Virginia Transportation Construction Alliance (VTCA) Joint Conference with Salem and Lynchburg Districts May 2, 2017 Ken King, P.E., Salem District Engineer Chris Winstead, P.E., Lynchburg District Engineer Safety Talk Work Zone Safety Jan. 2016 – Jan. 2017 Three Year Average Lynchburg District 80 64 Salem District 167 154 2 VDOT Performance Measures 3 Lynchburg District 4 Lynchburg District Organization Chris Winstead District Engineer Don Austin Appomattox Residency John Hays ADA Business Dale Totten ADA Maintenance Scot Shippee Dillwyn Residency Terry Meadows ADA Construction Robert Guercia ADA Preliminary Engineering/PIM Paula K. Jones Communications Chris McDonald Regional Operations Lynchburg District Residencies Kenneth Martin Halifax Residency Mike Allen Safety Appomattox – Amherst, Appomattox, Campbell and Nelson Counties Dillwyn – Buckingham, Charlotte, Cumberland and Prince Edward Counties Halifax – Halifax and Pittsylvania Counties 5 Lynchburg District • Comprised of 10 counties including Amherst, Appomattox, Buckingham, Campbell, Charlotte, Cumberland, Halifax, Nelson, Pittsylvania and Prince Edward • Includes two cities, numerous towns and two of the largest counties by land area in the Commonwealth • Responsible for maintenance of more than 15,000 miles of primary and secondary roads. This is the only district that does not maintain interstate highways. • Responsible for 1,959 structures on all roads 6 Lynchburg District Safety Worker and Contractor Safety Goals: Zero fatalities, Zero injuries, Zero preventable crashes • • • FY 2017 Most frequent injury types – Struck by and Sprain/Strain Most frequent lost-time injury types – Struck by and Sprain/Strain Most frequent crash cause – Failure to ensure clear path • Continue to emphasize Slow Down to Speed Up, Safety First, and communicating expectation that employees work together in assessing risks, mitigating risks and watching each other’s backs when it comes to safety. • District Safety Committee has been expanded to include more members from various sections including operators from the field. Committee continues reviewing crashes incidents and injuries, reviewing safety ideas and serves a communication resource between the field and the District. • District Management continues visits with teams across the district. 7 Lynchburg Project Performance FY 2017 Project Development / Delivery (2/17/17 Dashboard Data) District Improvement Strategies: Continued focus upon excellent plan quality and adjusting to new metrics associated with SmartScale DB. Frequent/open communication among VDOT and Contractor staff at all levels Close collaboration between Project Development and Project Delivery staff – Team work Contract accountability and rapid collaborative response to any slippage Lynchburg District Pavement Conditions 9 Lynchburg District Pavement Conditions Percent Sufficient by System (by the end of CY 2017) 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Target Predicted Primary 82% 88% Secondary 65% 75% Target Predicted 10 Lynchburg District Bridge Conditions 11 Salem District 12 Salem District Comprised of 12 counties including Bedford, Botetourt, Carroll, Craig, Floyd, Franklin, Giles, Henry, Montgomery, Patrick, Pulaski and Roanoke Includes five cities and numerous towns including the Commonwealth’s most populous town (Blacksburg) Responsible for maintenance of more secondary roads than any other district—some 7,000 miles, in addition to 117.8 miles of interstate and 983 miles of primary roads. Responsible for 2,902 bridges with 1,926 on secondary roads, 5 in urban areas, 760 on the primary system and 211 on the interstates. 13 Salem District Organization Ken King District Engineer Todd Daniel Bedford Residency Thelma Ingle ADA Business/PIM Allen Williams ADA Maintenance Jason Bond Communications David Clarke Christiansburg Residency Robbie Williams ADA Construction Tommy DiGiulian ADA Preliminary Engineering Chris McDonald Regional Operations Salem District Residencies Lisa Hughes Martinsville Residency Mike LaFon Safety Bedford – Bedford and Franklin Counties Christiansburg – Floyd, Giles, Montgomery and Pulaski Counties Martinsville – Carroll, Henry and Patrick Counties Dan Collins Salem Residency Salem – Botetourt, Craig and Roanoke Counties 14 Salem District Worker and Contractor Safety • District Recordable Injury and Lost Time Rates