GENERAL SCHEDULE OF WORKS: Nor th Strip out kitchen All work to be to the approval of building control and environment department of the local council. The below schedule relates only to the ground and lower ground floors of the building. Strip out windows LIGHTWELL Strip out the following: Mechanical installation complete. Electrical installation complete. Bathroom sanitaryware, tiles and furniture. Kitchen furniture, tiles and appliances. Carpet and floor coverings. Bathroom floor boarding. Suspended ceilings. Built in cupboards generally Built-in shelves Radiator casings. Staircase between the lower ground and ground floors. Strip out floor locally to staircase. Strip out all internal doors and associated joinery. Strip out lower ground vault door. Strip out applied mouldings, architraves and skirting's. Strip out ceilings, finishes and cornice. Retain ground floor reception ceiling and cornice. Strip out existing glass to windows. Strip out the general decorations and floor finishes including recently laid timber floors. Strip out ground floor kitchen and bathroom window. Strip out lower ground kitchen, bedroom and store windows. VOID D CONSERVATORY C B Strip out cupboards & suspended ceiling to bedroom BRICK EXTENSION Form opening for new doors DOWN Strip out fire place FIREPLACE Strip out walls locally Window cill 0.87m head 2.63m UP .37 VOID Window cill 1.01m head 2.27m Window cill 0.89m head 3.86m Window cill 1.63m head 2.32m BEDROOM 2 General demolitions: RECEPTION BATHROOM Ht 2.18m Ht 2.34m Ht 2.16m Window cill 0.89m head 3.86m HALL DOWN Ht 2.16m Ht 2.19m C HALL LIFT Ht 1.93m HALL Window cill .91m head 3.07m SHOWER RM Ht 3.76m Ht 2.49m UP UP Ht 2.41m C MASTER BEDROOM UP ENTRANCE Form new door opening to the ground floor reception \ bedroom 2 wall. Form new door openings to the ground floor bedroom 2 to the hall and kitchen. Form opening to the wall locally to the ground floor staircase. Hack up lower ground floor slab and drainage. Hack up external slab to side return and form strip foundations. Hack off wall plaster complete to the lower ground floor complete. Ditto to defective plaster to walls generally. Locally form opening to the external flank lower ground wall to the bedroom, kitchen and store to the lower ground floor as indicated on the drawings. Hack up front vault slab and locally lower floor level of vault. Form door opening to the external flank wall of bedroom 3 to the lower ground floor. Strip out associated doors, windows and external pipework as indicated on the drawings to suit the new layout. Demolish internal partition walls as indicated on the drawings to suit the new layout. Form new enlarged door openings to suit the new layout with raised heads as shown on the drawings. Raise the heads of the existing door openings. Ht 2.00m Ht 2.19m VOID Ht 2.05m Ht 2.08m Ht 2.05m KITCHEN HALL Strip out cupboards UP Strip out staircase & cupboards Strip out shower room Work to Lift & Area Approved LB/12/01985 11 March 2013 D C B GROUND FLOOR PLAN Form new opening to wall & strip out floor locally B A D Hack up slab to vault Strip out doors & windows Strip out nib Hack up external slab & excavate locally for strip foundation RWP under 2.24m Ht 2.13m SVP Ht 1.98m Ht 1.96m 8 6 Window cill .91m head 3.07m 5 100.00 Tel: 020 7610 6827 Mobile: 07831 549946 [email protected] C UP 7 HURLINGHAM STUDIOS RANELAGH GARDENS FULHAM LONDON SW6 3PA IC Window cill .91m head 3.07m Ht 2.18m BATHROOM BATHROOM WC THIS DRAWING IS THE COPYRIGHT OF LEONARD ARCHITECTURE LTD. © Project WT UP 17 under3.00m VAULT 37 CADOGAN SQUARE LONDON RWP 3 Ht 1.88m STORE BEDROOM 3 Ht 2.14m Ht 2.11m HALL 100.00 C 100.00 Ht 1.93m 100.00 Ht 2.08m Ht 1.93m ENTRANCE Ht 1.86m Ht 1.94m HALL UP .15 Ht 1.88m KITCHEN RWP PATIO GARDEN Ht 2.10m under 3.06m Ht 1.71m Ht 1.95m DOWN .15 Ht 1.86m Ht 1.88m UP .06 GULLY IC Ht 1.94m Ht 1.93m VAULT ARCHITECTURE - INTERIOR DESIGN 4 Ht 1.93m cill .95m head 1.76m LEONARD ARCHITECTURE LTD Ht 2.08m E UP SVP Ht 1.98m RECEPTION Ht 1.88m IC Window cill 1.18m head 1.88m 9 Window cill 1.12m head 2.30m 3.42 HATCH 100.00 BEDROOM Ht 2.18m 100.00 100.00 Window cill 1.08m head 3.13m Window cill 0.78m head 2.91m STORE IC 10 VAULT Strip out walls locally internally Scales BASEMENT FLOOR PLAN 2 EXISTING FLOOR PLANS GROUND & LOWER GROUND Strip out bathrooms and staircase D B Strip out walls Lift Extension to the Lower Ground Floor Approved LB/12/01985 11 March 2013 A Form new door opening Drawing Drawn A3 at 1:100 Date PTADT 1 Strip out doors Drawing No 37.PP.030B 0 JULY.2014 0 1 2 3 4 5 6 7 SCALE M 8 9 10 GENERAL SCHEDULE OF WORKS: All work to be to the approval of building control and environment department of the local council. Works to be to a high standard and as indicated on the drawings. The below schedule relates only to the ground and lower ground floors of the building. Construction works: General: Allow to re render and skim walls