Volume 10 // Number 1 FICO ISS: UNIQUE FEATURES FOR INCREASED SYSTEM OUTPUT Datacon // Cyclical Uplooking Camera Search with “The Smart Accuracy Mode” Esec // New High-Speed Solution on Die Bonder 2100 CONTENT content Esec: Soft Solder Die Bonding // 4-5 With its new generation of leading edge soft solder die bonders, Esec offers the ideal solution for power packaging Corporate News // 6 Strong results for Besi Honours go to Datacon Fico: Proven process for improved product development // 14 With its Stage-Gate™ process, Fico speeds up product developments for improved time to market Fico: Individual laser marking // 15 Datacon: Cyclical uplooking camera search on 2200 evo // 8-9 The partial use of the uplooking camera combines two die attach strategies with excellent accuracy Meco: Even more power at a lower cost // 10-11 Meco launches its Direct Plating Line for metallization directly onto silicon Esec: X becomes Z // 12-13 Esec’s new Z-Pattern© process achieves best bonding quality at record-breaking throughput Fico’s expanded functionality of its stand-alone laser marker allows individual, product-specific marking Fico: Singulation of small products // 17 Fico manages to saw and handle smallest products Besi: Expanding production capacity in Asia with Zollner // 18 Gradually increased assembly labor in Malaysia will reduce time to market for faster lead times Esec: Shaping the technological future // 19 For more than 20 years, Esec has been successfully forming tomorrow’s industry specialists 07 Fast and reliable singulation Fico // Fico’s singulation process knowledge incorporated in Fico ISS increases yields and lowers cost of ownership. IMPRINT EDITORIAL OFFICE Esec Ltd., Hinterbergstrasse 32, 6330 Cham, Switzerland, Tel: +41 41 749 58 47, Fax: +41 41 749 51 77, www.besi.com, [email protected] EDITOR-IN-CHIEF Frida C. Hirt COPY EDITOR Polyglotte Sàrl, 1167 Lussy-sur-Morges, Switzerland LAYOUT & PRINT Victor Hotz AG, Steinhausen, Switzerland PHOTOGRAPHS BE Semiconductor Industries N.V. (Besi) CIRCULATION 6,000 English © 2010 BE Semiconductor Industries N.V. (Besi), The Netherlands. All rights reserved. Contents (text and pictures) may not be reproduced in whole or part without the written consent of Besi. 2 // Spotlights 2010-01 EDITORIAL For the Benefit of our Customers Given rapid industry growth this year, particularly in our die attach business, our key priority for 2010 has been the expansion of our production capacity and supply chain worldwide to meet increased customer demand and reduce system cycle times. Toward this end, we exceeded our production goals in the first half of 2010 at all our worldwide facilities and, in particular, tripled our direct shipments from our Malaysian operations and significantly increased production from our Swiss die attach facilities. In addition, we expanded our Asian production capacity and sales & service capabilities to better service our customers. A dedicated spares organization centered in Switzerland and Singapore, under the direction of Danilo Gerletti, will also facilitate faster delivery times and improve our performance in meeting customer demand. On the development front, Besi has enjoyed great success this year with recently introduced products such as Esec’s new soft solder system, Fico’s foil assisted molding system and Datacon’s new thin die processes and flip chip machines. In the coming months, we shall be releasing new platforms and machine generations, further demonstrating our innovation strength. The new Datacon Die Sorter will spearhead this next launch phase in January 2011. Besi’s vision and strategy for the future continues to focus on the development of a technology-led company, serving both mainstream and niche assembly markets. In this vision, our European operations will maintain their focus on preserving and enhancing our core strength, our intellectual capital base, through the ongoing development of new systems and process solutions for the assembly equipment market. Our Asian operations will primarily produce our leading edge products for more rapid direct shipment to local customers, while maintaining our exacting product standards. We look forward to sharing our progress with you in the near future. Richard W. Blickman President & CEO Besi Spotlights 2010-01 // 3 DIE ATTACH 1 1: The flexible machine concept can handle a wide variety of packages like SOT, SOD, SO, PSSO, PSOP, DPAK, TO, PQFN, Power LED and power modules on one single platform. 2: Process control has been brought to perfection, reducing gas consumption by up to 50% and keeping equipment running costs at a minimum. 4 // Spotlights 2010-01 Die Bonder 2009 SSI – The Solution for Power Packaging Esec introduces a new generation of leading edge Soft Solder Die Bonders, bringing a new player to the market that is faster and more adapted for matrix strips than previously available models. Developed in close cooperation with long-term customers, the new Die Bonder 2009 SSI incorporates numerous innovations that lead to increased speed – 40% faster than conventional equipment. Since its formal launch in 2009, the Esec Die Bonder 2009 SSI is well on its way to conquering the market. 