CRP Motorisation Status

EP
Status & Plans for Slow Control System / CRP Motorisation
AIMARD B., LAPP
BALIK G., LAPP
BOURGEOIS N., CERN
BRUNETTI L., LAPP
CANTINI C., ETHz
DELEGLISE G., LAPP
DUCHESNEAU D., LAPP
GEFFROY N., LAPP
KARYOTAKIS Y., LAPP
MURPHY S., ETHz
RAVAT S., CERN
RIGAUT Y., CERN
VIANT T., ETHz
WA105, General Meeting, CERN, 23th March 2016
1
EP
PLANNING FOR THE 2 NEXT MONTHS
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation
2
EP
Planning
08/03/2016:
14/03/2016:
Cable trays
BathTest
End of April/May 2016:
End of Mars/April 2016:
Racks
Test Motorisation transfert
Internal cabling
3rd week of March 2016:
3rd week April 2016:
External cabling
4rd week of March 2016:
2nd
week of March 2016:
Modif cablage rack
LAPP + test
PVSS Motorisation integration
2nd week of April 2016:
CRP Global test on the
top cap
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation
3
EP
CRP Motorisation Status
After the return of the CRP motorisation system to
the CERN, we made the last necessary
modifications at the level of the rack cabling to
make it functional.
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation
4
EP
Planning
08/03/2016:
14/03/2016:
Cable trays
BathTest
End of April/May 2016:
End of Mars/April 2016:
Racks
Test Motorisation transfert
Internal cabling
3rd week of March 2016:
3rd week April 2016:
External cabling
4rd week of March 2016:
2nd
week of March 2016:
Modif cablage rack
LAPP + test
PVSS Motorisation integration
2nd week of April 2016:
CRP Global test on the
top cap
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation
5
EP
CRP Motorisation Status
After having set up jacks on the side of our rack,
we were able to make quite a series of tests with
the touch panel to testing the operability.
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation
6
EP
Planning
08/03/2016:
14/03/2016:
Cable trays
BathTest
End of April/May 2016:
End of Mars/April 2016:
Racks
Test Motorisation transfert
Internal cabling
3rd week of March 2016:
3rd week April 2016:
External cabling
4rd week of March 2016:
2nd
week of March 2016:
Modif cablage rack
LAPP + test
PVSS Motorisation integration
2nd week of April 2016:
CRP Global test on the
top cap
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation
7
EP
CRP Motorisation Status
Supervision Layer
Unicos
WINCC-OA
(PVSS)
Control Layer
OK
Communication
layer
OK
Need to be tested
Hardware Part
CRP Motorisation
Program
OK
CRP Motorisation
OK
CRP Motorisation global test
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation
8
EP
Supervision
Here, we can see a preview of what will be
the final version of the motorisation
supervision.
Start Cycle
Manual
Move Plan
Stop Cycle
• Move Plan (Jog)
• Move Plan (Position)
Move 1 axis
Set Homing
End Manual Mode
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation
9
EP
Planning
08/03/2016:
14/03/2016:
Cable trays
BathTest
End of April/May 2016:
End of Mars/April 2016:
Racks
Test Motorisation transfert
Internal cabling
3rd week of March 2016:
3rd week April 2016:
External cabling
4rd week of March 2016:
2nd
week of March 2016:
Modif cablage rack
LAPP + test
PVSS Motorisation integration
2nd week of April 2016:
CRP Global test on the
top cap
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation
10
EP
Racks construction
CAEN
Remote Racks
Distant Racks
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation
11
EP
Cables status
Number of
connectors on the
flange
Usage
Connector 1
Connector 2
Status
Cable
Cable Status
General Status
SCFT1
Pt - Temperature
LEM power, PMT HV
Level Meters
Extraction Grid, FFS
Pressure
5 D-SUB 50 pins
10 LEMO HV 10 kV
12 SMA (RG-316)
2 HV LEMO
1 D-SUB 9 pins
Burndy 48
SHV
SMA (RG-316)
HV LEMO
Direct
Available
Available
To order
Done by CAEN
CERN Store
MCA50
Pending
RG-178-BU
HV cable
NE4
Available*
Pending
To order
Done by CAEN
CERN Store
Ok
Pending
To order
OK
Ok
Heaters/LED
LEM power, PMT HV
Level Meters
Calibration Electronic
1 MDC 20 pins
10 LEMO HV 10 kV
12 SMA (RG-316)
3 KEL 40 pins
Direct
SHV
SMA (RG-316)
Pending
Available
Available
To order
Pending
2x10
Pending
RG-178-BU
Pending
Available
Pending
To order
Pending
Ok
Pending
To order
Pending
Pt - Temperature
Camera
LEM power, PMT HV
Level Meters
Extraction Grid, FFS
Pressure
3 D-SUB 50 pins
2 D-SUB 50 pins
10 LEMO HV 10 kV
12 SMA (RG-316)
2 HV LEMO
1 D-SUB 9 pins
Burndy 48
D-SUB 50 pins
SHV
SMA (RG-316)
HV LEMO
Direct
Available
Available
Available
To order
Done by CAEN
CERN Store
MCA50
MCA50
Pending
RG-178-BU
HV cable
NE4
Available*
Available*
Pending
To order
Done by CAEN
CERN Store
Ok
Ok
Pending
To order
OK
Ok
SCFT2
SCFT3
SFT1..6
Thermocouple - Temperature
Pressure
6 MSK 3 C16
6 M12
Direct
Direct
Available
To order
NE8
NE4
Available
Available
To order
Pt - Temperature
Pressure
Vaccum Pump
Trace Analyser
4 D-SUB 50 pins
3 ?M12
2 Direct
1 Direct
Burndy 48
Direct
Direct
Direct
Available
To order
Available
Available
MCA50
NE4
2x
2x
Available*
Available
Available
Available
Ok
To order
Ok
Ok
High Voltage feedtrough
1 Coaxial
Coaxial
Available
Coaxial
Available
Ok
Insulation Space
Others
N. BOURGEOIS, CERN – S. RAVAT, CERN - Y. RIGAUT, ETHz/CERN - WA105 Presentation
12
EP
Thanks for your attention.