replacement of stolen equipment 14 Nov 3 Dry and or collapsed Drilling of new borehole 1 Mechanical fault Repairing of diesel engine and reconstruction of concrete slab 14 Nov Contractor on site as it is still under Defects Liability Period 3 Mechanical fault Repairing and/or replacement of broken equipment 14 Nov Procurement of spares is underway. 2 Mechanical fault Replacement of engine 14 Nov Contractor on site as it they are still under Defects Liability Period 3 Vandalized or dry Refurbishment Included in the 2015/16 approved MWIG BP Non Operational Planned Intervention Operational Bonn Challenge No. of Boreholes Communit y Name 13 2 4 8 2 Procurement for a contractor is underway Included in the 2015/16 approved MWIG BP Mafarana Mulati Ntsako 11 4 4 2 Challenge Planned Intervention Timefra Progress me 1 Mechanical fault Repairing or replacement of broken equipment 7 Nov 4 Mechanical fault Replacement of engine 14 Nov Contractor on site as it is still under Defects Liability Period 2 Vandalized Refurbishment Receiving attention from the internal maintenance team 1 No power supply Application for electricity connection 1 Motor and cables stolen Replacement of stolen equipment 14 Nov Procurement underway 1 Collapsed Re-drilling of borehole 18 Dec Procurement of a contractor is underway Non Operational No. of Boreholes Communit y Name Operational STATUS OF WATER SUPPLY: BOREHOLES: WARD 25 14 Nov Receiving attention from the maintenance team Awaiting for a quotation from Eskom STATUS OF WATER SUPPLY: BOREHOLES: WARD 25 Diesel engine stolen Replacement of engine 18 Dec Procurement of a contractor is underway 1 Collapsed Re-drilling of borehole Procurement of a contractor is underway Non Operational Planned Intervention Operational Sedan Challenge No. of Boreholes Communit y Name 3 1 1 Timefra Progress me 18 Dec STATUS OF WATER SUPPLY: BULK WATER: WARD 26 Communit y Name Populatio Water n Supply Scheme Challenge Planned Intervention Timefram e Progress Bourdeaux 217 Tours The stand pipes are vandalised and the existing infrastructure has not been working for some time Refurbishment of the infrastructure an extension of the reticulation network.. Implement ation is dependent on the approval of the technical report Technical reports completed and being assessed by DWS to access MIG funds and the plant is being upgraded Hoveni 1 564 Tours The stand pipes are vandalised and the existing infrastructure has not been working for some time Refurbishment of the infrastructure an extension of the reticulation network.. As above As above Hweetji 1 716 Tours The stand pipes are vandalised and the existing infrastructure has not been working for some time Refurbishment of the infrastructure an extension of the reticulation network.. As above As above STATUS OF WATER SUPPLY: BULK WATER: WARD 26 Communi Populatio Water ty Name n Supply Scheme Challenge Planned Intervention Timeframe Progress Masoma 4 192 Tours The stand pipes are vandalised and the existing infrastructure has not been working for some time Refurbishment of the infrastructure an extension of the reticulation network. Implementatio n is dependent on the approval of the technical report Technical reports completed and being assessed by DWS to access MIG funds. The plant is being upgraded Nyanyuka ni 885 Tours Part of the village is getting water from the illegal connection on the rising main Refurbishment of As above the infrastructure an extension of the reticulation network.. As above Rhulani 3 052 Tours Part of the village is getting water from the illegal connection on the rising main Refurbishment of As above the infrastructure an extension of the reticulation network. As above STATUS OF WATER SUPPLY: BULK WATER: WARD 26 Communit y Name Populatio n Water Supply Challenge Scheme Planned Intervention Timefram e Progress Solani 510 Tours Refurbishment of the infrastructure an extension of the reticulation network. Implement ation is dependent on the approval of the technical report Technical reports completed and being assessed by DWS to access MIG funds. The plant is being upgraded The stand pipes are vandalised and the existing infrastructure has not been working for some time No. of Boreholes Operational Non Operational STATUS OF WATER SUPPLY: BOREHOLES: WARD 26 Communit y Name Challenge Bourdeaux 4 4 0 Not applicable Not applicable N/A Not applicable Hoveni 3 2 1 Broken pipes Replacement and or repairing of the pipes 