By Miss Kate-rachada Klankrong Department of Drainage and Sewerage Bangkok Metropolitan Administration, Bangkok, Thailand General Information of Bangkok PATHUMTHANI NONTHABURI BANGKOK SAMUT PRAKAN SAMUT SONGKRAM THAILAND BANGKOK MAP • Bangkok : Area 1,568.7 km2 Register Population 5.69 million (2015) • Surface Water: Canal 1,682 canals Length 2,604 km • Chao Praya River 372 km (Total Length) Bangkok 35 km • Source of Water Supply to Bangkok and vicinity: Upstream of Chao Praya River at Sam Lae, Pathum Thani • Water Consumption Rate in Bangkok (2015) : 2.544 mil. m3/day JICA Master Plan (27 zones) In 2011, Bangkok in collaboration with JICA has proposed a 30-year master plan for Bangkok to construct the wastewater treatment . The construction area is divided into 27 areas of wastewater treatment cover 80-90% of total wastewater generated in 3 Bangkok Existing Central WWTPs in Bangkok Bangsue EECC 1. 2. 3. 4. Source: JICA, 2011 Year of operation : 2013 Service Area: 20.7km2 Population 223,990 Capacity 120,000m3/d Total Capacity of 8Central WWTPs Wastewater Plant Population Served Service Area (sq.km.) Capacity (m3/d) 120,000 2.7 30,000 70,000 4.1 40,000 1,080,000 37 350,000 4. Chong Non Si WWTP 580,000 28.5 200,000 5. Nong Khaem WWTP 520,000 44 157,000 6. Tung Kru WWTP 177,000 42 65,000 7. Chatu Chak WWTP 432,000 33.4 150,000 8. Bangsue EECC 223,990 20.7 120,000 3,202,990 212.4 1,112,000 1. Si Phraya WWTP 2. Rattanakosin WWTP 3. Din Dang WWTP Total 14% of total area 45% of wastewater generation in 2015 Bangkok Bang Sue Education and Environmental Conservation Center The 1st Underground Wastewater Treatment Plant in Bangkok Future Scheme of WWTP Thonburi WWTP Minburi WWTP Service Areas: 36.44 km2 Capacity: 160,000 m3/day Service Areas : 4.43 km2 Capacity : 10,000 m3/day Nongbon WWTP Service Areas : 63.85 km2 Capacity : 135,000 m3/day KlongToei WWTP Service Areas : 71 km2 Capacity : 360,000 m3/day Total Capacity of Central WWTP Wastewater Project Population Served Service Area (sq.km.) Capacity (m3/d) 1. Minburi WWTP 13,000 4.43 10,000 2. Thonburi WWTP 404,730 36.44 160,000 3. Klong Toei WWTP 485,000 71 360,000 4. Nongbon WWTP 265,000 63.85 135,000 Status FS and DD completed in 2012 and preparation for Construction 2015-2016 FS and DD in 2014-2016 and preparation for PPP Preparation for DD and PPP FS in 2011 by JICA and preparation for PPP Treated Water Reuse • In 2015, ~6% of treated water is reused for several purposes such as planting, cleaning the road and market 9 Sludge for Land Application Thonburirom Park Sirikit Park • Digested Sludge from WWTPs used as raw material for composting and then mainly provide to BMA public park • In 2015, about 13,150 m3 of sludge compost has been used 10 Challenges and Solutions • “Public Private Partnership (PPP)” should be implemented for the future projects in order to solve the financial problems • “Treated Wastewater” is the alternative water for using in some specific activities (6% of treated wastewater using for watering plant, cleaning the road, flushing system etc.) • “People Participation” will pay an important role to improve the surface water quality • “Energy Saving Technology” for Wastewater Treatment System should be studied and applied for solving global warming
© Copyright 2024 Paperzz