The multiproject created consists of a SIMATIC PC station

The multiproject created consists of a
SIMATIC PC station "EF3020050D", a
SIMATIC 300 station and a SIMATIC 400
station.
Technische Aenderungen vorbehalten.
 Siemens AG 2006
Ind_Eth_error_routing_multi-projects.doc
page 1 / 12
version 20.06.2006
Overview of the network connections in
NetPro:
The SIMATIC PC station "EF3020050D" is
connected to the SIMATIC 300 (1) via
Industrial Ethernet.
Technische Aenderungen vorbehalten.
 Siemens AG 2006
Ind_Eth_error_routing_multi-projects.doc
page 2 / 12
version 20.06.2006
The configuration of the SIMATIC 400 (1):
The "SINAMICS S120" and "MASTERDRIVES CBP2"
drives are connected to the integrated DP interface of
the SIMATIC-CPU 416-2DP via PROFIBUS DP.
The SIMATIC 300 and the SIMATIC 400 are
connected to one another via Industrial Ethernet.
In so doing, a CP 343-1 is used for the SIMATIC 300
and a CP 443-1 for the SIMATIC 400.
Technische Aenderungen vorbehalten.
 Siemens AG 2006
Ind_Eth_error_routing_multi-projects.doc
page 3 / 12
version 20.06.2006
The IE General (the SIMATIC PC
station "EF3020050D") is inserted
into the station configuration editor
so that it can be operated in
configured mode.
Technische Aenderungen vorbehalten.
 Siemens AG 2006
Ind_Eth_error_routing_multi-projects.doc
page 4 / 12
version 20.06.2006
The "EF3020050D", SIMATIC 300 and
SIMATIC 400 stations are loaded via the
SIMATIC Manager.
Technische Aenderungen vorbehalten.
 Siemens AG 2006
Ind_Eth_error_routing_multi-projects.doc
page 5 / 12
version 20.06.2006
The STARTER V4.0 is started from the
SIMATIC Manager to set up the routing
connection from the SIMATIC PC station
"EF3020050D" to the SINAMICS S120
drive via the SIMATIC 300 and the
SIMATIC 400.
Technische Aenderungen vorbehalten.
 Siemens AG 2006
Ind_Eth_error_routing_multi-projects.doc
page 6 / 12
version 20.06.2006
To set up the connection to the
SINAMICS S120 drive, clock on button
"Connect to target system".
Technische Aenderungen vorbehalten.
 Siemens AG 2006
Ind_Eth_error_routing_multi-projects.doc
page 7 / 12
version 20.06.2006
Setting up a connection
with STARTER V4.0 to
the SINAMICS S120
has failed.
Technische Aenderungen vorbehalten.
 Siemens AG 2006
Ind_Eth_error_routing_multi-projects.doc
page 8 / 12
version 20.06.2006
An attempt is made to connect to the
MASTERDRIVES MC Plus via the same routing
connection.
To do this, the Drive Monitor is started from the
SIMATIC Manager.
The drive object MASTERDRIVES MC Plus is
selected with the right mouse button. The context
menu appears:
The Drive Monitor is started via Target system ->
Drive -> Parameterization.
Technische Aenderungen vorbehalten.
 Siemens AG 2006
Ind_Eth_error_routing_multi-projects.doc
page 9 / 12
version 20.06.2006
During the attempt to set up a routing connection to the
MASTERDRIVES MC Plus drive, an error message
appears with a reference to the station configuration editor.
As the station name is already identical and the interface
has been switched to PC internal, one has already made
the settings required for the routing.
Technische Aenderungen vorbehalten.
 Siemens AG 2006
Ind_Eth_error_routing_multi-projects.doc
page 10 / 12
version 20.06.2006
As an alternative to going online via the context
menu with the right mouse button, one can also
start the Drive Monitor from the SIMATIC Manager
by double-clicking on the parameter set.
Technische Aenderungen vorbehalten.
 Siemens AG 2006
Ind_Eth_error_routing_multi-projects.doc
page 11 / 12
version 20.06.2006
The error message with the reference
to the station configuration editor is
also displayed here.
Technische Aenderungen vorbehalten.
 Siemens AG 2006
Ind_Eth_error_routing_multi-projects.doc
page 12 / 12
version 20.06.2006