Item Quantity Price Extension Price Extension Cleaning Existing

Item
Schedule of Prices
Cleaning Existing Structures - Lump Sum
Contractor Construction Staking - Lump Sum
Foundation Stabilization - Cu. Yd.
Mobilization - Lump Sum
Removal of Existing Structures - Lump Sum
Concrete for Seal Course (Set Price) - Cu. Yd.
Clearing and Grubbing - Lump Sum
Common Excavation - Cu. Yd.
Rock Excavation - Cu. Yd.
Class ||| Excavation - Cu. Yd.
Compaction of Earthwork (Type AA) (MR-0-5) - Cu.
Compaction of Earthwork (Type AA) (MR-5-5) - Cu.
Water (Grading) (Set Price) - MGal
Granular Backfill (Wingwalls) - Cu. Yd.
Concrete (Grade 3.0) (AE) - Cu. Yd.
Riprap (Light Stone) (100 Lb) - Sq. Yd.
Riprap (Heavy Stone) (1/2 Ton) - Sq. Yd.
Riprap (Heavy Stone) (1/4 Ton) - Sq. Yd.
Slope Protection (Riprap Stone) (6") - Cu. Yd.
Bedding for Slope Protection - Cu. Yd.
Geotextile Fabric - Sq. Yd.
Guardrail, Steel Plate (MGS) - Lin. Ft.
Guardrail End Terminal (MGS-SRT) - Each
Guardrail, Removal of Steel Plate - Lin. Ft.
Impact Attenuator (SCI-TL2) - Each
Concrete Safety Barrier (Type I) - Lin. Ft.
Concrete Safety Barrier (Type II) - Lin. Ft.
Concrete Safety Barrier (Type III-F) - Lin. Ft.
Concrete Safety Barrier (Type IV) - Lin. Ft.
Permanent Precast Concrete Median Barrier - Lin. Ft.
Concrete Pavement (10" Uniform) (AE) (NRDJ) - Sq.
Cohron-Hamm Joint Venture Clarkson Construction Company
Quantity
Price
Extension
Price
Extension
1
$2,865.00
1
$71,100.00
83
$75.00
1 $1,309,100.00
1 $991,620.00
1
$175.00
1
$8,920.00
33,142
$8.75
4,717
$16.90
2,749
$22.80
749
$0.98
27,667
$0.85
1
$35.00
134
$56.50
1
$150.00
157
$41.00
284
$62.45
205
$62.50
72
$63.75
144
$39.75
862
$2.54
536
$40.72
4
$3,423.00
1,304
$5.00
6
$25,238.00
664
$109.00
46
$98.00
206
$114.00
148
$117.25
2,640
$53.00
3,529
$109.50
$2,865.00
$71,100.00
$6,225.00
$1,309,100.00
$991,620.00
$175.00
$8,920.00
$289,992.50
$79,717.30
$62,677.20
$734.02
$23,516.95
$35.00
$7,571.00
$150.00
$6,437.00
$17,735.80
$12,812.50
$4,590.00
$5,724.00
$2,189.48
$21,825.92
$13,692.00
$6,520.00
$151,428.00
$72,376.00
$4,508.00
$23,484.00
$17,353.00
$139,920.00
$386,425.50
$74,129.68
$42,000.00
$100.00
$1,465,016.50
$651,803.77
$175.00
$25,252.53
$8.59
$13.64
$10.43
$1.52
$1.26
$35.00
$109.49
$1,280.54
$59.29
$31.86
$46.46
$162.82
$61.68
$5.76
$34.50
$2,400.00
$6.50
$23,750.00
$125.16
$160.50
$173.23
$228.30
$76.45
$109.50
$74,129.68
$42,000.00
$8,300.00
$1,465,016.50
$651,803.77
$175.00
$25,252.53
$284,689.78
$64,339.88
$28,672.07
$1,138.48
$34,860.42
$35.00
$14,671.66
$1,280.54
$9,308.53
$9,048.24
$9,524.30
$11,723.04
$8,881.92
$4,965.12
$18,492.00
$9,600.00
$8,476.00
$142,500.00
$83,106.24
$7,383.00
$35,685.38
$33,788.40
$201,828.00
$386,425.50
Concrete Pavement (10" Uniform) (AE) (Macro Fiber
Reinforced) - Sq. Yd.
Concrete Core (Set Price) - Each
Sidewalk Construction (4") (AE) - Sq. Yd.
Sidewalk Ramp - Sq. Yd.
Pavement Edge Wedge (Rock) - Ton
Aggregate Base (AB-3) (8") - Sq. Yd.
Aggregate Base (AB-3) (10") - Sq. Yd.
