EN-CV Review TT2 12-01-2016 Cooling PS – TT2: existing Booster cooling plant : For all equipments from Booster + TT2 Nominal pressure:14 bar Flow capacity: 310 m3/h Central building cooling plant : Copper circuit for power converters, RF,.. All equipments except main magnets Nominal pressure: 15 bar Flow capacity: 160 m3/h Main magnet cooling plant : Aluminium circuit for main magnets. Nominal pressure:10 bar Flow capacity: 260 m3/h Cooling 1/2 Consolidation during LS2 : • Project approved: • Refurbishment of the Booster TT2 cooling plant • Refurbishment of the PS Central building cooling plant • Refurbishment of the PS Main magnet cooling plant • The connection of the TT2 cooling to the PS central building plant is not included in the consolidation program. • A reasonable technical solution should be found to supply TT2 (including the new power converters in bldg. 269) by the PS circuit during this YETS. Cooling 2/2 • The central building cooling plant can’t take the future needs for the PS (even without the TT2) because of the 10 MHz cavities and probably other requirements (new beam dumps, new ionization profile monitor and one additional magnet, new vertical correctors,..) • In the PS the diameters of the pipes are already small compare to the actual flow. A replacement of the distribution lines are not included in the consolidation packages. Ventilation TT2: Existing • 4 air handling units only for thermal load. • No smoke extraction, fresh air, ventilation mode, etc.. • Air handling units replaced in 2001 • Chilled water coming from the ISR circuit. • Consolidation have been postponed after LS2 • The thermal load is low so the impact of a chilled water failure does not have an immediate effect. This allows in many cases to repair before affecting the beam. Summary Installation Work Budget Schedule of installation TT2 magnet cooling New lines in order to supply cooling from the PS Following the technical solution could be consolidation or LIU Probably in LS2 TT2 power converters in bldg. 269 New distribution inside the renovated bldg. 269 LIU budget See presentation LIU in September Ventilation of the bldg. 269. Replacement of the existing ventilation with a new one. LIU budget See presentation LIU in September Summary Installation Work Budget Schedule of installation Ventilation in TT2 No work foreseen Chiller water for the air handling units TT2 Replacing the existing pipes Consolidation After LS2 PS distribution: from cooling central bldg If needed replace LIU the pipes by bigger ones to cope with the LIU additionnal needs. LS2 Summary Installation Work Budget Schedule of installation Booster cooling plant Full refurbishment Consolidation Without TT2 needs LS2 PS Central building cooling plant Full refurbishment including TT2 needs. Consolidation LS2 PS Main magnet cooling plant Full refurbishment Consolidation LS2
© Copyright 2026 Paperzz