More Than Smart Transmission-Distribution Interface Pilot Proposal Pathion 1 CAISO / IOU Interface Pilot Scenario • PV Scenario • Locate PV with pre-existing (or new PV deployment) • In-front-of-the-meter PV connection – where PV is used as pure capacity resource and not for behind-the-meter peak load shaving • Location where solar generation capacity is not fully consumed at time of generation on line segment (e.g. excess generation moves up line) • Location where PV line host capacity is stressed • Location where evening load is equal to or greater than daytime load • Storage Role • • • • Increasing host capacity for new PV on line segment where PV was/is deployed Time shift excess PV generation (store locally and release to address evening ramp) Provide FR and DR services Explore IOU Backup service to local customer(s) Pathion 2 CAISO / IOU Pilot Interface Phase I • Phase I • IOU Line Balancing • IOU leverages battery for Load shifting to best utilize PV generation to address demand • FR/DR • IOU dispatches FR/DR signaling Beyond Initial Pilot • Phase II • IOU Substation Balancing • Phase III • IOU-wide balancing Example diagram is modified version of existing PG&E DER diagram Pathion 3 Proposed Pilot Location • Valencia Gardens, Mission District, San Francisco, CA • Existing solar • Add storage to increase PV host capacity, provide load shifting and grid services • Already Funded! • Recipient of CEC EPIC Grant for Solar+ • Clean Coalition (lead), Pathion (sub) • Grant support letters from PG&E and CAISO Pathion 4 BEFORE Pilot Specific Details • Existing in-front-of-meter VNEM PV generation • Store excess PV generation locally and use to address evening ramp • Portion of battery dedicated to gird services • Determine optimal use of storage to address multiple value add services AFTER Pathion 5
© Copyright 2026 Paperzz