Milling (2") - Sq. Yd.
Water (Aggregate Base) (Set Price) - MGal
Fence (Woven Wire) (Type A or B) - Lin. Ft.
Posts (Corner) (Woven Wire Type A or B) - Each
Posts (End) (Woven Wire Type A or B) - Each
Right-of-Way Survey Monument - Each
Rumble Strips (Milled) (Asphalt) - Sta.
Temporary Shoring - Lump Sum
HMA-Commercial Grade (Class A)(PG 70-28) - Ton
HMA Commercial Grade (Class A) - Ton
Asphalt Core (Set Price) - Each
Concrete Headwall - Each
Concrete (Grade 4.0) - Cu. Yd.
Reinforcing Steel (Grade 60) - Lbs.
Inlet (Manhole) (Special) - Each
Inlet (Type V Median) - Each
Adjustment of Catch Basin - Each
End Section (15") (RC) - Each
End Section (72") (RC) - Each
Flowable Fill (Low Strength) - Cu. Yd.
Edge Drain Pipe - Lin. Ft.
Storm Sewer (15") (RCP) - Lin. Ft.
Storm Sewer (24") (CSP) - Lin. Ft.
Storm Sewer (48") (CSP) - Lin. Ft.
Storm Sewer (72") (RCP) - Lin. Ft.
Sign (Flat Sheet) (High Performance) - Sq. Ft.
743
$101.50
$75,414.50
$101.50
$75,414.50
1
57
3
1,870
20,819
5,315
6,867
1
1,203
10
9
4
44
1
2,369
9,615
1
1
304
36,395
3
1
1
2
2
8
210
221
30
68
211
166
$120.00
$69.00
$243.00
$21.40
$7.50
$9.50
$8.50
$35.00
$10.00
$350.00
$300.00
$100.00
$135.23
$165,000.00
$75.65
$67.10
$45.00
$1,500.00
$1,142.28
$0.90
$3,674.00
$5,986.00
$2,167.00
$592.00
$3,114.50
$105.30
$30.00
$51.50
$63.00
$131.50
$305.20
$23.81
$120.00
$3,933.00
$729.00
$40,018.00
$156,142.50
$50,492.50
$58,369.50
$35.00
$12,030.00
$3,500.00
$2,700.00
$400.00
$5,950.12
$165,000.00
$179,214.85
$645,166.50
$45.00
$1,500.00
$347,253.12
$32,755.50
$11,022.00
$5,986.00
$2,167.00
$1,184.00
$6,229.00
$842.40
$6,300.00
$11,381.50
$1,890.00
$8,942.00
$64,397.20
$3,952.46
$120.00
$69.00
$243.00
$18.18
$7.58
$9.85
$2.24
$35.00
$10.00
$350.00
$300.00
$100.00
$135.25
$37,538.65
$70.06
$55.72
$45.00
$10,000.00
$727.00
$0.88
$3,005.05
$5,555.56
$2,525.25
$479.80
$2,777.78
$131.77
$14.14
$32.32
$58.59
$90.91
$217.17
$19.00
$120.00
$3,933.00
$729.00
$33,996.60
$157,808.02
$52,352.75
$15,382.08
$35.00
$12,030.00
$3,500.00
$2,700.00
$400.00
$5,951.00
$37,538.65
$165,972.14
$535,747.80
$45.00
$10,000.00
$221,008.00
$32,027.60
$9,015.15
$5,555.56
$2,525.25
$959.60
$5,555.56
$1,054.16
$2,969.40
$7,142.72
$1,757.70
$6,181.88
$45,822.87
$3,154.00
Sign (Reinforced Panel) (High Performance) - Sq. Ft.
Sign Post (1-3/4" Perforated Square Steel Tube) Sign Post (2-1/4" Perforated Square Steel Tube) Sign Post (2-1/2" Perforated Square Steel Tube) Sign Post (W6x9 Steel Beam) - Lin. Ft.
Sign Post Stub Post with Breakaway Base Plate
Sign Post Breakaway Base Plate (W6x9) - Each
Sign Post Footing (24" Dia. Concrete) (Steel Beam
Sign Post Footing (1-3/4" Perforated Square Steel
Sign Post Footing (2-1/4" Perforated Square Steel
Sign Post Footing (2-1/2" Perforated Square Steel
Signing Delineator (Type A) (White Flexible) (Type 1
Anchor) - Each
Signing Delineator (Type A) (Yellow Flexible) (Type 1
Anchor) - Each
Signing Delineator (Type B) (White Flexible) (Type 1
Anchor) - Each
Pavement Marking (Paint)(White)(6") - Lin. Ft.
