Gold Standard Local Stakeholder Consultation Report CONTENTS A. Invitations 1. Invitation tracking table 2. Text of invitations or newspaper ads B. Meeting 1. Program 2. Non-technical summary 3. Participants i. list ii. feedback forms 4. Pictures 5. Outcomes of consultation i. Minutes of the meeting ii. Assessment of comments iii. Revisit sustainable development assessment iv. Summary of alterations based on comments C. Sustainable development matrix 1. Own sustainable development assessment 2. Outcome blind exercise stakeholders 3. Consolidated sustainable development matrix D. Preparation of Stakeholder Feedback Round Annex 1: Participant list Annex 2: Feedback forms Gold Standard Local Stakeholder Consultation Report SECTION A. A.1. Invitations Invitation tracking table Category Code Organisation (if relevant) Name of invitee Way of invitation Date of invitation A เจ้าอาวาสวัดร่ มเมือง Abbot of Rommueng temple Personal contact July 2, 08 A เจ้าอาวาสวัดกมลศรี Abbot of Kamolsri temple Personal contact July 2, 08 Y B นายกเทศมนตรี เทศบาลตาบลควนกุน Mayor of Kuan kun municipal district นายกองค์การบริ หารส่ วนตาบลกะลาเส Mayor of Kalase Subdistrict administration organization ผูอ้ านวยการโรงเรี ยนวัดเจริ ญร่ มเมือง Principal of Watcharoenrommueng school ผูอ้ านวยการโรงเรี ยนวัดกมลศรี Principal of Kamolsri school พระครู สุกิจวิธาน Monk Sukitvithan พระครู กมลวรการ Monk Kamolworakarn คุณเขียว อั้นเต้ง Kiao Anteng Confirmation received? Y/N Y Personal contact July 2, 08 Y คุณประสิ ทธิ์ ตี้ฮอ้ Prasit Teehor Personal contact July 2, 08 Y คุณกันภัย คุปกุนกานต์ Kanpai Kupkunnakarn Personal contact July 3, 08 Y คุณเคลือบ เผือกจีน Kleab Puakjean คุณเสรี พาณิชย์กุล Seri Panichayakul คุณชัยฤทธิ์ ถ่ายย้วน Chailit Taiyuan Personal contact July 3, 08 Y Personal contact July 4, 08 Y Personal contact July 3, 08 Y คุณยงยุทธ ตี้ฮอ้ Yongyut Teehor คุณเกีรติศกั ดิ์ ตี้ฮอ้ Kiatisak Teehor คุณณัฐพร สิ นไชย Nattaporn Sinchai Personal contact July 4, 08 Y Personal contact Personal contact July 5, 08 Y July 2, 08 Y คุณสงวน อันตั้ง Sanguan Antung Personal contact July 4, 08 Y คุณเดชา เกื้อกูล Decha Kuakul Personal contact July 2, 08 Y B A A B นายอาเภอสิ เกา Sikao Sheriff A กานันตาบลกะลาเส Village headman of Kalase subdistrict ผูใ้ หญ่บา้ นหมู่ 2 Head of moo 2 village A A B B B ผูใ้ หญ่บา้ นหมู่ 5 Head of moo 5 village สจ. เขตพื้นที่สิเกา Member of province administrative organization at Si kao area สจ.เขตพื้นที่สิเกา Member of province administrative organization at Si kao area ผูแ้ ทนอุตสาหกรรมจังหวัดตรัง Department of an industrial officer of Trang Province Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 2 Gold Standard Local Stakeholder Consultation Report B A สวัสดิการและคุม้ ครองแรงงานจังหวัดตรัง Department Labour Protection and Welfare, Trang province บริ ษทั โอทาโก้ จากัด Otaco Co., Ltd. A บริ ษทั ตรังน้ ามันปาล์ม จากัด A บริ ษทั พิทกั ษ์ปาล์มออยล์ จากัด Pitak Palm Oil Co., Ltd. A ประชาชนตาบลกะลาเส Citizen of Kalase district A A ประชาชนตาบลกะลาเส Citizen of Kalase district ประชาชนตาบลกะลาเส Citizen of Kalase district ประชาชนตาบลกะลาแส Citizen of Kalase district ข้าราชการบานาญ Retired governmental officer teacher A teacher A ประชาชนตาบลกะลาแส Citizen of Kalase district A ประธานชุมชนหัวสะพาน Head of Huasapan community หัวหน้าสถานีอนามัยตาบลกะลาแส Head of Kalasae Health Center เจ้าหน้าที่สาธารณสุ ขสถานีอนามัยกะลาเส officer of Sanitarian and public health center of Kalase district ครู โรงเรี ยนบ้านสายควน Teacher of Ban Sai Kuan A A A A B B A คุณเตือนจิต ศรี ศาลา Tuenjit Srisara Personal contact July 2, 08 Y คุณสุ วทิ ย์ ดรุ กานนท์ Suwit Darukanon คุณมานิต วงษ์สุรีรัตน์ Manit Wongsurirat คุณนันทนา พนาพิทกั ษ์กุล Nantana Panapitakkul คุณประเสริ ฐ ตี้ฮอ้ Prasert Teehor คุณฉลอง ล่องตี้ Chalong Longtee คุณยอง ภัตศรี Yong Patsri คุณทวน ชุ่นจ้อ Tuan Chunjor คุณวิวฒั น์ ฮ่างเต็ก Wiwat Hangtek คุณเฉลิม เดชะพันธ์ Charoem Dechapan ครู คล่อง ปิ ยดิลก Klong Piyadilok ครู ยวน พงษ์ศิริกุล Yuan Pongsirikul ป้าพริ้ ง พรหมบังเกิด Prink Prombangkert คุณสมพร นะแก้ว Somporn Nakaew คุณสมพล เสี ยมไหม Sompol Siammai คุณประเสริ ฐ ผนึกทรัพย์สกุล Prasert Panuksapskul คุณเยาวรัตน์ ศรี กระจ่าง Yaowarat Sri Personal contact July 2, 08 Y Personal contact July 2, 08 N Personal contact July 2, 08 Y Personal contact Personal contact July 4, 08 Y July 3, 08 Y Personal contact Personal contact Personal contact Personal contact July 3, 08 Y July 3, 08 Y July 3, 08 Y July 5, 08 Y Personal contact Personal contact July 3, 08 Y July 5, 08 Y Personal contact July 5, 08 Y Personal contact July 3, 08 Y Personal contact July 3, 08 Y Personal contact July 5, 08 Y Personal contact July 3, 08 Y Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 3 Gold Standard Local Stakeholder Consultation Report A F F F F F D D school ประชาชน Citizen มูลนิธิสถาบันพลังงานทดแทนแห่ งประเทศไทย Renewable Energy Institute of Thailand Foundation (REITF) World Wide Life Fund (WWF) Greenpeace Krajang คุณจาลอง บูกง้ Jumlong Bookong คุณวนัน เพิ่มพิบูลย์ Wanun Permpibul - Appropriate Technology Association Dhammanart Foundation - ผูส้ ื่ อข่าว TV5 Press from TV5 media ผูส้ ื่ อข่าว TV5 Press from TV5 media คุณศรี อิ้งมู Sri Ingmoo คุณมนต์เจริ ญ ศรี มงคล Moncharoen Srimongkol คุณฐิติพงษ์ ยังช่วย Titipong Yungshuay คุณปิ ยวัฒน์ หย่อมพิบูลย์ D ผูส้ ื่ อข่าว NBT Press from NBT media D ผูส้ ื่ อข่าว TV3 Press from TV3 media - Personal contact July 3, 08 Y E-mail and telephone call Telephone call Telephone call Telephone call Telephone call Telephone call Telephone call April 08 Y 28, April 28 N April 28 N April 28 N April 28 N July 9, 08 Y July 9, 08 Y Telephone call July 9, 08 Y Telephone call July 9, 08 Y A. 2. Invitation text Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 4 Gold Standard Local Stakeholder Consultation Report Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 5 Gold Standard Local Stakeholder Consultation Report Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 6 Gold Standard Local Stakeholder Consultation Report SECTION B. Meeting B. 1. Agenda of the meeting [See Toolkit 2.6.1 and Toolkit Annex J] The first Stakeholder Agenda ครั้ งที่ 1วันที่ 27พฤษภาคม 2551 ณ ห้ องประชุมอาเภอสิ เกา อาเภอสิ เกา จังหวัดตรั ง 09.00–09.30 น. ลงทะเบียนการประชุม 09.30– 09.40 น. การกล่าวต้อนรับและเชิญผูม้ ีส่วนเกี่ยวข้องในการจัดทาโครงการซีดีเอ็ม 09.40–10.00 น. การบรรยายหัวข้อความเป็ นมาเกี่ยวกับโครงการ ระบบบาบัดน้ าเสี ย โดย คุณสว่ าง เลิศถิรสุนทร ,บริ ษัท สหอุตสาหกรรมนา้ มันปาล์ ม จากัด (มหาชน) 10.00–10.20 น. การบรรยายรายละเอียดเกี่ยวกับระบบบาบัดน้ าเสี ย โดย คุณบดินทร์ ลือเลิศยศ สถาบันวิจัยและพัฒนาพลังงาน มหาวิทยาลัยเชียงใหม่ 10.20–10.40 น. พักรับประทานอาหารว่างและเครื่ องดื่ม 10.40–11.00 น. การบรรยายเกี่ยวกับความเป็ นมาของโครงการซีดีเอ็มและการลดการปลดปล่อยก๊าซเรื อนกระจก โดยบริ ษทั เอ็นวีม่า (ประเทศไทย )จากัดโดย คุณธาริ ณี ลีพ้ ูลทรั พย์ บริ ษัท เอ็นวีม่า (ประเทศไทย )จากัด 11.00–11.20 น. การบรรยายเกี่ยวกับสถานการณ์ ภาวะโลกร้อนกับการซื้อขายคาร์บอนภายใต้มาตรฐานโกลด์แสตนดาร์ด (Gold Standard) โดยคุณวนัน เพิ่มพิบูลย์ ,มูลนิธิสถาบันพลังงานทดแทนแห่ งประเทศไทย 11.20–12.00 น. อภิปรายซักถาม 12.00– 13.30 น. รับประทานอาหารกลางวัน 13.30 น. เยี่ยมชมโครงการ (สาหรับผูท้ ี่มีความสนใจ) The second stakeholder agenda ครั้ งที่ 2วันที่ 10 กรกฎาคม 2551 ณ ห้ องประชุมเทศบาลตาบลควนกุน อาเภอสิ เกา จังหวัดตรั ง 09.00 – 09.25 น. ลงทะเบียนการประชุม 09.25– 09.40 น. การกล่าวต้อนรับและเชิญผูม้ ีส่วนเกี่ยวข้องในการจัดทาโครงการซีดีเอ็ม 09.40– 10.00 น . การบรรยายวัตถุประสงค์ ความเป็ นมาเกี่ยวกับโครงการการผลิตก๊าซชีวภาพ สรุ ปผลการประชุมผูม้ ีส่วนเกี่ยวข้องในการจัดทาโครงการครั้งที่ 1(26 พฤษภาคม )2551 โดย คุณสว่ าง เลิศถิรสุนทร ,บริ ษัท สหอุตสาหกรรมนา้ มันปาล์ ม จากัด (มหาชน) 10.00– 10.30 น. การบรรยายเกี่ยวกับปรากฏการณ์ภาวะเรื อนกระจก การลดการปลดปล่อยก๊าซเรื อนกระจก ความเป็ นมาและขั้นตอนการดาเนินการโครงการกลไกการพัฒนาที่สะอาด หรื อ ซีดีเอ็ม (Clean Development MechanismCDM) สรุ ปผลการศึกษาการประเมินผลกระทบสิ่ งแวดล้อมเบื้องต้นภายใต้โครงการซีดีเอ็ม (IEE) โดย คุณธาริ ณี ลีพ้ ูลทรั พย์ บริ ษัท เอ็นวีม่า (ประเทศไทย )จากัด 10.30– 10.45 น. พักรับประทานอาหารว่าง 10.45– 11.15 น . การบรรยายรายละเอียดเกี่ยวกับระบบการผลิตก๊าซชีวภาพ โดย คุณอลงกรณ์ ศิริพฒั น์ สถาบันวิจัยและพัฒนาพลังงาน มหาวิทยาลัยเชียงใหม่ 11.15 – 11.45 น. การบรรยายเกี่ยวกับสถานการณ์ ภาวะโลกร้อนกับการซื้อขายคาร์บอนภายใต้มาตรฐานโกลด์แสตนดาร์ด (Gold Standard) โดยคุณวนัน เพิ่มพิบูลย์ ,มูลนิธิสถาบันพลังงานทดแทนแห่ งประเทศไทย 11.45– 12.30 น. อภิปราย การตอบข้อซักถาม การสอบถามความคิดเห็นจากผูม้ ีส่วนเกี่ยวข้องกับโครงการ Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 7 Gold Standard Local Stakeholder Consultation Report 12.30 – 13.30 น. รับประทานอาหารกลางวัน B. 2. Non-technical summary [See Toolkit 2.6.1 and Toolkit Annex J] The Lam Soon Trang factories have daily average production rates of 300 tonnes of FFB (fresh fruit bunches) on 300 days per year and 16 hrs/day of operation. Currently the factory is operating a conventional open pond waste water treatment system with several open ponds. A modern waste water treatment technology will be implemented at Lam Soon (Thailand) PCL to clean the wastewater generated in the production processes (an average of 0.8 m3 per ton of FFB of wastewater is generated). This palm oil mill processes about 90,000 tonnes FFB and thus 75,000 m3 wastewater per year. This digester system will recover methane and produce biogas. The latter will be utilized for electricity generation for on-site usage and feeding into the grid. The proposed project activity is expected to foster sustainable development on the local, regional and national scale in several regards: Impacts on the local and regional level - As a result of reduced methane emissions, offensive smells from the operation of the plant will be minimized. The project activity will thus improve living standards for employees and working standards of the local community. The expected wastewater from the palm oil mill will be reused in their own factory and not contribute to additional smell or harmful discharge to open water bodies. - Produced biogas can be used to produce electricity feed into the grid to substitute approx. 6,483 MWh/year that would otherwise have been generated from fossil fuels with high green house gas emission. This substitution will lower the emission of air pollutants. - The chemical oxygen demand (COD) of effluents will be reduced by approximately 90 percent (wastewater system design calculation from Chiang Mai University) - The significant reduction of COD of discharged water helps to protect natural water resources (groundwater) and thus to improve the quality of the water supplied to the local community. The treated wastewater will finally be used as liquid fertilizer on the grass area within the factory boarders. - Treated sludge can be used for fertilizing farm land without negatively impacting ground water quality. - The construction, operation and maintenance of the anaerobic wastewater and biogas system will create additional employment opportunities. During construction within 18 months a total of approximately 40 temporary jobs and during operation 5 permanent jobs (technicians, engineers) will be created. Impacts on the national level - The project activity helps to reduce the dependency on fossil fuels by implementing a modern technology that produces biogas (autonomous renewable energy). - The project activity might constitute a positive example for other palm oil plants in Thailand. Applied on a large scale, the project type may have macroeconomic benefits by reducing the need for fossil fuel imports. - The project activity serves the industrial pollution prevention scheme of the government according to the 10th National Economic and Social Development Plan (NESDP) 2007 - 20111. The NESDP focuses, amongst others, on the promotion on renewable energy, improving energy conservation, fighting air pollution and promoting eco-efficiency of the agro-industry of Thailand. On the global level, the project activity reduces emissions of greenhouse gases, primarily of methane. The project involves technology know-how transfer to local communities. The CSTR (completely stirred tank 1 The National Economic and Social Development Plan (NESDP) 2007 - 2011, National Economic and Social Development Board (NESDB), Office of the Prime Minister, Bangkok 2007. Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 8 Gold Standard Local Stakeholder Consultation Report reactor) system for this project is developed by ERDI from Chiangmai University in the north of Thailand to enhance the treatment efficiency for palm oil wastewater with its special characteristics, containing oil and other ingredients different from other industries. The know-how transfer will be done by technicians from ERDI in a training program. The training includes technical, environmental and safety knowledge and operational and maintenance instructions. Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 9 Gold Standard Local Stakeholder Consultation Report B. 3. Participants i. List of participants [See Toolkit 2.6.1 and Toolkit Annex J] Please attach participant list in Annex 1. Participant list stakeholder consultation (The first meeting) Date and time: 27 May 2008 9:00 a.m. Location: meeting room of Sikao district administration building ชื่ อ สกุล ลำดับที/่ Name surname number 1 พระครู สุกิจวิธาน Monk Sukitvithan, 2 3 4 พระครู กมลวรการ Monk Kamolworakarn คุณเสรี พาณิ ชย์กุล Seri Panichakul คุณเขียว อั้นเต้ง Kiao Anteng 5 คุณประสิ ทธิ์ ตี้ฮอ้ Prasit Teehor 6 คุณกันภัย คุปกุนกานท์ Kanpai Kupkoonkarn 7 คุณเคลือบ เผือกจีน Kluab Puakjene คุณชัยฤทธิ์ ถ่ายย้วน Chailit Taiyuan 8 9 คุณณัฐพร สิ นไชย Nattaporn Sinchai 10 คุณยงยุทธ ตี้ฮอ้ Yongyut Teehor คุณสายันต์ 11 ตำแหน่ งหน่ วยงำน/Position/organization เจ้าคณะอาเภอวังวิเศษ เจ้าอาวาสวัดเจริ ญร่ มเมือง Abbot of Jaroenrommueng Temple เจ้าอาวาสวัดกมลศรี Abbot of Kamolsri temple นายอาเภอสิ เกา Si Kao district chief officer นายกเทศมนตรี เทศบาลตาบลควนกุน Mayor of Kuan kun municipal district นายกองค์การบริ หารส่วนตาบลกะลาเส Mayor of Kalase Subdistrict administration organization ผูอ้ านวยการโรงเรี ยนวัดเจริ ญร่ มเมือง Principal of Watcharoenrommueng school ผูอ้ านวยการโรงเรี ยนกมลศรี Principal of Kamolsri school กานันตาบลกะลาเส Village headman of Kalase subdistrict สจ .เขตพื้นที่สิเกา Member of province administrative organization at Si kao area ผูใ้ หญ่บา้ นหมู่ 2 Head of moo 2 village ผูแ้ ทนผูใ้ หญ่บา้ นหมู่ 5 Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD เพศ/ Sex M เบอร์ โทรติดต่ อ/ contact detail 6521752-089 M - M 8671330-081 M 2-293001-075 M 7437772-089 M 267077-075 M 213606-075 M 0776365-085 F 086-8667744 M 085-7836227 M - 10 Gold Standard Local Stakeholder Consultation Report ลำดับที/่ number 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ชื่ อ สกุล Name surname Sayan คุณวิทยา จิราจินดากุล Witaya Jirajindakul Head of moo 5 village ผูแ้ ทนอุตสาหกรรมจังหวัดตรัง Department of an industrial officer of Trang Province คุณชานินทร์ ดรุ กานนท์ Chanin Darukarn คุณมานิต วงษ์สุรีรัตน์ Manit Wongsurirat คุณประกอบ ทองนะ Prakorb Tongna คุณประเสริ ฐ ตี้ฮอ้ Prasert Teehor คุณฉลอง ตี้ฮอ้ Chalong Teehor คุณเพ็ญจันทร์ ภัตศรี Chanpen Patsri คุณชาม ชู่พลิ้ว Cham Chuplew คุณพรรณพัชร ฮ่างเต็ก Panpat Hangtek คุณยวน พงศ์ศิริกุล Yuan Pongsirikul คุณสมพล เสี ยมีใหม Sompol Siameemai คุณเยาวรัตน์ ศรี กระจ่าง Yaowarat Srikrajang คุณวินยั ล่องตี้ Winai Longtee คุณพงษธร ลาเลิศกิตติกุล Pongsatorn Lumlertkittikul คุณจินตนา คงช่ง Jintana Kongchong คุณสว่าง เลิศถิรสุ นทร Sawang Lertirasoontorn คุณวนัน เพิ่มพิบูลย์ Wanun Permpibul เพศ/ Sex ตำแหน่ งหน่ วยงำน/Position/organization เบอร์ โทรติดต่ อ/ contact detail M - บริ ษทั โอทาโก้ จากัด Otaco Co., Ltd. บริ ษทั ตรังน้ ามันปาล์ม จากัด M 075-267141 M 075-570008 บริ ษทั พิทกั ษ์ปาล์มออยล์ จากัด Pitak Palm Oil Co., Ltd. ประชาชนตาบลกะลาเส Citizen of Kalase district ประชาชนตาบลกะลาเส Citizen of Kalase district ประชาชนตาบลกะลาเส Citizen of Kalase district ประชาชนตาบลกะลาเส Citizen of Kalase district ประชาชนตาบลกะลาแส Citizen of Kalase district ครู โรงเรี ยนบ้านบางค้างดาล Teacher of Ban Bangkangdan school เจ้าหน้าที่สาธารณสุ ขสถานีอนามัยกะลาเส officer of Sanitarian and public health center of Kalase district ครู โรงเรี ยนบ้านสายควน Teacher of Ban Sai Kuan school ประชาชนตาบลกะลาเส Citizen of Kalase district ตรัง ไปโอเทคโนโลยี จากัด Trang Biotechnology Co., Ltd. ประชาชนตาบลกะลาเส Citizen of Kalase district ผูจ้ ดั การทัว่ ไป บริ ษทั ล่าสู ง จากัด General Manager Lam Soon PCL. มูลนิธิสถาบันพลังงานทดแทนแห่งประเทศไทย M 3268461-081 M 086-2786493 M 075-267222 F 087-8816952 F - F 081-9789579 F 089-4699667 M 075-267102 F 230257-075 M 075-267222 M 083-1522057 F 084-0595678 M 089-9686366 F 081-7239866 Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 11 Gold Standard Local Stakeholder Consultation Report ชื่ อ สกุล ลำดับที/่ Name surname number 29 คุณธาริ ณี ลี้พูลทรัพย์ Tarinee Leepulsap 30 คุณบดินทร์ ลือเลิศยศ Bordin Luelertyot 31 คุณอัจฉริ ยะ นพรัตน์ Audchariya Nopparat คุณโสภณ รักรู ้ Sopol Rakroo คุณลดาพร ขุณิกากรณ์ Ladaporn Kunikakorn 32 33 เพศ/ Sex F เบอร์ โทรติดต่ อ/ contact detail 086-3483272 M 086-1845182 M 089-8114301 M 086-2697385 F 089-4447970 ตำแหน่ งหน่ วยงำน/Position/organization ผูเ้ ชี่ยวชาญด้านสิ่ งแวดล้อม บริ ษทั เอ็นวีม่า)ประเทศไทย(จากัด Environmental Specialist Envima(Thailand) Co., Ltd. วิศวกรสิ่ งแวดล้อม สถาบันวิจยั และพัฒนาพลังงาน )สวพ.( มหาวิทยาลัยเชียงใหม่ Environmental Engineer, Energy Research and Development Institute, ChiangMai University ผูจ้ ดั การโรงงานล่าสู งตรัง Manager, Lam Soon Trang Factory หัวหน้าฝ่ ายผลิตน้ ามันเมล็ดในปาล์ม Chief of Palm Oil production ผูเ้ ชี่ยวชาญด้านการเปลี่ยนแปลงสภาพภูมิอากาศ Climate Change Specialist Participant list stakeholder consultation (The second meeting) Date and time: 10 July 2008 9:00 a.m. Location: meeting room of Kuan Kun Municipal District Administration Building ชื่ อ สกุล ลำดับที/่ Name surname number 1 พระครู กมลวรการ Monk Kamolworakarn 2 คุณเสรี พาณิ ชย์กุล Seri Panichakul 3 คุณเขียว อั้นเต้ง Kiao Anteng 4 คุณประสิ ทธิ์ ตี้ฮอ้ Prasit Teehor 5 คุณชัยฤทธิ์ ถ่ายย้วน Chailit Taiyuan 6 คุณชัยฤทธิ์ ถ่ายย้วน Chailit Taiyuan ตำแหน่ งหน่ วยงำน/Position/organization เจ้าอาวาสวัดกมลศรี Abbot of Kamolsri temple นายอาเภอสิ เกา Si Kao district chief officer นายกเทศมนตรี เทศบาลตาบลควนกุน Mayor of Kuan kun municipal district นายกองค์การบริ หารส่วนตาบลกะลาเส Mayor of Kalase Subdistrict administration organization ผูอ้ านวยการโรงเรี ยนวัดเจริ ญร่ มเมือง Principal of Watcharoenrommueng school กานันตาบลกะลาเส Village headman of Kalase subdistrict Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD เพศ/ Sex M เบอร์ โทรติดต่ อ/ contact detail - M 8671330-081 M 2-293001-075 M 7437772-089 M 267077-075 M 0776365-085 12 Gold Standard Local Stakeholder Consultation Report ชื่ อ สกุล ลำดับที/่ Name surname number 7 คุณณัฐพร สิ นไชย Nattaporn Sinchai 8 9 คุณยงยุทธ ตี้ฮอ้ Yongyut Teehor คุณสงวน อันตั้ง Sanguan Antung เพศ/ Sex สจ .เขตพื้นที่สิเกา Member of province administrative organization at Si kao area ผูใ้ หญ่บา้ นหมู่ 2 Head of moo 2 village สจ.