Joint Conference with Lynchburg and Salem Districts

Virginia Transportation Construction Alliance (VTCA)
Joint Conference
with
Salem and Lynchburg Districts
May 2, 2017
Ken King, P.E., Salem District Engineer
Chris Winstead, P.E., Lynchburg District Engineer
Safety Talk
Work Zone Safety
Jan. 2016 – Jan. 2017
Three Year Average
Lynchburg District
80
64
Salem District
167
154
2
VDOT Performance Measures
3
Lynchburg District
4
Lynchburg District Organization
Chris Winstead
District Engineer
Don Austin
Appomattox
Residency
John Hays
ADA Business
Dale Totten
ADA Maintenance
Scot Shippee
Dillwyn Residency
Terry Meadows
ADA Construction
Robert Guercia
ADA Preliminary
Engineering/PIM
Paula K. Jones
Communications
Chris McDonald
Regional Operations
Lynchburg District Residencies
Kenneth Martin
Halifax Residency
Mike Allen
Safety
Appomattox – Amherst, Appomattox, Campbell and Nelson
Counties
Dillwyn – Buckingham, Charlotte, Cumberland and Prince
Edward Counties
Halifax – Halifax and Pittsylvania Counties
5
Lynchburg District
•
Comprised of 10 counties including Amherst, Appomattox,
Buckingham, Campbell, Charlotte, Cumberland, Halifax, Nelson,
Pittsylvania and Prince Edward
•
Includes two cities, numerous towns and two of the largest
counties by land area in the Commonwealth
•
Responsible for maintenance of more than 15,000 miles of
primary and secondary roads. This is the only district that does
not maintain interstate highways.
• Responsible for 1,959 structures on all roads
6
Lynchburg District Safety
Worker and Contractor Safety
Goals: Zero fatalities, Zero injuries, Zero preventable crashes
•
•
•
FY 2017
Most frequent injury types – Struck by and Sprain/Strain
Most frequent lost-time injury types – Struck by and Sprain/Strain
Most frequent crash cause – Failure to ensure clear path
•
Continue to emphasize Slow Down to Speed Up, Safety First, and communicating
expectation that employees work together in assessing risks, mitigating risks and
watching each other’s backs when it comes to safety.
•
District Safety Committee has been expanded to include more members from various
sections including operators from the field. Committee continues reviewing crashes
incidents and injuries, reviewing safety ideas and serves a communication resource
between the field and the District.
•
District Management continues visits with teams across the district.
7
Lynchburg Project Performance
FY 2017 Project Development / Delivery
(2/17/17 Dashboard Data)
District Improvement Strategies:
Continued focus upon excellent plan quality and adjusting to new metrics associated with SmartScale DB.
Frequent/open communication among VDOT and Contractor staff at all levels
Close collaboration between Project Development and Project Delivery staff – Team work
Contract accountability and rapid collaborative response to any slippage
Lynchburg District Pavement Conditions
9
Lynchburg District Pavement Conditions
Percent Sufficient by System
(by the end of CY 2017)
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
Target
Predicted
Primary
82%
88%
Secondary
65%
75%
Target
Predicted
10
Lynchburg District Bridge Conditions
11
Salem District
12
Salem District
Comprised of 12 counties including Bedford, Botetourt, Carroll,
Craig, Floyd, Franklin, Giles, Henry, Montgomery, Patrick,
Pulaski and Roanoke
Includes five cities and numerous towns including the
Commonwealth’s most populous town (Blacksburg)
Responsible for maintenance of more secondary roads than any
other district—some 7,000 miles, in addition to 117.8 miles of
interstate and 983 miles of primary roads.
Responsible for 2,902 bridges with 1,926 on secondary roads, 5
in urban areas, 760 on the primary system and 211 on the
interstates.
13
Salem District Organization
Ken King
District Engineer
Todd Daniel
Bedford Residency
Thelma Ingle
ADA Business/PIM
Allen Williams
ADA Maintenance
Jason Bond
Communications
David Clarke
Christiansburg
Residency
Robbie Williams
ADA Construction
Tommy DiGiulian
ADA Preliminary
Engineering
Chris McDonald
Regional Operations
Salem District Residencies
Lisa Hughes
Martinsville
Residency
Mike LaFon
Safety
Bedford – Bedford and Franklin Counties
Christiansburg – Floyd, Giles, Montgomery and
Pulaski Counties
Martinsville – Carroll, Henry and Patrick Counties
Dan Collins
Salem Residency
Salem – Botetourt, Craig and Roanoke Counties
14
Salem District
Worker and Contractor Safety
•
District Recordable Injury and Lost Time Rates continue to be reduced.
•
Leading causes of injury include Strains and Sprains, Struck by Objects, and
Walking Working Surfaces (stepping in holes).
•
Engage upper management in accountability for safe operations, using Self
Review checklist that informs and encourages safe operations.
