EP Status & Plans for Slow Control System / CRP Motorisation AIMARD B., LAPP BALIK G., LAPP BOURGEOIS N., CERN BRUNETTI L., LAPP CANTINI C., ETHz DELEGLISE G., LAPP DUCHESNEAU D., LAPP GEFFROY N., LAPP KARYOTAKIS Y., LAPP MURPHY S., ETHz RAVAT S., CERN RIGAUT Y., CERN VIANT T., ETHz WA105, General Meeting, CERN, 23th March 2016 1 EP PLANNING FOR THE 2 NEXT MONTHS N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation 2 EP Planning 08/03/2016: 14/03/2016: Cable trays BathTest End of April/May 2016: End of Mars/April 2016: Racks Test Motorisation transfert Internal cabling 3rd week of March 2016: 3rd week April 2016: External cabling 4rd week of March 2016: 2nd week of March 2016: Modif cablage rack LAPP + test PVSS Motorisation integration 2nd week of April 2016: CRP Global test on the top cap N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation 3 EP CRP Motorisation Status After the return of the CRP motorisation system to the CERN, we made the last necessary modifications at the level of the rack cabling to make it functional. N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation 4 EP Planning 08/03/2016: 14/03/2016: Cable trays BathTest End of April/May 2016: End of Mars/April 2016: Racks Test Motorisation transfert Internal cabling 3rd week of March 2016: 3rd week April 2016: External cabling 4rd week of March 2016: 2nd week of March 2016: Modif cablage rack LAPP + test PVSS Motorisation integration 2nd week of April 2016: CRP Global test on the top cap N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation 5 EP CRP Motorisation Status After having set up jacks on the side of our rack, we were able to make quite a series of tests with the touch panel to testing the operability. N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation 6 EP Planning 08/03/2016: 14/03/2016: Cable trays BathTest End of April/May 2016: End of Mars/April 2016: Racks Test Motorisation transfert Internal cabling 3rd week of March 2016: 3rd week April 2016: External cabling 4rd week of March 2016: 2nd week of March 2016: Modif cablage rack LAPP + test PVSS Motorisation integration 2nd week of April 2016: CRP Global test on the top cap N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation 7 EP CRP Motorisation Status Supervision Layer Unicos WINCC-OA (PVSS) Control Layer OK Communication layer OK Need to be tested Hardware Part CRP Motorisation Program OK CRP Motorisation OK CRP Motorisation global test N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation 8 EP Supervision Here, we can see a preview of what will be the final version of the motorisation supervision. Start Cycle Manual Move Plan Stop Cycle • Move Plan (Jog) • Move Plan (Position) Move 1 axis Set Homing End Manual Mode N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation 9 EP Planning 08/03/2016: 14/03/2016: Cable trays BathTest End of April/May 2016: End of Mars/April 2016: Racks Test Motorisation transfert Internal cabling 3rd week of March 2016: 3rd week April 2016: External cabling 4rd week of March 2016: 2nd week of March 2016: Modif cablage rack LAPP + test PVSS Motorisation integration 2nd week of April 2016: CRP Global test on the top cap N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation 10 EP Racks construction CAEN Remote Racks Distant Racks N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation 11 EP Cables status Number of connectors on the flange Usage Connector 1 Connector 2 Status Cable Cable Status General Status SCFT1 Pt - Temperature LEM power, PMT HV Level Meters Extraction Grid, FFS Pressure 5 D-SUB 50 pins 10 LEMO HV 10 kV 12 SMA (RG-316) 2 HV LEMO 1 D-SUB 9 pins Burndy 48 SHV SMA (RG-316) HV LEMO Direct Available Available To order Done by CAEN CERN Store MCA50 Pending RG-178-BU HV cable NE4 Available* Pending To order Done by CAEN CERN Store Ok Pending To order OK Ok Heaters/LED LEM power, PMT HV Level Meters Calibration Electronic 1 MDC 20 pins 10 LEMO HV 10 kV 12 SMA (RG-316) 3 KEL 40 pins Direct SHV SMA (RG-316) Pending Available Available To order Pending 2x10 Pending RG-178-BU Pending Available Pending To order Pending Ok Pending To order Pending Pt - Temperature Camera LEM power, PMT HV Level Meters Extraction Grid, FFS Pressure 3 D-SUB 50 pins 2 D-SUB 50 pins 10 LEMO HV 10 kV 12 SMA (RG-316) 2 HV LEMO 1 D-SUB 9 pins Burndy 48 D-SUB 50 pins SHV SMA (RG-316) HV LEMO Direct Available Available Available To order Done by CAEN CERN Store MCA50 MCA50 Pending RG-178-BU HV cable NE4 Available* Available* Pending To order Done by CAEN CERN Store Ok Ok Pending To order OK Ok SCFT2 SCFT3 SFT1..6 Thermocouple - Temperature Pressure 6 MSK 3 C16 6 M12 Direct Direct Available To order NE8 NE4 Available Available To order Pt - Temperature Pressure Vaccum Pump Trace Analyser 4 D-SUB 50 pins 3 ?M12 2 Direct 1 Direct Burndy 48 Direct Direct Direct Available To order Available Available MCA50 NE4 2x 2x Available* Available Available Available Ok To order Ok Ok High Voltage feedtrough 1 Coaxial Coaxial Available Coaxial Available Ok Insulation Space Others N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation 12 EP Thanks for your attention. N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation 13
© Copyright 2026 Paperzz