Internship final report September – October 2015 EDYTA PILORZ (Cracow University of Technology) Supervisors: Jérôme Daguin Philippe Lenoir 1 Main tasks 1. Integration the dummy load inside the TIF manifold 2. Attaching the Carel Valve with the dummy load 3. Replacing the old bypass valve with the Carel Valve in the plant Additional tasks 1. Designing the flange which will connect the DP flowmeters with the capillaries 2. Placing the DP flowmeters both in TIF and CMS P5 manifolds 3D models Edyta Pilorz – internship final report 2 Integration the dummy load inside the manifold Measuring the connectors Edyta Pilorz – internship final report 3 Integration the dummy load inside the manifold Preparing the 3D model of the dummy load Edyta Pilorz – internship final report 4 Integration the dummy load inside the manifold The view of the manifold containing the dummy load inside Edyta Pilorz – internship final report 5 Attaching the Carel Valve with the dummy load Simplified model of the Carel Valve Edyta Pilorz – internship final report 3D of the Carel Valve provided by manufacturer 6 Attaching the Carel Valve with the dummy load The assembly of the connectors and the Carel Valve Edyta Pilorz – internship final report 7 Attaching the Carel Valve with the dummy load Modifications of the tubing Edyta Pilorz – internship final report 8 Replacing the bypass valve with the Carel Valve in the plant The view of the present bypass valve in TIF plant Edyta Pilorz – internship final report 9 Replacing the old bypass valve with the Carel Valve in the plant First version of mounting the Carel Valve Second version of mounting the Carel Valve 14 mm 60 mm disadvantages of this solution: - Short gland - Tee microfit Edyta Pilorz – internship final report 10 Designing the flange which will connect the DP flowmeters with the capillaries The first concept Edyta Pilorz – internship final report 11 Designing the flange which will connect the DP flowmeters with the capillaries CMS manifold with DP flowmeters The first concept Edyta Pilorz – internship final report 12 Designing the flange which will connect the DP flowmeters with the capillaries The second concept Edyta Pilorz – internship final report 13 Designing the flange which will connect the DP flowmeters with the capillaries The second concept Swagelok ½inch 6 mm gland Swagelok standard piece Swagelok standard pieces Swagelok tee microfits Edyta Pilorz – internship final report 14 Designing the flange which will connect the DP flowmeters with the capillaries The second concept Edyta Pilorz – internship final report 15 Placing the DP flowmeters both in TIF and CMS P5 manifolds The view of the loop in CMS manifold Edyta Pilorz – internship final report 16 Placing the DP flowmeters both in TIF and CMS P5 plant The view of the loop in TIF manifold Before in TIF After in TIF one standard Swagelok element Edyta Pilorz – internship final report 17 Thank you for the attention! Edyta Pilorz – internship final report 18
© Copyright 2026 Paperzz