เขตพื้นที่สิเกา Member of province administrative organization at Si kao area ผูแ้ ทนอุตสาหกรรมจังหวัดตรัง Department of an industrial officer of Trang Province F เบอร์ โทรติดต่ อ/ contact detail 086-8667744 M 085-7836227 M 089-8667744 M - ตำแหน่ งหน่ วยงำน/Position/organization 10 คุณวิทยา จิราจินดากุล Witaya Jirajindakul 11 คุณเดชา เกื้อกูล Decha Kuakul ผูแ้ ทนอุตสาหกรรมจังหวัดตรัง Department of an industrial officer of Trang Province M 081-8081193 12 คุณมานิต วงษ์สุรีรัตน์ Manit Wongsurirat คุณนันทนา พนาพิทกั ษ์กุล Nantana Panapitakkul คุณประเสริ ฐ ตี้ฮอ้ Prasert Teehor คุณยอง ภัตสี Yong Patsi คุณทวน ชุ่นจ้อ Tuan Chunjor คุณชาม ชู่พลิว้ Cham Chuplew คุณวิวฒั น์ ฮ่างเต็ก Wiwat Hangtek คุณเฉลิม เดชะพันธ์ Charoem Dechapan คุณประเสริ ฐ ผนึกทรัพย์สกุล Prasert Panuksapskul บริ ษทั ตรังน้ ามันปาล์ม จากัด M 075-570008 บริ ษทั พิทกั ษ์ปาล์มออยล์ จากัด Pitak Palm Oil Co., Ltd. ประชาชนตาบลกะลาเส Citizen of Kalase district ประชาชนตาบลกะลาเส Citizen of Kalase district ประชาชนตาบลกะลาเส Citizen of Kalase district ประชาชนตาบลกะลาเส Citizen of Kalase district ประชาชนตาบลกะลาแส Citizen of Kalase district ข้าราชการบานาญ Retired governmental officer เจ้าหน้าที่สาธารณสุ ขสถานีอนามัยกะลาเส officer of Sanitarian and public health center of Kalase district นสษ.คนตรัง M 3268461-081 M 086-2786493 F - M - F - F 081-9789579 M 075-267198 M 087-4643577 F 089-6338824 13 14 15 16 17 18 19 20 21 คุณอุษามาศ เฉลิมวรรณ์ Usamas Charoemwan Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 13 Gold Standard Local Stakeholder Consultation Report ชื่ อ สกุล ลำดับที/่ Name surname number 22 คุณวิริณีย ์ วัฒนา Wirinee Wattana 23 คุณศรี อิ้งมู Sri Ingmoo 24 คุณมนต์เจริ ญ ศรี มงคล Moncharoen Srimongkol 25 คุณฐิติพงษ์ ยังช่วย Titipong Yungshuay 26 คุณปิ ยวัฒน์ หย่อมพิบูลย์ 27 28 29 คุณมิตรชา โพธิ์ แก้ว Mitcha Pokaew คุณสว่าง เลิศถิรสุ นทร Sawang Lertirasoontorn คุณวนัน เพิ่มพิบูลย์ Wanun Permpibul 30 คุณธาริ ณี ลี้พูลทรัพย์ Tarinee Leepulsap 31 คุณอลงกรณ์ ศิริพฒั น์ Alongkorn Siripat 32 คุณอัจฉริ ยะ นพรัตน์ Audchariya Nopparat คุณโสภณ รักรู ้ Sopol Rakroo คุณลดาพร ขุณิกากรณ์Ladaporn Kunikakorn 33 34 35 คุณสเตฟาน เฟนนิงเงอร์ Stefan Pfeninger เพศ/ Sex F เบอร์ โทรติดต่ อ/ contact detail 081-6070541 F 081-0821246 M 081-6073888 M 087-4762100 M 089-9171120 M 089-7826872 M 089-9686366 F 081-7239866 F 086-3483272 M 081-8827955 M 089-8114301 M 086-2697385 F 089-4447970 M - ตำแหน่ งหน่ วยงำน/Position/organization ประชาชนตาบลกะลาเส Citizen of Kalase district ผูส้ ื่ อข่าว TV5 Press from TV5 media ผูส้ ื่ อข่าว TV5 Press from TV5 media ผูส้ ื่ อข่าว NBT Press from NBT media ผูส้ ื่ อข่าว TV3 Press from TV3 media ประชาชนตาบลกะลาเส Citizen of Kalase district ผูจ้ ดั การทัว่ ไป บริ ษทั ล่าสู ง จากัด General Manager Lam Soon PCL. มูลนิธิสถาบันพลังงานทดแทนแห่งประเทศไทย Renewable Energy Institute of Thailand Foundation, REITF ผูเ้ ชี่ยวชาญด้านสิ่ งแวดล้อม บริ ษทั เอ็นวีม่า)ประเทศไทย(จากัด Environmental Specialist Envima(Thailand) Co., Ltd. วิศวกรสิ่ งแวดล้อม สถาบันวิจยั และพัฒนาพลังงาน )สวพ.( มหาวิทยาลัยเชียงใหม่ Environmental Engineer, Energy Research and Development Institute, ChiangMai University ผูจ้ ดั การโรงงานล่าสู งตรัง Manager, Lam Soon Trang Factory หัวหน้าฝ่ ายผลิตน้ ามันเมล็ดในปาล์ม Chief of Palm Oil production, Lam Soon Trang ผูเ้ ชี่ยวชาญด้านการเปลี่ยนแปลงสภาพภูมิอากาศ Climate Change Specialist Envima(Thailand) Co., Ltd. Envima(Thailand) Co., Ltd. Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 14 Gold Standard Local Stakeholder Consultation Report Comments accompanying Annex 1 ii. Evaluation forms [See Toolkit 2.6.1, 2.6.2 and Toolkit Annex J] Please attach participant list as Annex 2. Name What is your impression of the meeting? What do you like about the project? What do you not like about the project? Signature Comments accompanying Annex 2 Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 15 Gold Standard Local Stakeholder Consultation Report B. 4. Pictures The first stakeholder meeting The second stakeholder meeting Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 16 Gold Standard Local Stakeholder Consultation Report Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 17 Gold Standard Local Stakeholder Consultation Report B. 5. Outcome of consultation i. Minutes of the meeting [See Toolkit 2.6, 2.6.1, 2.6.2 and Toolkit Annex J] Minutes of the first stakeholder meeting - Lam Soon representative made a company presentation, - Envima presented on CDM and climate changed, - Energy Research and Development Institute, ERDI, Chiangmai University, described more detail on the technology that will be applied, - and Renewable Energy Institute of Thailand Foundation, REITF, presented more on Climate Change, CDM GS, REITF role, and criteria considering for GS. Questions and comments session 1. The Mayor of Kuan Kun Municipal district gave a comment on the cooperation between the factory and the surrounding population. The cooperation should be an honest and transparent way as there was an environmental contamination situation occurred in this area few years ago. Therefore the cooperation and prevention of such cases is necessary. From the presentations of the project and CDM details, he thinks that if this project is realized, it would create a positive affect to every party. He invited all participants to make comments and suggestions for the project owner during project discussion session. 2. The principal of Kamolsri School sees that this project gives benefits to the community. He recommended that the presentation of biogas technology application should be published for student and any interested people in the community, and it would be even better if the factory owner allows students to have a factory visit to learn about the technology which could create more understanding and benefit for their community in the future. 3. Besides utilizing the produced biogas for electricity generation, can the biogas be used in household application? If yes, can the factory support this biogas or donate electricity for community? Ans. At present, the factory already donates tap water for surrounding communities. The factory is glad to support all useful activity for surrounding communities. Referring to the question, the biogas produced from this system can be used in the household application, however, before make any donation of biogas or electricity, the factory need to consider transportation, safety and regulation issues first. 