X-ray Pump-Probe (WBS 1.2) David Fritz System Specifications System Description WBS Early Science Schedule and Costs Summary LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 1 David Fritz [email protected] Science Team Specifications and instrument concept developed with the science team. The XPP team leaders Kelly Gaffney, Photon Science, SLAC (leader) Jorgen Larsson, Lund Institute of Technology, Sweden David Reis, University of Michigan Thomas Tschentscher, DESY, Germany LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 2 David Fritz [email protected] X-ray Pump-Probe Science photoexcitation Stampfli and Bennemann Phys. Rev. B 49, 7299 (1994) Phase Transitions Order / Disorder Metal/Insulator Phonon Dynamics Charge Transfer Reactions Photosynthesis Photovoltaics Vision Photoactive Proteins photoexcitation LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 3 David Fritz [email protected] Time Resolved Scattering LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 4 David Fritz [email protected] Ultrafast Hard X-ray Sources to Date 3rd Generation Synchrotrons (APS) ~ 1 x 10 9 photons/second coincident with a 1 kHz Laser 100 ps pulse duration Slicing Source ~ 1 x 10 6 photons/second coincident with a 1 kHz Laser 100 fs pulse duration Laser Plasma Source ~ 1 x 10 5 photons/second collected at 10 Hz 300 fs pulse duration Sub-Picosecond Pulse Source ~ 1 x 10 7 photons/second coincident with a 10 Hz Laser 100 fs pulse duration LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 5 David Fritz [email protected] Ultrafast X-ray Science to Date Non-thermal Melting of Semiconductors Large Amplitude Coherent Phonons Single Shot at SPPS 20 minute acquisition at SPPS Limited to slow processes ( > 100 ps) or X-ray diffraction from single crystals LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 6 David Fritz [email protected] XPP SCOPE - WBS 1.2 Scope/CD-1 Estimate Includes: Physics support & engineering integration X-ray optics – monochromator, focusing optics, slit systems, attenuators Ultrafast laser system Detectors - 2D detector from BNL by MOU, Emission Spectrometer Sample environments - diffractometer system, thermal environments, vacuum environment Laboratory facilities Vacuum system Installation Diagnostics (WBS 1.5) Controls and data system (WBS 1.6) LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 7 David Fritz [email protected] System Specifications Item Purpose Narrow x-ray spectrum, Monochromator multiplex LCLS Beam Specification 600 mm horizontal offset, 9°-50° scattering range, 0.02 arcsec angular res. and repeat. Focusing optics Reduces beam size, maximize on sample flux 10 - 60 µm variable spot size Laser system Photoexcitation of samples < 50 fs, 20 mJ/Pulse, 800 nm, wavelength tunable, temporal pulse shaping capable X-ray diffractometer Sample orientation, Positioning of detector Orientation in all degrees of freedom Detector positioning acc. and res. < 90 µm Operation in direct and mono. beam Detector Measure of diffraction patterns 2D,1024 x 1024 pixels, 9090 µm pixel size, 120 Hz, 10 4 dynamic range, variable gain LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 8 David Fritz [email protected] Laser System (Fundamental) Small Angle Scattering X-ray Diffractometer & BNL Detector Wavelength Conversion X-ray Optics and Diagnostics Offset Monochromator X-ray Pump-Probe Instrument LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 9 David Fritz [email protected] XPP System Description 1.2.1 Physics support and engineering integration 1.2.2 X-ray optics 1.2.3 Laser system 1.2.4 Detector 1.2.5 Sample environments 1.2.6 Laboratory facilities 1.2.7 Vacuum system 1.2.8 Installation LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 10 David Fritz [email protected] X-ray Pump-Probe System Description (2) Parameter Value Energy Range 6 – 24 keV Horizontal Offset 600 mm Scattering Angle 90 - 500 Accuracy 0.02 arcsec χ Accuracy 4 arcsec 1.2.2 X-ray optics Monochromator Thin crystals Be lens Slits Attenuators LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 11 David Fritz [email protected] X-ray Pump-Probe System Description (3) 1.2.3 Femtosecond laser system (similar to LCLS gun laser) Ti:Sapphire based system Up to 20 mJ/pulse (<1.5 % rms