2 Author // René Betschart The newly developed machine concept, combined with process technology leadership in soft solder processing, provides customers with a new platform designed for tomorrow’s challenges in power die attach. It offers the flexibility to handle a vast variety of power module packages on one platform. Its advanced indexer exchange concept ensures rapid conversion and helps to convert from one product to another. With its wide application range, handling both ultra-thin and ultra-wide lead frames is a challenge easily met. In conjunction with the new point-to-line pick and place capability, the Die Bonder 2009 SSI increases the process speed and thus lowers the cost of ownership, particularly in the growing market of matrix applications. Another feature keeping equipment running costs very low is improved process control, with up to 50% less gas consumption than conventional solutions on the market. Undisputed Market Leader Esec has been market leader in Soft Solder Die Bonders for more than 10 years and its product development succeeds through close collaboration with long-term customers. Working together from the design stage to the final process/product solution enables Esec to meet current and future customer requirements most effectively, which in turn places Esec in a strong position for future market growth. The most significant market growth for the Soft Solder Die Bonder 2009 SSI is currently in Mainland China and the South East Asia (SEA) region, which today already contribute three quarters of Esec’s soft soldering business and thus represent the most important markets. In the fourth quarter of 2010, the Die Bonder 2009 SSI will be replaced with the 2009 SSIE model, which basically is the same machine, but will include the next generation of motion control hardware. The new Soft Solder Die Bonder 2009 SSI, introduced to the market in March 2009, and the awardwinning die attach platform Die Bonder 2100 xP launched in May 2008, completes Esec’s product range, representing the most modern assembly equipment assortment available on the market today. René Betschart joined Esec in 1996 and has been Head of the Product Line Soft Solder Technology at Esec since June 2009. Before that, he held various management positions within the Esec R&D and product support departments. Die Bonder 2009 SSI – Key Facts • Highest speed through new point-to-line pick and place, and high accuracy dispensing technology • Best process quality from patented dispensing and bonding technology • Widest application range handling ultra-thin up to ultra-wide lead frames • Fastest time to yield, thanks to fast product changeover with exchangeable indexer, user-friendly menu structure and easy-to-use mechanical design • Most expandable machine design with multiprocess capability and ultra-thin die handling Spotlights 2010-01 // 5 INSIDE BESI corporate News Strong 2010 financial Results Also Fico’s packaging business showed very healthy increases in growth as well. Second quarter revenue and net income levels represent the most visible evidence of the progress Besi has made via its organizational restructuring and acquisitions into a broad based equipment supplier efficiently serving both mainstream and niche assembly markets. Second quarter revenue and gross margins exceeded prior guidance and adjusted net margins reached 12.3%. Profitability in the second quarter of 2010 was favorably influenced by sequential revenue growth of 58%, improved gross margins and operating leverage as Besi was able to ramp revenue with only a limited increase in its overhead levels. A positive sequential profit trends is expected to continue into the third quarter of 2010 based on forecasted revenue growth of 10–15%. In its second quarter earnings announcement (ended June 30, 2010), Besi reported substantial growth in orders, backlog, revenue and profitability. Revenue and order levels reached EUR 89.5 million and EUR 133.7 million respectively due to the continued expansion of industry demand for memory, personal computing and smart phone devices and Besi’s ability to ramp production at its global facilities more rapidly than anticipated. The product line Die Attach (comprising systems by Datacon and Esec) was the main source of growth of Besi’s consolidated results. Access the complete Half Year Report 2010 on www.besi.com Honours Go To Datacon EVENTS CALENDAR (as per September 2010, subject to change) For the second time in a row, Datacon was voted by Skyworks as the best supplier in the “Capital Equipment” category. Since 2007, Skyworks, an innovator of high reliability in analog and mixed signal semiconductors, has been distinguishing various categories of winners among its suppliers at its annual supplier conference. In the “Capital Equipment” category, quality in the areas of OEM, Equipment Service and Supply are most important. SEMICON TAIWAN 8 – 10 September 2010, Booth No. 720 World Trade Center, Taipei, Taiwan SMT HYBRID PACKAGING 3 – 5 May 2011 Nurnberg, Germany SEMICON SINGAPORE IMAPS USA 2 – 4 November 2010 Raleigh, North Carolina SEMICON KOREA 26 – 28 January 2011, Booth No. 1566 COEX, Seoul, Korea 11 – 13 May 2011, Booth No. 1102 Suntec, Singapore SEMICON WEST 12 – 14 July 2011, Booth No. 5867 Moscone Center, San Francisco (USA) SEMICON CHINA 15 – 17 March 2011, Booth No. 2623 Shanghai New International Expo Centre, Shanghai IPC APEX EXPO USA 12 – 14 April 2011, Booth No. 365 Mandalay Bay Resort & Convention Center, Las Vegas Gregg Taran (right), Besi Vice President Sales & Customer Service Europe & North America, accepts the best supplier award on behalf of Datacon from Bruce Freyman (left), Vice President of Global Operations, Skyworks. 