•
Participate in annual Work Zone Awareness Week, April 10-14, 2017.
•
Keeping focus on work zone training, installation and removal of traffic control
devices, and completion of Daily work zone reviews.
•
Coordination, Communication, and notification for work zones is very
important.
•
Notify Traffic Operations Center at 1-888-782-7982 for all work zones
(sign/cone up to sign/cone down)!
15
Salem Project Performance
FY 2017 Project Development / Delivery
(2/17/17 Dashboard Data)
District Improvement Strategies:
•
•
•
•
Continue working with our localities to help develop/monitor schedules and holding quarterly teleconferences to discuss project progress.
Continuing progress on SMART SCALE, SGR and FY17 HSIP projects.
Continuing to work closely with Industry and to provide additional training to staff over the winter in an effort to improve quality of our pavements and bridge work.
Added a third ACE to serve the Bedford and Martinsville Residencies and re-structured staff under the District Project Controls Engineer to improve consistency and
accuracy of schedules / CTD’s and CEI budgets. Potential utility impacts and coordination with regulatory TOY restrictions and limitations of operations is also a focus.
Salem District Pavement Conditions
17
Salem District Pavement Conditions
18
Salem District Bridge Conditions
19
Salem District Operations
Target
FY16
(July-Jan)
FY17
(July-Jan)
Vehicle Hours of
Delay
TBD
450,773
454,273
Median Incident
Duration
47
50
50
Measure
Travel Time
Reliability Index
• I-77 ASTMS/VSL Project (Carroll County)
• Implementation October 3, 2016
• Speed limits reduced for visibility for a total of 361 hours over 26 days
• Crash on December 26, 2016 during active fog event with variable
speed limits enacted
• Significant Delay Incidents
• I-77 MM 6.5 12/26/2016 multiple vehicle crash – 18,817 vhd
• I-81 MM 139 10/7/2016 tractor trailer crash – 16,745 vhd
• I-81 MM 113 9/3/2016 Tractor-trailer crash – 32,392 vhd
• High Profile Events
• Martinsville NASCAR Race Weekend – March 31-April 2
• Providing TOC support for the I-81 Exit 150 project along with the I-81
New River bridge project
Data through January 31, 2017
Vehicle Hours of Delay data source = RITIS Vehicle Probe Project
Incident data source = VaTraffic: Disabled Vehicles, Vehicle Crashes and Tractor-Trailer Crashes on Interstates and at Special Facilities on Interstates
20
Robert Guercia, P.E.
&
Alex Price, P.E.
Consulting Engineering Opportunities
Upcoming Construction Projects
Lynchburg and Salem Districts
21
Roundabout at Route 24 & 646
Campbell County
Est. Construction Cost $2.1 million
Advertisement –
October 10, 2017
22
Lynchburg District
Construction Program Advertisements
Scheduled through June 30, 2018
UPC
Route
Locality
Project Description
Projected AD
Estimated
Cost
108202
Various
Various
2017 PM Retrace Secondaries District-wide (federal)
1/10/2017
$81,973
108203
109577
109575
110306
107015
107012
109593
108200
104679
109590
109554
82510
Various
60
1001
Various
29
29
151
Various
24
15
U000
711
Various
Amherst
Nelson
Various
Amherst
Pittsylvania
Amherst
Various
Campbell
Campbell
Lynchburg
Campbell
2017 PM Retrace Secondaries District-wide
Rte 60 - Construct Sidewalk
Rte 1001 - Construct Sidewalk
DP3A18 Lynchburg District Wide Pipe Rehab/Replacement
Bus 29 - Shoulder Widening/Rumble Strips/GR
Rte 29 - Shoulder Widening/Rumble Strips/GR
Rte 151 - Shoulder Widening/Rumble Strips/GR
GR Upgrades
Rte 24 - Roundabout at Rte 646
Rte 24 - Construct Sidewalk
HB2 Oddfellows Road Segment B2 - Recoonstruction
SGR Rte 711 - Bridge & Approaches over NS Railway
1/10/2017
3/14/2017
3/14/2017
5/9/2017
6/13/2017
6/13/2017
6/13/2017
TBD
10/10/2017
10/10/2017
11/14/2017
5/8/2018
$261,868
$691,319
$249,446
$1,112,511
$3,250,268
$3,025,538
$1,154,872
$979,933
$2,066,199
$592,536
$14,410,269
$3,481,327
$31,358,059
13 Projects - Total Estimated Cost of $31 Million
23
Lynchburg District
Locally Administered Advertisements
Scheduled through June 30, 2018
UPC
