ITEM 7A Space Coast 2040 LRTP DRAFT Cost Feasible Plan Technical and Citizens Committees July 6, 2015 TPO Board July 9, 2015 ITEM 7A Overview • Long Range Transportation Plan (LRTP) Overview • Needs Plan • Project Evaluation • Cost Feasible Plan Development • Summary of Cost Feasible Plan • Next steps ITEM 7A 2040 LRTP Overview • Long Range Transportation Plan (LRTP) one of three core TPO functions • LRTP must be updated every five years • Public engagement is key to development ITEM 7A 2040 LRTP Overview 2035 LRTP Intelligent Transportation System (ITS) Master Plan Bike/Ped/Trail Plan Complete Streets Transit Development Plan VISION PLAN (cost feasible by 2040) NEEDS PLAN Vision Goals Project Screening FINANCIAL RESOURCES VISION PLAN (unfunded needs) 2060 Vision Plan 4 ITEM 7A Needs Plan • 2035 LRTP • SCAT Transit Development Plan • FDOT Strategic Intermodal System • ITS Master Plan • Bike/Ped Master Plan • Complete Streets • Vision Plan Corridors • TPO Project Priorities ITEM 7A Project Evaluation • Corresponding corridor evaluation • Project status criteria – Current/past investments – Priority status in parallel plans ITEM 7A Corridor Evaluation • • • • • • Access to commerce centers Access to intermodal hubs Travel choices Safety and security Congestion Air quality ITEM 7A Corridor Evaluation Multimodal Corridors • US-1 • St John Heritage Parkway • Fiske/Stadium • SR 520 • Wickham • Babcock • Malabar • A1A • SR 50/405 (E of I-95) • Grissom • SR 524 • Eau Gallie • US 192 (E of I-95) • Palm Bay Rd • Pineda Intermodal Corridors • I-95 • SR 528 • SR 407 • SR 50 • SR 520 (W of I-95) • Pineda/I-95/Ellis • US 192 (W of I-95) ITEM 7A Corridor Summary Sheets • Comprehensive corridor project information • Analysis AND implementation tool • Promotes coordination of improvements in same facility/corridor ITEM 7A .2040 LRTP Space Coast TPO THIS CORRIDOR SHEET IS FOR ILLUSTRATIVE PURPOSES ONLY – IT DOES NOT REPRESENT A DRAFT OR FINAL CORRIDOR SUMMARY Babock St. Multimodal Corridor Functional Classification: Corridor Length: 16 miles From: Brevard Ave To: Micco Rd Jurisdiction(s): Corridor Context: Period 2021‐2025 2031‐2035 2036‐2040 Unfunded Project Type Highway Capacity Transit Bike/ Ped Candidate Projects ITS Complete Streets 2040‐2060 Transit Corridor Projects Facility From To Babcock St Babcock St Babcock St Babcock St Babcock St Babcock St Babcock St Babcock St Babcock St Babcock St Babcock St Babcock St Babcock St Babcock St Babcock St Palm Bay Rd Malabar Rd St Johns Heritage Pkwy US 192 150’ S of Sunlake Dr Valkaria Rd Valkaria Rd Malabar Rd US 192 Malabar Rd Brevard Ave W Fee Ave Ellis Rd University Palm Bay Rd Malabar Rd St Johns Heritage Pkwy Indian River Co Micco Rd 1350’ N of Palm Bay Rd 2200’ NW of Buffer Pres. Dr 2350’ NW of Tim Goodwin Rd Valkaria Rd University Blvd/Country Club Valkaria Rd 150’ S of Lagoon Ave New Haven Ave Malabar Rd Sheridan Eber & Pirate Ln Melbourne regional MM hub Emerald City regional MM hub Description Net Cost* Widen to 6 lanes Widen to 4 lanes Widen to 4 lanes Fixed route bus service Designated bike lane Off road shared‐use path Off road shared‐use path Paved shoulder Sharrow marking Sidewalk Sidewalk Sidewalk ITS improvements Complete St Complete St TOTAL $22,889 $48,232 $38,585 $360 $2 $1,057 $1,054 $518 $4 $914 $139 $77 TBD TBD TBD $113,831 Bus Rapid Transit service $220,631 TOTAL $220,631 *Includes capital costs in year of expenditure dollars net of private contributions or programmed phases (in 000’s) Reference Documents Space Coast Bicycle and Pedestrian Mobility Plan (2013) Space Coat TPO Complete Streets Evaluation Methodology (2014) Space Coast TPO ITS Master Plan (2015) Space Coast Area Transit Development Plan 2040 Long Range Transportation Plan ‐ Corridors Page 1 ITEM 7A DRAFT Cost Feasible Plan Components • Individual projects – 2035 Cost Feasible Plan – SCAT Transit Development Plan – Strategic Intermodal System 2040 CFP • Program projects – Intelligent Transportation System – Multimodal (bike/ped and Complete Streets) – Corridor studies implementation ITEM 7A DRAFT Cost Feasible Plan Development • 1st period: 2016-2020 represented by TIP • 2nd period: 2021-2025 • 3rd period: 2026-2030 • 4th period: 2031-2035 • 5th period: 2036-2040 • Plan must be represented in Year of Expenditure $ (YOE) ITEM 7A DRAFT Cost Feasible Plan Revenue Allocation Revenue Source Revenue Strategic Intermodal System funds $1,269 Allocation SIS projects Other roadways Other Arterials and Right-of-Way $551 ITS Set-Aside Corridor studies Set-Aside Transportation Management Area (aka SU) $122 Other roadways Transportation Alternatives (aka enhancement) $13 Multimodal Set-Aside Transit (State/Federal) net of existing system O&M $15 Multimodal Set-Aside Transportation Impact Fees (County, Melbourne, Palm Bay) TOTAL $341 Local roadways $2,311 Note: Local revenues, including LOGT, 9th cent tax on diesel, Constitutional Fuel Tax, County Fuel Tax assumed committed to existing system O&M. ITEM 7A DRAFT Cost Feasible Plan • • • • • • • 11 new roadway projects 25 roadway widening projects 15 developer funded projects ITS/operational projects Complete Streets projects Bike/ped projects Corridor studies implementation Program Projects ITEM 7A DRAFT Cost Feasible Plan revenue allocation (in millions YOE $) ITEM 7A DRAFT Cost Feasible Plan ITEM 7A Next Steps • Public Comment August – October • LRTP Adoption (October 2015) ITEM 7A Space Coast 2040 LRTP DRAFT Cost Feasible Plan Technical and Citizens Committees July 6, 2015 TPO Board July 9, 2015
© Copyright 2026 Paperzz