6 // Spotlights 2010-01 LABELEXPO EUROPE 28 September – 1 October 2011 Brussels, Belgium SINGULATION Fast and Reliable Saw Singulation with Fico ISS The modular design of the Fico ISS is just one of the numerous key innovations making it one of the leading singulation systems in the market. Its unique features such as up-side-down sawing process, the patented chuck system, easy and fast conversion and the reliable gravity based scrap management system are designed to significantly increase system output. Author // Henri in ’t Veld The Fico ISS (Integrated Sawing System) is a fully automatic saw singulation system, based on the existing MISS II platform. The high quality singulation and advanced inspection & sorting methods are suitable for a wide variety of products. Overmolded caps, substrate materials or film-based array substrates, these are product types that can be singulated with the Fico ISS. Fico’s long-term experience and high quality standards offer a unique and cost-effective solution for saw singulation and sorting of your products. Due to the fully integrated solution of the Fico sawing engine and the Fico device sorter, the resulting footprint of 4 square meters is the smallest one in the market today. Fast Sorting Cycle The high performance eight head device sorter results in a significantly faster sorting throughput. The eight picker-heads with the patented automatic pitch adjustment provide a high output for the overall sorting system. On top of this each individual picker-head can make a Z-stroke to ensure that always eight products are handled. Furthermore the flexibility of the individual Z-strokes results in easier placement in case of multiple position offload. Clean Sawing Process Remaining dust from a laser marker or solder flux can often show up as severe contamination at the bottom (ball-)side of the products. An optional three nozzle high pressure rinsing action cleans the proAdditional Highlight of the Fico ISS: • Dual spindle configuration enable highest output of 18,500 UPH • A special magazine loader pusher guarantees optimal substrate transfer, regardless of the substrate warpage • Patented in-line blade diameter measurement with automatic coolant adjustment • Fastest conversion / product changeover in less than 5 minutes • Fully integrated dicing engine with data feedback system In the Fico ISS sawing and sorting are integrated in one machine. ducts after the sawing process is finished. The newly developed parallel clean & dry system guarantees optimal drying of the products without influencing the output. It uses a specially developed foam roller which removes both water and dust in combination with a vacuum / suction action. The new system results in faster and more reliable drying. Unique Upside-Down Sawing Process One of the unique features if the Fico ISS is the upside-down sawing process. In combination with the reliable gravity based scrap management system it prevents saw blade breakage, and possible yield loss. Henri in ’t Veld has been Product Manager Singulation at Fico in Duiven (The Netherlands) since 2005. His fields of expertise are mainly dicing and sawing. Fico equipment significantly increases yields, whilst keeping the cost of ownership low. On top of this, Fico’s process knowledge and support contribute the improvement of current processes and enable the introduction of new packages. Spotlights 2010-01 // 7 DIE ATTACH Cyclical Uplooking Camera Search with “The Smart Accuracy Mode” The Datacon 2200evo platform basically provides two different die attach strategies. The first method is to attach the components in the “accuracy mode” by using the uplooking camera. The advantage is a very high placement accuracy, but with an impact on the cycle time. The second method is “direct die attach”, where the components will be aligned with the wafer camera and be placed directly onto the board with the fastest possible speed, but with lower accuracy. Now Datacon provides a functionality to combine both methods by using the uplooking camera only partly, with excellent accuracy and only a low UPH impact. plooking camera search with 2200evo Author // Bernhard Dablander accuracy mode” This production mode works with a special algorithm platform at production start and cyclically in the production des 2 run, to detect the position of the picked component on the pickup tool. At production start, a programattach st mable number of components will be measured e 1 using the uplooking camera. Based on this search ach the result, the position of the component on the tool and n the the reproducibility (Cpk value) of the pickup process Bernhard Dablander by using joined Datacon in 1989. will be calculated. After a number of components, camera. As Product Specialist of the the pickup position will be corrected so that the s a very 2200 platform, he makes a component is at the target position on the pickup tool. If the calculated Cpk value exceeds the defined accuracy significant contribution to the target Cpk by at least 1 sigma (>1.33 in our exampct on the platform’s continued improvele in Fig.1), the machine switches to speed mode he 2nd ments anticipating the market and the components are attached directly without requirements. ect die the uplooking camera. After a number of directly the attached components, the machine periodically ill be checks components again with the uplooking camewafer camera and be placed directly onto the board with the fastest possible speed curacy. Now Datacon provides a functionality to combine both methods by using the only partly, with excellent accuracy and only a low UPH impact. ing camera: This production ith a special algorithm at and cyclically in the production the position of the picked e pickup tool. rt, a programmable number of be measured using the a. Based on this search result, component on the tool and the pk value) of the pickup process ated. After a number of e pickup position will be the component is at the target ckup tool. Cpk value exceeds the defined least 1 sigma (>1.33 in our 8 // Spotlights 2010-01 1), the machine switches to the components are attached Process capability window: warm up phase Fig.1: Compensation phase at production start with accuracy mode 1: Compensation phase at production start with accuracy and switch to speed mode. mode and switch to speed mode. If the calculated Cpk value drops below the defined Cpk value (1.0 in our example in Fig.1) during production for any reason, the machine switches automatically back from speed mode to 100% accuracy mode (uplooking camera). The ra. Depending on the search result, the machine will dynamically adjust the pickup position to have the component always centered on the pickup tool. If the calculated Cpk value