Funding
Locality
Project Description
Projected AD
Estimated Cost
106560/
108158
Transportation
Alternatives
Nelson
Nelson County Blue Ridge Tunnel Phase 2 and Phase 3
4/28/2017
$3,128,183
100822
UCI/SMART SCALE
Danville
City of Danville Mount Cross Roads
12/31/2017
$3,568,826
107726
Transportation
Alternatives
Danville
City of Danville Multi-use Trail Phase VII
12/31/2017
$389,427
108762
Revenue Sharing
Danville
Drainage Improvements – Patton/ South Union Streets
12/28/2017
$760,000
104173
Revenue Sharing
Lynchburg
Main Street Bridge Replacement
12/31/2017
$9,500,000
106027
Transportation
Alternatives
Farmville
Farmville Buffalo Creek Bike/Pedestrian Bridge and Trail Connections
12/31/2017
$816,395
6 Projects - Total Estimated Cost of $18.2 Million
24
Salem District
25
Project Development
Consultant Engineering Opportunities
Project Specific Consultant Contract
Western Perimeter Road – VT Campus, Blacksburg
Revenue Sharing Project – Montgomery County (VDOT Administered)
Estimated Cost = $34.5 Million
RFP Release Date – Anticipated Summer 2017
For more info visit www.montgomerycountyva.gov/mpo
(then go to “Plans, reports and studies”, then “2015”)
26
Project Development
Consultant Engineering Opportunities
Design-Build Contract
I-81/Route 8 (Exit 114) Bridge Replacements Project
Total Funding = $34.9 Million
RFQ Release Date – Summer 2017
RFP Release Date – Late Fall 2017
27
Salem District
Construction Program Advertisements
Scheduled through June 30, 2018
Project Ad Date
Estimated CN
Cost
($Millions)
Bridge Replacement over Big Otter River
2017
$3.1
Roanoke Conty
Bridge Replacement over Back Creek
2017
$5.6
634
Beford County
Bridge Replacement over Roanoke River
2017
$9.7
82193
220
Roanoke Conty
Bridge Replacement over Back Creek
2017
$16.9
5319
703
Carroll County
Bridge Replacement over Little Reed Island Creek
2017
$1.4
87905
750
Floyd County
Reconstruction & Safety Improvements
2017
$2.0
77300
11
Botetourt County
Bridge Replacement over Tinker Creek
2017
$3.3
77302
11
Botetourt County
Bridge Replacement over Tinker Creek
2017
$2.7
107053
24
Bedford County
Shoulder Paving, Rumble Strips & Guardrail Upgrades
2017
$1.4
110100
220
Franklin County
Shoulder Paving & Guardrail Upgrades
2017
$2.4
108514
460
Bedford County
Shoulder Paving, Rumble Strips & Guardrail Upgrades
2017
$0.5
107051
100
Giles County
Shoulder Paving, Rumble Strips & Guardrail Upgrades
2017
$3.6
97225
43
Bedford County
Bridge Replacement over Stoney Creek
2018
$3.1
104183
100
Pulaskie County
Bridge Replacement/Rehabilitation over NSRR/Rte 11
2018
$6.6
8753
460
City of Salem
Widening to 3 Lanes w/Bike Lanes, C&G & Sidewalk
2018
$10.4
UPC
Route
Locality
94722
43
Bedford County
77305
116
62650
Project Description
15 Projects - Total Estimated Construction Cost of $72.7M
28
Salem District - Locally Administered Advertisements
Scheduled through June 30, 2018
UPC
Locality
87002
106544
87005
104128
104241
104298
105304
105748
105768
105775
106270
106486
107294
108359
108859
108864
108867
108868
108896
109288
109558
109562
109566
109567
109569
110351
110364
89655
107283
107291
107297
107310
107312
107313
104078
108360
108851
Henry Co
Henry Co
Pulaski Co
Floyd
Blacksburg
Martinsville
Montgomery Co
Franklin Co
Christiansburg
Blacksburg
Boones Mill
Salem
Giles Co
Rich Creek
Blacksburg
Christiansburg
Christiansburg
Christiansburg
Roanoke
Roanoke
Roanoke
Roanoke
Roanoke
Roanoke
Roanoke
Blacksburg
Roanoke
Giles Co
Blacksburg
Christiansburg
Montgomery Co
Roanoke Co
Roanoke Co
Roanoke Co
Martinsville
Christiansburg
Roanoke
Project Description
Collinsville Streetscaping
Collinsville Street Signs, Ped Signals
New River Trail Extension
Town of Floyd Heritage Pathways Phases 3-4
Construct Sidewalk West side of Giles Road
Repave Streets and Crosswalks – Uptown Revitalization Ph 2
SRTS Auburn Elementary/Middle School
Construction fo Pedestrian Bridge
Drainage Improvements to Town Streets
Research Center Drive Improvements
Boones Mill Depot Relocation
Eddy Ave Bike/Ped Bridge