4. In the next meeting, it is recommended to invite more people from the surrounding area to participate in the meeting. Minutes of the second stakeholder meeting - The presentation topics covered the overview of the project activities for those who have not participate in the first meeting: - Lam Soon representative made a company presentation, - Envima presented on CDM, climate change, IEE result, and report about the results of comments from the documents made available publicly for more than 1 month. - ERDI described more detail on technology be implemented, and Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 18 Gold Standard Local Stakeholder Consultation Report - REIT presented more on Climate Change, CDM GS, REIT role, and criteria considering for GS. Questions and comments session 1. How could stakeholder participate in the project? Will the factory allow people to observe and monitor the activity inside the project area? And how people can come inside the factory? Ans. Mr.Sawang responded that surrounding people are welcome to Lam Soon factory but need to process the letter of intention first due to the criteria of ISO 14001:2004. Before entering in the factory, there will be short safety training for every visitor. Moreover, Lam Soon is joining with Department of Alternative Energy Development and Efficiency, Ministry of Energy, Thailand in “Biogas technology promotion program”. With this program, anybody who are interested in biogas system is allowed to visit the project site. Besides, there will be the third party, DOE, to verify and check monitoring system annually. 2. As mentioned during the presentation that there will be 5 job opportunities, are these jobs for local people? Ans. Changing from open ponds system to the biogas system creates 5 jobs for engineer (Bachelor degree) 1 person, system officer (Diploma) 4 positions. For selecting people, Lam Soon has policy to look for local applicant as first priority. These selected people will be trained by ERDI to take care of the system. 3. The selected bacteria will be used to digest organic substances in the wastewater. Where are these bacteria coming from (locally or imported)? Can these bacteria cause any effect to the local ecosystem or biodiversity? Ans. The bacteria will be used in this system are anaerobic bacteria which are taken from swine farm biogas systems in Thailand. The bacteria are depending on certain conditions they only find in this anaerobic environment, thus they cannot harm anyone or anything outside the system 4. How does the factory manage the generated sludge from this system? Ans. The system will produce 1.34 m3/day of sludge which will be dried naturally and will be used as fertilizer for agricultural area. (see calculation of sludge amount in Annex2) 5. Lam Soon should organize a trip for stakeholder to visit a successful operation of digester operation to learn and evaluate what might be the potential impact from a digester on local communities and to discuss after the trip how Lam Soon will manage further? Ans. Lam Soon agree with this comment and will arrange a site visit for any interested local people and governmental officer to Univanich Palm Oil PCL factory in the same province. It will need some time for preparation. The schedule will be announced later. On August 01, 2008, Lam Soon had arranged a site visiting trip to Univanich Palm Oil PCL. (please see in Annex-2 ) The comments from stakeholder who participated in the trip were that this trip created more understanding. It was recommended that the information of the system should be published for local people. 6. The stakeholder knows that the digester system is a useful project. What would be a long term benefit of the project to the local people? And what is the feed back on the question from the last stakeholder meeting referring the request to Lam Soon on biogas and electricity distribution for surrounding people. Ans. Lam Soon Trang will distribute Pros and Cons of the digester system to surrounding Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 19 Gold Standard Local Stakeholder Consultation Report people. (the document was delivered on August 26, 08 See Annex-2) Referring to the request, Lam Soon is glad to provide biogas and electricity following stakeholder requests. However, the regulation, safety factor, any other obstruction need to be considered very carefully before starting this activity. (Lam Soon did contact to the PEA to clarify on the electricity issue (see Annex-2), PEA said Lam Soon can distribute electricity for people without charge but it need to be done separately with the PEA grid system. Consequently Lam Soon need to invest into a new grid system including EIA, and response for local safety which is beyond Lam Soon capacity. Therefore, to avoid safety problems in the future and a huge investment of the system as well as for biogas distribution request, Lam Soon decided to produce electricity and feed into the grid to reduce the use of fossil fuel of the country. However, Lam Soon will support activities which create sustainable development of the local community. 7. Lam Soon should publish the system knowledge for people. Ans. People are welcome into Lam Soon factory. There was an activity called ‘Green Factory” to present the factory activities to the public. If there are interested institutes would like Lam Soon to make a presentation on site or at the institute, they are welcome. Inside the factory, there is a drug learning center for communities which is planned to be expanded to provide information on biogas system as well. 8. Khun Wanun from REITF gave an example activity to attract tourist by using renewable energy, and providing useful information in the public. 9. As the digester is located in high area, there is some concern referring the leaking from the system to contaminate the groundwater. What is the life time of the system and are there any possibility of the leaking occur? Will the biogas release into the atmosphere during operation? Ans. The digester system constructed with concrete material which is designed to prevent any leaking to the groundwater. The system lifetime is 15 years at least. While the electricity generator lifetime is 20 years. Lam Soon will install a sophisticate instruments and monitoring system to monitor digester efficiency and implement an instruments’ maintenance plan. However, the existing ponds have no liner, just clay as barriers against large leaking. The existing ponds are emitting Biogas including CH4 and odor every day. Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 20 Gold Standard Local Stakeholder Consultation Report ii. Assessment of comments [See Toolkit 2.6] Stakeholder Comment A Site visit requested to example installation Biogas and electricity distribution Assessment LS agree with the propose Involve huge investment, regulation and safety issue Biogas Learning Centre LS agree with the propose Response to comment The trip was arranged Instead of distributing to surrounding people LS decide to produce electricity feed into the grid and support local activities The drug learning centre is planned to be expanded to provide information on biogas system for any interested people iii. Revisit sustainability assessment [See Toolkit 2.7] Yes Are you going to revisit the sustainable development assessment? No x Give reasoning behind decision the decision. There is no negative comment from stakeholder and Lam Soon had fulfilled their requests which could satisfy stakeholders already. iv. Summary of alterations based on comments [See Toolkit 2.6.2, 2.8] It has been described in ii. Please see Assessment of comments above. No alteration from technical point of view and referring Digester operation and Biogas utilization needed to be undertaking due to comments. Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 21 Gold Standard Local Stakeholder Consultation Report SECTION C. C.1. Sustainable Development Matrix Own sustainable development matrix [See Toolkit 2.4.2 and Toolkit Annex I] Indicator Mitigation measure Relevance to achieving MDG Gold Standard indicators of sustainable development. If relevant copy mitigation measure from "do no harm" – table, or include mitigation measure used to neutralise a score of ‘–‘ Check www.undp.or/mdg and www.mdgmonitor.org none Ensure Environmental Sustainability (Goal 7) 7.2 Co2 emissions Air quality Water quality and quantity Chosen parameter and explanation Defined by project developer Describe how your indicator is related to local MDG goals The project activity reduces emissions of GHG and particulate matter emission by substituting biogas for fossil fuel in power plants. Odor from waste water will be reduced through closed system. Ensure Environmental Sustainability (Goal 7) 7.8 Proportion of population using an improved drinking water source Concentration and emissions of CO2, CH4, PM, SO2, etc. Levels of BOD, COD and releasing rate. Water consumption. Preliminary score Negative impact: score ‘–‘ in case negative impact is not fully mitigated score 0 in case impact is planned to be fully mitigated No change in impact: score 0 Positive impact: score ‘+’ + 0 The quality of wastewater is improved by 85% COD reduction. The Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 22 Gold Standard Local Stakeholder Consultation Report effluent will be used in the soccer field in their own factory area. There will be no discharge in the receiving water. Thus no affect to neither water quality nor quantity. Soil condition Other pollutants Biodiversity Quality of employment Ensure Environmental Sustainability (Goal 7) 7.6 Proportion of terrestrial and marine areas protected No significant impact to geology and soil is expected as the project is located on an existing wastewater treatment area. The digester and all ponds will have leakage protection through concrete basins and liners. Therefore, the quality of soil will not be affected. Ensure Environmental Sustainability (Goal 7) 7.B Reduce biodiversity loss This project does not affect biodiversity as it is located in an existing factory area. Eradicate Extreme Poverty and Hunger (Goal 1) 1.B.Achieve full and productive employment and decent work for all, including woman and young people. COD, BOD 0 none 0 none 0 number of workers employed thanks to the project activity. + People in that area are not suffering extreme poverty and hunger Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 23 Gold Standard Local Stakeholder Consultation Report The project creates 70 temporary jobs during 1.5 years of construction and 5 permanent jobs at different qualification for operation. The technology provider is committed to provide operation and maintenance training to Lam Soon staffs and will supervise for the first year operation. Livelihood of the poor Less odour and an increase in environmental awareness will be achieved Eradicate Extreme Poverty and Hunger (Goal 1) 1.B.Achieve full and productive employment and decent work for all, including woman and young people. Change in traditional fuel consumption calculated as the amount of + The population in that area is not suffering extreme poverty and hunger The project creates 70 temporary jobs during 1.5 years of construction and 5 permanent jobs at different qualification for operation. The local people will be considered on first priority for each position. (IEE page 12) The social support program will definitely have a positive impact on the livelihood of the people sustainable development and education program of Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 24 Gold Standard Local Stakeholder Consultation Report the Project Developer Access to affordable and clean energy services None Biogas will be used as an alternative energy source ( instead of fossil fuel) to generate electricity Human and institutional capacity None Achieve Universal Primary Education (Goal 2) 2.A. Primary schooling Quantitative employment and income generation None Balance of payments and investment - Technology transfer and technological - Lam Soon is setting up a budget for social contribution such as support local activity, support education of the poor by giving scholarship. (see also indicator “Livelihood of the poor”) Environmental awareness arising. Some workers will be trained to increase know-how and capacity of take care the digester system. Eradicate Extreme Poverty and Hunger (Goal 1) 1.B.Achieve full and productive employment and decent work for all, including woman and young people. The project creates 70 temporary jobs during 1.5 years of construction and 5 permanent jobs at different qualification for operation. . Develop a Global Partnership for Development (Goal 8) Develop a Global Partnership for Change in traditional fuel consumption calculated as the amount of electricity produced by the project and fed into the grid Number of population with access to education + + Number of trained worker. Number of jobs and household income generated by the project + CER revenues and electricity sales + R&D Expenditure + Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 25 Gold Standard Local Stakeholder Consultation Report self-reliance Development (Goal 8) The technology is replicable and will induce more installations in similar agricultural sectors or wastewater treatment conditions Number of training-related opportunities Number of future replicated installations Comments