Pavement Marking (Paint)(White)(8") - Lin. Ft.
Pavement Marking (Paint)(White)(12") - Lin. Ft.
Pavement Marking (Paint)(Yellow)(6") - Lin. Ft.
Pavement Marking (Paint)(Yellow)(12") - Lin. Ft.
Pavement Marking (Multi-Component) (White) (4") Pavement Marking (Multi-Component) (White) (6") Pavement Marking (Multi-Component) (Yellow) (4") Pavement Marking (Multi-Component) (Yellow) (6") Pavement Marking (Multi-Component) (Yellow) (12") Temporary Fertilizer (15-30-15) - Lb
Temporary Seed (Canada Wildrye) - Lb
Temporary Seed (Grain Oats) - Lb
Temporary Seed (Sterile Wheatgrass) - Lb
Soil Erosion Mix - Lb
Temporary Ditch Check (Rock) - Cu. Yd.
Temporary Ditch Check (Non-Rock) - Lin. Ft.
207
13
135
10
94
6
6
36
2
9
1
18
$27.93
$14.25
$13.50
$15.50
$43.00
$122.00
$72.00
$200.00
$137.00
$151.00
$143.00
$56.00
$5,781.51
$185.25
$1,822.50
$155.00
$4,042.00
$732.00
$432.00
$7,200.00
$274.00
$1,359.00
$143.00
$1,008.00
$23.50
$11.00
$8.50
$13.00
$44.00
$235.00
$60.00
$125.00
$120.00
$140.00
$130.00
$85.00
$4,864.50
$143.00
$1,147.50
$130.00
$4,136.00
$1,410.00
$360.00
$4,500.00
$240.00
$1,260.00
$130.00
$1,530.00
11
$56.00
$616.00
$85.00
$935.00
40
$56.00
$2,240.00
$85.00
$3,400.00
28,776
2,887
691
21,989
237
860
184
2,306
3,994
2,786
1,012
135
304
304
741
696
20
$0.50
$0.75
$5.00
$0.50
$5.00
$0.60
$0.90
$0.60
$0.90
$5.00
$3.00
$15.00
$10.00
$15.00
$15.00
$71.95
$20.00
$14,388.00
$2,165.25
$3,455.00
$10,994.50
$1,185.00
$516.00
$165.60
$1,383.60
$3,594.60
$13,930.00
$3,036.00
$2,025.00
$3,040.00
$4,560.00
$11,115.00
$50,077.20
$400.00
$0.50
$0.75
$5.00
$0.50
$5.00
$0.60
$0.90
$0.60
$0.90
$5.00
$3.00
$15.00
$10.00
$15.00
$15.00
$73.90
$20.00
$14,388.00
$2,165.25
$3,455.00
$10,994.50
$1,185.00
$516.00
$165.60
$1,383.60
$3,594.60
$13,930.00
$3,036.00
$2,025.00
$3,040.00
$4,560.00
$11,115.00
$51,434.40
$400.00
Filter Sock (18") - Lin. Ft.
Silt Fence - Lin. Ft.
Erosion Control (Class 1, Type C) - Sq. Yd.
Sediment Removal (Set Price) - Cu. Yd.
Mulch Tacking Slurry - Lbs
Mulching (Temporary) - Ton
Fertilizer (13-13-13) - Lb
Seed (Fescue)(Tall Turf-type Blend) - Lb
Seed (Kentucky) (Bluegrass) (Baron) - Lb
Mulching (Permanent) (Set Price) - Ton
Toll Plaza - Lump Sum
Toll Booth (Type B) - Each
Toll Plaza Canopy - Lump Sum
Electrical System - Lump Sum
Equipment Enclosure - Each
Entry Lane Sign Structure (Remove & Reset) - Each
Exit Lane Sign Structure (Installation Only) - Each
Electric Lighting System (Light Towers) - Lump Sum
Traffic Control - Lump Sum
Concrete Safety Barrier (Type F3) (Temporary) - Lin.
Concrete Safety Barrier (Type F3)(Temp.-Relocate) Inertial Barrier System - Each
Replacement Modules (IBS) - Each
Flagger (Set Price) - Hour
Sanitary Sewer (15") (PVCP) - Lin. Ft.
Manhole (Sanitary Sewer) - Each
Bridge Items for Br. No. 177.377
Common Excavation - Cu. Yds.
Rock Excavation - Cu. Yds.
Compaction of Earthwork (Type A MR 5-5) - Cu. Yds.
Water (Grading)(Set Price) - Mgal
Storm Sewer (24")(ACSP) - Lin. Ft.
End Section (24")(CM) - Each
Concrete Grade 4.0(AE) - Cu. Yds.