drops below the defined Cpk value (1.0 in our example in Fig.2) during production for any reason, the machine switches automatically back from speed mode to 100% accuracy mode (uplooking camera). The machine would now run in the uplooking camera mode until the calculated Cpk value exceeds again the required target value (1.3). This can happen if either the component release process is not stable (sticky tape) or the 3s calculation is running outside the limits because of some other circumstance. This feature can be installed on all Datacon 2200evo machines by activating the function with a software option. The required software is v007p50, v008 or higher. Process capability window: production Fig. 2: Production run in speed mode showing a short phase with 2: Production run in speed mode showing a short phase with 100% uplooking camera due to calculated cpk dropping below 100% uplooking camera due to calculated cpk dropping below defined limit (e.g. 1.0) defined limit (e.g. 1.0) This functionality ensures that the machine is always running in the right production mode even if the material quality changes. Fig.3: Th percenta Accur applic camer se with below Cpk calculation from the position of the component on the pickup tool The calculation by the uplooking camera continuously monitors the stability of the component position on the pickup tool. Depending on the uplooking camera Cpk result, the machine decides if it is possible to run this component at the required accuracy with speed mode (i.e. without using the uplooking camera). Pickup position correction With reference to the search result of the uplooking camera, the machine calculates dynamic corrections of the pickup position, in order to have the component perfectly centered on the tool. This adjustment compensates for thermal drifts caused by the warming up of the machine during the start phase or room temperature changes. The cyclical uplooking camera search offers excellent accuracy. Throughput improvement The throughput improvement for a standard single die application with a component size of 3x3mm is about 20% to 30% compared to production at 100% accuracy mode (Fig. 3). Accuracy Example of a typical single die application, utilizing the cyclical uplooking camera adjust. The die placement accuracy with cyclical uplooking Fig. 2:camera Production run inthe speed mode showing short phase with fulfills required 20μm3sa specification 100% uplooking camera due to calculated cpk dropping below (Fig. 4). defined limit (e.g. 1.0) This Throughput functionalityimprovement ensures that the machine is always running in the right production mode even if the material quality changes. Target performance Easy to use The accuracy setting must be defined in the component dataset (e.g. 20μm, Cpk 1.0). The machine now decides automatically whether this component is capable of reaching the accuracy taking into account all production factors, such as pattern recognition, tooling and stickiness of the wafer tape. If the machine can’t reach the required accuracy for any reason during component pick up, all components will be Fig.3: Throughput from the speed to mode, order of the aligned usingimprovement the uplooking camera get inthe best percentage components running without uplooking camera. possiblefrom accuracy result. Accuracy: Example of a typical single die application, utilizing the cyclical uplooking Accuracy camera adjust. Mean (µm) Stddev (µm) 3 sigma (µm) Accuary (µm) cp cpk Target performance Cpk calculation from the position of the component on the pickup tool: The calculation with the uplooking camera continuously monitors the stability of the component position on the pickup tool. Depending on the uplooking camera Cpk result, the machine decides if it is possible to run this component at the required accuracy with speed Fig.3: Throughput improvement from the speed mode, in order of the mode without using running the camera). percentage fromimprovement components camera. 3: (i.e. Throughput from uplooking thewithout speed uplooking mode, in order of the percentage from components running without uplooking camera. Accuracy: Example of a typical single die application, utilizing the cyclical uplooking ne is camera adjust. mode Pickup position correction: In reference to the search result of the uplooking camera, the machine calculates dynamic overview X Y -1.0 0.3 3.4 2.9 10.1 8.8 20.0 20.0 2.0 2.3 1.9 2.2 Fig.4: XY placement result measured with post bond inspection.´ 4: XY placement result measured with post bond inspection. Mean (µm) Stddev (µm) 3 sigma (µm) Accuracy (µm) cp cpk X -1,0 3,4 10,1 20,0 2,0 1,9 Y 0,3 2,9 8,8 20,0 2,3 2,2 Spotlights 2010-01 // 9 PLATING Light assisted Ni plating. Light assisted Cu plating. Even more power at a lower cost! After the introduction of the Meco Cell Plating Line (CPL) in 2009, Meco recently launched its Direct Plating Line (DPL) for metallization directly onto silicon. The DPL which can be used together with the CPL platform, perfectly fits into advanced metallization routes which are currently developed by the PV industry. Author // Martijn Zwegers 10 // Spotlights 2010-01 The photovoltaic market is growing rapidly with growth rates of 40 – 50 % per year. Although different solar cell technologies can be distinguished within the PV industry, mono c-Si and multi c-Si cells strongly dominate this market. For the formation of the front electrode on the solar cell, silver paste is deposited by a screen printing process. To form electrical contact with the cell emitter a firing step is subsequently done where glass particles in the Ag paste “eat” through the dielectric SiN layer on top of the cell emitter. This is a well-established production method within the PV industry although there are areas for further improvement. Because of their poor aspect ratio, screen printed contact fingers are typically 110 – 