Proceeding No.: Exhibit No.: Witness: R.12-06-013 SCE-119A R. Garwacki (U 338-E) Corrected Workpaper for Table V-11 “Cost Breakdown for Typical SCE Residential Customer” Before the Public Utilities Commission of the State of California Rosemead, California November 24, 2014 Filed and Settled Customer Marginal Costs ‐ 2012 GRC Phase II Marginal Customer Cost Final Line Transformer (FLT) Service Drop Meter & Panel Cust Service Total $/ Customer ‐ Month SCE Filed RECC 2012 Phase 2 $4.2 $4.0 $2.2 $2.9 $13.3 TURN Filed NCO 2012 Phase 2 $0.8 $0.8 $0.4 $2.5 4.5 (1) Monthly RECC 2012 Phase 2 $3.7 $3.5 $2.0 $2.9 12.1 (2) Monthly NCO 2012 Phase 2 $1.7 $1.7 $0.8 $2.9 7.18 (2) 2012 GRC Phase 2 35.3% Jan 2013 3.5% Jan 2014 2.2% 50:50 NCO:RECC Revenue Allocation Settlement 2012 Phase 2 $2.7 $2.6 $1.4 $2.9 9.6 (3) EPMC Scalars Equal Percent of Marginal Cost (EPMC) Scalars Customer Charge by Component Scaled Charge Component Charge Component Final Line Transformer (FLT) Service Drop Meter & Panel Cust Service Total $/ Customer ‐ Month Note: 2012 dollars and annualized Monthly RECC Customer Costs (2012$) $3.7 $3.5 $2.0 $2.9 12.1 (2) 2012 GRC Phase 2 $5.0 $4.8 $2.6 $4.0 $16.4 Jan 2013 $5.2 $4.9 $2.7 $4.1 $16.9 Jan 2014 $5.3 $5.0 $2.8 $4.2 $17.3 (1) ‐ $53.94/12 months. See Table 5 (page 21) of Prepared Testimony of Garrick F. Jones and William B. Marcus on behalf of TURN, SCE 2012 Test Year General Rate Case Phase II (CPUC App. A.11‐06‐007). (2) ‐ See Table RA‐3 on Page 12 of Marginal Cost and Revenue Allocation Settlement Agreement in SCE's 2012 Test Year General Rate Case Phase II (CPUC App. A.11‐06‐007). (3) ‐ Settlement values used for class revenue allocation purposes only ‐ not precedential for rate design purposes. 2012 GRC Phase 2, Distribution Marginal Cost ‐ TURN Voltage Level TURN Distribution Marginal Cost (without SCE's losses and Diversity Factors (EDFs) applied) $/MW‐ Year TURN Distribution Marginal Cost (with SCE's losses and Diversity Factors (EDFs) applied) $/MW‐ Year 66 kV $37.6 $12.81 12 kV and Below Total $105.8 $35.73 $48.5 Residential Class Design Demand Marginal Cost Revenue Requirement (MCRR) Sum of NCP Demands Max kW 25,729,116 Marginal Cost Revenue Requirement $1,248,651,574 Residential Forecasted Sales 2012 GRC Phase 2 kWh (Annual) 29,134,393,419 Forecasted Sum of Max kW (Annual) 197,969,647 Marginal Cost Rate $/kW ‐ Month $6.3 2012 GRC Phase 2, Distribution Marginal Cost ‐ SCE Voltage Level SCE Distribution Marginal Cost (without SCE's losses and Diversity Factors (EDFs) applied) $/MW‐ Year SCE Distribution Marginal Cost (with SCE's losses and Diversity Factors (EDFs) applied) $/MW‐ Year 66 kV $33.7 $11.5 12 kV and Below Total $83.9 $28.3 $39.8 Residential Class Design Demand Marginal Cost Revenue Requirement (MCRR) Sum of NCP Demands Max kW 25,729,116 Marginal Cost Revenue Requirement $1,024,356,366 Residential Forecasted Sales 2012 GRC Phase 2 kWh (Annual) 29,134,393,419 Forecasted Sum of Max kW (Annual) 197,969,647 Marginal Cost Rate $/kW ‐ Month $5.2 Notes: (1) TURN Unit Marginal Distribution Costs from Page 29, Prepared Testimony of Garrick F. Jones and William B. Marcus on behalf of TURN, SCE 2012 Test Year General Rate Case Phase II (CPUC App. A.11‐06‐007) (2) SCE Unit Marginal Distribution Costs Page 12 of Marginal Cost and Revenue Allocation Settlement Agreement, in SCE's 2012 Test Year General Rate Case Phase II (CPUC App. A.11‐06‐007). Example of Table V‐11 in Exhibit SCE 101 Billing Determinants used for the Average and No Load Scenarios Average Monthly Usage (kWh) Average Non Coincident Peak demand (kW) Average coincident peak demand (kW) Average Monthly Bill See Appendix A, SCE Exhibit 101 Marginal Cost by Function Ancillary/ Balancing Services Transmission $/kW ‐ Month Distribution Services $/kW‐Month Generation Capacity $/kW‐ Month (1) (2) Customer Costs $/Customer ‐ Month Fixed Charges for Average & No Load Scenarios Ancillary/ Balancing Services Transmission $/kW ‐ Month Distribution Services $/kW‐Month Generation Capacity $/kW‐ Month Customer Costs $/Customer ‐ Month Total Non Energy Charges for Customer (Monthly) Fixed Charges for Average & No Load Scenarios Ancillary/ Balancing Services Transmission Systems ($/Month) Distribution Services ($/Month) Generation Capacity ($/Month) Customer Costs ($/Month) Total Non Energy Charges for Customer (Monthly) Average Cust 589 5.5 2 $112 Low / No Load 0 2.1 0.4 $41 Scaled Charge Component Jan‐14 SCE Unit MC TURN's Unit MC $1.3 $4.9 $12.5 $17.3 $1.3 $5.2 $12.0 $12.1 $1.3 $6.3 $6.7 $4.5 Fixed Cost ‐ SCE Average Cust Low / No Load $0 $0 $7 $3 $27 $10 $25 $5 $17 $17 $76 $35 % of Fixed Cost Average Cust No Load 0% 0% 9% 8% 36% 29% 33% 14% 22% 49% 100% 100% SCE Method ‐ Fixed Cost ‐ TURN Example Inputs % of Fixed Cost Average Cust Low / No Load Average Cust No Load $0 $0 0% 0% $7 $3 12% 12% $35 $13 58% 57% $13 $3 22% 12% $4 $4 8% 20% $60 $23 100% 100% (1) SCE Unit Marginal Generation Capacity Cost of $114 From Page 9 of Marginal Cost and Revenue Allocation Settlement Agreement, in SCE's 2012 Test Year General Rate Case Phase II (CPUC App. A.11‐06‐007). This is adjusted for Resource adequacy (15%) and Line losses (9.75%) to amount to $143.9 (2) TURN Unit Marginal Generation Capacity Cost of $80.23 from Table 20, Page 60, Prepared Testimony of Garrick F. Jones and William B. Marcus on behalf of TURN, SCE 2012 Test Year General Rate Case Phase II (CPUC App. A.11‐06‐007)
© Copyright 2024 Paperzz