complete. New finished timber floors to be installed generally with stone floor finish in the kitchen, bathrooms, stair, utility and halls. Carpet to the bedrooms. New suspended ceilings in the bathrooms. Overhaul the sub floor finishes throughout the house. Level floors fix ply substrate. New ply floor substrate under stone floor finishes. New concrete slab to the lower ground floor complete. New drainage runs and manholes to the lower ground floor to suit new requirements. Construct a new staircase from the lower ground floor up to the ground floor, stone cladding. Allow for all structural alterations to the structural engineers details within the house and to the rear side return addition. Existing lathe & plaster ceiling to be retained. Where none new plasterboard ceilings with acoustic insulation within ceiling voids. New fibrous plaster cornice to the ceilings. Overhaul the retained ground floor reception ceiling. New timber doors with raised heads of 2.4m. New architraves and skirting's to the flat complete. Architraves and skirting to the ground floor reception to be retained and overhauled. All doors and windows to have new ironmongery. Flat to be redecorated throughout and specialist painted. New sanitaryware, stone floors and walls to the new bathrooms. Stone floors to be laid on Wedi board sub base, seal floors. Install new kitchen furniture, worktops, appliances and utility room furniture as indicated. Construct built in cupboard throughout the house as indicated on the drawings incorporating fan coil units. Existing windows to be overhauled with single pane acoustic glass installed. Lower ground floor: Construct new side return infill extension with new decorated timber sash window. Provide new glass roof light to new lead work roof of infill extension. New infill wall and door to form new hall at base of new staircase. Allow to tank lower ground floor and walls full height complete. Construct partition walls to form the new bathrooms and utility \ storage areas. New utility and storage area. New door form storage area to front service area. New decorated timber sash window to lightwell to bathroom 3. New decorated timber French doors to lightwell to bedroom 2 & 3. Ground Floor: New double doors between reception and dining room. Ditto to kitchen from the hall. Construct new studwork to form new shower room and study to hall with new doors. New decorated timber sash window to shower room. New casement window to match existing to dining room. New fireplace to the ground floor reception room. Clean and line flue. New built-in cupboards and low level joinery with fan coil units within. New infill conservatory with decorated French doors and casement windows with glass roof above set within a lead work box gutter. Extend up party wall locally to accommodate new infill. Metalwork balcony to the French doors. Mechanical & electrical installation: Install new boilers & pressurised hot water storage cylinders. Supply gas to the boiler, kitchen, and reception rooms. Upgrade water, gas & electrical supplies to the property. Flat to be rewired complete for lighting and power. Install Lutron system for lighting control. Install new low voltage recessed down lighters to the ceilings generally. Install fire hoods to the recessed ceiling down lighters. Install wall lights to the house generally. Install new bathrooms, utility & kitchen - provide drainage and hot & cold water supplies. Install new extract fans to the bathrooms and kitchen - vent externally. Bathrooms, hall and the lower ground floor to have under floor heating. Install comfort cooling \ heating units within the house, form vents and ducts to suit. Provide grill to joinery \ walls as indicated on the drawings. Connect small bore pipe work from the proposed condensers in the front vault. Install a video entry phone system & CCTV. Allow to audio visual installation through out the house. Install cables for a Crestron control systems. Include for ceiling speakers. Install smoke and heat detectors \ fire alarm. Install security alarm system. Externally: Install new external doors and windows to the rear side return infill extension as indicated. Provide metalwork balustrade to the rear ground floor side return infill conservatory. Provide replacement timber door to the front light well to bedroom 4 to match existing. New rear side return ground floor timber and double glazed glass conservatory. New rear side return lower ground floor infill extension with lead roof and double glazed roof light. Existing external pipe work to be altered to suit the new layout. New glazing to be double glazed, existing glazing to be replaced with acoustic clear glass. Redecorate all joinery and pipe work. Install air bricks for the ventilation exhausts to the rear of the house. New windows to be timber construction and decorated. Existing windows and doors to be overhauled and