Springdale Rd Reconstruction
Downtown Rich Creek Streetscaping Improvements Ph 3A
Mount Tabor Rd Drainage Improvements
North Franklin St Drainage Improvements
Arbor Dr Storm Drain and Curb & Gutter Improvements
Roanoke St Sidewalk Construction
Colonial Avenue Improvements (Smart Scale)
Transit Accessibility Improvements on Edgewood St (Smart Scale)
Flashing Yellow Arrow Upgrade – Williamson Rd & Airport Rd
Flashing Yellow Arrow Upgrade – Valley View
Orange Ave / Blue Hills Signal Upgrade
Flashing Yellow Arrow Upgrade – Jefferson St & Elm Ave
Flashing Yellow Arrow Upgrade – Brandon Ave & Colonial Ave
South Main St Sidewalks
New Sidewalks – Tiption Ave, New Sprinch Branch Rd, 9th St
Rte. 673 – Replace Bridge over Wolf Creek
Sidewalk Missing Links – Various Locations
Signalized Intersection at Roanoke St & Falling Branch Rd
Prices Fork Rd Turn Lane Construction
Kenwick Tr Drainage Improvements
Belle Meade Dr Drainage Improvements
Merriman Rd Drainage Improvements
Commonwealth Blvd Bridge Repairs
Huckleberry Trail Phase 3
Berkley Bridge at King St
Projected AD Estimated CN Cost ($Mil)
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2018
2018
2018
2018
2018
2018
2018
2018
2018
2018
$1.30
$0.08
$1.85
$0.79
$0.34
$0.75
$0.18
$1.27
$1.40
$0.53
$0.10
$1.37
$0.39
$0.42
$0.14
$0.58
$0.21
$0.33
$6.40
$0.34
$0.02
$0.02
$0.02
$0.02
$0.02
$0.10
$0.70
$0.79
$0.11
$0.77
$1.65
$0.04
$0.04
$0.08
$2.10
$0.76
$1.47
37 Projects - Total Estimated Cost of $27.5 M
29
Dale Totten, P.E.
Maintenance Contracts
Lynchburg District
30
Lynchburg District
Pavement Action Plan
•
Exceeding performance targets for Primary and Secondary Systems
•
Residencies and district partners are engaged in planning pavement
solutions.
• Evaluating pavement locations and preparing for new paving projects
throughout the year.
31
Lynchburg District Paving Mileage
Advertised
32
Lynchburg District
Resurfacing Program
Treatment
2017
Estimate
d
Quantitie
s
# of 2016
Contracts
2016
Quantities
Contract
Value 2016
# of 2017
Contracts
Plant Mix
9
236,095
Tons
$27.4M
6
237,000
Tons
$27.6M
Latex
1
5,556
Tons
$1.6M
1
5,500
Tons
$1.6M
Surface
3
6,877,139
SY
$8.6M
4
6,400,00
0
SY
$8.0M
Total
13
$37.6M
11
2016 advertised Fall 2016 for CY2017
2017 advertise Fall 2017 for CY2018
Contract
Value 2017
$37.2M
33
Lynchburg District
Traditional Pavement Contract Advertisements Scheduled
through June 30, 2018
2017 Projects
Lane Miles
Estimated
Cost
Preliminary
2018
Lane Miles
Estimated
Cost
203
$22.8 M
207
$23.2 M
Secondary
1308
$14.8M
1237
$14.M
Total
1511
$37.6 M
1444
$37.2M
System
Primary
2016 advertised Fall 2016 for 2017 Projects
2017 advertise Fall 2017 for 2018 (preliminary)
34
Lynchburg District
Bridge Action Plan
Lynchburg District currently has 91 structurally deficient (SD) structures:
•
•
60 - SD bridges
31 - SD culverts
Anticipate eliminating 34 SD structures in FY17:
•
•
17-SD bridges
17-SD culverts
Continued effort to target SD structures
• Focus on SD culverts (27 SD culverts on Secondary System)
Continue focus on Condition Yellow Structures
• Since 2010, Lynchburg has improved/reduced the number of condition yellow
(GCR = 5) structures by 43 (from 474 to 431)
• During the same timeframe, Lynchburg eliminated 79 SD structures.
Concentrate efforts on the Secondary System
• 79 of the 91 SD’s
95.4% of Lynchburg’s VDOT maintained
structures are non - deficient
35
Lynchburg District
Bridge Maintenance
FY17
•
•
•
•
FY18
•
•
•
•
FY19
•
•
•
•
Preventive Maintenance - $2.5M
Restorative Maintenance - $3.0M
Replacements - $7.9M
Bridge Inspection - $3.5M
TOTAL - $16.9M
Preventive Maintenance - $1.8M
Restorative Maintenance - $1.7M
Replacements - $7.7 M
Bridge Inspection - $3.7M
TOTAL - $14.9M
Preventive Maintenance ~ $2.7M
Restorative Maintenance ~ $2.7M
Replacements ~ $5.4M
Bridge Inspection ~ $4.2M
TOTAL – $15M
TOTAL COST - $46.8M
 Preventive Maintenance
includes cleaning, joints,
epoxy overlays and
bridge painting.
 Restorative Maintenance
includes rigid deck
overlays and super/sub
repairs.
