March 2011 doc.: IEEE 802.11-11/0356r0 Selection Procedure for TGai Date: 2011-03-14 Authors: Name Affiliations Address Phone email Yukimasa Nagai Mitsubishi Electric Corp. +81-457-412115 [email protected] ubishiElectric.co.jp Akira Yamada NTT Docomo, Inc +81-46-8406527 yamadaakira@nttdocomo. com Fujio WATANABE DOCOMO USA Labs Inc. +1-650-4964726 [email protected] Ping Fang Huawei Technologies Co., Ltd. 5-1-1, Ofuna, Kamakura-shi, Kanagawa, Japan 3-6, Hikarino-oka, Yokosuka-shi, Kanagawa, Japan 3240 Hillview Avenue, Palo Alto, CA 94304-1201, USA Vision Software Park, Nanshan District, Shenzhen, Guangdong, China, 518057 +86 755 36835101 [email protected] Submission Slide 1 Yukimasa Nagai, Mitsubishi Electric March 2011 doc.: IEEE 802.11-11/0356r0 Abstract This presentation shows selection procedures of TGn, TGr, TGac TGad and TGah as references for TGai selection procedure Submission Slide 2 Yukimasa Nagai, Mitsubishi Electric March 2011 doc.: IEEE 802.11-11/0356r0 Selection procedure discussed in TGai • Defined documents for TGai in January meeting. • We’ve not defined – Procedure / evaluation methodology for CFP, down selection, etc – Necessary and sufficient condition for documents (11-11/0201r00) Submission Slide 3 Yukimasa Nagai, Mitsubishi Electric March 2011 doc.: IEEE 802.11-11/0356r0 Selection Procedures Documents in others • PHY/MAC: TGn, TGac, TGad • MAC Only: TGr, etc • PHY Only(?): TGah, etc Submission Slide 4 Yukimasa Nagai, Mitsubishi Electric March 2011 doc.: IEEE 802.11-11/0356r0 e.g. TGn Selection Procedure Flow Chart Mergers may take place. The TG may Step 11 decide time required for consideration of new mergers A Initial 60 Minutes presentation for all proposals. Panel discussion. Step 7 Step 8 Step 16 Procedure Start Step 9 Any new mergers? Y Step 2: Adopt Channel Models Step 3: Adopt Functional Requirements Step 4: Adopt Comparison Criteria Step 10 Step 12 Elimination vote. Eliminate proposal with least support. Recess to allow merger granted at option of TG. Presentation of merged proposals. Y N Step 1: Adopt Usage Models Step 11 Mergers may Step 13 The remaining take place. proposals may The TG may undergo technical decide time changes without required for requiring a consideration of merge. new mergers Any Mergers take place? Discard unmerged partial proposals. Step 13 N Final 5 minute statement. 25% low-bar Elimination vote The remaining proposals may undergo technical changes without requiring a merge. More than 1 proposal left? Y Presentation of all remaining proposals Y Panel Discussion at option of the chair N Step 5: Issue Call for Proposals Step 14 60 minute presentation of remaining proposals including Q & A Step 17 Step 15 More than 1 proposal left? N Statements from no voters of why they voted no. Roll-call confirmation vote N Step 20 Editor prepares Draft 1.0. Vote that it is technically consistent with technical spec. Step 6: Classify Proposals Step 19 Adopt proposal as initial technical specification Y 75% for ? Response by proposers. 75% for ? Roll-call confirmation vote N Y 75% for ? Y Step 11 Step 21 Forward Draft 1.0 to WG for Letter Ballot A Procedure End Submission Slide 5 Mergers may take place. The TG may decide time required for consideration of new mergers Step 18 N Step 13 The remaining proposals may undergo technical changes without requiring a merge. Bring back last three proposals Drawing by Adrian Stephens September 16, 2003 Yukimasa Nagai, Mitsubishi Electric March 2011 doc.: IEEE 802.11-11/0356r0 e.g. TGac Selection Procedure Flow Chart Usage Models Channel Models Functional Requirements* Draft Spec Complete and Coherent Enough for Letter Ballot? 