redecorated. Make good to defective brickwork generally. Repoint external brickwork generally and clean. Rear patio to be re-laid with new sawn York stone. ROOF 103.66 1ST 103.48 GF 100.00 FLANK ELEVATION VAULT ELEVATION TO FRONT LIGHTWELL DATUM LEVEL = 99.00m ROOF 115.38 ROOF 114.21 9 10 ROOF 107.31 LEONARD ARCHITECTURE LTD 8 ARCHITECTURE - INTERIOR DESIGN Strip out windows Allow to locally redirect soil pipework 1ST 103.48 6 1ST 103.48 7 HURLINGHAM STUDIOS RANELAGH GARDENS FULHAM LONDON SW6 3PA Form new window & wall openings Form new window & wall openings THIS DRAWING IS THE COPYRIGHT OF LEONARD ARCHITECTURE LTD. © Strip out windows & wall panel below Project 4 Form new door opening 5 Tel: 020 7610 6827 Mobile: 07831 549946 [email protected] Strip out windows and door Strip out window and wall below GF 100.00 3 37 CADOGAN SQUARE LONDON GF 100.00 Drawing 2 EXISTING ELEVATIONS Excavte for local strip footings Drawn REAR ELEVATION Date PTADT 1 A3 at 1:100 Drawing No JULY.2014 37.PP.031C 0 FLANK ELEVATION Scales DATUM LEVEL = 99.00m DATUM LEVEL = 99.00m 0 1 2 3 4 5 6 7 SCALE M 8 9 10 Strip out staircase Strip out suspended ceilings VOID BEDROOM HALL RECEPTION 1ST 103.48 VOID BEDROOM BATHROOM BATHROOM HALL HALL HALL CELLAR GF 100.00 DATUM LEVEL = 99.00m SECTION C-C Strip out suspended ceilings VOID Strip out cupboards & bulkhead stud Raise head of door Form new door opening HALL RECEPTION SHOWER RM 1ST 103.48 10 KITCHEN BEDROOM HALL 1ST 103.48 1ST 103.48 9 Strip out windows GENERAL SCHEDULE OF WORKS: All work to be to the approval of building control and environment department of the local council. Works to be to a high standard and as indicated on the drawings. The below schedule relates only to the ground and lower ground floors of the building. Construction works: General: Allow to re render and skim walls complete. New finished timber floors to be installed generally with stone floor finish in the kitchen, bathrooms, stair, utility and halls. Carpet to the bedrooms. New suspended ceilings in the bathrooms. Overhaul the sub floor finishes throughout the house. Level floors fix ply substrate. New ply floor substrate under stone floor finishes. New concrete slab to the lower ground floor complete. New drainage runs and manholes to the lower ground floor to suit new requirements. Construct a new staircase from the lower ground floor up to the ground floor, stone cladding. Allow for all structural alterations to the structural engineers details within the house and to the rear side return addition. Existing lathe & plaster ceiling to be retained. Where none new plasterboard ceilings with acoustic insulation within ceiling voids. New fibrous plaster cornice to the ceilings. Overhaul the retained ground floor reception ceiling. New timber doors with raised heads of 2.4m. New architraves and skirting's to the flat complete. Architraves and skirting to the ground floor reception to be retained and overhauled. All doors and windows to have new ironmongery. Flat to be redecorated throughout and specialist painted. New sanitaryware, stone floors and walls to the new bathrooms. Stone floors to be laid on Wedi board sub base, seal floors. Install new kitchen furniture, worktops, appliances and utility room furniture as indicated. Construct built in cupboard throughout the house as indicated on the drawings incorporating fan coil units. Existing windows to be overhauled with single pane acoustic glass installed. Lower ground floor: Construct new side return infill extension with new decorated timber sash window. Provide new glass roof light to new lead work roof of infill extension. New infill wall and door to form new hall at base of new staircase. Allow to tank lower ground floor and walls full height complete. Construct partition walls to form the new bathrooms and utility \ storage areas. New utility and storage area. New door form storage area to front service area. New decorated timber sash window to lightwell to bathroom 3. New decorated timber French doors to lightwell to bedroom 2 & 3. Ground Floor: New double doors between reception and dining room. Ditto to kitchen from the hall. Construct new studwork to form new shower room and study to hall with new doors. New decorated timber sash window to shower room. New casement window to match existing to dining room. New fireplace to the ground floor reception room. Clean and line flue. New built-in cupboards and low level joinery with fan coil units within. New infill conservatory with decorated French doors and casement windows with glass roof above set within a lead work box gutter. Extend up party wall locally to accommodate new infill. Metalwork balcony to the French doors. Mechanical & electrical installation: Install new boilers & pressurised hot water storage cylinders. Supply gas to the boiler, kitchen, and reception rooms. Upgrade water, gas & electrical supplies to the