T Flowers: First Fix For Flooding at Ft Hamilton F/G Commence updating south end of Ft. Hamilton subway exit by replanting green areas to control erosion & prevent flooding Cost $325,000 (with an additional $325,000 in matched funds provided by another city agency) Location Ft. Hamilton F/G - Southern entrance Who Benefits Fed-up commuters in Kensington & Windsor Terrace will rejoice as beautiful plantings address the erosion and run-off issues that contribute to the longstanding problem known as Lake Ft. Hamilton. Project Description By tackling the run-off and erosion problems that impede drainage, this project addresses the dangerous flooding and icing outside the subway entrance and kicks off a series of improvements for this area.
© Copyright 2026 Paperzz