3GPP TSG-SA5 (Telecom Management) Meeting SA5#71, 10-14 May 2010, Montreal, Canada S5-101135 revision of S5-10xyzw Source: Title: Istvan Aba, Deutsche Telekom UID_440062 User Data Convergence (UDC) - Framework for Model Handling and Management session Rapporteur Report Document for: Agenda Item: Approval 6.7.1 1 Progress status Percentage of completion: 100% (previously 80%) Summary of progress: Outstanding issues: 2 Minutes The RG session was held on May 11 Q3 and May 12 Q3 Tdoc Title/Discussion/Conclusion Source S5-101380 Draft LS proposal to CT4 on UDC Provisioning ForntEnd To be revised in S5-101467 After the first session E/// objected to the LS They see no need to have a provisioning GW and they don’t agree of the removal of the provisioning FE. The draft LS has been rejected. Nokia Siemens Networks S5-101374 Reply LS on Update on status of Service User Profile Management Approved, TS 32.181 and 32.182 shall be attached in S5-101455 and present to SA5 Plenary Alcatel-Lucent S5-101134r1 Agenda UDC Framework for Model Handling and Management (440062) Approved Rapporteur S5-101236 pCR to 32181 - input on UDC Information models Nokia Siemens Networks, Deutsche Telekom, Ericsson Approved S5-101237 pCR to 32181 - relation of UDC and SUM Approved Nokia Siemens Networks, Deutsche Telekom S5-101267 pCR on 32.181, UDC Framework - Subscription and Notification Related Data ALU: ‘requested data’ to be replaced by requested to be observed, better wording on notification conditions. To be revised in S5-101467 Huawei, Deutsche Telekom, China Mobil S5-101467 pCR on 32.181, UDC Framework - Subscription and Notification Related Data Huawei, Deutsche Telekom, China Mobile Approved -1- S5-101271 pCR on 32.181, UDC Framework - Information and Data Model Figure Change Approved S5-101283 pCR on 32.181, Chapter 8 Consolidated data model management The late document was presented by DT. ALU: Explain ProvGW as for provisioning of all user data Alcatel-Lucent, Deutsche Telekom, Nokia Siemens Networks, Ericsson, Huawei Deutsche Telekom, Nokia Siemens Networks NSN: ProvGW - The main point is that this is integral part of the UDR and this is the single point for provisioning of all services of UDR. To be revised in S5-101466 S5-101466 pCR on 32.181, Chapter 8 Consolidated data model management The revised document was presented by DT. E///: We can’t find the functional entity "Provisioning Front-End" using Ud interface to access UDR for provisioning purpose which is defined in 23.335; don’t agree of the removal of the provisioning FE. Provisioning entity being part of the UDR or not is a deployment scenario. We disagree to the pRC that violates the latest approved UDC architecture. DT: Prov FE are not removed, they are just applications in the figure using Ud. This will be clarified in the text ALU: Arrows between Application boxes and the UDR should be marked Ud DT: will be done E///: We don't agree to the proposal to have a "Provisioning Gateway" being deployed in UDR and accessing user data directly. Having both ProvFE and PG, as proposed as an option during the session, also violates the UDC architecture because PG is a totally new entity and also there would be two interfaces for provisioning, which is redundant. DT and others: This is a function every data base provides and has always been part of GSM//3GPP. In the past 12.02 has provided the functionality, currently SuM should do it, but it is not there yet.. DT and others: Only having ProvFE for provisioning would at least not make the IOC EndUser accessible to the operator provisioning. are true subsets of CDM, Application Data View with severe overhead, Identifiers, ServiceProfiles but cannot create/delete EndUser Only the function ‘Provisioning Gateway’ meets all provisioning requirements from Clause 6.7 of 23.985 ALU: The ProvGW is a logical function. DT: logical will be inserted The contribution is agreed to be revised in S5-101540 with Ericsson objecting The discussion continued offline, at a break-out session and over email. In that discussion there was still no agreement. -2- Deutsche Telekom, Nokia Siemens Networks 3 Action items Item Description Release Owner Status Target 71.1 Implement the approved pCR and forward 32.181 for approval Rel-9 Rapporteur New SA5#64 -3-
© Copyright 2025 Paperzz