Item Schedule of Prices Cleaning Existing Structures - Lump Sum Contractor Construction Staking - Lump Sum Foundation Stabilization - Cu. Yd. Mobilization - Lump Sum Removal of Existing Structures - Lump Sum Concrete for Seal Course (Set Price) - Cu. Yd. Clearing and Grubbing - Lump Sum Common Excavation - Cu. Yd. Rock Excavation - Cu. Yd. Class ||| Excavation - Cu. Yd. Compaction of Earthwork (Type AA) (MR-0-5) - Cu. Compaction of Earthwork (Type AA) (MR-5-5) - Cu. Water (Grading) (Set Price) - MGal Granular Backfill (Wingwalls) - Cu. Yd. Concrete (Grade 3.0) (AE) - Cu. Yd. Riprap (Light Stone) (100 Lb) - Sq. Yd. Riprap (Heavy Stone) (1/2 Ton) - Sq. Yd. Riprap (Heavy Stone) (1/4 Ton) - Sq. Yd. Slope Protection (Riprap Stone) (6") - Cu. Yd. Bedding for Slope Protection - Cu. Yd. Geotextile Fabric - Sq. Yd. Guardrail, Steel Plate (MGS) - Lin. Ft. Guardrail End Terminal (MGS-SRT) - Each Guardrail, Removal of Steel Plate - Lin. Ft. Impact Attenuator (SCI-TL2) - Each Concrete Safety Barrier (Type I) - Lin. Ft. Concrete Safety Barrier (Type II) - Lin. Ft. Concrete Safety Barrier (Type III-F) - Lin. Ft. Concrete Safety Barrier (Type IV) - Lin. Ft. Permanent Precast Concrete Median Barrier - Lin. Ft. Concrete Pavement (10" Uniform) (AE) (NRDJ) - Sq. Cohron-Hamm Joint Venture Clarkson Construction Company Quantity Price Extension Price Extension 1 $2,865.00 1 $71,100.00 83 $75.00 1 $1,309,100.00 1 $991,620.00 1 $175.00 1 $8,920.00 33,142 $8.75 4,717 $16.90 2,749 $22.80 749 $0.98 27,667 $0.85 1 $35.00 134 $56.50 1 $150.00 157 $41.00 284 $62.45 205 $62.50 72 $63.75 144 $39.75 862 $2.54 536 $40.72 4 $3,423.00 1,304 $5.00 6 $25,238.00 664 $109.00 46 $98.00 206 $114.00 148 $117.25 2,640 $53.00 3,529 $109.50 $2,865.00 $71,100.00 $6,225.00 $1,309,100.00 $991,620.00 $175.00 $8,920.00 $289,992.50 $79,717.30 $62,677.20 $734.02 $23,516.95 $35.00 $7,571.00 $150.00 $6,437.00 $17,735.80 $12,812.50 $4,590.00 $5,724.00 $2,189.48 $21,825.92 $13,692.00 $6,520.00 $151,428.00 $72,376.00 $4,508.00 $23,484.00 $17,353.00 $139,920.00 $386,425.50 $74,129.68 $42,000.00 $100.00 $1,465,016.50 $651,803.77 $175.00 $25,252.53 $8.59 $13.64 $10.43 $1.52 $1.26 $35.00 $109.49 $1,280.54 $59.29 $31.86 $46.46 $162.82 $61.68 $5.76 $34.50 $2,400.00 $6.50 $23,750.00 $125.16 $160.50 $173.23 $228.30 $76.45 $109.50 $74,129.68 $42,000.00 $8,300.00 $1,465,016.50 $651,803.77 $175.00 $25,252.53 $284,689.78 $64,339.88 $28,672.07 $1,138.48 $34,860.42 $35.00 $14,671.66 $1,280.54 $9,308.53 $9,048.24 $9,524.30 $11,723.04 $8,881.92 $4,965.12 $18,492.00 $9,600.00 $8,476.00 $142,500.00 $83,106.24 $7,383.00 $35,685.38 $33,788.40 $201,828.00 $386,425.50 Concrete Pavement (10" Uniform) (AE) (Macro Fiber Reinforced) - Sq. Yd. Concrete Core (Set Price) - Each Sidewalk Construction (4") (AE) - Sq. Yd. Sidewalk Ramp - Sq. Yd. Pavement Edge Wedge (Rock) - Ton Aggregate Base (AB-3) (8") - Sq. Yd. Aggregate Base (AB-3) (10") - Sq. Yd. Milling (2") - Sq. Yd. Water (Aggregate Base) (Set Price) - MGal Fence (Woven Wire) (Type A or B) - Lin. Ft. Posts (Corner) (Woven Wire Type A or B) - Each Posts (End) (Woven Wire Type A or B) - Each Right-of-Way Survey Monument - Each Rumble Strips (Milled) (Asphalt) - Sta. Temporary Shoring - Lump Sum HMA-Commercial Grade (Class A)(PG 70-28) - Ton HMA Commercial Grade (Class A) - Ton Asphalt Core (Set Price) - Each Concrete Headwall - Each Concrete (Grade 4.0) - Cu. Yd. Reinforcing Steel (Grade 60) - Lbs. Inlet (Manhole) (Special) - Each Inlet (Type V Median) - Each Adjustment of Catch Basin - Each End Section (15") (RC) - Each End Section (72") (RC) - Each Flowable Fill (Low Strength) - Cu. Yd. Edge Drain Pipe - Lin. Ft. Storm Sewer (15") (RCP) - Lin. Ft. Storm Sewer (24") (CSP) - Lin. Ft. Storm Sewer (48") (CSP) - Lin. Ft. Storm Sewer (72") (RCP) - Lin. Ft. Sign (Flat Sheet) (High Performance) - Sq. Ft. 743 $101.50 $75,414.50 $101.50 $75,414.50 1 57 3 1,870 20,819 5,315 6,867 1 1,203 10 9 4 44 1 2,369 9,615 1 1 304 36,395 3 1 1 2 2 8 210 221 30 68 211 166 $120.00 $69.00 $243.00 $21.40 $7.50 $9.50 $8.50 $35.00 $10.00 $350.00 $300.00 $100.00 $135.23 $165,000.00 $75.65 $67.10 $45.00 $1,500.00 $1,142.28 $0.90 $3,674.00 $5,986.00 $2,167.00 $592.00 $3,114.50 $105.30 $30.00 $51.50 $63.00 $131.50 $305.20 $23.81 $120.00 $3,933.00 $729.00 $40,018.00 $156,142.50 $50,492.50 $58,369.50 $35.00 $12,030.00 $3,500.00 $2,700.00 $400.00 $5,950.12 $165,000.00 $179,214.85 $645,166.50 $45.00 $1,500.00 $347,253.12 $32,755.50 $11,022.00 $5,986.00 $2,167.00 $1,184.00 $6,229.00 $842.40 $6,300.00 $11,381.50 $1,890.00 $8,942.00 $64,397.20 $3,952.46 $120.00 $69.00 $243.00 $18.18 $7.58 $9.85 $2.24 $35.00 $10.00 $350.00 $300.00 $100.00 $135.25 $37,538.65 $70.06 $55.72 $45.00 $10,000.00 $727.00 $0.88 $3,005.05 $5,555.56 $2,525.25 $479.80 $2,777.78 $131.77 $14.14 $32.32 $58.59 $90.91 $217.17 $19.00 $120.00 $3,933.00 $729.00 $33,996.60 $157,808.02 $52,352.75 $15,382.08 $35.00 $12,030.00 $3,500.00 $2,700.00 $400.00 $5,951.00 $37,538.65 $165,972.14 $535,747.80 $45.00 $10,000.00 $221,008.00 $32,027.60 $9,015.15 $5,555.56 $2,525.25 $959.60 $5,555.56 $1,054.16 $2,969.40 $7,142.72 $1,757.70 $6,181.88 $45,822.87 $3,154.00 Sign (Reinforced Panel) (High Performance) - Sq. Ft. Sign Post (1-3/4" Perforated Square Steel Tube) Sign Post (2-1/4" Perforated Square Steel Tube) Sign Post (2-1/2" Perforated Square Steel Tube) Sign Post (W6x9 Steel Beam) - Lin. Ft. Sign Post Stub Post with Breakaway Base Plate Sign Post Breakaway Base Plate (W6x9) - Each Sign Post Footing (24" Dia. Concrete) (Steel Beam Sign Post Footing (1-3/4" Perforated Square Steel Sign Post Footing (2-1/4" Perforated Square Steel Sign Post Footing (2-1/2" Perforated Square Steel Signing Delineator (Type A) (White Flexible) (Type 1 Anchor) - Each Signing Delineator (Type A) (Yellow Flexible) (Type 1 Anchor) - Each Signing Delineator (Type B) (White Flexible) (Type 1 Anchor) - Each