property. Flat to be rewired complete for lighting and power. Install Lutron system for lighting control. Install new low voltage recessed down lighters to the ceilings generally. Install fire hoods to the recessed ceiling down lighters. Install wall lights to the house generally. Install new bathrooms, utility & kitchen - provide drainage and hot & cold water supplies. Install new extract fans to the bathrooms and kitchen - vent externally. Bathrooms, hall and the lower ground floor to have under floor heating. Install comfort cooling \ heating units within the house, form vents and ducts to suit. Provide grill to joinery \ walls as indicated on the drawings. Connect small bore pipe work from the proposed condensers in the front vault. Install a video entry phone system & CCTV. Allow to audio visual installation through out the house. Install cables for a Crestron control systems. Include for ceiling speakers. Install smoke and heat detectors \ fire alarm. Install security alarm system. Externally: Install new external doors and windows to the rear side return infill extension as indicated. Provide metalwork balustrade to the rear ground floor side return infill conservatory. Provide replacement timber door to the front light well to bedroom 4 to match existing. New rear side return ground floor timber and double glazed glass conservatory. New rear side return lower ground floor infill extension with lead roof and double glazed roof light. Existing external pipe work to be altered to suit the new layout. New glazing to be double glazed, existing glazing to be replaced with acoustic clear glass. Redecorate all joinery and pipe work. Install air bricks for the ventilation exhausts to the rear of the house. New windows to be timber construction and decorated. Existing windows and doors to be overhauled and redecorated. Make good to defective brickwork generally. Repoint external brickwork generally and clean. Rear patio to be re-laid with new sawn York stone. LEONARD ARCHITECTURE LTD ARCHITECTURE - INTERIOR DESIGN 8 Strip out floor locally for new stairs Strip out wall Strip out wall HALL Hack up external slab & excavate locally for strip foundation WC GF 100.00 GF 100.00 6 RECEPTION KITCHEN VOID BEDROOM Tel: 020 7610 6827 Mobile: 07831 549946 [email protected] GF 100.00 5 Strip out walls and ceilings 7 HURLINGHAM STUDIOS RANELAGH GARDENS FULHAM LONDON SW6 3PA Form new opening THIS DRAWING IS THE COPYRIGHT OF LEONARD ARCHITECTURE LTD. © 4 Project 37 CADOGAN SQUARE LONDON 3 SECTION D-D Drawing EXISTING SECTIONS 2 SECTION B-B DATUM LEVEL = 99.00m Scales Drawn A3 at 1:100 Date PTADT 1 SECTION A-A DATUM LEVEL = 99.00m Drawing No JULY.2014 37.PP.032B 0 DATUM LEVEL = 99.00m 0 1 2 3 4 5 6 7 SCALE M 8 9 10 Decorated timber & glass roof to conservatory Timber floor to Study / Conservatory Lining wall locally raised within conservatory structure - not above New double doors to new opening LIGHTWELL VOID EXISTING BRICK EXTENSION No.35 EXISTING CONSERVATORY No.35 A B New sash windows to lightwell & brickwork panel to match existing brickwork New doors CONSERVATORY ROOF PLAN RWP DOWN RWP Fireplace RWP French doors with Juliet metalwork balcony VOID CONSERVATORY Structural glass panel to Leadwork Flat roof Vent vent RWP DINING ROOM Fan coil units to low level housing below the windows RWP (Timber Floor) Vent RECEPTION (Timber Floor) vent Flue RWP Lightweight conservatory Timber & glass construction Box leadwork gutters both sides SHOWER RM (Stone Floor) STUDY FCU FCU Boiler New kitchen furniture HALL Vent (Timber Floor) KITCHEN Stone flooring to Kitchen and Hall FCU C ENTRANCE ENTRANCE HALL C STORAGE HALL COMMON PARTS LIFT UP UP A D Z B Z Low level joinery units to house fan coil units LIFT WORKS LBC LB/12/01985 11 March 2013 GROUND FLOOR PLAN New staircase New double doors Replacement suspended ceiling to Hall Locally infill floor where staircase removed New cupboard and wall New drainage below concrete slab to suit invert levels of existing drainage Retain spine wall Recessed manhole cover to Lightwell Low level stub stack to collect bathroom drainage Local studwork infill New walls to form Bathroom New timber frame window New double doors Low level stub stack to collect bathroom drainage French doors New recessed manhole cover to replace existing A D Brick infill to door B Joinery to detail RWP LIGHTWELL Vent VAULT RWP Vent SS Vent SS (Stone Floor) RWP Vent RWP BEDROOM 2 SS BEDROOM 3 FCU (Stone Floor) (Timber Floor) DOWN HURLINGHAM STUDIOS RANELAGH GARDENS FULHAM LONDON SW6 3PA MASTER BEDROOM (Timber Floor) UP 6 HALL FCU (Stone Floor) C STORAGE BATHROOM 2 (Stone Floor) HWC Replace existing door to match existing THIS DRAWING IS THE COPYRIGHT OF LEONARD ARCHITECTURE LTD. © SS CUPBD Z Project RWP Z A New hot water cylinders LIFT WORKS LBC LB/12/01985 11 March 2013 New staircase Infill existing door openings New door openings Low level stub stack