VALIDATION REPORT VCS Version 3, CCB Standards Second Edition VCS+CCB Validation Report Template Instructions for completing the validation report: TITLE PAGE: All items in the boxes on this title page must be completed using Arial 10pt, black, regular (non-italic) font. All boxes must appear in the final document. Reports may also feature the title and preparers’ name, logo and contact information more prominently on the title page, using Arial 24pt font for title and Arial 11pt, black font for all other information. VALIDATION REPORT: Instructions for completing the joint Verified Carbon Standard (VCS) and Climate, Community & Biodiversity (CCB) Standards validation report template can be found under each section heading in blue or green italicized text. The blue text represents guidance for the carbon component of the validation report that must follow VCS project-level requirements and the applied VCS methodology. The green text represents guidance for the community and biodiversity components of the validation report that must follow CCB Standards requirements and includes a cross reference to the relevant CCB Standards criteria. It should be noted that the instructions provided in this document are meant to help and aid the user in completing the template and the instructions do not represent the VCS or CCB Standards requirements. All requirements are found in the relevant VCS program and CCB Standards documents and these documents should be consulted before completing this template. Any and all findings (ie, corrective action requests, clarification requests and public comments received during the CCBA public comment period) shall be documented under the appropriate section of this template or in an appendix (insert tables as needed). This shall include how non-conformities identified, and relevant public comments, have been addressed through corrective action. All sections must be completed using Arial 10pt, black, regular (non-italic) font. Sections which are not applicable may be left blank but should NOT be deleted from the final document. All instructions, including this introductory text, should be deleted from the final document. VALIDATION PROJECT TITLE Logo (optional) Document Prepared By (individual or entity) Contact Information (optional) Project Title Version Report ID v3.0 Name of project Version number of validation report Identification number of this document 1 VALIDATION REPORT VCS Version 3, CCB Standards Second Edition Report Title Title of validation report Client Client for whom the report was prepared Pages Number of pages of this report Date of Issue DD-Month-YYYY report issued Prepared By Contact Validation/verification body that prepared report Physical address, telephone, email, website Approved By Individual at the validation/verification body who approved the validation report Work Carried Out By Individuals who conducted the validation Summary: Provide the following: A brief description of the validation and the project, The purpose and scope of validation The method and criteria used for validation Any findings, restrictions of uncertainties related to the validation Summary of the validation conclusion v3.0 2 VALIDATION REPORT VCS Version 3, CCB Standards Second Edition Table of Contents Insert table of contents v3.0 3 VALIDATION REPORT VCS Version 3, CCB Standards Second Edition 1 INTRODUCTION 1.1 Objective Explain the purpose of the validation. 1.2 Scope and Criteria Describe the scope and criteria of the validation. 1.3 Level of assurance Indicate the level of assurance of the validation report. 1.4 Summary Description of the Project Provide a summary description of the project. 2 VALIDATION PROCESS 2.1 Method and Criteria Describe the method and criteria, including the sampling plan, used for undertaking the validation. 2.2 Document Review Describe how the validation was performed as an audit where the project description and any supporting documents were reviewed and compared with identified and stated requirements. 2.3 Interviews Describe the interview process and identify personnel, including their roles, who were interviewed and/or provided information additional to that provided in the project description and any supporting documents. 2.4 Site Inspections Describe the method and objectives for any on-site inspections performed. 