Combined Run Gasifier and CHP Engine Commissioning test 1. Pre- start safety review meetings The Aston team has undertaken a full review of the measures in place to prepare the Gasifier and CHP Engine for the commissioning test. A Risk Assessment and a Safe Operating Procedure have been prepared and circulated among all the relevant people. A number of safety review meetings have taken place involving the EBRI team, Graham Faulks (Deputy Director of Estates), David White (Fire Safety Officer) and Gez Cooney (EAS Technical Manager). The EBRI staff involved in the test is: Muhammad Saghir, Plan Manager Clara Serrano, Senior Engineer Jim Scott, Research Fellow Dan Wright, Research Fellow Thiruvilan Arakkonam, Plant Engineer Wehrle Werk will be running the gasifier: Christian Eder Christoph Kornmayer Andreas Niglas A number of engineers have been hired for this commissioning test: Control engineer for the gasifier: Mr Hilmes Control engineer for the engine: Dennis Eichenauer Control engineer for the load matching system: Chris Marklew, from Marklew.Net Engine specialists: Phil Starr and Dan Best (GMI Power) and Paul Johns (CRA Europe) Project manager: Jeremy Mayes from Otto Simon Ltd. Mechanical engineer: Michel Wray from Otto Simon Ltd. -1- 2. Preparation week The gasifier package will be preparing during the week of the 01.09.2015, ready for the test campaign in the week of the 07.09.2015. This is a phase of inspection and checking and some cold commission the gasifier has not run for some time so all components to be checked. 1. List of the equipment to be checked: 1.1. Function test of each cycle with all relevant components (syngas, cooling water, cold water, thermal oil, compressed air, nitrogen, flare) including: - Positions of hand valves, check the whole compressed air, nitrogen system, cooling water system, cold water system, thermal oil system, syngas system, natural gas system. Function test of the overpressure release syphon with air Function test of all pumps. Function test of level measurements Function test of the limit and flow switches Function of the pressure measurements Calibration of the gas analyzer Cleaning and test of the centrifuge 1.2. Filling in the new scrubbing oil with conditioning of demulsifier 2. Completion of the new pipework installation: - Installation of the isolation valve to the CHP Installation of the gas flow meter to the CHP Pressure test of the pipework Cold commissioning of the equipment Testing of the wiring installation 3. Cold gasifier test At the end of the week a test run will be undertaken in cold mode without wood pellets of the complete plant. 4. Engine test The CHP Engine also needs to be checked and a further test will be run to ensure it is fully operational and ready to receive syngas. The LMS control system functionality to be verified. -2- 3. Test campaign. Execution week Monday: 7/09/2015 - Cold commissioning of the new equipment. - Programming works: Mr. Hilmes and Chris Marklew. Tuesday: 8/09/2015 - Gasifier heating up to 900°C, electrical heating and then combustion - Programming works: Mr. Hilmes and Chris Marklew. Wednesday 09/09/2015 - Reheating the gasifier up to 900°C and shift to gasification at about 09:00 am. - Gasifier-engine test run. Start and stop tests to control the safety features, regulating the gasifier near to the CHP maximum demand of syngas. - Gasifier back to combustion mode and shut down overnight. - Further programming with minor modifications can be carried out in parallel o M. Hilmes is leaving the site in the afternoon. o Dennis Eichenauer will be on site Wednesday and Thursday. Thursday 10/09/2015 - Reheating the gasifier up to 900°C and shift to gasification at about 09:00 am. - Gasifier-engine test run. Start and stop tests to control the safety features, regulating the gasifier near to the CHP maximum demand of syngas. - Gasifier back to combustion mode (burning out char in the bed material) and shut down. - Further programming with minor modifications can be carried out in parallel o Dennis Eichenauer will be on site. Friday 11/09/2015 - Clean up the plant. Wehrle will be leaving the site at about 10:00 am. -3- Combined Run Gasifier and CHP Engine Monday Tuesday Wednesday Thursday Friday Gasification plant Contractors Mr Hilmes Mr Hilmes Mr Hilmes (half-day) EBRI and Muhammad Saghir 6:00am – 2:00pm 6:00am – 2:00pm 6:00am – 2:00pm Muhammad Saghir Wehrle staff Thiruvilan Arakkonam Christoph Kornmayer C. Kornmayer Christian Eder T. Arakkonam Thiruvilan Arakkonam Clara Serrano Thiru Arakkonam 1:00pm – 9:00pm 1:00pm – 9:00pm 1:00pm – 9:00pm Christian Eder Christian Eder C. Kornmayer Clara Serrano Thiru Arakkonam Clara Serrano (Tuesday to Thursday, 2 shifts) Christian Eder Christoph Kornmayer Andreas Niglas (Wehrle until 10:00 am) Engine and Load Matching System Contractors Varlowe Paul Johns Dennis Eichenauer Dennis Eichenauer Chris Marklew Chris Marklew Chris Marklew Chris Marklew EBRI staff Jim Scott and Dan Wright Plant Manager Muhammad Saghir (plant inductions and First Aider) Deputy Plant Manager Clara Serrano (internal coordinator and Fire warden) Coordination Jeremy Mayes (Project Manager) and Michael Wray (Mechanical Engineer), from Otto Simon Ltd. Security Ext. 4803 and Channel 2 in radios Combined Run Gasifier and CHP Engine Results CHP Thermal output, kW 600 500 400 300 200 100 0 Combined Run Gasifier and CHP Engine Power to the Load bank, kW 350 300 250 200 150 100 50 0
© Copyright 2026 Paperzz