14 Nov Receiving attention from the internal maintenance team Hweetji Sabela 1 1 1 Not applicable Not applicable N/A Not applicable Nyanyukan 2 i 0 2 Vandalized Replacement of stolen transformer and refurbishment of borehole 18 Dec Reported to Eskom for the replacement of the transformer and that procurement are underway for the reequipping of the borehole Rhulani 2 1 Vandalized Refurbishment of the borehole 18 Dec Procurement is underway for the appointment of a contractor 3 Planned Intervention Timefra Progress me STATUS OF WATER SUPPLY: BOREHOLES: WARD 26 Timefra Progress me Non Operational Planned Intervention Operational Challenge No. of Boreholes Community Name Solani 3 1 2 Vandalized and diesel engine stolen Replacement of diesel engine and refurbishment of boreholes N/A Procurement is underway for the appointment of a contractor Tours 1 1 1 Not applicable Not applicable N/A Not applicable STATUS OF WATER SUPPLY: BULK WATER: WARD 27 Community Populati Name on Water Supply Scheme Challenge Planned Intervention Timeframe Progress Makhubidun 6 020 g Tours Part of the village is getting water from the illegal connection on the rising main Refurbishme nt of the infrastructure an extension of the reticulation network. Implementatio n is dependent on the approval of the technical report Technical reports completed and being assessed by DWS to access MIG funds. The plant is being upgraded Mogapeng Tours They get water daily from the illegal connections that are made on the rising main Refurbishme As above nt of the infrastructure an extension of the reticulation network. 10 278 As above STATUS OF WATER SUPPLY: BULK WATER: WARD 27 Community Populati Name on Water Supply Scheme Challenge Planned Intervention Timeframe Progress Pharare 7 978 Tours Part of the village is getting water from the illegal connection on the rising main Refurbishmen t of the infrastructure and extension of the reticulation network Implementati on is dependent on the approval of the technical report Technical reports completed and being assessed by DWS to access MIG funds. The plant is being upgraded Shiluvane 15 861 Tours Part of the village is getting water from the illegal connection on the rising main Refurbishmen t of the infrastructure and extension of the reticulation network Implementati As above on is dependent on the approval of the technical report STATUS OF WATER SUPPLY: BULK WATER: WARD 27 Community Populati Name on Water Supply Scheme Challenge Planned Intervention Lephephan e Thabina The booster pump station has been discontinued and there is no bulk water in those villages they depend on mountain water stream which was community driven and upgraded by CSIR Completion of March 2016 the booster pump station and the damaged bulk pipeline 1 226 Timeframe Progress Assessment report concluded. STATUS OF WATER SUPPLY: BOREHOLES: WARD 27 Timefra Progress me Vandalized Refurbishment of borehole 18 Dec Procurement is underway for the reequipping of the borehole 1 Collapsed Fishing of pipes and rods 30 Nov Procurement is underway for the reequipping of the borehole Not applicable N/A Not applicable Non Operational Planned Intervention Operational Makhubidun g Challenge No. of Boreholes Community Name 4 2 1 Mineview 1 1 0 Not applicable Mogapeng 3 2 1 No power source Application for electricity connection Pharare 4 1 3 Vandalized and or motor and cable stolen Refurbishment of boreholes Application done. Awaiting for quotation from Eskom 30 Nov Procurement is underway for the reequipping of the borehole STATUS OF WATER SUPPLY: BOREHOLES: WARD 27 Operational Non Operational Shiluvane No. of Boreholes Community Name 7 2 3 Challenge Planned Intervention Timefra Progress me Collapsed Re-drilling 18 Dec Procurement is underway for the reequipping of the borehole STATUS OF WATER SUPPLY: BULK WATER: WARD 34 Communit Populatio Water Supply Challenge y Name n Scheme Planned Intervention Timefra me Progress Maake 3 371 Thabina Loss of water along Replacement the bulk pipeline and upgrading through illegal of the bulk pipe End of A diversion Feb 2016 pipeline is being constructed Bokgaga 5 236 Thabina Loss of water along Replacement the bulk pipeline and upgrading through illegal of the bulk pipe End of A diversion Feb 2016 pipeline is being constructed Mphame 3 269 Thabina Loss of water along Replacement the bulk pipeline and upgrading through illegal of the bulk pipe End of A diversion Feb 2016 pipeline