continue to be reduced. • Leading causes of injury include Strains and Sprains, Struck by Objects, and Walking Working Surfaces (stepping in holes). • Engage upper management in accountability for safe operations, using Self Review checklist that informs and encourages safe operations. • Participate in annual Work Zone Awareness Week, April 10-14, 2017. • Keeping focus on work zone training, installation and removal of traffic control devices, and completion of Daily work zone reviews. • Coordination, Communication, and notification for work zones is very important. • Notify Traffic Operations Center at 1-888-782-7982 for all work zones (sign/cone up to sign/cone down)! 15 Salem Project Performance FY 2017 Project Development / Delivery (2/17/17 Dashboard Data) District Improvement Strategies: • • • • Continue working with our localities to help develop/monitor schedules and holding quarterly teleconferences to discuss project progress. Continuing progress on SMART SCALE, SGR and FY17 HSIP projects. Continuing to work closely with Industry and to provide additional training to staff over the winter in an effort to improve quality of our pavements and bridge work. Added a third ACE to serve the Bedford and Martinsville Residencies and re-structured staff under the District Project Controls Engineer to improve consistency and accuracy of schedules / CTD’s and CEI budgets. Potential utility impacts and coordination with regulatory TOY restrictions and limitations of operations is also a focus. Salem District Pavement Conditions 17 Salem District Pavement Conditions 18 Salem District Bridge Conditions 19 Salem District Operations Target FY16 (July-Jan) FY17 (July-Jan) Vehicle Hours of Delay TBD 450,773 454,273 Median Incident Duration 47 50 50 Measure Travel Time Reliability Index • I-77 ASTMS/VSL Project (Carroll County) • Implementation October 3, 2016 • Speed limits reduced for visibility for a total of 361 hours over 26 days • Crash on December 26, 2016 during active fog event with variable speed limits enacted • Significant Delay Incidents • I-77 MM 6.5 12/26/2016 multiple vehicle crash – 18,817 vhd • I-81 MM 139 10/7/2016 tractor trailer crash – 16,745 vhd • I-81 MM 113 9/3/2016 Tractor-trailer crash – 32,392 vhd • High Profile Events • Martinsville NASCAR Race Weekend – March 31-April 2 • Providing TOC support for the I-81 Exit 150 project along with the I-81 New River bridge project Data through January 31, 2017 Vehicle Hours of Delay data source = RITIS Vehicle Probe Project Incident data source = VaTraffic: Disabled Vehicles, Vehicle Crashes and Tractor-Trailer Crashes on Interstates and at Special Facilities on Interstates 20 Robert Guercia, P.E. & Alex Price, P.E. Consulting Engineering Opportunities Upcoming Construction Projects Lynchburg and Salem Districts 21 Roundabout at Route 24 & 646 Campbell County Est. Construction Cost $2.1 million Advertisement – October 10, 2017 22 Lynchburg District Construction Program Advertisements Scheduled through June 30, 2018 UPC Route Locality Project Description Projected AD Estimated Cost 108202 Various Various 2017 PM Retrace Secondaries District-wide (federal) 1/10/2017 $81,973 108203 109577 109575 110306 107015 107012 109593 108200 104679 109590 109554 82510 Various 60 1001 Various 29 29 151 Various 24 15 U000 711 Various Amherst Nelson Various Amherst Pittsylvania Amherst Various Campbell Campbell Lynchburg Campbell 2017 PM Retrace Secondaries District-wide Rte 60 - Construct Sidewalk Rte 1001 - Construct Sidewalk DP3A18 Lynchburg District Wide Pipe Rehab/Replacement Bus 29 - Shoulder Widening/Rumble Strips/GR Rte 29 - Shoulder Widening/Rumble Strips/GR Rte 151 - Shoulder Widening/Rumble Strips/GR GR Upgrades Rte 24 - Roundabout at Rte 646 Rte 24 - Construct Sidewalk HB2 Oddfellows Road Segment B2 - Recoonstruction SGR Rte 711 - Bridge & Approaches over NS Railway 1/10/2017 3/14/2017 3/14/2017 5/9/2017 6/13/2017 6/13/2017 6/13/2017 TBD 10/10/2017 10/10/2017 11/14/2017 5/8/2018 $261,868 $691,319 $249,446 $1,112,511 $3,250,268 $3,025,538 $1,154,872 $979,933 $2,066,199 $592,536 $14,410,269 $3,481,327 $31,358,059 13 Projects - Total Estimated Cost of $31 Million 23 Lynchburg District Locally Administered Advertisements Scheduled through June 30, 2018 UPC Funding Locality Project Description Projected AD Estimated Cost 106560/ 108158 Transportation Alternatives Nelson