to collect bathroom drainage New door to access Storage Area New concrete slab to Lower Ground Floor complete 4 LIFT B HWC (Stone Floor) 37 CADOGAN SQUARE LONDON 3 SERVICE AREA UP UTILITY STORAGE D VAULT Tel: 020 7610 6827 Mobile: 07831 549946 [email protected] C 5 IC GARDEN FCU UP Studwork infill to form cupboard Drawing PROPOSED FLOOR PLANS GROUND & LOWER GROUND Existing York Stone Slabs to be replaced with new sawn York Stone Scales Drawn A3 at 1:100 LOWER GROUND FLOOR PLAN 2 VAULT ARCHITECTURE - INTERIOR DESIGN BATHROOM 3 BEDROOM 4 LEONARD ARCHITECTURE LTD RWP (Timber Floor) (Timber Floor) 8 UP 9 BATHROOM 4 10 MASTER BATHROOM Date PTADT 1 UP UP AC UP 7 Timber floor to Reception & Dining Room D Infill door opening GENERAL SCHEDULE OF WORKS: All work to be to the approval of building control and environment department of the local council. Works to be to a high standard and as indicated on the drawings. The below schedule relates only to the ground and lower ground floors of the building. Construction works: General: Allow to re render and skim walls complete. New finished timber floors to be installed generally with stone floor finish in the kitchen, bathrooms, stair, utility and halls. Carpet to the bedrooms. New suspended ceilings in the bathrooms. Overhaul the sub floor finishes throughout the house. Level floors fix ply substrate. New ply floor substrate under stone floor finishes. New concrete slab to the lower ground floor complete. New drainage runs and manholes to the lower ground floor to suit new requirements. Construct a new staircase from the lower ground floor up to the ground floor, stone cladding. Allow for all structural alterations to the structural engineers details within the house and to the rear side return addition. Existing lathe & plaster ceiling to be retained. Where none new plasterboard ceilings with acoustic insulation within ceiling voids. New fibrous plaster cornice to the ceilings. Overhaul the retained ground floor reception ceiling. New timber doors with raised heads of 2.4m. New architraves and skirting's to the flat complete. Architraves and skirting to the ground floor reception to be retained and overhauled. All doors and windows to have new ironmongery. Flat to be redecorated throughout and specialist painted. New sanitaryware, stone floors and walls to the new bathrooms. Stone floors to be laid on Wedi board sub base, seal floors. Install new kitchen furniture, worktops, appliances and utility room furniture as indicated. Construct built in cupboard throughout the house as indicated on the drawings incorporating fan coil units. Existing windows to be overhauled with single pane acoustic glass installed. Lower ground floor: Construct new side return infill extension with new decorated timber sash window. Provide new glass roof light to new lead work roof of infill extension. New infill wall and door to form new hall at base of new staircase. Allow to tank lower ground floor and walls full height complete. Construct partition walls to form the new bathrooms and utility \ storage areas. New utility and storage area. New door form storage area to front service area. New decorated timber sash window to lightwell to bathroom 3. New decorated timber French doors to lightwell to bedroom 2 & 3. Ground Floor: New double doors between reception and dining room. Ditto to kitchen from the hall. Construct new studwork to form new shower room and study to hall with new doors. New decorated timber sash window to shower room. New casement window to match existing to dining room. New fireplace to the ground floor reception room. Clean and line flue. New built-in cupboards and low level joinery with fan coil units within. New infill conservatory with decorated French doors and casement windows with glass roof above set within a lead work box gutter. Extend up party wall locally to accommodate new infill. Metalwork balcony to the French doors. Mechanical & electrical installation: Install new boilers & pressurised hot water storage cylinders. Supply gas to the boiler, kitchen, and reception rooms. Upgrade water, gas & electrical supplies to the property. Flat to be rewired complete for lighting and power. Install Lutron system for lighting control. Install new low voltage recessed down lighters to the ceilings generally. Install fire hoods to the recessed ceiling down lighters. Install wall lights to the house generally. Install new bathrooms, utility & kitchen - provide drainage and hot & cold water supplies. Install new extract fans to the bathrooms and kitchen - vent externally. Bathrooms, hall and the lower ground floor to have under floor heating. Install comfort cooling \ heating units within the house, form vents and ducts to suit. Provide grill to joinery \ walls as indicated on the drawings. Connect small bore pipe work from the proposed condensers in the front vault. Install a video entry phone