120 μm wide to obtain sufficient electrical conductance. These wide contact fingers create a relatively large shading area on the active surface of the solar cell. As all PV manufacturers are working on further increasing the efficiency of solar cells new metallization techniques are currently becoming mass production ready, where the goal is to achieve finer contact fingers with the same or even better conductivity as screen printed contact fingers. The Meco CPL is based on electroplating Ag or Ni-Cu-Sn onto a seed layer of Ag paste. As the width of the contact finger is largely determined by the width of the seed layer it will typically become 65 – 70 micron after plating. This gives efficiency improvements of 0.3 – 0.4 % where electroplating is used in combination with the well-known screen printing process. For next generation solar cells, ultimately even more efficiency improvement is required: first the SiN layer of the solar cell is opened with a wet etching process, or more commonly by laser ablation to form the pattern of the front electrode. At this point the Meco DPL comes in: by using a Light Assisted Plating process first a base layer of Ni is deposited directly onto the silicon emitter of the solar cell. This is followed by a light assisted Cu plating process and as soon as the conductivity of the plated layer is sufficiently low further thickening of the contact fingers is done with a CPL Cu electroplating process. Finally a thin capping layer of Ag or Sn is plated onto Cu. Alternately after the Light Assisted Ni plating process we can also offer a Light Assisted Ag plating process followed by a CPL Ag electroplating step. State-of-the art laser sources can machine < 20 micron wide tracks into SiN. After the plating process this results in solid metal contact fingers of 35 – 40 micron wide, or even less! Compared to conventionally screen printed solar cells this leads to efficiency improvements up to + 1%. In addition to that, for the front side metallization process the screen printing step can completely be eliminated saving enormous amounts of expensive Ag paste! The Meco DPL + CPL leads to a true revolution in both efficiency improvement and cost reduction at the same time! Martijn Zwegers joined Meco in 2007 and holds a master’s degree in Physics. In his function as Sales & Product Manager CPL, he focuses on commercialization of plating equipment for the metallization of crystalline solar cells. Available Metallization Routes SiN Plated Ag LIP Ag LIP Ni SiN Plated Ag LIP Ag LIP Ni SiN SiN Plated Ag or Sn Plated Cu LIP Cu LIP Ni SiN n doped silicon n doped silicon p doped silicon p doped silicon Plated Ag or Sn Plated Cu LIP Cu LIP Ni SiN Spotlights 2010-01 // 11 DIE ATTACH Introducing Z-Pattern© for Small Die Epoxy Dispensing For small die applications (0.8–1.5mm) the epoxy process is done with a single dot printing or with a cross pattern writing process. Both solutions have some limitations in terms of UPH, epoxy coverage, fillet symmetry and tailing characteristics. For this reason Esec introduces the new Z-Pattern© writing process that combines the advantages of both solutions in one pattern, achieving the best die bonding quality at record-breaking throughput of 20,000 per hour. Author // Dr. Roland Stalder As one of the leaders in die attach for more than two decades, Esec is committed to surpassing its customers’ needs by constantly setting new industry standards in die attach. With its latest die attach platform, the revolutionary Die Bonder 2100, Esec demonstrates time and time again its innovative strength. Dr. Roland Stalder is a Process Expert in Research and Development and has been working for the last 14 years on numerous process innovations on Esec’s die bonding platforms. During this time he applied for several patents in the field. Prior to joining Esec he worked for NASA and earned a Ph.D. in physics from the Swiss Federal Institute of Technology (ETH Zurich) in 1992. Esec introduces the Z-Pattern© for small die bonding in the range of 0.8-1.5 mm, achieving best process quality at unbeatable UPH rates. The new process combines the strengths of both: the process quality of a cross pattern writing and the UPH performance of a single dot printing. Compared to the cross pattern the new Z-pattern gives 40% faster dispense process times, provides an excellent epoxy volume stability of ± 2%, reduces the average tail length (at any dispense height) by 50%, increases the pre-wetting area due to unhindered epoxy flow by 20% and also improves the epoxy symmetry and the resulting fillet coverage. Compared to the single dot printing, the new Z-Pattern© delivers equivalent shortest dispense process times with improved volume stability, due to its much shorter and better controlled tail lengths. It also offers much better epoxy coverage and fillet quality. When we compare the epoxy tailing behavior of the various patterns, we find that with the single dot, the complete epoxy volume is dispensed at the tail position, resulting in long epoxy tails and potential dripping problems. With the cross pattern, the dispense nozzle moves 5 times through the tailing position in the center and builds up a considerable volume under the tail. By using the Z-Pattern© the tail is pulled off at a clean position, where the dispense nozzle has not dispensed previously. Therefore the epoxy amount in the tail of the Z-Pattern© is minimized and easily controlled by a single parameter “Dispense stop delay”. 