2.5 Public Comments Describe the process for addressing comments received through the CCB Alliance (CCBA) public comment period during the validation process. 2.6 Resolution of Any Material Discrepancy Describe the process for the resolution of any material discrepancies (corrective actions, clarifications or other findings) raised by the validation team during the validation process. v3.0 4 VALIDATION REPORT VCS Version 3, CCB Standards Second Edition VALIDATION FINDINGS 3 GENERAL 3.1 Summary Description of the Project (G3) Document the evidence used to determine that the project satisfies G3.1. 3.2 Project Location (G1 & G3) Identify, discuss and justify conclusions regarding project location, including the requirements of G1.1, G1.3 and G3.3. 3.3 Conditions Prior to Project Initiation (G1) Identify, discuss and justify conclusions regarding the condition prior to project initiation, including the requirements of G1.2, G1.5-8.6. 3.4 Project Proponent (G4) Identify, discuss and justify conclusions regarding roles/responsibilities for the project proponent(s), including the requirements of G4.1. 3.5 Other Entities Involved in the Project (G4) Identify, discuss and justify conclusions regarding roles/responsibilities for any other entities involved in the development of the project, including the requirements of G4.2. 3.6 Project Start Date Identify, discuss and justify conclusions regarding the project start date. 3.7 Project Crediting Period (G3) Identify, discuss and justify conclusions regarding the project crediting period, including the requirements of G3.4. 4 DESIGN 4.1 Sectoral Scope and Project Type Identify, discuss and justify conclusions regarding the sectoral scope(s), type, technologies and measures implemented and eligibility of the project. 4.2 Description of the Project Activity (G3) Identify, discuss and justify conclusions regarding the project activity, including the requirements of G3.2. v3.0 5 VALIDATION REPORT VCS Version 3, CCB Standards Second Edition 4.3 Management of Risks to Project Benefits (G3) Document the evidence used to determine that the project satisfies G3.5 and G3.7. 4.4 Measures to Maintain High Conservation Values (G3) Document the evidence used to determine that the project satisfies G3.6. 4.5 Project Financing (G3 & G4) Document the evidence used to determine that the project satisfies G3.11 and G4.7. 4.6 Employment Opportunities and Worker Safety (G4) Document the evidence used to determine that the project satisfies G4.3-4 and G4.6. 4.7 Stakeholders (G3) Document the evidence used to determine that the project satisfies G3.8-10. 4.8 Commercially Sensitive Information Identify, discuss and justify conclusions regarding commercially sensitive information. 5 LEGAL STATUS 5.1 Compliance with Laws, Statues, Property Rights and Other Regulatory Frameworks (G4 & G5) Identify, discuss and justify conclusions regarding compliance with applicable laws, statutes and regulatory frameworks, including the requirements of G4.5 and G5.1-5.2.. 5.2 Evidence of Right of Use (G5) Identify, discuss and justify conclusions regarding evidence of right of use, including the requirements of G5.6. 5.3 Emissions Trading Programs and Other Binding Limits Identify, discuss and justify conclusions regarding emissions trading programs and other binding limits. 5.4 Participation under Other GHG Programs Identify, discuss and justify conclusions regarding participation under other GHG programs. v3.0 6 VALIDATION REPORT VCS Version 3, CCB Standards Second Edition 5.5 Other Forms of Environmental Credit Identify, discuss and justify conclusions regarding other forms of GHG-related environmental credit. 5.6 Projects Rejected by Other GHG Programs Identify, discuss and justify conclusions regarding rejection by any other GHG programs. 5.7 Respect for Rights and No Involuntary Relocation (G5) Document the evidence used to determine that the project satisfies G5.3-4. 5.8 Illegal Activities and Project Benefits (G5) Document the evidence used to determine that the project satisfies G5.5. 6 APPLICATION OF METHODOLOGY 6.1 Title and Reference of Methodology Identify the title, reference and version number of the applied methodology 6.2 Applicability of Methodology Identify, discuss and justify conclusions regarding the applicability of the methodology. 6.3 Methodology Deviations Identify, discuss and justify conclusions regarding methodology deviations applied to the project. 