system & CCTV. Allow to audio visual installation through out the house. Install cables for a Crestron control systems. Include for ceiling speakers. Install smoke and heat detectors \ fire alarm. Install security alarm system. Externally: Install new external doors and windows to the rear side return infill extension as indicated. Provide metalwork balustrade to the rear ground floor side return infill conservatory. Provide replacement timber door to the front light well to bedroom 4 to match existing. New rear side return ground floor timber and double glazed glass conservatory. New rear side return lower ground floor infill extension with lead roof and double glazed roof light. Existing external pipe work to be altered to suit the new layout. New glazing to be double glazed, existing glazing to be replaced with acoustic clear glass. Redecorate all joinery and pipe work. Install air bricks for the ventilation exhausts to the rear of the house. New windows to be timber construction and decorated. Existing windows and doors to be overhauled and redecorated. Make good to defective brickwork generally. Repoint external brickwork generally and clean. Rear patio to be re-laid with new sawn York stone. Drawing No 37.PP.300E 0 JULY.2014 0 1 2 3 4 5 6 7 SCALE M 8 9 10 GENERAL SCHEDULE OF WORKS: All work to be to the approval of building control and environment department of the local council. Works to be to a high standard and as indicated on the drawings. The below schedule relates only to the ground and lower ground floors of the building. Construction works: General: Allow to re render and skim walls complete. New finished timber floors to be installed generally with stone floor finish in the kitchen, bathrooms, stair, utility and halls. Carpet to the bedrooms. New suspended ceilings in the bathrooms. Overhaul the sub floor finishes throughout the house. Level floors fix ply substrate. New ply floor substrate under stone floor finishes. New concrete slab to the lower ground floor complete. New drainage runs and manholes to the lower ground floor to suit new requirements. Construct a new staircase from the lower ground floor up to the ground floor, stone cladding. Allow for all structural alterations to the structural engineers details within the house and to the rear side return addition. Existing lathe & plaster ceiling to be retained. Where none new plasterboard ceilings with acoustic insulation within ceiling voids. New fibrous plaster cornice to the ceilings. Overhaul the retained ground floor reception ceiling. New timber doors with raised heads of 2.4m. New architraves and skirting's to the flat complete. Architraves and skirting to the ground floor reception to be retained and overhauled. All doors and windows to have new ironmongery. Flat to be redecorated throughout and specialist painted. New sanitaryware, stone floors and walls to the new bathrooms. Stone floors to be laid on Wedi board sub base, seal floors. Install new kitchen furniture, worktops, appliances and utility room furniture as indicated. Construct built in cupboard throughout the house as indicated on the drawings incorporating fan coil units. Existing windows to be overhauled with single pane acoustic glass installed. Lower ground floor: Construct new side return infill extension with new decorated timber sash window. Provide new glass roof light to new lead work roof of infill extension. New infill wall and door to form new hall at base of new staircase. Allow to tank lower ground floor and walls full height complete. Construct partition walls to form the new bathrooms and utility \ storage areas. New utility and storage area. New door form storage area to front service area. New decorated timber sash window to lightwell to bathroom 3. New decorated timber French doors to lightwell to bedroom 2 & 3. Ground Floor: New double doors between reception and dining room. Ditto to kitchen from the hall. Construct new studwork to form new shower room and study to hall with new doors. New decorated timber sash window to shower room. New casement window to match existing to dining room. New fireplace to the ground floor reception room. Clean and line flue. New built-in cupboards and low level joinery with fan coil units within. New infill conservatory with decorated French doors and casement windows with glass roof above set within a lead work box gutter. Extend up party wall locally to accommodate new infill. Metalwork balcony to the French doors. Mechanical & electrical installation: Install new boilers & pressurised hot water storage cylinders. Supply gas to the boiler, kitchen, and reception rooms. Upgrade water, gas & electrical supplies to the property. Flat to be rewired complete for lighting and power. Install Lutron system for lighting control. Install new low voltage recessed down lighters to the ceilings generally. Install fire hoods to the recessed ceiling