 Replacements includes
superstructure and
culvert/pipe
replacements.
 Bridge Inspection
includes the scheduled
inspections required for
all structures (bridges
and large culverts).
36
Lynchburg District
Other Maintenance Contracts
Roadside
FY17 - $1.2 M
FY18 - $1.2 M
FY19 - $1.2M
Drainage/Pipes/Slopes
FY17 - $1.2M
FY18 - $1.0 M
FY19 - $1.0M
37
Allen Williams, P.E.
Maintenance Contracts
Salem District
38
Salem District
Pavement Action Plan
•
Advertising target for paving was $62M.
•
As of April 24, the district plans to pave 1,071 lane miles.
•
Based on planned paving, the district is predicted to meet performance
targets on the interstate and primary systems but not on the secondary
system in CY18.
•
Currently the district has 0 lane miles with CCI < 30 on the interstate system.
39
Salem District Paving Mileage
Advertised
40
Salem District
Resurfacing Program
Contract
Value
2017
Treatment
# of 2016
Contracts
2016
Quantities
Contract
Value 2016
# of 2017*
Contracts
2017
Quantities
Plant Mix
30
263,448
tons
$39.2 M
28
348,699
tons
Latex
3
8,958
tons
$4.1 M
4
9,637
tons
$3.8 M
Slurry Seal
3
1,454,706
SY
$3.5 M
4
1,716,451
SY
$5.2 M
Surface
10
$6.8 M
6
Total
46
$53.6 M
42
4,573,953
SY
2,974,524
SY
$49 M
$3.7 M
$62 M
* May 24, 2017 letting:
 Plant Mix: 6 Contracts, 61,102 Tons
 Latex: 2 Contracts, 1,333 Tons
 Cape Seal: 1 Contract, 373,479 SY
41
Salem District
Traditional Pavement Contracts Advertisements
System
2017 Lane
Miles
Est. Cost
Preliminary
2018 Lane
Miles
Est. Cost
Interstate
26 lane miles
$9 M
51 lane miles
$14.4 M
Primary
354 lane miles
$34 M
224 lane miles
$27.5 M
Secondary
691 lane miles
$19 M
419 lane miles
$18 M
Total
1071 lane miles
$62 M
694 lane miles
$60 M
42
Salem District
Bridge Action Plan
Salem District currently has 125 structurally deficient structures.
• 85% of those structures are currently in an active work plan:
• 32 are currently under construction
• 51 are in the PE phase
• 28 are in the Six-Year Program awaiting PE start
Salem District is currently at 95.7% non-SD
We continue to target structurally deficient structures in our planning:
• $10.8 million (30%) of our FY17 discretionary maintenance allocation
targets SD structure projects
• FY17 goal is to eliminate 20 SD structures (net); we have eliminated 18 to
date
We also continue to maintain our “Good” bridges:
• Currently 714 (24%) of our structure inventory is rated 5.
• $22.8 million (70%) of our FY17 discretionary maintenance allocation
targets preventive and restorative maintenance on “Good” structures.
43
Salem District
Bridge Maintenance
FY17
Preventive Maintenance - $8.1 M
Restorative Maintenance - $14.7 M
Replacements - $10.8 M
Bridge Inspection - $4.1 M
TOTAL – $37.7M
FY18
Preventive Maintenance - $10.2 M
Restorative Maintenance - $16.0 M
Replacements - $13.6 M
Bridge Inspection - $4.5 M
TOTAL – $44.3M
FY19
Preventive Maintenance - $12.5 M
Restorative Maintenance - $17.9 M
Replacements - $8.6 M
Bridge Inspection - $4.1 M
TOTAL – $43.1M
TOTAL COSTS - $85.3M
 Preventive Maintenance
includes cleaning, joints,
and bridge painting.
 Restorative Maintenance
includes deck overlays
and super/sub repairs.
 Replacements includes
superstructure and
culvert/pipe
replacements.
 Bridge Inspection
includes the scheduled
inspections required for
all structures (bridges
and large culverts).
44
Salem District
Other Maintenance Contracts
Roadside
FY15 - $8.0 million
FY16 - $8.1 million
FY17 - $7.6 million
Drainage/Pipes/Slopes
FY15 - $14.5 million
FY16 - $17.6 million
FY17 - $11.6 million
Interstate Maintenance
FY17 - $13.4 million
45
Salem District
Other Potential Maintenance Contracts
Interstate Maintenance
Flexible Asset Management Contract
CY18-CY22 - $7.75 million
46
Christopher McDonald, P.E., PTOE
Regional Operations Engineer
Southwest Region
47
Southwest Regional Operations
•
•
Performance Measures
Procurement of TOC Contracts
• TOC Floor Operations and Safety Service Patrol (SSP)
• Operations Program Management Support (OPMS)
• Platform as a Service (PaaS)
• ITS Maintenance
•
Quick Clearance
• Implementation of Instant Tow
program in Roanoke County –
Spring 2017
• Expanded emergency tow program
to include medium-sized wreckers
•
Lane Closure Advisory Management
System (LCAMS)
Signal Optimization
I-77 Variable Speed Limit
•
•
48
Southwest Regional Operations
•
Limited Service Contract for Tunnel Repair Plans and Inspections (Statewide)
– Scheduled for advertisement in Summer 2017
•
SCADA Installation at Big Walker and East River Mountain Tunnels –
Scheduled for advertisement in Fall 2017
49
Anne Booker, P.E., PTOE
Salem District Traffic Engineer
&
Gerry Harter, P.E., PTOE
Lynchburg District Traffic Engineer
50
Salem District Safety Projects
•
Approximately 46% of fatal crashes in
2016 were fixed object off road (road
departure).