accompanying own sustainable development matrix C.2. Outcome Blind sustainable development exercise [See Toolkit 2.6.1] Indicator Mitigation measure Chosen parameter and explanation Score given by stakeholders Gold Standard indicators of sustainable development. If relevant copy mitigation measure from "do no harm" – table, or include mitigation measure used to neutralise a score of ‘–‘ Defined by project developer Air quality Dust and noise reduction during construction Concentration and emissions of CO2, CH4, PM, SO2, etc. Negative impact: score ‘-‘ in case negative impact is not fully mitigated score 0 in case impact is planned to be fully mitigated No change in impact: score 0 Positive impact: score ‘+’ - Water quality and quantity None Levels of BOD, COD and releasing rate. Water consumption. + Soil condition None COD, BOD 0 Other pollutants None None 0 Biodiversity None None 0 Quality of employment None Skilled worker requirements + Livelihood of the poor None Number of workers employed thanks to project activity + Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 26 Gold Standard Local Stakeholder Consultation Report Access to affordable and clean energy services None Change in traditional fuel consumption calculated as the amount of electricity sold. + Human and institutional capacity None Number of population with access to education + Number of trained worker. Quantitative employment and income generation None Number of job opportunities and household income generated from the project Balance of payments and investment Technology transfer and technological self-reliance - CER revenues - R&D Expenditure + + Number of trainingrelated opportunities Comments resulting from the blind sustainable development exercise The blind sustainable development exercise has been done via the questionnaires together with the stakeholder consultation meetings. Many comments and suggestions have been summarized as per above section (i. Minute of meetings). Give analysis of difference between own sustainable development table and the one resulting from the blind exercise with stakeholders. Explain way of consolidation. The own SD and the blind exercise have been compared and analyzed by each indicator after the stakeholder consultation meeting. The outcome results positive as the participants in the blind test anticipated generally negative impacts through new upcoming industrial activities as usual. The majority of the participants learned about the environmental and social improvements and performance of the project activity. There are two indicators different between blind test and own SD analysis. The first one is air quality, the own SD scored “+” while the blind exercise gives “-” due to general negative anticipation of industrial development referring environmental performance, based on experiences. Due to the project activity GHG emission can be reduced. Planned mitigation measures will reduce impacts as well. The score of water quality and quantity of the own SD matrix is “0” while the blind exercise is “+” due to the experienced and reliability of the technology provider, ERDI, Chiagn Mai University. The stakeholders believe that the technologies and activity constructed by ERDI will be benefit to people. As this is a wastewater treatment project, the stakeholder perceive that the biogas technology is a better technology than open pond system then the wastewater effluent should have higher quality thus effect positively to the water quality. However, in this project, the effluent will be used in theire palm oil field in its own factory. There will be no discharge in the receiving water. Thus no affect to neither water quality nor quantity. During the stakeholder consultation meeting, information about project activity, technology and the mitiatigation plan has been explained to all participants. Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 27 Gold Standard Local Stakeholder Consultation Report C.3. Consolidated sustainable development matrix [See Toolkit 2.4.2] Indicator Mitigation measure Relevance to achieving MDG Gold Standard indicators of sustainable development. If relevant copy mitigation measure from "do no harm" – table, or include mitigation measure used to neutralise a score of ‘–‘ Check www.undp.or/mdg and www.mdgmonitor.org none Ensure Environmental Sustainability (Goal 7) 7.2 Co2 emissions Air quality Water quality and quantity Chosen parameter and explanation Defined by project developer Describe how your indicator is related to local MDG goals The project activity reduces emissions of GHG and particulate matter emission by substituting biogas for fossil fuel in power plants. Odor from waste water will be reduced through closed system. Ensure Environmental Sustainability (Goal 7) 7.8 Proportion of population using an improved drinking water source Concentration and emissions of CO2, CH4, PM, SO2, etc. Levels of BOD, COD and releasing rate. Water consumption. Preliminary score Negative impact: score ‘–‘ in case negative impact is not fully mitigated score 0 in case impact is planned to be fully mitigated No change in impact: score 0 Positive impact: score ‘+’ + 0 The quality of wastewater is improved by 85% COD reduction. The effluent will be used in the soccer field in their own factory area. There will be no discharge in the receiving water. Thus no affect to neither water quality nor quantity. Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 28 Gold Standard Local Stakeholder Consultation Report Soil condition Other pollutants Biodiversity Quality of employment Ensure Environmental Sustainability (Goal 7) 7.6 Proportion of terrestrial and marine areas protected No significant impact to geology and soil is expected as the project is located on an existing wastewater treatment area. The digester and all ponds will have leakage protection through concrete basins and liners. Therefore, the quality of soil will not be affected. Ensure Environmental Sustainability (Goal 7) 7.B Reduce biodiversity loss This project does not affect biodiversity as it is located in an existing factory area. Eradicate Extreme Poverty and Hunger (Goal 1) 1.B.Achieve full and productive employment and decent work for all, including woman and young people. COD, BOD 0 none 0 none 0 number of workers employed thanks to the project activity. + People in that area are not suffering extreme poverty and hunger The project creates 70 temporary jobs during 1.5 years of construction and 5 permanent jobs at different qualification for operation. Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 29 Gold Standard Local Stakeholder Consultation Report The technology provider is committed to provide operation and maintenance training to Lam Soon staffs and will supervise for the first year operation. Less odour and an increase in environmental awareness will be achieved Eradicate Extreme Poverty and Hunger (Goal 1) 1.B.Achieve full and productive employment and decent work for all, including woman and young people. Livelihood of the poor Change in traditional fuel consumption calculated as the amount of + Change in traditional fuel consumption calculated as the amount of electricity produced by the + The population in that area is not suffering extreme poverty and hunger The project creates 70 temporary jobs during 1.5 years of construction and 5 permanent jobs at different qualification for operation. The local people will be considered on first priority for each position. (IEE page 12) Access to affordable and clean energy services None The social support program will definitely have a positive impact on the livelihood of the people sustainable development and education program of the Project Developer Biogas will be used as an alternative energy source ( instead of fossil fuel) to generate electricity Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 30 Gold Standard Local Stakeholder Consultation Report Human and institutional capacity Quantitative employment and income generation None None Balance of payments and investment - Technology transfer and technological self-reliance - Achieve Universal Primary Education (Goal 2) 2.A. Primary schooling Lam Soon is setting up a budget for social contribution such as support local activity, support education of the poor by giving scholarship. (see also indicator “Livelihood of the poor”) Environmental awareness arising. Some workers will be trained to increase know-how and capacity of take care the digester system. Eradicate Extreme Poverty and Hunger (Goal 1) 1.B.Achieve full and productive employment and decent work for all, including woman and young people. The project creates 70 temporary jobs during 1.5 years of construction and 5 permanent jobs at different qualification for operation. Develop a Global Partnership for Development (Goal 8) Develop a Global Partnership for Development (Goal 8) The technology is replicable and will induce more installations in similar agricultural sectors or wastewater treatment conditions project and fed into the grid Number of population with access to education + Number of trained worker. Number of jobs and household income generated by the project + CER revenues and electricity sales + R&D Expenditure + Number of training-related opportunities Number of future replicated installations Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 31 Gold Standard Local Stakeholder Consultation Report Justification choices, data source and provision of references Air quality Water quality and quantity Soil condition Other pollutants Biodiversity Quality of employment Livelihood of the poor Access to affordable and clean energy services Human and institutional capacity Quantitative employment and income generation Balance of payments and investment Technology transfer and technological self-reliance Department of Industrial work. 2008. industrial management manual, Thailand. http://www2.diw.go.th/I_standard/index.html. Pollution Control Department, Factory air emission standard, http://www.pcd.go.th/info_serv/reg_std_airsnd03.html. Lam Soon Wastewater Treatment for Energy Generation, Trang PDD, project description Lam Soon Wastewater Treatment for Energy Generation, Trang PDD, project description none Lam Soon Wastewater Treatment for Energy Generation, Trang IEE, Environmental assessment result, biodiversity Lam Soon Wastewater Treatment for Energy Generation, Trang IEE, Environmental assessment result, social aspect. Lam Soon Wastewater Treatment for Energy Generation, Trang IEE, Environmental assessment result, social aspect. Lam Soon Wastewater Treatment for Energy Generation, Trang PDD, project description Lam Soon Wastewater Treatment for Energy Generation, Trang PDD, Monitoring system Lam Soon Wastewater Treatment for Energy Generation, Trang IEE, Environmental assessment result, social aspect. Financial Feasibility Lam Soon Wastewater Treatment for Energy Generation, Trang PDD, project description Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 32 Gold Standard Local Stakeholder Consultation Report Annex 1: Participant list The 1st stakeholder consultation participant list Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 33 Gold Standard Local Stakeholder Consultation Report Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 34 Gold Standard Local Stakeholder Consultation Report The 2nd stakeholder participant list Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 35 Gold Standard Local Stakeholder Consultation Report Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 36 Gold Standard Local Stakeholder Consultation Report Annex 2: Feedback forms Sludge calculation from ERDI referring concerns mentioned by participant Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 37 Gold Standard Local Stakeholder Consultation Report Invitation letter for Univanich plant site visit The schedule of the site visit Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 38 Gold Standard Local Stakeholder Consultation Report Participants list of the site visit Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 39 Gold Standard Local Stakeholder Consultation Report Summary of the stakeholder feed back of site visit Photo of site visit Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 40 Gold Standard Local Stakeholder Consultation Report Project information letter to Mayor of Kuan Kun municipal district for publication Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 41 Gold Standard Local Stakeholder Consultation Report List of the receiver of the letter Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 42 Gold Standard Local Stakeholder Consultation Report PEA gave technical advise on the requirements and feasibility for distributing electricity and gas individually referring to the stakeholder request. Gold Standard Passport version 2.0 July 2008 Developed by Ecofys, TÜV-SÜD and FIELD 43
© Copyright 2026 Paperzz