down lighters. Install wall lights to the house generally. Install new bathrooms, utility & kitchen - provide drainage and hot & cold water supplies. Install new extract fans to the bathrooms and kitchen - vent externally. Bathrooms, hall and the lower ground floor to have under floor heating. Install comfort cooling \ heating units within the house, form vents and ducts to suit. Provide grill to joinery \ walls as indicated on the drawings. Connect small bore pipe work from the proposed condensers in the front vault. Install a video entry phone system & CCTV. Allow to audio visual installation through out the house. Install cables for a Crestron control systems. Include for ceiling speakers. Install smoke and heat detectors \ fire alarm. Install security alarm system. Externally: Install new external doors and windows to the rear side return infill extension as indicated. Provide metalwork balustrade to the rear ground floor side return infill conservatory. Provide replacement timber door to the front light well to bedroom 4 to match existing. New rear side return ground floor timber and double glazed glass conservatory. New rear side return lower ground floor infill extension with lead roof and double glazed roof light. Existing external pipe work to be altered to suit the new layout. New glazing to be double glazed, existing glazing to be replaced with acoustic clear glass. Redecorate all joinery and pipe work. Install air bricks for the ventilation exhausts to the rear of the house. New windows to be timber construction and decorated. Existing windows and doors to be overhauled and redecorated. Make good to defective brickwork generally. Repoint external brickwork generally and clean. Rear patio to be re-laid with new sawn York stone. Lightweight conservatory Timber & glass construction Box leadwork gutter Conservatory structure to adjoining property French doors with Juliet metalwork balcony CONSERVATORY New sash windows to lightwell Structural glass panel to Leadwork Flat roof Gate to stair to lower ground floor Extract vent to ceiling zone terminated externally with an air brick New French Doors to lightwell BEDROOM 3 LIGHTWELL BEDROOM 2 MASTER BATHROOM New painted French Doors to match existing to bay Infill brickwork panel to match existing brickwork VAULT ELEVATION TO FRONT LIGHTWELL 10 FLANK ELEVATION Lightweight conservatory Timber & glass construction Box leadwork gutters both sides 9 Lightweight conservatory Timber & glass construction Box leadwork gutters both sides LEONARD ARCHITECTURE LTD 8 ARCHITECTURE - INTERIOR DESIGN Existing conservatory & extension to adjoining property Partywall locally raised in accordance with Party Wall Award to match existing brickwork KITCHEN 6 Raised extension in matching brickwork with stone copings 7 HURLINGHAM STUDIOS RANELAGH GARDENS FULHAM LONDON SW6 3PA French doors with Juliet metalwork balcony Cast iron rainwater pipes & hoppers 5 Tel: 020 7610 6827 Mobile: 07831 549946 [email protected] French doors with Juliet metalwork balcony Structural glass panel to Leadwork Flat roof THIS DRAWING IS THE COPYRIGHT OF LEONARD ARCHITECTURE LTD. © Vent 4 Project 37 CADOGAN SQUARE LONDON MASTER BATHROOM 3 MASTER BEDROOM Drawing Infill brickwork panel to match existing brickwork Scales Drawn A3 at 1:100 Date Drawing No JULY.2014 SECTION D-D PTADT 37.PP.301E 0 REAR ELEVATION 2 PROPOSED ELEVATIONS AND SECTIONS 1 New painted French Doors to match existing to bay 0 1 2 3 4 5 6 7 SCALE M 8 9 10 KITCHEN HALL GENERAL SCHEDULE OF WORKS: All work to be to the approval of building control and environment department of the local council. Works to be to a high standard and as indicated on the drawings. The below schedule relates only to the ground and lower ground floors of the building. Construction works: General: Allow to re render and skim walls complete. New finished timber floors to be installed generally with stone floor finish in the kitchen, bathrooms, stair, utility and halls. Carpet to the bedrooms. New suspended ceilings in the bathrooms. Overhaul the sub floor finishes throughout the house. Level floors fix ply substrate. New ply floor substrate under stone floor finishes. New concrete slab to the lower ground floor complete. New drainage runs and manholes to the lower ground floor to suit new requirements. Construct a new staircase from the lower ground floor up to the ground floor, stone cladding. Allow for all structural alterations to the structural engineers details within the house and to the rear side return addition. Existing lathe & plaster ceiling to be retained. Where none new plasterboard ceilings with acoustic insulation within ceiling voids. New fibrous plaster cornice to the ceilings. Overhaul the retained ground floor reception ceiling. New timber doors with raised heads of 2.4m. New architraves and skirting's to the flat complete. Architraves and skirting to the ground