Nelson County Blue Ridge Tunnel Phase 2 and Phase 3 4/28/2017 $3,128,183 100822 UCI/SMART SCALE Danville City of Danville Mount Cross Roads 12/31/2017 $3,568,826 107726 Transportation Alternatives Danville City of Danville Multi-use Trail Phase VII 12/31/2017 $389,427 108762 Revenue Sharing Danville Drainage Improvements – Patton/ South Union Streets 12/28/2017 $760,000 104173 Revenue Sharing Lynchburg Main Street Bridge Replacement 12/31/2017 $9,500,000 106027 Transportation Alternatives Farmville Farmville Buffalo Creek Bike/Pedestrian Bridge and Trail Connections 12/31/2017 $816,395 6 Projects - Total Estimated Cost of $18.2 Million 24 Salem District 25 Project Development Consultant Engineering Opportunities Project Specific Consultant Contract Western Perimeter Road – VT Campus, Blacksburg Revenue Sharing Project – Montgomery County (VDOT Administered) Estimated Cost = $34.5 Million RFP Release Date – Anticipated Summer 2017 For more info visit www.montgomerycountyva.gov/mpo (then go to “Plans, reports and studies”, then “2015”) 26 Project Development Consultant Engineering Opportunities Design-Build Contract I-81/Route 8 (Exit 114) Bridge Replacements Project Total Funding = $34.9 Million RFQ Release Date – Summer 2017 RFP Release Date – Late Fall 2017 27 Salem District Construction Program Advertisements Scheduled through June 30, 2018 Project Ad Date Estimated CN Cost ($Millions) Bridge Replacement over Big Otter River 2017 $3.1 Roanoke Conty Bridge Replacement over Back Creek 2017 $5.6 634 Beford County Bridge Replacement over Roanoke River 2017 $9.7 82193 220 Roanoke Conty Bridge Replacement over Back Creek 2017 $16.9 5319 703 Carroll County Bridge Replacement over Little Reed Island Creek 2017 $1.4 87905 750 Floyd County Reconstruction & Safety Improvements 2017 $2.0 77300 11 Botetourt County Bridge Replacement over Tinker Creek 2017 $3.3 77302 11 Botetourt County Bridge Replacement over Tinker Creek 2017 $2.7 107053 24 Bedford County Shoulder Paving, Rumble Strips & Guardrail Upgrades 2017 $1.4 110100 220 Franklin County Shoulder Paving & Guardrail Upgrades 2017 $2.4 108514 460 Bedford County Shoulder Paving, Rumble Strips & Guardrail Upgrades 2017 $0.5 107051 100 Giles County Shoulder Paving, Rumble Strips & Guardrail Upgrades 2017 $3.6 97225 43 Bedford County Bridge Replacement over Stoney Creek 2018 $3.1 104183 100 Pulaskie County Bridge Replacement/Rehabilitation over NSRR/Rte 11 2018 $6.6 8753 460 City of Salem Widening to 3 Lanes w/Bike Lanes, C&G & Sidewalk 2018 $10.4 UPC Route Locality 94722 43 Bedford County 77305 116 62650 Project Description 15 Projects - Total Estimated Construction Cost of $72.7M 28 Salem District - Locally Administered Advertisements Scheduled through June 30, 2018 UPC Locality 87002 106544 87005 104128 104241 104298 105304 105748 105768 105775 106270 106486 107294 108359 108859 108864 108867 108868 108896 109288 109558 109562 109566 109567 109569 110351 110364 89655 107283 107291 107297 107310 107312 107313 104078 108360 108851 Henry Co Henry Co Pulaski Co Floyd Blacksburg Martinsville Montgomery Co Franklin Co Christiansburg Blacksburg Boones Mill Salem Giles Co Rich Creek Blacksburg Christiansburg Christiansburg Christiansburg Roanoke Roanoke Roanoke Roanoke Roanoke Roanoke Roanoke Blacksburg Roanoke Giles Co Blacksburg Christiansburg Montgomery Co Roanoke Co Roanoke Co Roanoke Co Martinsville Christiansburg Roanoke Project Description Collinsville Streetscaping Collinsville Street Signs, Ped Signals New River Trail Extension Town of Floyd Heritage Pathways Phases 3-4 Construct Sidewalk West side of Giles Road Repave Streets and Crosswalks – Uptown Revitalization Ph 2 SRTS Auburn Elementary/Middle School Construction fo Pedestrian Bridge Drainage Improvements to Town Streets Research Center Drive Improvements Boones Mill Depot Relocation Eddy Ave Bike/Ped Bridge Springdale Rd Reconstruction Downtown Rich Creek Streetscaping Improvements Ph 3A Mount Tabor Rd Drainage Improvements North Franklin St Drainage Improvements Arbor Dr Storm Drain and Curb & Gutter Improvements Roanoke St Sidewalk Construction Colonial Avenue Improvements (Smart Scale) Transit Accessibility Improvements on Edgewood St (Smart Scale) Flashing Yellow Arrow Upgrade – Williamson Rd & Airport Rd Flashing Yellow Arrow Upgrade – Valley View Orange Ave / Blue Hills Signal Upgrade Flashing Yellow Arrow Upgrade – Jefferson St & Elm Ave Flashing Yellow Arrow Upgrade – Brandon Ave & Colonial Ave South Main St Sidewalks New Sidewalks – Tiption Ave, New Sprinch Branch Rd, 9th St Rte. 673 – Replace Bridge over Wolf Creek Sidewalk Missing Links – Various Locations Signalized Intersection at Roanoke St & Falling Branch Rd Prices Fork Rd Turn Lane Construction Kenwick Tr Drainage Improvements Belle Meade Dr Drainage Improvements Merriman Rd Drainage Improvements Commonwealth Blvd Bridge Repairs Huckleberry Trail Phase 3 Berkley Bridge at King St Projected AD Estimated CN Cost ($Mil) 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 $1.30 $0.08 $1.85 $0.79 $0.34 $0.75 $0.18 $1.27 $1.40 $0.53 $0.10 $1.37 $0.39 $0.42 $0.14 $0.58 $0.21 $0.33 $6.40 $0.34 $0.02 $0.02 $0.02 $0.02 $0.02 $0.10 $0.70 $0.79 $0.11 $0.77 $1.65 $0.04 $0.04 $0.08 $2.10 $0.76 $1.47 37 Projects - Total Estimated Cost of $27.5 M 29 Dale Totten, P.E. Maintenance Contracts Lynchburg District 30 Lynchburg District Pavement Action Plan • Exceeding performance targets for Primary and Secondary Systems • Residencies and district partners are engaged in planning pavement solutions. • Evaluating pavement locations and preparing for new paving projects throughout the year. 31 Lynchburg District Paving Mileage Advertised 32 Lynchburg District Resurfacing Program Treatment 2017 Estimate d Quantitie s # of 2016 Contracts 2016 Quantities Contract Value 2016 # of 2017 Contracts Plant Mix 9 236,095 Tons $27.4M 6 237,000 Tons $27.6M Latex 1 5,556 Tons $1.6M 1 5,500 Tons $1.6M Surface 3 6,877,139 SY $8.6M 4 6,400,00 0 SY $8.0M Total 13 $37.6M 11 2016 advertised Fall 2016 for CY2017 2017 advertise Fall 2017 for CY2018 Contract Value 2017 $37.2M 33 Lynchburg District Traditional Pavement Contract Advertisements Scheduled through June 30, 2018 2017 Projects Lane Miles Estimated Cost Preliminary 2018 Lane Miles Estimated Cost 203 $22.8 M 207 $23.2 M Secondary 1308 $14.8M 1237 $14.M Total 1511 $37.6 M 1444 $37.2M System Primary 2016 advertised Fall 2016 for 2017 Projects 2017 advertise Fall 2017 for 2018 (preliminary) 34 Lynchburg District Bridge Action Plan Lynchburg District currently has 91 structurally deficient (SD) structures: • • 60 - SD bridges 31 - SD culverts Anticipate eliminating 34 SD structures in FY17: • • 17-SD bridges 17-SD culverts Continued effort to target SD structures • Focus on SD culverts (27 SD culverts on Secondary System) Continue focus on Condition Yellow Structures • Since 2010, Lynchburg has improved/reduced the number of condition yellow (GCR = 5) structures by 43 (from 474 to 431) • During the same timeframe, Lynchburg eliminated 79 SD structures. Concentrate efforts on the Secondary System • 79 of the 91 SD’s 95.4% of Lynchburg’s VDOT maintained structures are non - deficient 35 Lynchburg District Bridge Maintenance FY17 • • • • FY18 • • • • FY19 • • • • Preventive Maintenance - $2.5M Restorative Maintenance - $3.0M Replacements - $7.9M Bridge Inspection - $3.5M TOTAL - $16.9M Preventive Maintenance - $1.8M Restorative Maintenance - $1.7M Replacements - $7.7 M Bridge Inspection - $3.7M TOTAL - $14.9M Preventive Maintenance ~ $2.7M Restorative Maintenance ~ $2.7M Replacements ~ $5.4M Bridge Inspection ~ $4.2M TOTAL – $15M TOTAL COST - $46.8M Preventive Maintenance includes cleaning, joints, epoxy overlays and bridge painting. Restorative Maintenance includes rigid deck overlays and super/sub repairs. Replacements includes superstructure and culvert/pipe replacements. Bridge Inspection includes the scheduled inspections required for all structures (bridges and large culverts). 36 Lynchburg District Other Maintenance Contracts Roadside FY17 - $1.2 M FY18 - $1.2 M FY19 - $1.2M Drainage/Pipes/Slopes FY17 - $1.2M FY18 - $1.0 M FY19 - $1.0M 37 Allen Williams, P.E. Maintenance Contracts Salem District 38 Salem District Pavement Action Plan • Advertising target for paving was $62M. • As of April 24, the district plans to pave 1,071 lane miles. • Based on planned paving, the district is predicted to meet performance targets on the interstate and primary systems but not on the secondary system in CY18. • Currently the district has 0 lane miles with CCI < 30 on the interstate system. 