Project Introduction
 The work comprises of detailed shop drawing design of
civil, structural, building works, electrical, plumbing and
mechanical installation work, site work and all other works
for the construction, completion of the King Fahad CardioSurgery and Disease Center Building. This is a seven (7)
storey building a total floor area of 70.000 m2, one (1) of
which is basement.
 The project duration is 720 calendar days from the site
handover date confirmed with a signed acceptance by ABV
Rock Group Ltd., Project Manager.
Project Highlights
 Client :







King Saud University, Ministry for Higher Education
Design Consultant
:
Zuhair Fayez Partnership
Shop Drawing
:
ABV Rock Group Limited
Contractor
:
ABV Rock Group Limited
Contract Type
:
Lump sum contract
Project Area
:
70.000 M2 [Building/Floor Area]
Project Start Date
:
27th December 2009
Project Finish Date: 29 April 2012 (After Receiving an Extension Time)
Progress Achievements:
 Partial Site hand over from 27th December accepted
 Excavation in hand-over area of the building mostly
completed
 Structural work with foundation started, into the fifth
floor.
 Masonry works started in basement, ground and 1st
floor
Project Progress Overview
DIV
1
DETALLS
REMARKS
General Requirements
Soil Investigation
-
Soil Testing/Boreholes
Done
-
Cavity Probing
Done
-
Cavity Injection
Not required
2
Site Work & General Excavation
Started and on-going in handed over area
3
Cast-In-Place Concrete
Work on-going up to roof floor
4
Masonry
Startedin basement, Ground floor and 1st floor
5
Metal Works
6
Wood & Plastic
7
Thermal & Moisture Protection
8
Doors & Windows
9
Finishes
10
Specialties
14
Conveying System
15
Mechanical Works – sub- Structure
Work on-going
Drainage system work in progress
Plumbing and fire protection started up to 2 nd floor
16
Electrical Works
Grounding work under progress
Electrical first fix started up to 5th floor
BUILDING INFORMATION SHEET
Abdullah ALQhtani
‫ متر للبدروم من‬7 ‫ حفر بالموقع لعمق اليتجاوز‬description
quantity
unit cost total cost
‫نقل خارج‬m3 35 3685500 excavate over site to form basement not exceeding 7m deep 105300 ‫حفر‬
‫منسوب االرض الطبيعية‬
quantity daily prod of crew crew make up man hours total man hours total crew hours avg 1170000 13 90000 ‫الموقع‬
wage rate 105300 100 1forman - labor3 per unit 11232 3744 12.5
0.106
labor subtotal rate per hour equip
truck 2
-‫ شويل‬1__‫بوكلين‬subtotal total cost 140400 6×700÷8=525 1965600 2106000 20
3
h 7200(88+75)=1173600$ 1173600÷90000=13 7200=12.5÷90000
‫قالبي‬
50 3‫م‬76
‫ متر من مكنسوب االرض‬1 ‫حفر خنادق لزوم كمرات الربط واالساسات بعمق اليتجاوز‬13 100m3/day÷8h/day=12.5m3/h
‫حفر قواعد‬excavate trenches for tie beams and bases not exceeding1 m deep
3800
excavate pits for column pads not exceeding 1m
15400 50 3‫م‬308
‫ متر من منسوب االرض الطبيعية‬1 ‫االعمدة لعمق اليتجاوز‬
‫ردم بمواد حبيبية معتمدة تم اختيارها من مواد نواتج الحفر او من خارج‬deep
commencing at existing ground level
‫اعمال الدك وماشابه ذلك‬
‫حسب توصيات تقرير فحص تربة الموقع وذلك لتعويض المناسيب متضمنة‬m3 108072 /$12 3‫م‬9006
‫الموقع‬
approved granular fill selected from excavated material according or
02200 ‫من اعمال حسب المواصفات القسم‬