•
FY18-23 HSIP Program has a total value
of $34M with $23.8M planned for road
departure mitigation projects within the
district.
•
Upcoming locality safety projects include
flashing yellow arrow (FYA) and
pedestrian focused projects in the City of
Roanoke.
• $17.8M in projects to be advertised over the next 24 months.
• Bike and pedestrian safety project (Route 11/Route 117) - $1M
• Shoulder widening, guardrail, rumble strips on six corridors$16.8M
51
Lynchburg District Safety
Action Items
•
2016 deaths were about 10.1 percent
above the 3-year average
•
Overall crashes were up from 3-year
average by 2.3%
•
Over 60 percent of fatal crashes in 2016
were fixed object off road (road
departure).
•
HSIP Program has over $35.9 M in
ongoing and planned projects for road
departure mitigation within the District and
over $50 M in total ongoing and planned
HSIP Projects.
•
FY18 projects include pedestrian (sidewalk) projects, dynamic flashing safety
lights, and sinusoidal rumble (mumble) strips.
•
Locality safety projects included a Flashing Yellow Arrow Retrofit project (Danville)
and an Adaptive Signal Control System installation (Lynchburg).
•
Ongoing safety projects include left-turn lanes, curve countermeasure signage,
and a roundabout.
52
On-Call Project Opportunities
•
Contracts will have a one-year initial term with two, one-year
renewable terms for a maximum contract duration of three years.
•
Guardrail - Upgrade existing guardrail or new installation. Scheduled
for advertisement in Fall 2017.
•
•
Salem Guardrail – $1.5M
Pavement Markings – Refresh existing pavement markings, markers
and messages. Scheduled for advertisement in Fall 2017.
•
Salem Pavement Markings – $1.5M
53
Project Specific Opportunities
•
Salem District - Guardrail
• One scheduled advertisement in the next 12 months for guardrail
upgrades with an estimated total of $1.6M
•
Salem District - Signs
• Two scheduled advertisements in the next 18-24 months to
replace ground mount signs with an estimated total of $1.5M
•
Lynchburg District - Guardrail
− One scheduled advertisement in the next 6-8 months for guardrail
upgrades with an estimate of $600,000
•
Lynchburg District - Signs and Pavement Markings
− One scheduled advertisement within the next 12 months to
replace pavement markings with an estimate of $600,000
54
Terry Meadows, P.E.
&
Robbie Williams, P.E.
District Construction Programs
55
Focus Areas for 2017 Construction
Season
• Project safety and work zone safety
• Conformance with new OSHA Silica standard
• LCAMS and Public Notice
• Schedule required prior to starting work
• Starting work within 15 days after Notice to Proceed
• Material invoices to be submitted prior to payment for work
56
Focus Areas for 2017 Construction
Season
• Pavement markings and work zone maintenance
• Quality construction both pavements and bridges
• Surface Treatment and Slurry Seal Applications
• Uniform tack application; performance of trackless tack
• Renewed focus on Project Communication and Decision Making
57
Specification Changes (Asphalt)
Asphalt Density by Cores
Expanding application of requirements for
all 2017 contracts:
• Field density acceptance using cores (selected routes)
• Interstates acceptance by plugs*
• Primary /Secondary >5,000 ADT acceptance by plugs*
• Primary/Secondary <5,000 ADT acceptance by nuclear
*all roadways for plug acceptance must be 20’or wider
Specification Changes (Asphalt)
•
•
•
•
Section 211 - 50 gyration mixes to improve quality
Section 310 - Tack & Bond - Tack as a pay item
Section 305 - RAP use as shoulder stone
Section 315 - Scratch & Leveling Course – defines
quantitative and compensation
• Section 515 – Cold Planing (Milling) Operations –
Requirements (time and disincentives)
• Pilot Projects to emphasis quality (increased density and
consistency)
59
MITS/PLAID Enhancement
• Modified Acceptance Materials on Project Details
• Corrected TL 102
• Quasi back button
• TL102 Submission Notifications becoming Optional
• TL 102 list displaying TL 102 from newest to oldest
60
Specification Changes
(Concrete)
•
Low Shrinkage Concrete (217.12) – SRA added to Specification and
Lightweight Aggregate option
•
Type 1L Cement Added
•
Changes to Material Approved List #31 – Separating repair mixes into
strength categories
•
Self Consolidating Mix – Added specs for making test cylinders and a
stability test
61
Mechanistic Empirical Pavement
Design Guide
•
Implementation of the long awaited MEPDG will be in January of 2018.