is being constructed Mogoboya 4 398 Thabina Loss of water along Replacement the bulk pipeline and upgrading through illegal of the bulk pipe End of A diversion Feb 2016 pipeline is being constructed Rasebalan 1 226 e Thabina Loss of water along Replacement the bulk pipeline and upgrading through illegal of the bulk pipe End of A diversion Feb 2016 pipeline is being constructed STATUS OF WATER SUPPLY: BULK WATER: WARD 34 Communi ty Name Populatio Water Supply Challenge n Scheme Serare 1 489 Topanama 846 Planned Intervention Timefra me Progress Thabina Loss of water along Replacement the bulk pipeline and upgrading through illegal of the bulk pipe End of February 2016 Rehabilitation of the bulk pipeline is underway Thabina Loss of water along Replacement the bulk pipeline and upgrading through illegal of the bulk pipe End of February 2016 Rehabilitation of the bulk pipeline is underway STATUS OF WATER SUPPLY: BOREHOLES: WARD 34 Timefra Progress me Vandalized Refurbishment 14 Nov Contractor on site 1 No Power source Application for electricity connection 30 Nov Application done. Awaiting for quotation from Eskom Replacement of a pumping unit (element) 15 Nov Procurement is underway for supply and delivery of the required element. Non Operational Planned Intervention Operational Challenge No. of Boreholes Community Name Lephephane Co-op 3 1 1 Bokgaga 2 1 1 Mechanical fault Maake Headkraal 2 0 1 No power source Application for electricity connection Application done. Awaiting for quotation from Eskom 1 Transformer and cable stolen Replacement of transformer and cable Reported to Eskom 1 Vandalized Refurbishment of boreholes Mogoboya 1 0 30 Nov Procurement is underway for the reequipping of the borehole STATUS OF WATER SUPPLY: BOREHOLES: WARD 34 Timefra Progress me Non Operational Planned Intervention Operational Challenge No. of Boreholes Community Name Rasebalane 2 1 1 Damaged electrical cable Replacement of the damaged cable 7 Nov Receiving attention from the internal maintenance team Serare 3 0 3 Not applicable Not applicable N/A Not applicable CHALLENGES Illegal Connections; • The Bulk pipe lines, on the entire Bulk Water Schemes, have a lot of leakages caused by illegal connections. • The connections are done by communities on pipe lines from water treatment works to various reservoirs. • The extent of the illegal connections has resulted in high water losses on bulk pipelines and thus water does not reach existing reservoirs and the sections of distribution network. CHALLENGES Supply System Below Standard • Most villages within the scheme have water supply systems which are below the minimum standard, • There is no proper reticulation. • Some people walk for long distances to fetch water • Thabina Water Treatment works is drawing more water than the dam can supply Poor state of repair of the water system; • The existing Bulk pipe lines are currently perforated with illegal connections. • Most pipelines were built pre 1994 using Asbestos Cement (AC) pipes. This type of pipes contributes to water losses since they are prone to cracks and (Solid) settlements. CHALLENGES Increase in water demand • The design of most of infrastructures within the scheme was based on the demand of 25l/c/d, which has been beyond doubt proven to be an unrealistic figure. • The consumption pattern has significantly changed since most of the communities have illegally connected water into their yards. This automatically rises to yard connection category with consumption between 60-100l/c/d. • Furthermore, the villages within the scheme have grown in population resulting in increased water demand. Challenges and interventions Challenges Intervention Vandalism and theft of water services infrastructure. Public awareness on By-Laws and enforcement Water allocations The review of the allocated quota to allow upgrades Illegal connections that renders water supply Extension of water reticulation network and schemes inefficient. uproot/remove illegal connections Ageing water infrastructure Source more funds to replace it, e.g asbestos pipes Demand higher than the supply capacity Upgrading of the water infrastructure Ageing infrastructure resulting into high frequency in Develop replacement program and source funding services interruption Physical condition of the water services infrastructure Refurbish and rehabilitate both water and waste water (WWTP) plants Thank You 43
© Copyright 2026 Paperzz