6.4 Project Boundary (G1) Identify, discuss and justify conclusions regarding the definition of the project boundary. 6.5 Baseline Scenario (G2) Identify, discuss and justify conclusions regarding the determination of the baseline scenario, including the requirements of G2.1 and G2.4-5. 6.6 Additionality (G2) Identify, discuss and justify conclusions regarding the demonstration of additionality, including the requirements of G2.2. v3.0 7 VALIDATION REPORT VCS Version 3, CCB Standards Second Edition 7 QUANTIFICATON OF GHG EMISSION REDUCTIONS AND REMOVALS 7.1 Project Scale and Estimated GHG Emission Reductions or Removals Identify, discuss and justify conclusions regarding the project scale and the estimated GHG emission reductions or removals, including the requirements of G1.4. 7.2 Leakage Management Identify, discuss and justify conclusions regarding leakage management. 7.3 Baseline Emissions (G2) Identify, discuss and justify conclusions regarding the quantification of baseline emissions, including the requirements of G2.3. 7.4 Project Emissions Identify, discuss and justify conclusions regarding quantification of project emissions. 7.5 Leakage Identify, discuss and justify conclusions regarding quantification of leakage emissions. 7.6 Summary of GHG Emission Reductions and Removals Identify, discuss and justify conclusions regarding the summary of GHG emission reductions or removals and uncertainties associated with the calculation of emissions. 7.7 Climate Change Adaptation Benefits (GL1) If applicable, document the evidence used to determine that the project satisfies GL1.1-4. 8 COMMUNITY 8.1 Net Positive Community Impacts (CM1) Document the evidence used to determine that the project satisfies CM1.1-2. 8.2 Negative Offsite Stakeholder impacts (CM2) Document the evidence used to determine that the project satisfies CM2.1-3. 8.3 Exceptional Community Benefits (GL2) If applicable, document the evidence used to determine that the project satisfies GL2.1-5. v3.0 8 VALIDATION REPORT VCS Version 3, CCB Standards Second Edition 9 BIODIVERSITY 9.1 Net Positive Biodiversity Impacts (B1) Document the evidence used to determine that the project satisfies B1.1-5. 9.2 Negative Offsite Biodiversity Impacts (B2) Document the evidence used to determine that the project satisfies B2.1-3. 9.3 Exceptional Biodiversity Benefits (GL3) If applicable, document the evidence used to determine that the project satisfies GL3.1-2. 10 MONITORING 10.1 Description of the Monitoring Plan (CM3 & B3) Identify, discuss and justify conclusions regarding the following: Data and parameters available at validation Data and parameters monitored Applicability and eligibility of monitoring equipment and procedures Document the evidence used to determine that the project satisfies CL3.1-2, CM3.1-2, B3.1-2, CM3 and B3. 11 VALIDATION CONCLUSION Clearly state whether the project conforms with the validation criteria for projects, as set out in VCS Version 3 and CCB Standards Second Edition, and include any qualifications or limitations. Conclude whether the project is likely to achieve estimated GHG emission reduction or removals and positive community and biodiversity impacts. CCB STANDARDS CRITERIA CHECKLIST: GENERAL SECTION CONFORMANCE G1. Original Conditions in the Project Area (Required) YES __ NO __ G2. Baseline Projections (Required) YES __ NO __ G3. Project Design and Goals (Required) YES __ NO __ G4. Management Capacity and Best Practices (Required) YES __ NO __ G5. Legal Status and Property Rights (Required) YES __ NO __ CL1. Net Positive Climate Impacts (Required) YES __ NO __ CL2. Offsite Climate Impacts (“Leakage”) (Required) YES __ NO __ CLIMATE SECTION v3.0 9 VALIDATION REPORT VCS Version 3, CCB Standards Second Edition CL3. Climate Impact Monitoring (Required) YES __ NO __ CM1. Net Positive Community Impacts (Required) YES __ NO __ CM2. Offsite Community Impacts (Required) YES __ NO __ CM3. Community Impact Monitoring (Required) YES __ NO __ B1. Net Positive Biodiversity Impacts (Required) YES __ NO __ B2. Offsite Biodiversity Impacts (Required) YES __ NO __ B3. Biodiversity Impact Monitoring (Required) YES __ NO __ GL1. Climate Change Adaptation Benefits (Optional) YES __ NO __ GL2. Exceptional Community Benefits (Optional) YES __ NO __ GL3. Exceptional Biodiversity Benefits (Optional) YES __ NO __ COMMUNITY SECTION BIODIVERSITY SECTION GOLD SECTION v3.0 10
© Copyright 2026 Paperzz