Pavement Marking (Paint)(White)(6") - Lin. Ft. Pavement Marking (Paint)(White)(8") - Lin. Ft. Pavement Marking (Paint)(White)(12") - Lin. Ft. Pavement Marking (Paint)(Yellow)(6") - Lin. Ft. Pavement Marking (Paint)(Yellow)(12") - Lin. Ft. Pavement Marking (Multi-Component) (White) (4") Pavement Marking (Multi-Component) (White) (6") Pavement Marking (Multi-Component) (Yellow) (4") Pavement Marking (Multi-Component) (Yellow) (6") Pavement Marking (Multi-Component) (Yellow) (12") Temporary Fertilizer (15-30-15) - Lb Temporary Seed (Canada Wildrye) - Lb Temporary Seed (Grain Oats) - Lb Temporary Seed (Sterile Wheatgrass) - Lb Soil Erosion Mix - Lb Temporary Ditch Check (Rock) - Cu. Yd. Temporary Ditch Check (Non-Rock) - Lin. Ft. 207 13 135 10 94 6 6 36 2 9 1 18 $27.93 $14.25 $13.50 $15.50 $43.00 $122.00 $72.00 $200.00 $137.00 $151.00 $143.00 $56.00 $5,781.51 $185.25 $1,822.50 $155.00 $4,042.00 $732.00 $432.00 $7,200.00 $274.00 $1,359.00 $143.00 $1,008.00 $23.50 $11.00 $8.50 $13.00 $44.00 $235.00 $60.00 $125.00 $120.00 $140.00 $130.00 $85.00 $4,864.50 $143.00 $1,147.50 $130.00 $4,136.00 $1,410.00 $360.00 $4,500.00 $240.00 $1,260.00 $130.00 $1,530.00 11 $56.00 $616.00 $85.00 $935.00 40 $56.00 $2,240.00 $85.00 $3,400.00 28,776 2,887 691 21,989 237 860 184 2,306 3,994 2,786 1,012 135 304 304 741 696 20 $0.50 $0.75 $5.00 $0.50 $5.00 $0.60 $0.90 $0.60 $0.90 $5.00 $3.00 $15.00 $10.00 $15.00 $15.00 $71.95 $20.00 $14,388.00 $2,165.25 $3,455.00 $10,994.50 $1,185.00 $516.00 $165.60 $1,383.60 $3,594.60 $13,930.00 $3,036.00 $2,025.00 $3,040.00 $4,560.00 $11,115.00 $50,077.20 $400.00 $0.50 $0.75 $5.00 $0.50 $5.00 $0.60 $0.90 $0.60 $0.90 $5.00 $3.00 $15.00 $10.00 $15.00 $15.00 $73.90 $20.00 $14,388.00 $2,165.25 $3,455.00 $10,994.50 $1,185.00 $516.00 $165.60 $1,383.60 $3,594.60 $13,930.00 $3,036.00 $2,025.00 $3,040.00 $4,560.00 $11,115.00 $51,434.40 $400.00 Filter Sock (18") - Lin. Ft. Silt Fence - Lin. Ft. Erosion Control (Class 1, Type C) - Sq. Yd. Sediment Removal (Set Price) - Cu. Yd. Mulch Tacking Slurry - Lbs Mulching (Temporary) - Ton Fertilizer (13-13-13) - Lb Seed (Fescue)(Tall Turf-type Blend) - Lb Seed (Kentucky) (Bluegrass) (Baron) - Lb Mulching (Permanent) (Set Price) - Ton Toll Plaza - Lump Sum Toll Booth (Type B) - Each Toll Plaza Canopy - Lump Sum Electrical System - Lump Sum Equipment Enclosure - Each Entry Lane Sign Structure (Remove & Reset) - Each Exit Lane Sign Structure (Installation Only) - Each Electric Lighting System (Light Towers) - Lump Sum Traffic Control - Lump Sum Concrete Safety Barrier (Type F3) (Temporary) - Lin. Concrete Safety Barrier (Type F3)(Temp.