geomec group - UK Government Web Archive

GEOMEC GROUP
•
Geomec Engineering AS offers independent studies, consultancy, training
and auditing for oil and gas operators, with an emphasis on compaction
and subsidence, heavy oil, mud-loss management, sand management,
water management and wellbore stability. It has been operative since
2002.
•
Geomec Environmental Management AS is establishing an independent
control centre for planning, real time monitoring and the daily follow-up of
storage and IOR wells, to ensure safe permanent injection of cuttings,
water and CO2. The company has been operative since 2008, and the
centre will begin operations in 2010.
Geomec © 2010
2
GEOMEC METHODOLOGY
Geomec’s Technology Marguerite
Geomechanics is a core discipline
of oil and gas operations
Sand management
Water injection
Etc.
Wellbore Stability
Mud Loss
Etc.
Natural fractures
Core damage
Etc.
Compaction and Subsidence
Fracturing
Etc.
Waste management
Leakage
Etc.
Over the years Geomec’s staff
Has performed advanced(*) studies
In all domains of Petroleum Geomechanics
(*) Over 700 publications are co-authored by Geomec’s staff
© Geomec 2008
Completion
Well life expectancy
Etc.
multidisciplinarity is more than a word:
It is a way of life
3
SERVICE UK MARKET
•
An independent specialist-advisory centre for injection wells (cuttings,
water and CO2).
•
Planning/qualification, monitoring/analysing and reporting/advising for the
pre-injection, injection and post-injection phases.
•
Supplementary regulatory, laboratory and seminar/course services.
Geomec © 2010
4
REFERENCE UK MARKET
•
Nexen (Aberdeen and London).
•
Buzzard Field.
•
Water Injection and Produced Water Reinjection.
Geomec © 2010
5
THE PROBLEM: LEAKAGES FROM INJECTION WELLS
•
International water-leakage survey: Only operators not looking for
leakages report having no leakages.
•
Economic losses: Reduced life-span for injection wells, higher cost and
lower gain for IOR wells; and loss of and possible compensation for loss
of CO2 quotas.
•
Environmental pollution: Short and long-term soil, sea, (ground-) water
and air contamination; and risk of leakage-damages to injection facilities.
Geomec © 2010
6
OUR SOLUTION: INDEPENDENT SPECIALIST-ADVISORY CENTRE
PRE-INJECTION
INJECTION
POST-INJECTION
GEOMEC
INJECTION CENTRE
PROJECT
PHASES
OPERATOR
INJECTION WELLS
MONITORING-SYSTEM
& WELL-DATABASE
IOR & STORAGE
(NEW & EXISTING)
TECH & REGULATORY
EXPERT-SUPERVISION
ONSHORE
& OFFSHORE
LABORATORY &
SEMINAR / COURSES
NATIONAL &
INTERNATIONAL
PROJECT
ACTIONS
PLANNING &
QUALIFICATION
MONITORING
& ANALYSING
REPORTING
& ADVISING
STAVANGER CENTRE FOR SAFE INJECTION (24/7)
Geomec © 2010
CUTTINGS, WATER & CO2
7
PRELIMINARY CHALLENGES
•
Marketing (who and how) – Test on the mentor company.
•
Decision Makers (who and how) – Test on the mentor company.
•
Regulative support (who and how) – Door-opener in Norway !
•
Growth resources (personnel and money) – Frame-agreements ?
Geomec © 2010