•
Applicable to all projects starting the pavement design phase on or
after this date.
•
MEPDG will apply to all primary and interstate projects.
•
Secondary and subdivision roadway projects will continue to follow the
Secondary and Subdivision Design Guide.
62
Materials Manual of Instructions
• The Materials Division is working with the VTCA on revisions to Chapter
VII of the MOI for Design Build projects.
• This chapter outlines materials policy and directions for preparing the
Materials Documentation on a project.
• A meeting was held on March 23rd and a follow-up meeting is planned
for April 20th with representative Quality Assurance Managers (QAM).
63
Materials Certification School Program
(MCS)
Transition of courses to the Virginia Community College System (VCCS)


Virginia Education Center for Asphalt Technology (VECAT)
Community College Workforce Alliance (CCWA)
VCCS course delivery methods:
 VECAT currently providing hybrid-type courses
 CCWA providing traditional instructor-led and self-study courses (looking to
adopt online or hybrid format)
VDOT will continue to provide program oversight and issue individual MCS
credentials.
64
Materials Certification School Program
(MCS)
Major Policy and Programmatic Changes:

Students must register /pay for courses through VCCS.
 Some courses available for Workforce Credential Grant
 Students will continue to receive their formal grades/credentials
through VDOT-U (must have VDOT-U account)

Exams will be administered in electronic format (written exams will be
auto-graded upon completion).

Proficiency exams will also be administered by VCCS (beginning in
2018).

No recertification process (beginning in 2018)
65
Locally Administered Projects (LAP)
• Localities, consultants, inspectors and contractors should be
guided by the Locally Administered Projects Manual (Updated
March 2016).
http://www.virginiadot.org/business/locally_administered_projects
_manual.asp
• This Locally Administered Projects manual has been written to
assist the Local Public Agency (LPA) in the administration of
federal and state funded transportation projects.
• FHWA and VDOT are making concentrated efforts to ensure that
LAP projects are being executed in accordance with the
requirements of the LAP Manual.
66
Civil Rights
Special Provision for Section 105.06 Subcontracting – Federal and State Funded Projects
Effective with the February 28, 2017 Advertisement.
Per Executive Order 20, contractors are encouraged to utilize Small, Women-owed and
Minority-owned (SWaM) businesses certified by the Department of Small Business and Supplier
Diversity (DSBSD). – Federal and State Projects
The Contractor and/or subcontractor (first-tier) must inset this provision in each subcontract
and require inclusion in all lower tier subcontracts. – Federal and State Projects
On all approved Subletting Request, the Contractor shall indicate if the subcontractor is a
certified DBE or SWaM business. – Federal and State Projects
The Contractor shall report all DBE, SWaM and Non SWaM vendor payments quarterly on Form C-63,
Vendor Payment Compliance Report, and submit to the District Civil Rights Office. – Federal Projects
The Contractor shall report all SWaM subcontractor and vendor payments quarterly on Form C-61, Vendor
Payment Report, and submit to the District Civil Rights Office. – State Projects
If the Contractor fails to provide the required information, the Department may delay final
payment according to Specification Section 109.10. - Federal and State
If you have any questions about this provision, please contact any VDOT Civil Rights Office.
67
Environmental and VPDES Changes
Read permits and special provisions carefully.
• Permit conditions and time of year restrictions regarding
threatened and endangered species (i.e. bats, logperch, bog
turtles, others) continue to be major factors affecting projects.
Rain gauges and log are required.
• Inspections and completion of the Construction Runoff Control
Inspection Forms (C107) every seven calendar days and within
48 hours following a measurable storm event (0.25 inches).
68
Environmental and VPDES Changes
• Temporary seeding required when operations are anticipated to be
suspended for greater than 14 days. Permanent seeding within 24
hours of reaching final grade.
• Concrete trucks may not be washed out on the ground.
• The SWPPP and VPDES permits for off-site facilities must be obtained
by the Contractor.
• Obtaining SWM (inspector) certifications will become a priority for both
VDOT and consultant inspectors.
