Extraction Scenarios of CIS Zhengzheng Liu Mar 12th, IUCF Pulse from linac Extracted beam Lambertson septum Kicker 1 Kicker2 Shut down during extraction Some Parameters in extraction • • • • Extraction requirement estimation: (1) 13 turns injection scheme (horizontal tune 1.72) (2) 5 mm septum thickness (3) 60 MeV injection and extraction energy • Total energy delivered to the target in pulsed mode: • Assuming linac current 0.5 A, inject 40ns electron beam per turn. with 13 turn accumulation, we obtain Q 0.5 A 40ns 13 260nC Energy QE 260nC 60MV 15.6 J Accumulated beam after injection • After multi-turn injection, we will carry out single-turn extraction. Below is the accumulated beam at the septum right after the last injection turn. 0.015 0.01 0.005 -0.01 0.01 -0.005 -0.01 0.02 0.03 Electrostatic kicker for extraction The injection and extraction share the same section in the ring. Beam size is about 50 mm. So we need to bump the closed orbit by 47 mm in order to kick the whole beam into the septum. x’ 25mm 5mm 25mm x 8mm xco= 47mm ( s) 2 xco ( s) i i cos (s) i 2 sin i 1 k 36mrad Closed orbit bumped for extraction Kicker field and aperture requirement • For extraction, kick angle k 36.6mrad is needed for 47mm closed orbit bump. Using electrostatic kicker: EL k c B and B 0.2[Tm] for 60 MeV extraction Thus we get E L=2.2 [MV/m] [m] for 60 MeV extraction. If assume 50mm kicker length, displacement within the kicker are: Kicked beam θk beam (1)xco xco L tan( 0.006 / 2) 1.5mmat 13th injection turn. (2) xco turn). L tan( 0.036 / 2) 9mm at extraction (after 13th injection kicker strength operation (60MeV, x 1.75 ) Aperture requirement for kicker 2 44mm horizontal aperture is enough for the 2nd kicker. 0.02 0.01 -0.01 13th injection turn at the entrance of the second kicker. xco= 1.5mm. 0.01 -0.01 During extraction, kicker is shut down, so the phase space at the kicker location is like 0.02 Aperture requirement for kicker 1 After 12th injection turn, we shut down kicker 2. Thus, the 13th injection turn phase space at the kicker 1 entrance requires –x aperture to be at least 26mm. 0.015 xco 9mm at the exit 0.01 0.005 -0.025 -0.02 -0.015 -0.01 -0.005 0.005 0.01 -0.005 -0.01 -0.015 -0.02 Total horizontal aperture required : 52mm Vertical Lambertson extraction magnet The vertical Lambertson septum is used to extract beam vertically. Injection Extraction Septum 35 1.15m 35 35 0.81m 1.15m 0.2m We put the septum in the middle of the drift space where (kick sept.) / 2. Bx l z ' B we choose z ' 35 deflected by the septum to avoid the next element. Septum strength and aperture x 35 z z • For 25 MeV extraction, • For 60 MeV extraction, B 0.0834.[Tm] B 0.2[Tm] Bx 0.25[T ] Bx 0.61[T ] The beam displacement at the exit of septum is z 63mm. So, due to the 50mm horizontal beam size, we need 50mm horizontal aperture and 1cm vertical aperture.
© Copyright 2026 Paperzz