39 Salem District Paving Mileage Advertised 40 Salem District Resurfacing Program Contract Value 2017 Treatment # of 2016 Contracts 2016 Quantities Contract Value 2016 # of 2017* Contracts 2017 Quantities Plant Mix 30 263,448 tons $39.2 M 28 348,699 tons Latex 3 8,958 tons $4.1 M 4 9,637 tons $3.8 M Slurry Seal 3 1,454,706 SY $3.5 M 4 1,716,451 SY $5.2 M Surface 10 $6.8 M 6 Total 46 $53.6 M 42 4,573,953 SY 2,974,524 SY $49 M $3.7 M $62 M * May 24, 2017 letting: Plant Mix: 6 Contracts, 61,102 Tons Latex: 2 Contracts, 1,333 Tons Cape Seal: 1 Contract, 373,479 SY 41 Salem District Traditional Pavement Contracts Advertisements System 2017 Lane Miles Est. Cost Preliminary 2018 Lane Miles Est. Cost Interstate 26 lane miles $9 M 51 lane miles $14.4 M Primary 354 lane miles $34 M 224 lane miles $27.5 M Secondary 691 lane miles $19 M 419 lane miles $18 M Total 1071 lane miles $62 M 694 lane miles $60 M 42 Salem District Bridge Action Plan Salem District currently has 125 structurally deficient structures. • 85% of those structures are currently in an active work plan: • 32 are currently under construction • 51 are in the PE phase • 28 are in the Six-Year Program awaiting PE start Salem District is currently at 95.7% non-SD We continue to target structurally deficient structures in our planning: • $10.8 million (30%) of our FY17 discretionary maintenance allocation targets SD structure projects • FY17 goal is to eliminate 20 SD structures (net); we have eliminated 18 to date We also continue to maintain our “Good” bridges: • Currently 714 (24%) of our structure inventory is rated 5. • $22.8 million (70%) of our FY17 discretionary maintenance allocation targets preventive and restorative maintenance on “Good” structures. 43 Salem District Bridge Maintenance FY17 Preventive Maintenance - $8.1 M Restorative Maintenance - $14.7 M Replacements - $10.8 M Bridge Inspection - $4.1 M TOTAL – $37.7M FY18 Preventive Maintenance - $10.2 M Restorative Maintenance - $16.0 M Replacements - $13.6 M Bridge Inspection - $4.5 M TOTAL – $44.3M FY19 Preventive Maintenance - $12.5 M Restorative Maintenance - $17.9 M Replacements - $8.6 M Bridge Inspection - $4.1 M TOTAL – $43.1M TOTAL COSTS - $85.3M Preventive Maintenance includes cleaning, joints, and bridge painting. Restorative Maintenance includes deck overlays and super/sub repairs. Replacements includes superstructure and culvert/pipe replacements. Bridge Inspection includes the scheduled inspections required for all structures (bridges and large culverts). 44 Salem District Other Maintenance Contracts Roadside FY15 - $8.0 million FY16 - $8.1 million FY17 - $7.6 million Drainage/Pipes/Slopes FY15 - $14.5 million FY16 - $17.6 million FY17 - $11.6 million Interstate Maintenance FY17 - $13.4 million 45 Salem District Other Potential Maintenance Contracts Interstate Maintenance Flexible Asset Management Contract CY18-CY22 - $7.75 million 46 Christopher McDonald, P.E., PTOE Regional Operations Engineer Southwest Region 47 Southwest Regional Operations • • Performance Measures Procurement of TOC Contracts • TOC Floor Operations and Safety Service Patrol (SSP) • Operations Program Management Support (OPMS) • Platform as a Service (PaaS) • ITS Maintenance • Quick Clearance • Implementation of Instant Tow program in Roanoke County – Spring 2017 • Expanded emergency tow program to include medium-sized wreckers • Lane Closure Advisory Management System (LCAMS) Signal Optimization I-77 Variable Speed Limit • • 48 Southwest Regional Operations • Limited Service Contract for Tunnel Repair Plans and Inspections (Statewide) – Scheduled for advertisement in Summer 2017 • SCADA Installation at Big Walker and East River Mountain Tunnels – Scheduled for advertisement in Fall 2017 49 Anne Booker, P.E., PTOE Salem District Traffic Engineer & Gerry Harter, P.E., PTOE Lynchburg District Traffic Engineer 50 Salem District Safety Projects • Approximately 46% of fatal crashes in 2016 were fixed object off road (road departure). • FY18-23 HSIP Program has a total value of $34M with $23.8M planned for road departure mitigation projects within the district. • Upcoming locality safety projects include flashing yellow arrow (FYA) and pedestrian focused projects in the City of Roanoke. • $17.8M in projects to be advertised over the next 24 months. • Bike and pedestrian safety project (Route 11/Route 117) - $1M • Shoulder widening, guardrail, rumble strips on six corridors$16.8M 51 Lynchburg District Safety Action Items • 2016 deaths were about 10.1 percent above the 3-year average • Overall crashes