85
6,545
1,183
1
12,140
13
3,318
4,646
332
33
1
2
1
1
1
1
2
1
1
4,125
7,188
13
30
1
312
2
$15.00
$3.00
$4.00
$35.00
$1.00
$300.00
$2.00
$3.50
$10.00
$250.00
$652,600.00
$86,500.00
$217,250.00
$38,200.00
$81,900.00
$21,560.00
$73,437.00
$103,550.00
$385,750.00
$15.45
$4.45
$3,200.00
$1.00
$40.00
$84.00
$6,750.00
$1,275.00
$19,635.00
$4,732.00
$35.00
$12,140.00
$3,900.00
$6,636.00
$16,261.00
$3,320.00
$8,250.00
$652,600.00
$173,000.00
$217,250.00
$38,200.00
$81,900.00
$21,560.00
$146,874.00
$103,550.00
$385,750.00
$63,731.25
$31,986.60
$41,600.00
$30.00
$40.00
$26,208.00
$13,500.00
$15.00
$3.00
$4.00
$35.00
$1.00
$300.00
$2.00
$3.50
$10.00
$250.00
$573,337.15
$87,373.74
$219,444.44
$38,585.86
$82,727.27
$21,777.78
$29,500.00
$104,595.96
$385,750.00
$28.50
$9.50
$3,200.00
$1.00
$40.00
$277.12
$4,700.00
$1,275.00
$19,635.00
$4,732.00
$35.00
$12,140.00
$3,900.00
$6,636.00
$16,261.00
$3,320.00
$8,250.00
$573,337.15
$174,747.48
$219,444.44
$38,585.86
$82,727.27
$21,777.78
$59,000.00
$104,595.96
$385,750.00
$117,562.50
$68,286.00
$41,600.00
$30.00
$40.00
$86,461.44
$9,400.00
1,231
87
706
1
21
1
28
$9.06
$26.00
$0.92
$35.00
$63.00
$481.50
$2,289.00
$11,152.86
$2,262.00
$649.52
$35.00
$1,323.00
$481.50
$64,092.00
$11.78
$57.62
$5.12
$35.00
$154.75
$668.20
$1,482.50
$14,501.18
$5,012.94
$3,614.72
$35.00
$3,249.75
$668.20
$41,510.00
Reinforcing Steel (Gr. 60)(Epoxy Coated) - Lb.
Aggregate Ditch Lining (6") - Tons
Slope Portection (Riprap Stone) - Cu. Yds.
6 Ft. Dia. Standard Manhole (Type I)(0'-6') - Each
6 Ft. Dia. Additional Depth for Std. Manhole (Type I) 18" Sanitary Sewer (DIP) - Lin. Ft.
Connection to Existing Structure - Each
9" Reinforced Concrete Pavement - Sq. Yd.
Aggregate Base (AB-3)(6") - Sq. Yd.
Curb and Gutter, Combined (AE) - Lin. Ft.
Concrete Safety Barrier (Type II) - Lin. Ft.
Bridge No. 177.377 (EB)
Class I Excavation - Cu. Yds.
Concrete Grade 4.0(AE) - Cu. Yds.
Concrete Grade 4.0(AE)(SA)(MPC) - Cu. Yds.
Reinforcing Steel (Gr. 60) - Lbs.
Reinforcing Steel (Gr. 60)(Epoxy Coated) - Lbs.
Erection of Structural Steel - Lump Sum
Bridge Painting - Lump Sum
Welded Stud Shear Connectors - Each
Expansion Device (Finger Plate) - Lin. Ft.
Bridge Drainage System - Each
Pile (Steel)(HP12x53) - Lin. Ft.
Drilled Shaft (60")(Cased) - Lin. Ft.
Sonic Test (Drilled Shaft)(Set Price) - Each
Core Hole (Investigative) - Lin. Ft.
Bridge Deck Grooving - Sq. Yds.
Drilling & Grouting - Each
Abutment Strip Drain - Sq. Yds.
Bridge Backwall Protection System - Sq. Yds.
Flowable Fill (High Strength) - Cu. Yds.
Slope Protection (Aggregate) - Cu. Yds.
Fence (Chain Link)(8')(Special) - Lin. Ft.
