Chapter 2: Work Planning and Control Service Subcontractor Construction Site Release Form ENVIRONMENT, SAFETY, HEALTH, AND QUALITY DIVISION Product ID: 666 | Revision ID: 1676 | Date Published: 30 September 2014 | Date Effective: 30 September 2014 URL: http://www-group.slac.stanford.edu/esh/eshmanual/references/wpcFormServiceReleaseConstruct.pdf This form is used to document release by the SLAC field construction manager (FCM) of service subcontractors requiring access to a construction site. The form is to be completed by the FCM for the construction site and the workers involved; completed forms are maintained in the work package. (See Work Planning and Control: Work Planning and Control Procedure [SLAC-I-720-0A21C-002].) Required Permits / Plans (for service work being released) None Energy Isolation Plan (CoHE) Penetration Permit Confined Space Entry Permit Excavation Permit Radiological Work Permit Construction Project Air Permit Fire Protection Impairment Stormwater BMP Electrical Work Plan (EWP) Hoisting and Rigging Plan Other: Elevated Surface Work Plan (ESWP) Hot Work Permit-Fire (flame or sparks) Other: Worker and Releaser Acknowledgment Today’s construction site work activities, general or unique hazards, and controls have been discussed, including the permits above. Releaser has affirmed the worker’s JSA is adequate. Date Subcontractor Name (print) 30 September 2014 Subcontractor Signature Subcontractor Company SLAC-I-730-0A21J-054-R000 SLAC Releaser Name (print) SLAC Releaser Signature 1 of 1
© Copyright 2025 Paperzz