12 // Spotlights 2010-01 For all these reasons, the new Z-Pattern© is the preferred solution for small die epoxy dispensing in the range from 0.8 – 1.5 mm and is implemented for ease of use in the “autocalc pattern selection” of the Die Bonder 2100 platform (SW release 2.3). This innovation is currently used in high-volume production at various customer sites for rectangular die sizes of 2.0 mm and beyond. Record-breaking 20,000 dispense writing cycles per hour are achieved (SW release 3.0) for a 2.0 x 2.0 mm die size with highest process quality and 100% post dispense quality check. Unique Process Know-How Esec is a process innovator and, as such, strongly positioned in the market. New generations of complex micro-electronic components are introduced in ever shorter time cycles. Therefore, technology as well as processes increasingly demand faster innovation. Working closely with customers and suppliers, Esec utilizes its comprehensive process know-how and culture of innovation to develop and introduce technological advances to the market, as well as to provide a continuous flow of product improvements. This occurs not only in new systems and machines, but also in modules and software releases that comprise latest process innovation, such as the Z-Pattern© process. These releases are made available to existing customers every so often each year to keep pace with anticipated market requirements. Esec’s innovative products and continuous improvements enable customers to achieve significant productivity and quality advances in their manufacturing activities. A key factor in guaranteeing advantageous cost of ownership. «X» becomes «Z»: The Z-Pattern© achieves unreached throughput in small die attach. Benefits of the new Esec Z-Pattern© 1.0 1.0 1.0 0.5 0.5 0.5 0.0 0.0 0.0 – 0.5 – 0.5 – 0.5 – 1.0 – 1.0 – 0.5 0.0 0.5 1.0 – 1.0 – 1.0 – 0.5 0.0 0.5 1.0 – 1.0 – 1.0 3D view of the Epoxy Cross Pattern 2 x 2 mm – 0.5 0.0 0.5 1.0 3D view of the Epoxy Z-Pattern© 2 x 2 mm Dot Cross Pattern Z-Pattern Print/Write time 30 ms 83 ms 43 ms Tail breaking time 44 ms 39 ms 31 ms Dispense Process time 74 ms 122 ms 74 ms Rating Production speed Tailing Epoxy symmetry Epoxy coverage & fillet *** * *** * ** *** *** ** ** * *** *** Spotlights 2010-01 // 13 PACKAGING Improved Product Development Besi is in a highly competitive global market. To become and remain the leading supplier of semiconductor equipment we have to provide our customers with the best products and services. Excelling at new product development is the way to achieve this. Author // Frank Rood Fico has introduced the Stage-Gate™ process to improve the product generation capabilities. It is a system that provides a guideline for product development and project portfolio management. The system has a strong emphasis on market input and business cases (“doing the right things”), as well as on testing and validation (“doing things right”). Frank Rood Vice President Packaging, Fico R&D, has been working for 15 years in the semiconductor business, 10 years of which with Fico. Frank has a degree in Precision Engineering and a strong affinity with product development. Go-Hold versus Kill-Recycle Another strong feature of Stage-Gate™ is the use of a series of stages. Each stage is entered through a go/kill decision point (gate), where a choice is made to continue or stop a development. Stages Fico’s innovation system is broken down into five stages. Development activities are exercised and information is gathered during each stage. All stages are multi or cross-functional and a set of parallel activities is undertaken by different Fico departments, working together as a team. Gates Each stage is preceded by a gate, where a defined group decides to continue, recycle, halt, or cancel the project. Gates serve as quality-control checkpoints: is this project being executed as defined? The priority of the project is also determined in the gate, only successful projects are selected. Finally, gates are the points where the path and resource commitments for the next stage are decided. Recycle Kill prioritizing Go versus Hold Go Hold Stage Gate provides quality-control checkpoints supporting efficient and effective decision making. Advantages Stage-Gate™ was introduced in May 2008 and up to now it has yielded many benefits: • More focus on marketing and customer input: the right input at the right time helps to develop a successful product. • More focus in R&D: Fico optimizes its resources and fast, successful product development by selecting the projects, which deliver the highest added value for our customers. • Improved testing: our customers receive a fully functional and thoroughly tested product. Further improvement With the Stage-Gate™ process in place, Fico shifts its main focus onto speeding up product development, so you can enjoy new products and features sooner than before. Discovery Idea Stage Business case Scoping Gate 1 Go to Scoping Stage 1 Gate 2 Go to Business case Stage 2 Beta Testing Development Gate 3 Go to Development Stage 3 Gate 4 Go to Beta Testing Stage 4 Launch Gate 5 Go to Launch Fico’s technology project stages: 5 stages for successful product development and project portfolio management. 14 // Spotlights 2010-01 Stage 5 TRIM & FORM Individual laser marking Laser marking of packages is recognized as a standard back-end process. Fico expanded the functionality of its stand-alone laser marker, by connecting it as a client to a SECS/GEM host, allowing individual, product-specific marking. Author // Mike Krabben Mike Krabben has been collaborating with Fico in Duiven (The Netherlands), for more than 19 years, bringing innovative ideas in the field of Trim & Form to market. When a leadframe or board enters the laser marker, its orientation is checked and a marking is made on the top surface of each product. This marking usually contains information such as company logo, product type, manufacturing date and parent lot. The result is checked directly after marking and, if found correct, the products are offloaded. The laser marking module is universally designed and can accommodate all major laser brands. Integration of the laser marker in an existing Fico Compact Line is also possible. Inspection The inspection of each marking is done with a