75%?) Specification Framework Sufficient Support for Framework? (50%? or 75%?) Y N Contributions and Decision Making on Spec Element(s) 75% Y Letter Ballot N * Functional requirement document to include System Level Performance Targets and Simulation Instructions Note: This proposal does not foresee any changes to the subsequent steps in the IEEE procedure (Letter Ballots, Sponsor Ballots) Submission Slide 6 Yukimasa Nagai, Mitsubishi Electric March 2011 doc.: IEEE 802.11-11/0356r0 e.g. TGah Selection Procedure Flow Chart Submission Slide 7 Yukimasa Nagai, Mitsubishi Electric March 2011 doc.: IEEE 802.11-11/0356r0 e.g. TGad Selection Procedure Flow Chart A Procedure Start Y Step 3 Step 1: Issue Call for New Techniques and Complete Proposals Presentations of Complete Proposals Mergers N Step 4 Step 1 Step 6 Step 1 Strawpoll may be held on Complete Proposals Step 8 Any Mergers take place? Step 7 N Confirmation vote? Step 5 Step 2 Presentations of New Techniques Proposals Y Confirmation vote achieves 75%? Y Confirmed proposal becomes initial technical specification Procedure End A Submission Slide 8 Yukimasa Nagai, Mitsubishi Electric N March 2011 doc.: IEEE 802.11-11/0356r0 e.g. TGr Selection Procedure Document • Definitions for documents – Functional Requirements – A list of mandatory features, performances and behaviors of the amendment. These requirements shall be consistent with the PAR, the 5 Criteria and the Usage Models. The Functional Requirements document shall contain a template that defines the format that presenters shall use to declare compliance with the requirements. – Comparison Criteria – A list of metrics and their definitions by which proposals shall be compared. The Comparison Criteria document shall contain a template that defines the format that presenters shall use to state their responses. – Other definitions in TGr: Complete Proposal, Partial Proposal. • Steps of the Procedure 1. TGr shall adopt Usage Models for the IEEE 802.11r amendment. 2. Deleted 3. TGr shall adopt Functional Requirements that must be met by all complete proposals. (ToDo: necessary?) 4. TGr shall adopt Comparison Criteria that must be addressed by all proposals. (ToDo: delete?) 5. TGr shall issue a call for proposals. 6. Prior to the first vote, the presenters shall classify their proposals as partial or complete. (continued Step 21) Submission Slide 9 Yukimasa Nagai, Mitsubishi Electric March 2011 doc.: IEEE 802.11-11/0356r0 e.g. Proposed TGai Selection Procedure Procedure Start Step 3: Adopt Evaluation Criteria Step 2: Adopt Functional Requirement Step 1: Adopt Use Case Step 4: Issue Call for Proposals Step 5: Classify Proposals Need to Update Step 6: Baseline documents N Sufficient Support for Functional Requirement and Evaluation Criteria ? (50%? Or 75%?) Submission Step 7: Y Step 8: Contributions and Decision Making on Spec Element(s) Draft Spec Complete and Coherent Enough for Letter Ballot ? (75%?) Step 9: 75% Y Step 10: Letter Ballot N Slide 10 Yukimasa Nagai, Mitsubishi Electric March 2011 doc.: IEEE 802.11-11/0356r0 Suggestions • Define following unclear subjects before CFP ! – Procedure / evaluation methodology for CFP, down selection, etc – Necessary and sufficient condition for documents • Use Case • Functional Requirement • Evaluation Criteria – accept partial proposals or not – etc Submission Slide 11 Yukimasa Nagai, Mitsubishi Electric March 2011 doc.: IEEE 802.11-11/0356r0 References • 11-03-0665-09-0000-tgn-selection-procedure.doc • 11-09-0059-06-00ac-802-11ac-proposed-selectionprocedure.doc • 11-09-0935-05-00ad-selection-procedure.doc • 11-11-0239-02-00ah-proposed-selection procedure.docx • 11-04-0782-00-000r-tgr-selection-procedure.doc • 11-11-0201-00-00ai-tgai-closing-report-losangelsjanuary-2011-ppt.ppt Submission Slide 12 Yukimasa Nagai, Mitsubishi Electric
© Copyright 2026 Paperzz