Prepared By Abdullrhman Bin mahmoud Mohammed ALMannaa Abdullah ALQhtani Yazed ALarafj Emad Shieraz Faisal ALolyani Meshari ALOabied Supervisor : Prof.Naif bin Humaid Project Introduction The work comprises of detailed shop drawing design of civil, structural, building works, electrical, plumbing and mechanical installation work, site work and all other works for the construction, completion of the King Fahad CardioSurgery and Disease Center Building. This is a seven (7) storey building a total floor area of 70.000 m2, one (1) of which is basement. The project duration is 720 calendar days from the site handover date confirmed with a signed acceptance by ABV Rock Group Ltd., Project Manager. Project Highlights Client : King Saud University, Ministry for Higher Education Design Consultant : Zuhair Fayez Partnership Shop Drawing : ABV Rock Group Limited Contractor : ABV Rock Group Limited Contract Type : Lump sum contract Project Area : 70.000 M2 [Building/Floor Area] Project Start Date : 27th December 2009 Project Finish Date: 29 April 2012 (After Receiving an Extension Time) Progress Achievements: Partial Site hand over from 27th December accepted Excavation in hand-over area of the building mostly completed Structural work with foundation started, into the fifth floor. Masonry works started in basement, ground and 1st floor Project Progress Overview DIV 1 DETALLS REMARKS General Requirements Soil Investigation - Soil Testing/Boreholes Done - Cavity Probing Done - Cavity Injection Not required 2 Site Work & General Excavation Started and on-going in handed over area 3 Cast-In-Place Concrete Work on-going up to roof floor 4 Masonry Startedin basement, Ground floor and 1st floor 5 Metal Works 6 Wood & Plastic 7 Thermal & Moisture Protection 8 Doors & Windows 9 Finishes 10 Specialties 14 Conveying System 15 Mechanical Works – sub- Structure Work on-going Drainage system work in progress Plumbing and fire protection started up to 2 nd floor 16 Electrical Works Grounding work under progress Electrical first fix started up to 5th floor BUILDING INFORMATION SHEET Abdullah ALQhtani متر للبدروم من7 حفر بالموقع لعمق اليتجاوزdescription quantity unit cost total cost نقل خارجm3 35 3685500 excavate over site to form basement not exceeding 7m deep 105300 حفر منسوب االرض الطبيعية quantity daily prod of crew crew make up man hours total man hours total crew hours avg 1170000 13 90000 الموقع wage rate 105300 100 1forman - labor3 per unit 11232 3744 12.5 0.106 labor subtotal rate per hour equip truck 2 - شويل1__بوكلينsubtotal total cost 140400 6×700÷8=525 1965600 2106000 20 3 h 7200(88+75)=1173600$ 1173600÷90000=13 7200=12.5÷90000 قالبي 50 3م76 متر من مكنسوب االرض1 حفر خنادق لزوم كمرات الربط واالساسات بعمق اليتجاوز13 100m3/day÷8h/day=12.5m3/h حفر قواعدexcavate trenches for tie beams and bases not exceeding1 m deep 3800 excavate pits for column pads not exceeding 1m 15400 50 3م308 متر من منسوب االرض الطبيعية1 االعمدة لعمق اليتجاوز ردم بمواد حبيبية معتمدة تم اختيارها من مواد نواتج الحفر او من خارجdeep commencing at existing ground level اعمال الدك وماشابه ذلك حسب توصيات تقرير فحص تربة الموقع وذلك لتعويض المناسيب متضمنةm3 108072 /$12 3م9006 الموقع approved granular fill selected from excavated material according or 02200 من اعمال حسب المواصفات القسم imported fill material to site soil report recommendation and subject to engineers approval in making up levels including compaction and the like as per specifications section 02200 quantity daily prod of crew crew make up man hours total man hours total crew hours avg wage rate 9006 600m3/day 2 per unit 234.156 117 12.5 0.026 labor subtotal rate per hour equip subtotal material total cost material total cost $/m3 2927 350 يوم/3م600 ساعة/3م15=يوم/س8 ÷ يوم/3م120=يوم/ رحلة6× 3م20سعة تريال40950 5 $/m3 45030 88907 10$ س/$150×تريال5(س120 ساعة120=يوم15=تريال5÷120÷3م9006 تريال5= يوم للقالبي/3م120÷لشويل مواد ردم انشائية موردة من خارج الموقع ومدكوكة بصورة 3 م/$12=9006÷$105000 105000$=)س/$125+ القواعد للوصول إلى المناسيب شامال ذاك الدك حتى الوصول الى الكثافةm3 633395 /$35 3م18097 جيدة فوق االساسات و m3 /$8 3م80 مم تحت البالطات على سطح االوض100 طبقة من الحصى الخشن المدموك بسمك المطلوبة معالجة التربة ضد640 100mmthick drainage layer to underside of slab on grade as per specifications section 02200 m3 128480 to formation subgrade of slabs and beds /$8 2م16060 النمل االبيض تحت البالطات وعلى طول محيط المبنى m3 500000 allow for /$1000 3م500 حصر ومأل الفراغات بالصخر حسب ظروف الموقعincluding periphery of building cavity filling as required total cost 6245287$ FOR CONCRETE DESCRIPTOIN 6" SLAB quantity LENGTH 2 WIDTH 60 quantity HEIGHT 49.1 0.5 2946 مقدمة : وصل التأمين في المملكة العربية السعودية متأخرا ً ,و خصوصا ً في الجانب الهندسي ,وحتى اآلن ال تزال استخدامات التأمين محدودة في نعرج على أنواع التأمين المشاريع الضخمة ,ولعلنا في هذه الجزئية ّ الموجودة بالمملكة ,ونأخذ على سبيل المثال – الشركة التعاونية للتأمين – بحكم قدمها بالسوق السعودي عالوة ً على تربعها على سوق شركات التأمين . أنواع الـتأمني اهلندسي : أوالً :تأمين المقاولين "ضد جميع األخطار " ثانيا ً :تأمين تجهيزات وآليات المقاولين ثالثا ً :تأمين عطب اآلالت رابعا ً :تأمين خسائر األرباح الناتجة عن عطب اآلالت خامسا ً :تأمين المراجل وأوعية الضغط سادسا ً :تأمين األجهزة األلكترونية أتمني املقاولني ضد مجيع األخطار األكثر شيوعا ً ..المستخدم في هذا المشروع يطلب من طالب التأمني أن حيضر البياانت التالية : اسم المشروع و رقمه ,الموقع ,العنوان ,المقاولين الرئيسين و الباطن ,المهندسين االستشاريين وصف أعمال المشروع :المساحة ,نوع األساسات ,طرق التشييد ,مواد التشييد بعد ذلك يطلب منه أن جييب على بعض األسئلة املتعلقة ابملشروع و منفذ املشروع : هل المقاول سابق خبرة ؟ مدة التأمين مدى الخطوة في :الحرائق ,الفيضان ,العواصف ,التفجير ,البراكين , الزالزل ما مدى مستوى السالمة ؟ تفاصيل التربة التحتية المياه الجوفية مواسم األمطار مدى تأثر الممتلكات المحيطة بالمشروع يشمل التأمني يف هذا النوع على : األضرار المادية : األعمال الدائمة و المؤقتة ,منها :المواد التي تم توريدها من قبل صاحب العمل تجهيزات و معدات التشييد االليات المستخدمة في االنشاءات إزالة المخلفات الممتلكات الكائنة بموقع العمل المسؤولية تجاه الغير : اإلصابات الجسدية الممتلكات الكابالت و المواسير End
© Copyright 2026 Paperzz