were up from 3-year average by 2.3% • Over 60 percent of fatal crashes in 2016 were fixed object off road (road departure). • HSIP Program has over $35.9 M in ongoing and planned projects for road departure mitigation within the District and over $50 M in total ongoing and planned HSIP Projects. • FY18 projects include pedestrian (sidewalk) projects, dynamic flashing safety lights, and sinusoidal rumble (mumble) strips. • Locality safety projects included a Flashing Yellow Arrow Retrofit project (Danville) and an Adaptive Signal Control System installation (Lynchburg). • Ongoing safety projects include left-turn lanes, curve countermeasure signage, and a roundabout. 52 On-Call Project Opportunities • Contracts will have a one-year initial term with two, one-year renewable terms for a maximum contract duration of three years. • Guardrail - Upgrade existing guardrail or new installation. Scheduled for advertisement in Fall 2017. • • Salem Guardrail – $1.5M Pavement Markings – Refresh existing pavement markings, markers and messages. Scheduled for advertisement in Fall 2017. • Salem Pavement Markings – $1.5M 53 Project Specific Opportunities • Salem District - Guardrail • One scheduled advertisement in the next 12 months for guardrail upgrades with an estimated total of $1.6M • Salem District - Signs • Two scheduled advertisements in the next 18-24 months to replace ground mount signs with an estimated total of $1.5M • Lynchburg District - Guardrail − One scheduled advertisement in the next 6-8 months for guardrail upgrades with an estimate of $600,000 • Lynchburg District - Signs and Pavement Markings − One scheduled advertisement within the next 12 months to replace pavement markings with an estimate of $600,000 54 Terry Meadows, P.E. & Robbie Williams, P.E. District Construction Programs 55 Focus Areas for 2017 Construction Season • Project safety and work zone safety • Conformance with new OSHA Silica standard • LCAMS and Public Notice • Schedule required prior to starting work • Starting work within 15 days after Notice to Proceed • Material invoices to be submitted prior to payment for work 56 Focus Areas for 2017 Construction Season • Pavement markings and work zone maintenance • Quality construction both pavements and bridges • Surface Treatment and Slurry Seal Applications • Uniform tack application; performance of trackless tack • Renewed focus on Project Communication and Decision Making 57 Specification Changes (Asphalt) Asphalt Density by Cores Expanding application of requirements for all 2017 contracts: • Field density acceptance using cores (selected routes) • Interstates acceptance by plugs* • Primary /Secondary >5,000 ADT acceptance by plugs* • Primary/Secondary <5,000 ADT acceptance by nuclear *all roadways for plug acceptance must be 20’or wider Specification Changes (Asphalt) • • • • Section 211 - 50 gyration mixes to improve quality Section 310 - Tack & Bond - Tack as a pay item Section 305 - RAP use as shoulder stone Section 315 - Scratch & Leveling Course – defines quantitative and compensation • Section 515 – Cold Planing (Milling) Operations – Requirements (time and disincentives) • Pilot Projects to emphasis quality (increased density and consistency) 59 MITS/PLAID Enhancement • Modified Acceptance Materials on Project Details • Corrected TL 102 • Quasi back button • TL102 Submission Notifications becoming Optional • TL 102 list displaying TL 102 from newest to oldest 60 Specification Changes (Concrete) • Low Shrinkage Concrete (217.12) – SRA added to Specification and Lightweight Aggregate option • Type 1L Cement Added • Changes to Material Approved List #31 – Separating repair mixes into strength categories • Self Consolidating Mix – Added specs for making test cylinders and a stability test 61 Mechanistic Empirical Pavement Design Guide • Implementation of the long awaited MEPDG will be in January of 2018. • Applicable to all projects starting the pavement design phase on or after this date. • MEPDG will apply to all primary and interstate projects. • Secondary and subdivision roadway projects will continue to follow the Secondary and Subdivision Design Guide. 62 Materials Manual of Instructions • The Materials Division is working with the VTCA on revisions to Chapter VII of the MOI for Design Build projects. • This chapter outlines materials policy and directions for preparing the Materials Documentation on a project. • A meeting was held on March 23rd and a follow-up meeting is planned for April 20th with representative Quality Assurance Managers (QAM). 