State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder) 1 2 Agenda Timeline: detailed schedule Translation and Certification Country pilot feedback Country pilot results 3 Tasks and Timetable (from March 2007) Phase 1: First Pre-Test by December 2007 First survey draft: finished in July 2007 Programming: finished in September 2007 1st pilot : finished successfully in September/October 2007 2nd pilot: not in the field in January 2008, “in-house” testing Phase 2: Main Survey ready by November 2008 survey revision and translation for country pilots: March 2008 country pre-testing: July 2008 Phase 3: “First Results” by December 2009 data collection finished: June 2009 cleaning and first evaluation: November 2009 4 Timeline – Pre-Test Translations (LMU open): Version 3.5 (changes from pilot): May 2nd to May 9th Version 3.6 (pre-test version): May 16th to May 23rd SMS/CAPI versions scheduled release: Version 3.5 (generic): May 6th -> feedback until May 12th Version 3.5 (country): May 16th (Translation!) Version 3.6 (generic): May 16th Version 3.6 (country): May 30th (Translation!) SMS Server: First version released May 9th Final generic version May 16th 5 Timeline – Pre-Test Fieldwork material: SRC prepares To be delivered by May 13th Preload database: Prepared by MEA by May 16th Checked by Agencies until pre-test starts in June TTT: Server SMS: May 19th, Frankfurt Airport, 10:30-16:00 Make sure Survey Agencies know! May 27th-29th in Mannheim 6 Timeline – Pre-Test Pre-Test Field Duration: National Training Sessions (NTS) from June 2nd to 13th Deliver Data by July 18th (50 days after TTT) After the pre-test… Evaluation of pre-test results in August Edesheim 21./22.8. Translate the changes to final version TTT September 23rd – 26th in Mannheim Main Field Duration: Start in October/November 2008 Be finished by March/April 2009 7 Translation 8 Adaptation Certification Done externally by cApStAn Received a subset of the translated questions Evaluate adaptations using the generic questionnaire 14 Items in the first round, for all countries Based on first round results, second round with 11 Items 5 out of 10 versions went into second round Overall, some flaws were found, some questioning the comparability of the questions across countries For the LMU 3.5, each country will receive the results of the certification separately tomorrow (4-30) 9 Pilot - Feedback Thanks to all CTLs for providing feedback! The interviewer feedback is mainly positive Interview enjoyable Almost no technical breakdowns Flexible modules order was not used Corrections were made via the calendar The search tool is not used… 10 Length by Country SE DK DE FR BE_FR NL AT IT ES GR Median CZ Mean PL Total 0 20 40 60 Minutes 80 100 120 11 Length by Region Mean Median N 50.42 46.33 72 84.87 76.00 61 55.93 52.22 87 67.40 63.26 150 0 .005 .01 .015 .02 .025 Group East North South West 0 50 100 X North East 150 200 West South 12 Length by Module 2.83 3.85 2.03 3.02 Children Partner 8.88 Accommodation 11.79 3.23 3.65 Child SES 12.38 Work (no WQ/DQ) 3.33 3.68 Work Quality Work Disability Financial 14.92 0.93 1.32 1.13 1.45 5.33 Health 6.42 6.10 6.80 Health Care Median Mean 3.25 4.11 General Life 0 3 6 Minutes 9 12 15 13 Accommodation 7.29 7.85 4.67 6.94 8.90 7.43 4.52 3.53 5.90 4.00 3.00 3.85 5.66 SE DK DE FR BE_FR NL AT IT ES GR Median CZ Mean PL Total 0 5 10 15 Length of AC Module 20 25 14 Work 3.23 3.00 2.79 2.68 2.48 3.07 2.42 1.75 2.40 1.76 2.42 2.21 2.51 SE DK DE FR BE_FR NL AT IT ES GR Median CZ Mean PL Total 0 5 10 15 20 Length of RE Module 25 30 15 Age 70 Median 68 Mean 66 Minutes 64 62 60 58 56 54 52 < 58 59 - 66 67 - 73 74 - 82 > 83 Age Groups 16 Length Summary We are overall OK in terms of time What happened in Denmark? Some quick stats: 2% > 2.5 h 4% > 2 h 15% > 1.5 h 26% < 45 min 3% < 30 min But: still add CV and Grip Strength 17 And what now…? Cuts or changes have already been made in the… AC module: moves starting at age 10 RE module: some questions out, clarified others (ISCO) HS module: deleted some questions, combined others HC module: major cuts in the loops for preventive care RC module: cut the stillbirths and abortion loop RP module: improved the marriage section Addition in the GL-module on persecution Thanks to Radim and Michal for pointing this out One general filter and then some follow up questions 18 And what now…? Thanks! 19
© Copyright 2026 Paperzz