imported fill material to site soil report recommendation and subject to engineers approval in making up levels
including compaction and the like as per specifications section 02200
quantity daily prod of crew crew make up
man hours total man hours total crew hours avg wage rate 9006 600m3/day 2 per unit 234.156 117
12.5
0.026
labor subtotal rate per hour equip subtotal material total cost material total cost $/m3 2927 350
‫يوم‬/3‫م‬600
‫ساعة‬/3‫م‬15=‫يوم‬/‫س‬8 ÷ ‫يوم‬/3‫م‬120=‫يوم‬/ ‫رحلة‬6× 3‫م‬20‫سعة تريال‬40950 5 $/m3 45030 88907 10$
‫س‬/$150×‫تريال‬5(‫س‬120
‫ساعة‬120=‫يوم‬15=‫تريال‬5÷120÷3‫م‬9006
‫تريال‬5= ‫يوم للقالبي‬/3‫م‬120÷‫لشويل‬
‫مواد ردم انشائية موردة من خارج الموقع ومدكوكة بصورة‬
3‫ م‬/$12=9006÷$105000
105000$=)‫س‬/$125+
‫ القواعد للوصول إلى المناسيب شامال ذاك الدك حتى الوصول الى الكثافة‬m3 633395 /$35 3‫م‬18097
‫جيدة فوق االساسات و‬
m3 /$8 3‫م‬80
‫مم تحت البالطات على سطح االوض‬100 ‫طبقة من الحصى الخشن المدموك بسمك‬
‫المطلوبة‬
‫معالجة التربة ضد‬640
100mmthick drainage layer to underside of slab on grade as per specifications section 02200
m3 128480
to formation subgrade of slabs and beds /$8 2‫م‬16060
‫النمل االبيض تحت البالطات وعلى طول محيط المبنى‬
m3 500000 allow for /$1000 3‫م‬500
‫حصر ومأل الفراغات بالصخر حسب ظروف الموقع‬including periphery of building
cavity filling as required
total cost 6245287$

FOR CONCRETE
DESCRIPTOIN
6" SLAB
quantity
LENGTH
2
WIDTH
60
quantity
HEIGHT
49.1
0.5
2946
‫مقدمة ‪:‬‬
‫‪ ‬وصل التأمين في المملكة العربية السعودية متأخرا ً ‪ ,‬و خصوصا ً في‬
‫الجانب الهندسي ‪ ,‬وحتى اآلن ال تزال استخدامات التأمين محدودة في‬
‫نعرج على أنواع التأمين‬
‫المشاريع الضخمة ‪ ,‬ولعلنا في هذه الجزئية ّ‬
‫الموجودة بالمملكة ‪ ,‬ونأخذ على سبيل المثال – الشركة التعاونية‬
‫للتأمين – بحكم قدمها بالسوق السعودي عالوة ً على تربعها على سوق‬
‫شركات التأمين ‪.‬‬
‫أنواع الـتأمني اهلندسي ‪:‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫أوالً ‪ :‬تأمين المقاولين "ضد جميع األخطار "‬
‫ثانيا ً ‪ :‬تأمين تجهيزات وآليات المقاولين‬
‫ثالثا ً ‪ :‬تأمين عطب اآلالت‬
‫رابعا ً ‪ :‬تأمين خسائر األرباح الناتجة عن عطب اآلالت‬
‫خامسا ً ‪ :‬تأمين المراجل وأوعية الضغط‬
‫سادسا ً ‪ :‬تأمين األجهزة األلكترونية‬
‫أتمني املقاولني ضد مجيع األخطار‬
‫‪ ‬األكثر شيوعا ً ‪ ..‬المستخدم في هذا المشروع‬
‫يطلب من طالب التأمني أن حيضر البياانت التالية ‪:‬‬
‫‪ ‬اسم المشروع و رقمه ‪ ,‬الموقع ‪ ,‬العنوان ‪ ,‬المقاولين الرئيسين و الباطن‬
‫‪,‬المهندسين االستشاريين‬
‫‪ ‬وصف أعمال المشروع ‪ :‬المساحة ‪ ,‬نوع األساسات ‪ ,‬طرق التشييد ‪ ,‬مواد‬
‫التشييد‬
‫بعد ذلك يطلب منه أن جييب على بعض األسئلة املتعلقة ابملشروع و منفذ‬
‫املشروع ‪:‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫هل المقاول سابق خبرة ؟‬
‫مدة التأمين‬
‫مدى الخطوة في ‪ :‬الحرائق ‪ ,‬الفيضان ‪ ,‬العواصف ‪ ,‬التفجير ‪ ,‬البراكين ‪,‬‬
‫الزالزل‬
‫ما مدى مستوى السالمة ؟‬
‫تفاصيل التربة التحتية‬
‫المياه الجوفية‬
‫مواسم األمطار‬
‫مدى تأثر الممتلكات المحيطة بالمشروع‬
‫يشمل التأمني يف هذا النوع على ‪:‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫‪‬‬
‫األضرار المادية ‪:‬‬
‫األعمال الدائمة و المؤقتة ‪ ,‬منها ‪ :‬المواد التي تم توريدها من قبل صاحب‬
‫العمل‬
‫تجهيزات و معدات التشييد‬
‫االليات المستخدمة في االنشاءات‬
‫إزالة المخلفات‬
‫الممتلكات الكائنة بموقع العمل‬
‫‪ ‬المسؤولية تجاه الغير ‪:‬‬
‫‪ ‬اإلصابات الجسدية‬
‫‪ ‬الممتلكات‬
‫‪ ‬الكابالت و المواسير‬
End