63 Materials Certification School Program (MCS) Transition of courses to the Virginia Community College System (VCCS) Virginia Education Center for Asphalt Technology (VECAT) Community College Workforce Alliance (CCWA) VCCS course delivery methods: VECAT currently providing hybrid-type courses CCWA providing traditional instructor-led and self-study courses (looking to adopt online or hybrid format) VDOT will continue to provide program oversight and issue individual MCS credentials. 64 Materials Certification School Program (MCS) Major Policy and Programmatic Changes: Students must register /pay for courses through VCCS. Some courses available for Workforce Credential Grant Students will continue to receive their formal grades/credentials through VDOT-U (must have VDOT-U account) Exams will be administered in electronic format (written exams will be auto-graded upon completion). Proficiency exams will also be administered by VCCS (beginning in 2018). No recertification process (beginning in 2018) 65 Locally Administered Projects (LAP) • Localities, consultants, inspectors and contractors should be guided by the Locally Administered Projects Manual (Updated March 2016). http://www.virginiadot.org/business/locally_administered_projects _manual.asp • This Locally Administered Projects manual has been written to assist the Local Public Agency (LPA) in the administration of federal and state funded transportation projects. • FHWA and VDOT are making concentrated efforts to ensure that LAP projects are being executed in accordance with the requirements of the LAP Manual. 66 Civil Rights Special Provision for Section 105.06 Subcontracting – Federal and State Funded Projects Effective with the February 28, 2017 Advertisement. Per Executive Order 20, contractors are encouraged to utilize Small, Women-owed and Minority-owned (SWaM) businesses certified by the Department of Small Business and Supplier Diversity (DSBSD). – Federal and State Projects The Contractor and/or subcontractor (first-tier) must inset this provision in each subcontract and require inclusion in all lower tier subcontracts. – Federal and State Projects On all approved Subletting Request, the Contractor shall indicate if the subcontractor is a certified DBE or SWaM business. – Federal and State Projects The Contractor shall report all DBE, SWaM and Non SWaM vendor payments quarterly on Form C-63, Vendor Payment Compliance Report, and submit to the District Civil Rights Office. – Federal Projects The Contractor shall report all SWaM subcontractor and vendor payments quarterly on Form C-61, Vendor Payment Report, and submit to the District Civil Rights Office. – State Projects If the Contractor fails to provide the required information, the Department may delay final payment according to Specification Section 109.10. - Federal and State If you have any questions about this provision, please contact any VDOT Civil Rights Office. 67 Environmental and VPDES Changes Read permits and special provisions carefully. • Permit conditions and time of year restrictions regarding threatened and endangered species (i.e. bats, logperch, bog turtles, others) continue to be major factors affecting projects. Rain gauges and log are required. • Inspections and completion of the Construction Runoff Control Inspection Forms (C107) every seven calendar days and within 48 hours following a measurable storm event (0.25 inches). 68 Environmental and VPDES Changes • Temporary seeding required when operations are anticipated to be suspended for greater than 14 days. Permanent seeding within 24 hours of reaching final grade. • Concrete trucks may not be washed out on the ground. • The SWPPP and VPDES permits for off-site facilities must be obtained by the Contractor. • Obtaining SWM (inspector) certifications will become a priority for both VDOT and consultant inspectors. 