stability) , < 50 fs, 800 nm, 120 Hz Synchronized to LCLS RF ( <300 fs rms integrated jitter) Wavelength tunable Harmonic generation (400 nm, 266 nm) Parametric amplification (240 nm – 11,000 nm) Temporal pulse shaper Diagnostics Energy, wavelength, temporal profile, contrast, spatial profile 1.2.4 Detectors 2D Detector (BNL) 1024 x 1024 pixels 90 micron pixel size 10 4 dynamic range 120 Hz readout rate X-ray Emission Spectrometer 100 eV dynamic range 1 eV resolution High collection efficiency LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 12 David Fritz [email protected] X-ray Pump-Probe System Description (4) 1.2.5 Sample environments X-ray diffractometer Operate in both direct and monochromatic beam Detector motion about a spherical surface centered at sample Cryostat X-ray and optical window (collinear and non-collinear geometry) Decoupled sample motion from vacuum shroud Cryostream Liquid jet Vacuum chamber LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 13 David Fritz [email protected] X-ray Pump-Probe System Description (5) 1.2.6 Laboratory facilities 1.2.7 Vacuum system 1.2.8 Installation LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 14 David Fritz [email protected] 1.2 WBS 1.2 X-ray Pump-Probe 1.2.1 Physics Support Eng. Integration 1.2.2 X-ray Optics 1.2.3 Laser System 1.2.4 Detector System 1.2.5 Sample Environments 1.2.6 Lab Facilities 1.2.8 Installation 1.2.7 Vacuum 1.2.2.1 Monochromator 1.2.3.1 Oscillator 1.2.3.2 Amplifier 1.2.4.1 2D Detector 1.2.5.1 Diffractometer 1.2.6.1 Electrical 1.2.7.1 Vacuum Hardware 1.2.8.1 Non-recurring Engineering 1.2.2.2 Be Lenses 1.2.3.3 Pulse Shaper 1.2.3.4 Optics & Optomechanics 1.2.4.2 Emission Spectrometer 1.2.5.2 Cryostat Systems 1.2.6.2 Control Room Furniture 1.2.7.2 Bellows 1.2.8.2 Installation LCLS CD-4a 1.2.3.5 Vacuum Transport 1.2.3.6 Laser Diagnostics 1.2.5.3 Liquid Jet 1.2.6.3 Hutch Furniture 1.2.7.3 Spools 1.2.2.4 Attenuators Filters 1.2.3.7 Hutch Optical Tables 1.2.3.8 Laser Timing 1.2.5.4 Vacuum Chamber 1.2.6.4 Radiation Physics 1.2.7.4 Vacuum Supports 1.2.2.5 Collimator 1.2.3.9 Optical Exp. Hardware 1.2.3.10 Laser Containment 1.2.3.11 Optical Parametric Amplifier 1.2.3.12 Laser Lab Optical Tables 1.2.2.3 Slit System LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 15 1.2.8.3 Installation LCLS CD-4b 1.2.8.4 Complete \Installation LUSI CD-4 David Fritz [email protected] CD 4a XPP Instrumentation LCLS AMO Laser X-ray Optics and Diagnostics LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 16 X-ray Diffractometer Detector David Fritz [email protected] CD 4a XPP Science Early experimental techniques Time-resolved diffraction Time-resolved diffuse scattering ~ 100 fs temporal resolution Non-thermal melting and large amplitude coherent phonons Natural extension to research performed at SPPS Characterize source and instrument capabilities Interaction of FEL with solid state matter as soon as LCLS reaches saturation LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 17 David Fritz [email protected] XPP Schedule in Primavera 3.1 LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 18 David Fritz [email protected] XPP Milestones CD-1 Aug 01, 07 Conceptual Design Complete Sep 21, 07 CD-2a Dec 03, 07 CD-3a Jul 21, 08 Phase I Final Design Complete Oct 15, 08 Receive Diffractometer Feb 19, 09 Receive Focusing Lenses Feb 27, 09 Receive Laser Optics and DiagnosticsMar 18, 09 Phase I Installation Complete Oct 01, 09 Install BNL XPP Detector Nov 03, 09 CD-4a Feb 08, 10 LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 19 David Fritz [email protected] XPP Cost Estimate Direct Cost PED MS&T ASSY Indirect Cost Escalation Total Cost $7,916.9 $1,500.0 $5,656.9 $760.0 $1,390.0 $760.0 $10,066.9 Associated Contingency 30.3% LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 20 David Fritz [email protected] Summary Instrument concept is advanced 100% of Letters of Intent are represented in instrument concept Standing monthly meeting with XPP team Instrument concept is based on proven developments made at SPPS and SR sources Initial specifications well developed Ready to proceed with baseline cost and schedule development LUSI DOE Review July 23, 2007 XPP (WBS 1.2) 21 David Fritz [email protected]
© Copyright 2026 Paperzz