FicoVision Mark Inspection camera. A check is made to ensure the product is marked with the correct information as received by the host, and the quality of the marking (readability) matches the desired specification. SECS/GEM Host Marking Newly-added functionality allows each product to be marked with its own individual marking, using the mapping information provided by an earlier operation step requiring traceability, e.g. a tester unit. Individual identifications can be made to clearly distinguish reject products from products that passed the test or need to be reworked. Fico PLT PC Strip Tester Laser Mark PC Dot code reader Fico Vision camera Communication The laser marker is equipped with an additional PC to exchange the mapping information with a SECS/ GEM host. A dot code on the lead frame or board is read, identifying the product carrier. This information is sent to the host by the Product Lot Tracking PC. The host responds and sends the marking info for that specific lead frame or board to the laser marker. The laser marking process can be followed safely during production. The laster marking process can be followed safely during production. Spotlights 2010-01 // 15 For Your LED Mass Production Needs High Brightness Automotive LCD TV Backlight Camera Flash Building Illumination The Right Leading-Edge Equipment Esec 2100 FC • Solder Flip Chip (C4) Datacon 8800 Chameo • Thermosonic Flip Chip (GGI) Datacon 2200 evo • Phosphor Layer Attach • High Accuracy Lens and Frame Attach • Multi LED Attach Datacon CS1250 • WLCSP Sorting Fico AMS-W • Molding Fico ISS • Fast Leadtime Singulation System Datacon Die Sorter • LED and Layer Sorting • >130 Bins • CLC Thermo Release SINGULATION Left: In order to ensure the rigidity and flexibility of the cup and also the suction force to hold the products in position, a so-called “carpet cup” is used instead of individual cups. The cups are interconnected to prevent vacuum leakages and the rotation of the cups. Right: Fico manages to saw and handle products as small as 2.5 mm x 2.5 mm Singulation of Small Products Sawing and handling small products introduce specific challenges. Following the long-term trend of ever-decreasing product sizes, Fico is continuously improving its singulation systems to keep on track. Author // Roel Moonen Through technical improvements and process optimization, Fico manages to saw and handle products as small as 2.5mm x 2.5mm. New developments in vacuum cup design, vacuum upgrades, optimized pick & place handling and an advanced inspection method have contributed to a high, reliable performance level. Cup design The cups that hold the products during the different process steps need to be small to handle small products. This affects the rigidity and flexibility of the cup and also the suction force to hold the products in position. To cope with these possible issues, a so-called “carpet cup” is used instead of individual cups. One carpet can consist of up to 50 cups in a specified matrix, and its size can be altered to fill a complete chuck. The cups are interconnected to prevent vacuum leakages and the rotation of the cups. This results in better support for the products during sawing. By the use of carpet cups, product quality remains at the same high level as that of larger products. Pick & Place Handling of very small products requires a new approach. In general, smaller products are lighter than larger ones and the pitches are very small. Fico has optimized the pick strategy to handle the small pitch between neighboring devices without decreasing throughput. To eliminate the chance of misplaced products in trays – or even missing products – several new suction cups are used that have proved to be very reliable and accurate during in-house tests. Roel Moonen studied applied physics, and is working as Process Engineer for Fico Saw Singulation. He joined Fico early 2008. Inspection Since the products are so small, the conventional background cannot be used to provide optimal contrast during inspection. The solution is a suction cup with an integrated background so the cup itself acts as background. The size and color of the background can be optimized to serve the customer’s requirements. Spotlights 2010-01 // 17 INSIDE BESI Formally entering into a close collaboration: Johann Weber, CEO Zoller (left) and Richard W. Blickman, CEO & President Besi (right). (Photography by Zollner, 2010) Expanding Production Capacity in Asia with Zollner In its efforts to improve customer satisfaction and service, Besi is gradually expanding its production capacity in Asia. Through increased staffing at its Malaysian plant during 2011, time to market will gradually be reduced and lead times shortened. Another key factor in achieving this goal is the development of reliable, Asia-based supply chain partners. Besi found one such partner in Zollner and recently signed a supply agreement with them for joint business in Asia. Author // Frida C. Hirt 18 // Spotlights 2010-01 “We are in a highly volatile industry. Therefore, being agile and flexible in responding quickly to changing customer requests, is a key success factor”, comments Richard W. Blickman, Besi CEO. “We need to be where the customer operates our systems and requests our support services. Consequently, it’s sensible to transfer the production and the supply chain network closer to the customer, which in our case is Asia” he continues. By continuing to expand Besi’s production capacity in the Asian region, the Company will be better positioned to meet accelerated market demand and elevated backlog levels. While existing engineering skills in Besi’s production site in Malaysia are continuously strengthened, a network of experienced and reliable Asian-based suppliers is also being built up. In Zollner, Besi has found a reliable partner committed to its exacting quality standards. Since 2006, Zollner