69 Lynchburg Consultant CEI Contracts (Estimates) Contracts 2016 2017 2018 Contract 1 (2014) $1.5 m $1.65 m $1.65 m Contract 2 (2014) $1.5 m $1.65 m $1.65 m 2019 New District Wide $1.3 m $1.6 m New District Wide $1.3 m $1.6 m $5.9 m $3.2 m TOTAL $3 m $3.3m 70 Salem Consultant CEI Contracts (Estimates) Contracts 2017 2018 2019 2020 Contract II (2014) $3.0 m Contract III (2014) $4.0 m New District Wide (2017) $1.0 m $3.5 m $3.0 m $1.5 m New District Wide (2017) $1.0 m $3.5 m $3.0 m $1.5 m $1.5 m $3.0 m $3.0 m New District Wide (2018) New District Wide (2018/19) TOTAL $3.0 m $9.0 m $9.5 m $9.0 m $9.0 m 71 Chris Winstead, P.E. Lynchburg District Engineer & Ken King, P.E. Salem District Engineer 72 SMART SCALE Dashboard Using the current VDOT Dashboard as a starting point, a new SMART SCALE Dashboard was developed that is specifically focused on the SMART SCALE program. The new dashboard visualization tool: • tracks on-time and on-budget progress of projects • emphasizes on-budget and on-schedule (versus estimates and durations) • is intuitive and accessible to a wide audience • is accurate and transparent to the public to let them know how we are doing. Once a project is scored and approved by the Commonwealth Transportation Board (CTB), SMART SCALE projects are fully funded and their progress can now be viewed on the new dashboard. SMART SCALE Dashboard http://dashboard.vasmartscale.org/ SMART SCALE Revised Staff Recommended Funding Scenario Lynchburg District 75 SMART SCALE Revised Staff Recommended Funding Scenario Salem District 76 New Funding Cycle Even Fiscal Years • Smart Scale Odd Fiscal Years • Revenue Sharing • Surface Transportation Block Grant set aside (formally called the Transportation Alternative Program or TAP) Every Fiscal Year • Highway Safety Improvement Program (HSIP) • State of Good Repair (SGR) • Regional Surface Transportation Program (RSTP) • Congestion Mitigation and Air Quality (CMAQ) State of Good Repair State of Good Repair State of Good Repair Safety Points Worker and Contractor Safety Emphasis: Virginia Unique Standards are more stringent than Federal standards. Review applicable standards for compliance. The new OSHA Silica standard is in effect, basically prohibiting the creation of silica dust during construction. New monitoring requirements and PPE should be in effect. Refer to Table 1 for any activity where Silica dust may be generated. Virginia Administrative Regulations Manual requires training and usage of equipment and tools be in compliance with manufacturers recommendations. Reporting fatalities and catastrophes. Fatalities within 8 hours Any work-related inpatient hospitalization, amputation or loss of eye within 24 hours. 81 Safety Points Worker and Contractor Safety • • Review and update required employee training. Prepare personnel for the day’s tasks. Ensure staff are knowledgeable of: • SDS Data and how to obtain access, time is paramount in an emergency! • Silica Standard Updated, effective September 23, 2017 • • Reducing the permissible exposure limit (PEL) for crystalline silica to 50 micrograms per cubic meter of air, averaged over an eight-hour shift. Requiring employers to use engineering controls (such as water or ventilation) and work practices to limit worker exposure; provide respiratory protection when controls are not able to limit exposures to the permissible level; limit access to high exposure areas; train workers; and provide medical exams to highly exposed workers. • Virginia and OSHA emphasis on misclassification of workers – claiming 82 employees as independent contractors. Lynchburg District Contacts Chris Winstead, P.E., District Engineer 434-856-8173 Robert Guercia, P.E., Engineering, Planning & Investment 434-856-8174 Terry Meadows, P.E., Construction 434-856-8317 Gerry Harter, P.E., PTOE, Traffic Engineering 434-856-8211 Dale Totten, P.E., Maintenance 434-856-8175 Chris McDonald, Operations 540-375-0114 Kenneth Martin, Residency Administrator (434) 830-4059 Don Austin, Residency Administrator (434) 352-6675 Scot Shippee, P.E., Residency Engineer (434) 505-3255 83 Salem District Contacts Ken King, P.E., District Engineer 540-387-5348 Robbie Williams, P.E., Construction 540-387-5482 Tommy DiGiulian P.E., LS, Engineering, Planning & Investment 540-387-5356 Allen Williams, P.E., Maintenance 540-387-5346 Anne Booker, P.E., PTOE, Traffic Engineering 540-375-0143 Chris McDonald, Operations 540-375-0114 Lisa Hughes, P.E., Martinsville Residency Administrator (276) 629-2582 David Clarke, P.E., Christiansburg Residency Administrator (540) 381-7190 Todd Daniels, Bedford Residency Administrator (540) 682-7000 Dan Collins, Salem Residency Administrator (540) 387-5500 84 Questions? 85
© Copyright 2026 Paperzz