floor reception to be retained and overhauled. All doors and windows to have new ironmongery. Flat to be redecorated throughout and specialist painted. New sanitaryware, stone floors and walls to the new bathrooms. Stone floors to be laid on Wedi board sub base, seal floors. Install new kitchen furniture, worktops, appliances and utility room furniture as indicated. Construct built in cupboard throughout the house as indicated on the drawings incorporating fan coil units. Existing windows to be overhauled with single pane acoustic glass installed. Lower ground floor: Construct new side return infill extension with new decorated timber sash window. Provide new glass roof light to new lead work roof of infill extension. New infill wall and door to form new hall at base of new staircase. Allow to tank lower ground floor and walls full height complete. Construct partition walls to form the new bathrooms and utility \ storage areas. New utility and storage area. New door form storage area to front service area. New decorated timber sash window to lightwell to bathroom 3. New decorated timber French doors to lightwell to bedroom 2 & 3. Ground Floor: New double doors between reception and dining room. Ditto to kitchen from the hall. Construct new studwork to form new shower room and study to hall with new doors. New decorated timber sash window to shower room. New casement window to match existing to dining room. New fireplace to the ground floor reception room. Clean and line flue. New built-in cupboards and low level joinery with fan coil units within. New infill conservatory with decorated French doors and casement windows with glass roof above set within a lead work box gutter. Extend up party wall locally to accommodate new infill. Metalwork balcony to the French doors. Mechanical & electrical installation: Install new boilers & pressurised hot water storage cylinders. Supply gas to the boiler, kitchen, and reception rooms. Upgrade water, gas & electrical supplies to the property. Flat to be rewired complete for lighting and power. Install Lutron system for lighting control. Install new low voltage recessed down lighters to the ceilings generally. Install fire hoods to the recessed ceiling down lighters. Install wall lights to the house generally. Install new bathrooms, utility & kitchen - provide drainage and hot & cold water supplies. Install new extract fans to the bathrooms and kitchen - vent externally. Bathrooms, hall and the lower ground floor to have under floor heating. Install comfort cooling \ heating units within the house, form vents and ducts to suit. Provide grill to joinery \ walls as indicated on the drawings. Connect small bore pipe work from the proposed condensers in the front vault. Install a video entry phone system & CCTV. Allow to audio visual installation through out the house. Install cables for a Crestron control systems. Include for ceiling speakers. Install smoke and heat detectors \ fire alarm. Install security alarm system. Externally: Install new external doors and windows to the rear side return infill extension as indicated. Provide metalwork balustrade to the rear ground floor side return infill conservatory. Provide replacement timber door to the front light well to bedroom 4 to match existing. New rear side return ground floor timber and double glazed glass conservatory. New rear side return lower ground floor infill extension with lead roof and double glazed roof light. Existing external pipe work to be altered to suit the new layout. New glazing to be double glazed, existing glazing to be replaced with acoustic clear glass. Redecorate all joinery and pipe work. Install air bricks for the ventilation exhausts to the rear of the house. New windows to be timber construction and decorated. Existing windows and doors to be overhauled and redecorated. Make good to defective brickwork generally. Repoint external brickwork generally and clean. Rear patio to be re-laid with new sawn York stone. RECEPTION Studwork infill to form cupboard MASTER BEDROOM HALL BEDROOM 4 VAULT New staircase New concrete slab to Lower Ground Floor complete New door openings SECTION C-C Lightweight conservatory Timber & glass construction Box leadwork gutter New door and frame to raised opening to schedule STUDY HALL STORE STAIRS RECEPTION HALL 9 CONSERVATORY 10 New doors to new opening to schedule LEONARD ARCHITECTURE LTD 8 ARCHITECTURE - INTERIOR DESIGN New staircase HALL BATHROOM 2 BEDROOM 4 STORAGE 7 6 BEDROOM 2 HURLINGHAM STUDIOS RANELAGH GARDENS FULHAM LONDON SW6 3PA 5 Tel: 020 7610 6827 Mobile: 07831 549946 [email protected] THIS DRAWING IS THE COPYRIGHT OF LEONARD ARCHITECTURE LTD. © 37 CADOGAN SQUARE LONDON 3 SECTION B-B Drawing Drawn A3 at 1:100 Date PTADT 1 Scales 2 PROPOSED SECTIONS A-A, B-B & C-C Drawing No JULY.2014 37.PP.302D 0 SECTION A-A 4 Project 0 1 2 3 4 5 6 7 SCALE M 8 9 10
© Copyright 2026 Paperzz