GEOMEC GROUP • Geomec Engineering AS offers independent studies, consultancy, training and auditing for oil and gas operators, with an emphasis on compaction and subsidence, heavy oil, mud-loss management, sand management, water management and wellbore stability. It has been operative since 2002. • Geomec Environmental Management AS is establishing an independent control centre for planning, real time monitoring and the daily follow-up of storage and IOR wells, to ensure safe permanent injection of cuttings, water and CO2. The company has been operative since 2008, and the centre will begin operations in 2010. Geomec © 2010 2 GEOMEC METHODOLOGY Geomec’s Technology Marguerite Geomechanics is a core discipline of oil and gas operations Sand management Water injection Etc. Wellbore Stability Mud Loss Etc. Natural fractures Core damage Etc. Compaction and Subsidence Fracturing Etc. Waste management Leakage Etc. Over the years Geomec’s staff Has performed advanced(*) studies In all domains of Petroleum Geomechanics (*) Over 700 publications are co-authored by Geomec’s staff © Geomec 2008 Completion Well life expectancy Etc. multidisciplinarity is more than a word: It is a way of life 3 SERVICE UK MARKET • An independent specialist-advisory centre for injection wells (cuttings, water and CO2). • Planning/qualification, monitoring/analysing and reporting/advising for the pre-injection, injection and post-injection phases. • Supplementary regulatory, laboratory and seminar/course services. Geomec © 2010 4 REFERENCE UK MARKET • Nexen (Aberdeen and London). • Buzzard Field. • Water Injection and Produced Water Reinjection. Geomec © 2010 5 THE PROBLEM: LEAKAGES FROM INJECTION WELLS • International water-leakage survey: Only operators not looking for leakages report having no leakages. • Economic losses: Reduced life-span for injection wells, higher cost and lower gain for IOR wells; and loss of and possible compensation for loss of CO2 quotas. • Environmental pollution: Short and long-term soil, sea, (ground-) water and air contamination; and risk of leakage-damages to injection facilities. Geomec © 2010 6 OUR SOLUTION: INDEPENDENT SPECIALIST-ADVISORY CENTRE PRE-INJECTION INJECTION POST-INJECTION GEOMEC INJECTION CENTRE PROJECT PHASES OPERATOR INJECTION WELLS MONITORING-SYSTEM & WELL-DATABASE IOR & STORAGE (NEW & EXISTING) TECH & REGULATORY EXPERT-SUPERVISION ONSHORE & OFFSHORE LABORATORY & SEMINAR / COURSES NATIONAL & INTERNATIONAL PROJECT ACTIONS PLANNING & QUALIFICATION MONITORING & ANALYSING REPORTING & ADVISING STAVANGER CENTRE FOR SAFE INJECTION (24/7) Geomec © 2010 CUTTINGS, WATER & CO2 7 PRELIMINARY CHALLENGES • Marketing (who and how) – Test on the mentor company. • Decision Makers (who and how) – Test on the mentor company. • Regulative support (who and how) – Door-opener in Norway ! • Growth resources (personnel and money) – Frame-agreements ? Geomec © 2010 8
© Copyright 2026 Paperzz