-Relocate) Inertial Barrier System - Each Replacement Modules (IBS) - Each Flagger (Set Price) - Hour Sanitary Sewer (15") (PVCP) - Lin. Ft. Manhole (Sanitary Sewer) - Each Bridge Items for Br. No. 177.377 Common Excavation - Cu. Yds. Rock Excavation - Cu. Yds. Compaction of Earthwork (Type A MR 5-5) - Cu. Yds. Water (Grading)(Set Price) - Mgal Storm Sewer (24")(ACSP) - Lin. Ft. End Section (24")(CM) - Each Concrete Grade 4.0(AE) - Cu. Yds. 85 6,545 1,183 1 12,140 13 3,318 4,646 332 33 1 2 1 1 1 1 2 1 1 4,125 7,188 13 30 1 312 2 $15.00 $3.00 $4.00 $35.00 $1.00 $300.00 $2.00 $3.50 $10.00 $250.00 $652,600.00 $86,500.00 $217,250.00 $38,200.00 $81,900.00 $21,560.00 $73,437.00 $103,550.00 $385,750.00 $15.45 $4.45 $3,200.00 $1.00 $40.00 $84.00 $6,750.00 $1,275.00 $19,635.00 $4,732.00 $35.00 $12,140.00 $3,900.00 $6,636.00 $16,261.00 $3,320.00 $8,250.00 $652,600.00 $173,000.00 $217,250.00 $38,200.00 $81,900.00 $21,560.00 $146,874.00 $103,550.00 $385,750.00 $63,731.25 $31,986.60 $41,600.00 $30.00 $40.00 $26,208.00 $13,500.00 $15.00 $3.00 $4.00 $35.00 $1.00 $300.00 $2.00 $3.50 $10.00 $250.00 $573,337.15 $87,373.74 $219,444.44 $38,585.86 $82,727.27 $21,777.78 $29,500.00 $104,595.96 $385,750.00 $28.50 $9.50 $3,200.00 $1.00 $40.00 $277.12 $4,700.00 $1,275.00 $19,635.00 $4,732.00 $35.00 $12,140.00 $3,900.00 $6,636.00 $16,261.00 $3,320.00 $8,250.00 $573,337.15 $174,747.48 $219,444.44 $38,585.86 $82,727.27 $21,777.78 $59,000.00 $104,595.96 $385,750.00 $117,562.50 $68,286.00 $41,600.00 $30.00 $40.00 $86,461.44 $9,400.00 1,231 87 706 1 21 1 28 $9.06 $26.00 $0.92 $35.00 $63.00 $481.50 $2,289.00 $11,152.86 $2,262.00 $649.52 $35.00 $1,323.00 $481.50 $64,092.00 $11.78 $57.62 $5.12 $35.00 $154.75 $668.20 $1,482.50 $14,501.18 $5,012.94 $3,614.72 $35.00 $3,249.75 $668.20 $41,510.00 Reinforcing Steel (Gr. 60)(Epoxy Coated) - Lb. Aggregate Ditch Lining (6") - Tons Slope Portection (Riprap Stone) - Cu. Yds. 6 Ft. Dia. Standard Manhole (Type I)(0'-6') - Each 6 Ft. Dia. Additional Depth for Std. Manhole (Type I) 18" Sanitary Sewer (DIP) - Lin. Ft. Connection to Existing Structure - Each 9" Reinforced Concrete Pavement - Sq. Yd. Aggregate Base (AB-3)(6") - Sq. Yd. Curb and Gutter, Combined (AE) - Lin. Ft. Concrete Safety Barrier (Type II) - Lin. Ft. Bridge No. 177.377 (EB) Class I Excavation - Cu. Yds. Concrete Grade 4.0(AE) - Cu. Yds. Concrete Grade 4.0(AE)(SA)(MPC) - Cu. Yds. Reinforcing Steel (Gr. 60) - Lbs. Reinforcing Steel (Gr. 60)(Epoxy Coated) - Lbs. Erection of Structural Steel - Lump Sum Bridge Painting - Lump Sum Welded Stud Shear Connectors - Each Expansion Device (Finger Plate) - Lin. Ft. Bridge Drainage System - Each Pile (Steel)(HP12x53) - Lin. Ft. Drilled Shaft (60")(Cased) - Lin. Ft. Sonic Test (Drilled Shaft)(Set Price) - Each Core Hole (Investigative) - Lin. Ft. Bridge Deck Grooving - Sq. Yds. Drilling & Grouting - Each Abutment Strip Drain - Sq. Yds. Bridge Backwall Protection System - Sq. Yds. Flowable Fill (High Strength) - Cu. Yds. Slope Protection (Aggregate) - Cu. Yds. Fence (Chain Link)(8')(Special) - Lin. Ft. Falsework Inspection - Lump Sum 3,720 318 171 3 21 154 3 333 366 40 156 $1.20 $39.85 $60.40 $8,050.00 $220.00 $165.00 $3,000.00 $91.00 $6.25 $85.00 $98.00 $4,464.00 $12,672.30 $10,328.40 $24,150.00 $4,620.00 $25,410.00 $9,000.00 $30,303.00 $2,287.50 $3,400.00 $15,288.00 $0.90 $53.37 $81.99 $4,800.00 $780.00 $253.60 $6,500.00 $91.00 $17.09 $85.00 $136.28 $3,348.00 $16,971.66 $14,020.29 $14,400.00 $16,380.00 $39,054.40 $19,500.00 $30,303.00 $6,254.94 $3,400.00 $21,259.68 393 505 1,710 165,710 424,460 1 1 9,432 95 2 243 839 1 120 4,612 480 50 142 167 661 180 1 $25.00 $765.00 $600.00 $0.88 $1.20 $130,000.00 $110,000.00 $4.50 $2,500.00 $3,000.00 $42.00 $935.00 $1,800.00 $49.00 $6.00 $25.00 $90.00 $30.00 $185.00 $85.00 $120.00 $2,500.00 $9,825.00 $386,325.00 $1,026,000.00 $145,824.80 $509,352.00 $130,000.00 $110,000.00 $42,444.00 $237,500.00 $6,000.00 $10,206.00 $784,465.00 $1,800.00 $5,880.00 $27,672.00 $12,000.00 $4,500.00 $4,260.00 $30,895.00 $56,185.00 $21,600.00 $2,500.00 $28.24 $921.89 $785.66 $1.07 $1.01 $468,886.25 $117,750.00 $2.68 $2,231.73 $4,945.05 $65.55 $722.92 $1,800.00 $87.50 $2.77 $54.85 $52.81 $24.20 $107.25 $78.47 $113.00 $3,912.56 $11,098.32 $465,554.45 $1,343,478.60 $177,309.70 $428,704.60 $468,886.25 $117,750.00 $25,277.76 $212,014.35 $9,890.10 $15,928.65 $606,529.88 $1,800.00 $10,500.00 $12,775.24 $26,328.00 $2,640.50 $3,436.40 $17,910.75 $51,868.67 $20,340.00 $3,912.56 Temporary Shoring - Lump Sum Geotextile Fabric - Sq. Yds. Bridge No. 177.377 (WB) Class I Excavation - Cu. Yds. Concrete Grade 4.0(AE)(SA)(MPC) - Cu. Yds. Reinforcing Steel (Gr. 60) - Lbs. Reinforcing Steel (Gr. 60)(Epoxy Coated) - Lbs. Erection of Structural Steel - Lump Sum Bridge Painting - Lump Sum Welded Stud Shear Connectors - Each Expansion Device (Finger Plate) - Lin. Ft. Bridge Drainage System - Each Pile (Steel)(HP12x53) - Lin. Ft. Bridge Deck Grooving - Sq. Yds. Abutment Strip Drain - Sq. Yds. Bridge Backwall Protection System) - Sq. Yds. Flowable Fill (High Strength) - Cu. Yds. Slope Protection (Aggregate) - Cu. Yds. Fence (Chain Link)(8')(Special) - Lin. Ft. Falsework Inspection - Lump Sum Temporary Shoring - Lump Sum Geotextile Fabric - Sq. Yds. 182 Items 1 268 $30,000.00 $5.00 $30,000.00 $1,340.00 $38,103.89 $5.76 $38,103.89 $1,543.68 369 1,710 11,610 424,460 1 1 9,432 95 4 243 4,612 50 142 167 782 180 1 1 273 Totals $25.00 $605.00 $0.91 $1.23 $130,000.00 $110,000.00 $4.50 $2,500.00 $3,000.00 $42.00 $6.00 $90.00 $30.00 $185.00 $85.00 $120.00 $2,500.00 $30,000.00 $5.00 $9,225.00 $1,034,550.00 $10,565.10 $522,085.80 $130,000.00 $110,000.00 $42,444.00 $237,500.00 $12,000.00 $10,206.00 $27,672.00 $4,500.00 $4,260.00 $30,895.00 $66,470.00 $21,600.00 $2,500.00 $30,000.00 $1,365.00 $13,998,798.46 $28.24 $829.24 $1.23 $1.01 $468,666.41 $117,750.00 $2.68 $2,231.73 $4,945.04 $65.55 $2.77 $52.81 $24.20 $107.25 $78.47 $113.00 $3,912.56 $38,103.89 $5.76 $10,420.56 $1,418,000.40 $14,280.30 $428,704.60 $468,666.41 $117,750.00 $25,277.76 $212,014.35 $19,780.16 $15,928.65 $12,775.24 $2,640.50 $3,436.40 $17,910.75 $61,363.54 $20,340.00 $3,912.56 $38,103.89 $1,572.48 $14,566,534.46
© Copyright 2026 Paperzz