Falsework Inspection - Lump Sum
3,720
318
171
3
21
154
3
333
366
40
156
$1.20
$39.85
$60.40
$8,050.00
$220.00
$165.00
$3,000.00
$91.00
$6.25
$85.00
$98.00
$4,464.00
$12,672.30
$10,328.40
$24,150.00
$4,620.00
$25,410.00
$9,000.00
$30,303.00
$2,287.50
$3,400.00
$15,288.00
$0.90
$53.37
$81.99
$4,800.00
$780.00
$253.60
$6,500.00
$91.00
$17.09
$85.00
$136.28
$3,348.00
$16,971.66
$14,020.29
$14,400.00
$16,380.00
$39,054.40
$19,500.00
$30,303.00
$6,254.94
$3,400.00
$21,259.68
393
505
1,710
165,710
424,460
1
1
9,432
95
2
243
839
1
120
4,612
480
50
142
167
661
180
1
$25.00
$765.00
$600.00
$0.88
$1.20
$130,000.00
$110,000.00
$4.50
$2,500.00
$3,000.00
$42.00
$935.00
$1,800.00
$49.00
$6.00
$25.00
$90.00
$30.00
$185.00
$85.00
$120.00
$2,500.00
$9,825.00
$386,325.00
$1,026,000.00
$145,824.80
$509,352.00
$130,000.00
$110,000.00
$42,444.00
$237,500.00
$6,000.00
$10,206.00
$784,465.00
$1,800.00
$5,880.00
$27,672.00
$12,000.00
$4,500.00
$4,260.00
$30,895.00
$56,185.00
$21,600.00
$2,500.00
$28.24
$921.89
$785.66
$1.07
$1.01
$468,886.25
$117,750.00
$2.68
$2,231.73
$4,945.05
$65.55
$722.92
$1,800.00
$87.50
$2.77
$54.85
$52.81
$24.20
$107.25
$78.47
$113.00
$3,912.56
$11,098.32
$465,554.45
$1,343,478.60
$177,309.70
$428,704.60
$468,886.25
$117,750.00
$25,277.76
$212,014.35
$9,890.10
$15,928.65
$606,529.88
$1,800.00
$10,500.00
$12,775.24
$26,328.00
$2,640.50
$3,436.40
$17,910.75
$51,868.67
$20,340.00
$3,912.56
Temporary Shoring - Lump Sum
Geotextile Fabric - Sq. Yds.
Bridge No. 177.377 (WB)
Class I Excavation - Cu. Yds.
Concrete Grade 4.0(AE)(SA)(MPC) - Cu. Yds.
Reinforcing Steel (Gr. 60) - Lbs.
Reinforcing Steel (Gr. 60)(Epoxy Coated) - Lbs.
Erection of Structural Steel - Lump Sum
Bridge Painting - Lump Sum
Welded Stud Shear Connectors - Each
Expansion Device (Finger Plate) - Lin. Ft.
Bridge Drainage System - Each
Pile (Steel)(HP12x53) - Lin. Ft.
Bridge Deck Grooving - Sq. Yds.
Abutment Strip Drain - Sq. Yds.
Bridge Backwall Protection System) - Sq. Yds.
Flowable Fill (High Strength) - Cu. Yds.
Slope Protection (Aggregate) - Cu. Yds.
Fence (Chain Link)(8')(Special) - Lin. Ft.
Falsework Inspection - Lump Sum
Temporary Shoring - Lump Sum
Geotextile Fabric - Sq. Yds.
182 Items
1
268
$30,000.00
$5.00
$30,000.00
$1,340.00
$38,103.89
$5.76
$38,103.89
$1,543.68
369
1,710
11,610
424,460
1
1
9,432
95
4
243
4,612
50
142
167
782
180
1
1
273
Totals
$25.00
$605.00
$0.91
$1.23
$130,000.00
$110,000.00
$4.50
$2,500.00
$3,000.00
$42.00
$6.00
$90.00
$30.00
$185.00
$85.00
$120.00
$2,500.00
$30,000.00
$5.00
$9,225.00
$1,034,550.00
$10,565.10
$522,085.80
$130,000.00
$110,000.00
$42,444.00
$237,500.00
$12,000.00
$10,206.00
$27,672.00
$4,500.00
$4,260.00
$30,895.00
$66,470.00
$21,600.00
$2,500.00
$30,000.00
$1,365.00
$13,998,798.46
$28.24
$829.24
$1.23
$1.01
$468,666.41
$117,750.00
$2.68
$2,231.73
$4,945.04
$65.55
$2.77
$52.81
$24.20
$107.25
$78.47
$113.00
$3,912.56
$38,103.89
$5.76
$10,420.56
$1,418,000.40
$14,280.30
$428,704.60
$468,666.41
$117,750.00
$25,277.76
$212,014.35
$19,780.16
$15,928.65
$12,775.24
$2,640.50
$3,436.40
$17,910.75
$61,363.54
$20,340.00
$3,912.56
$38,103.89
$1,572.48
$14,566,534.46