69
Lynchburg Consultant CEI Contracts (Estimates)
Contracts
2016
2017
2018
Contract 1
(2014)
$1.5 m
$1.65 m
$1.65 m
Contract 2
(2014)
$1.5 m
$1.65 m
$1.65 m
2019
New District
Wide
$1.3 m
$1.6 m
New District
Wide
$1.3 m
$1.6 m
$5.9 m
$3.2 m
TOTAL
$3 m
$3.3m
70
Salem Consultant CEI Contracts (Estimates)
Contracts
2017
2018
2019
2020
Contract II
(2014)
$3.0 m
Contract III
(2014)
$4.0 m
New District
Wide (2017)
$1.0 m
$3.5 m
$3.0 m
$1.5 m
New District
Wide (2017)
$1.0 m
$3.5 m
$3.0 m
$1.5 m
$1.5 m
$3.0 m
$3.0 m
New District
Wide (2018)
New District
Wide
(2018/19)
TOTAL
$3.0 m
$9.0 m
$9.5 m
$9.0 m
$9.0 m
71
Chris Winstead, P.E.
Lynchburg District Engineer
&
Ken King, P.E.
Salem District Engineer
72
SMART SCALE Dashboard
Using the current VDOT Dashboard as a starting point, a new SMART
SCALE Dashboard was developed that is specifically focused on the
SMART SCALE program.
The new dashboard visualization tool:
• tracks on-time and on-budget progress of projects
• emphasizes on-budget and on-schedule (versus estimates and
durations)
• is intuitive and accessible to a wide audience
• is accurate and transparent to the public to let them know how we are
doing.
Once a project is scored and approved by the Commonwealth
Transportation Board (CTB), SMART SCALE projects are fully funded
and their progress can now be viewed on the new dashboard.
SMART SCALE Dashboard
http://dashboard.vasmartscale.org/
SMART SCALE Revised Staff
Recommended Funding Scenario
Lynchburg District
75
SMART SCALE Revised Staff
Recommended Funding Scenario
Salem District
76
New Funding Cycle
Even Fiscal Years
• Smart Scale
Odd Fiscal Years
• Revenue Sharing
• Surface Transportation Block Grant set aside (formally
called the Transportation Alternative Program or TAP)
Every Fiscal Year
• Highway Safety Improvement Program (HSIP)
• State of Good Repair (SGR)
• Regional Surface Transportation Program (RSTP)
• Congestion Mitigation and Air Quality (CMAQ)
State of Good Repair
State of Good Repair
State of Good Repair
Safety Points
Worker and Contractor Safety
Emphasis:
 Virginia Unique Standards are more stringent than Federal
standards. Review applicable standards for compliance.
 The new OSHA Silica standard is in effect, basically prohibiting the
creation of silica dust during construction. New monitoring
requirements and PPE should be in effect. Refer to Table 1 for any
activity where Silica dust may be generated.
 Virginia Administrative Regulations Manual requires training and
usage of equipment and tools be in compliance with manufacturers
recommendations.
 Reporting fatalities and catastrophes.
 Fatalities within 8 hours
 Any work-related inpatient hospitalization, amputation or loss of
eye within 24 hours.
81
Safety Points
Worker and Contractor Safety
•
•
Review and update required employee
training.
Prepare personnel for the day’s tasks.
Ensure staff are knowledgeable of:
• SDS Data and how to obtain access, time is paramount in an
emergency!
• Silica Standard Updated, effective September 23, 2017
•
•
Reducing the permissible exposure limit (PEL) for crystalline silica to 50 micrograms per
cubic meter of air, averaged over an eight-hour shift.
Requiring employers to use engineering controls (such as water or ventilation) and work
practices to limit worker exposure; provide respiratory protection when controls are not
able to limit exposures to the permissible level; limit access to high exposure areas; train
workers; and provide medical exams to highly exposed workers.
• Virginia and OSHA emphasis on misclassification of workers – claiming
82
employees as independent contractors.
Lynchburg District Contacts
Chris Winstead, P.E., District
Engineer
434-856-8173
Robert Guercia, P.E., Engineering,
Planning & Investment
434-856-8174
Terry Meadows, P.E., Construction
434-856-8317
Gerry Harter, P.E., PTOE, Traffic
Engineering
434-856-8211
Dale Totten, P.E., Maintenance
434-856-8175
Chris McDonald, Operations
540-375-0114
Kenneth Martin, Residency
Administrator
(434) 830-4059
Don Austin, Residency Administrator
(434) 352-6675
Scot Shippee, P.E., Residency
Engineer
(434) 505-3255
83
Salem District Contacts
Ken King, P.E., District Engineer
540-387-5348
Robbie Williams, P.E., Construction
540-387-5482
Tommy DiGiulian P.E., LS,
Engineering, Planning &
Investment
540-387-5356
Allen Williams, P.E., Maintenance
540-387-5346
Anne Booker, P.E., PTOE, Traffic
Engineering
540-375-0143
Chris McDonald, Operations
540-375-0114
Lisa Hughes, P.E., Martinsville
Residency Administrator
(276) 629-2582
David Clarke, P.E., Christiansburg
Residency Administrator
(540) 381-7190
Todd Daniels, Bedford Residency
Administrator
(540) 682-7000
Dan Collins, Salem Residency
Administrator
(540) 387-5500
84
Questions?
85