has been manufacturing highly complex basic assembly and other modules, including Esec’s latest Die Bonder 2100 platform. Zollner is also able to provide ideal logistics conditions from its plant in Taicang (China), to meet Besi’s requirements. The agreement for a close collaboration in Asia was formally signed by the CEOs of the two companies, Richard W. Blickman (Besi) and Johann Weber (Zollner), as well as by Besi Supply Chain Director Michael Leu and Zollner Deputy Director of the Electronics Division, Konrad Kick. Johann Weber commented on the new collaboration as follows: “The frequency of industry cycles, especially in the semiconductor market, will speed up even more in the future, which makes it ever so important to cement a continuously growing and evolving collaboration at the process and planning stage.” INSIDE BESI Shaping the Technological Future Within the Besi Group, quality is top priority not only at product level, but also in the training of future engineers. The extraordinarily good results, which the Esec apprentices are regularly achieving, are evidence that training is conducted at the highest level. Author // Ruedi Knuesel Again this year, all seven apprentices completed their final year training successfully. On average they obtained a mark of 5.04 (the highest possible mark being 6). The best final grade of 5.4 was achieved by Sven Körner, an electronics engineer. Ruedi Knuesel is Software Project Manager and working at Esec in Cham since 1991. In March 2009 he also took over the management responsibility for professional training. His many years of experience as a professional computer engineer trainer are ensuring the continuity and high quality of the apprenticeship training programme at new generation Esec. Professional training at Esec is based on the proven practical and customer-orientated concept. Right from the start, the apprentices get involved in real projects. On the one hand they can therefore put their theories into practice, and on the other, their new ideas stream into the projects. Over the last five years, the Esec apprentices have demonstrated the programme’s success beyond any doubt with their above-average grades and realized projects that are now in place either within Esec or at customer locations. We should like to extend our hearty congratulations to this year’s graduates of the Esec professional training program: • Buck Kilian, electronics engineer • Sven Körner, electronics engineer • Fidan Bajrami, computer scientist • Marc Frauenfelder, computer scientist • Pascal Röösli, design engineer • Jessica Bieri, business assistant • Chantal Sapin, business assistant Esec has been organising professional training for more than 20 years. From the beginning, emphasis was placed on a varied and interdisciplinary professional training with a high practical content. Currently over 20 apprentices are in training in professions which have priority within Esec: electrical engineers, computer scientists, design engineers, business assistants. A future-orientated and modern professional apprenticeship is, as always, the most important source of new blood for a technology-based company. Only with first-class, trained professionals can leading products emerge, guaranteeing success on the market. On 9 August 2010, six new youngsters began their professional apprenticeship with Esec in Cham. Esec apprentices regularly achieve above average results proving the effectiveness of Esec’s training program. Spotlights 2010-01 // 19 www.newfsl.com GLOBAL HEADQUARTERS YOUR GLOBAL NETWORK Besi South East Asia Esec (Shanghai) South Korea Fico B.V. BE Semiconductor Esec (Singapore) Pte. Ltd. Trading Co. Ltd. Besi Korea Ltd. Ratio 6 Industries N.V. 1, Science Park Road 1A0706, Singa Plaza Tower #1204 Downtown Building 6921 RW Duiven Ratio 6 Singapore Science Park 2 8 Jin Ji Hu Road 22-3 Sunae-dong The Netherlands 6921 RW Duiven #03-10, Capricorn Building Industrial Park Bundang-gu, Sungnam-si, Tel. +31 26 319 6100 The Netherlands Singapore 117528 Suzhou 215021 Gyeonggi-do Fax +31 26 319 6200 Tel. +31 26 319 45 00 Tel. + 65 6303 7000 P. R. China Korea 463-825 Fax +31 26 319 45 50 Fax + 65 6873 1133 Tel. +86 512 6767 1037 Tel. +82 31 718 9002 Meco Equipment Fax +86 512 6767 1022 Fax +82 31 718 9003 Engineers B.V. (Far East) Pte. Ltd. Esec (Shanghai) Taiwan 5151 DR Drunen 40, Jalan Pemimpin #04-06A Trading Co. Ltd. Besi Singapore Pte. Ltd. The Netherlands Tat Ann Building Suite 801, Galaxy Center Taiwan Branch Tel. +31 416 384 384 Singapore 577185 Building 8F, 276 Minsheng Road Fax +31 416 384 300 Tel. +65 6255 2722 Caitian Road, Futian District Hsinchu 30043 Fax +65 6255 6766 Shenzhen 518026 Taiwan Americas Guangdong Province Tel. +886 3 515 3488 Besi North America, Inc. Besi APac Sdn. Bhd. P. R. China Fax +886 3 515 2253 33 East Comstock Drive, 3 Jalan 26/7 Tel. +86 755 8826 4058 Section 26 Fax +86 755 8826 4067 Meco Equipment Engineers Marconilaan 2 40000 Shah Alam Suite 7 Europe Chandler, AZ 85225 Esec Ltd. USA Selangor Darul Ehsan Esec (Shanghai) Hinterbergstrasse 32 Tel. +1 480 497 6404 Malaysia Trading Co. Ltd. 6330 Cham Fax +1 480 497 9104 Tel. +603 5191 1719 Suite 316, Building 2, Switzerland Fax +603 5192 9416 No. 8 KeXin Road Tel. + 41 41 749 5111 Online West Park of Chengdu Fax + 41 41 749 5440 [email protected] China Hightech Zone Esec (Shanghai) Chengdu 610731, Datacon Technology GmbH Trading Co. Ltd. Sichuan Province Innstrasse 16 2/F (east), No. 32 P. R. China 6240 Radfeld Standard Building Tel. +86 28 879 581 59 Austria No. 76 Fu Te Dong San Lu Fax +86 28 879 581 59 Tel. +43 5337 6000 Road www.besi.com Fax +43 5337 600 66 Waigaoqiao Free Trade Zone Fico Tooling Leshan Co. Ltd. Shanghai 200131 High Tech Zone P. R. China Leshan 614012, Sichuan Tel. +86 21 6093 0588 P. R. China Fax +86 21 6093 0577 Tel. +86 833 259 6385 Fax +86 833 259 6368
© Copyright 2026 Paperzz