Silver Bullet<Company Name> Modernization of Relay Equivalence Drawing System Risk List <Project Name> Risk List Version: 1.1 Date: 1/19/05 Revision History Date Version Description Author 12/10/2004 0.1 Initial Revision David Kerstanski 12/12/2004 1.0 First Revision to be reviewed David Kerstanski 1/19/2005 1.1 Updated for status report David Kerstanski <Company Name>, 2017 Page 2 of 15 <Project Name> Risk List Version: 1.1 Date: 1/19/05 Table of Contents 1. 2. Introduction 6 1.1 1.2 1.3 1.4 1.5 6 6 6 6 6 Purpose Scope Definitions, Acronyms, and Abbreviations References Overview Risks 2.1 2.2 2.3 2.4 2.5 2.6 6 Meeting Time 2.1.1 Risk Magnitude or Ranking 2.1.2 Description 2.1.3 Impacts 2.1.4 Mitigation Strategy 2.1.5 Trigger 2.1.6 Contingency Plan Clear Information 2.2.1 Risk Magnitude or Ranking 2.2.2 Description 2.2.3 Impacts 2.2.4 Mitigation Strategy 2.2.5 Trigger 2.2.6 Contingency Plan Workflow Documentation 2.3.1 Risk Magnitude or Ranking 2.3.2 Description 2.3.3 Impacts 2.3.4 Mitigation Strategy 2.3.5 Trigger 2.3.6 Contingency Plan Placement Algorithm Rework 2.4.1 Risk Magnitude or Ranking 2.4.2 Description 2.4.3 Impacts 2.4.4 Mitigation Strategy 2.4.5 Trigger 2.4.6 Contingency Plan .dxf Understanding 2.5.1 Risk Magnitude or Ranking 2.5.2 Description 2.5.3 Impacts 2.5.4 Mitigation Strategy 2.5.5 Trigger 2.5.6 Contingency Plan .dxf Testing 2.6.1 Risk Magnitude or Ranking 2.6.2 Description 2.6.3 Impacts 2.6.4 Mitigation Strategy 2.6.5 Trigger 2.6.6 Contingency Plan <Company Name>, 2017 6 6 6 6 6 6 6 6 6 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 9 9 9 Page 3 of 15 <Project Name> Risk List 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 Version: 1.1 Date: 1/19/05 Symbol Database Access 2.7.1 Risk Magnitude or Ranking 2.7.2 Description 2.7.3 Impacts 2.7.4 Mitigation Strategy 2.7.5 Trigger 2.7.6 Contingency Plan .dxf Library Structures 2.8.1 Risk Magnitude or Ranking 2.8.2 Description 2.8.3 Impacts 2.8.4 Mitigation Strategy 2.8.5 Trigger 2.8.6 Contingency Plan Border Implementation 2.9.1 Risk Magnitude or Ranking 2.9.2 Description 2.9.3 Impacts 2.9.4 Mitigation Strategy 2.9.5 Trigger 2.9.6 Contingency Plan Input File Format 2.10.1 Risk Magnitude or Ranking 2.10.2 Description 2.10.3 Impacts 2.10.4 Mitigation Strategy 2.10.5 Trigger 2.10.6 Contingency Plan CAAPE Integration 2.11.1 Risk Magnitude or Ranking 2.11.2 Description 2.11.3 Impacts 2.11.4 Mitigation Strategy 2.11.5 Trigger 2.11.6 Contingency Plan .dxf Versions 2.12.1 Risk Magnitude or Ranking 2.12.2 Description 2.12.3 Impacts 2.12.4 Mitigation Strategy 2.12.5 Trigger 2.12.6 Contingency Plan Implementation Language 2.13.1 Risk Magnitude or Ranking 2.13.2 Description 2.13.3 Impacts 2.13.4 Mitigation Strategy 2.13.5 Trigger 2.13.6 Contingency Plan CAAPE Understanding 2.14.1 Risk Magnitude or Ranking 2.14.2 Description 2.14.3 Impacts <Company Name>, 2017 9 9 9 9 9 9 9 9 9 9 9 9 9 10 10 10 10 10 10 10 10 10 10 10 10 10 10 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 12 12 12 12 12 12 12 12 12 12 12 Page 4 of 15 <Project Name> Risk List 2.15 2.16 2.17 2.18 2.19 2.20 Version: 1.1 Date: 1/19/05 2.14.4 Mitigation Strategy 2.14.5 Trigger 2.14.6 Contingency Plan Hardware/Software Cross References 2.15.1 Risk Magnitude or Ranking 2.15.2 Description 2.15.3 Impacts 2.15.4 Mitigation Strategy 2.15.5 Trigger 2.15.6 Contingency Plan Hardware Requirements 2.16.1 Risk Magnitude or Ranking 2.16.2 Description 2.16.3 Impacts 2.16.4 Mitigation Strategy 2.16.5 Trigger 2.16.6 Contingency Plan User Manual/Online Help 2.17.1 Risk Magnitude or Ranking 2.17.2 Description 2.17.3 Impacts 2.17.4 Mitigation Strategy 2.17.5 Trigger 2.17.6 Contingency Plan Windows Printing 2.18.1 Risk Magnitude or Ranking 2.18.2 Description 2.18.3 Impacts 2.18.4 Mitigation Strategy 2.18.5 Trigger 2.18.6 Contingency Plan Intermediate Representation of Input file 2.19.1 Risk Magnitude or Ranking 2.19.2 Description 2.19.3 Impacts 2.19.4 Mitigation Strategy 2.19.5 Trigger Cell Rendering 2.20.1 Risk Magnitude or Ranking 2.20.2 Description 2.20.3 Impacts 2.20.4 Mitigation Strategy 2.20.5 Trigger 2.20.6 Contingency Plan <Company Name>, 2017 12 12 12 12 12 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 15 15 15 15 15 15 15 Page 5 of 15 <Project Name> Risk List Version: 1.1 Date: 1/19/05 Risk List 1. Introduction 1.1 Purpose The purpose of this document is to list the current risks that the team needs to address. The risks are described and strategies for dealing with the risks are also documented. 1.2 Scope The risks that are listed are those that deal with any aspect of the project, either a risk internal to the development team, or a risk that involves working with the project sponsor. 1.3 Definitions, Acronyms, and Abbreviations CAAPE - The system that the Relay Drawing program receives its input from. 1.4 References none 1.5 Overview The Risk List is a compilation of all current risks that have been established by the team. The Magnitudes of the risks range from 1 to 5 with 1 being the lowest risk and 5 being the highest risk. 2. Risks 2.1 Meeting Time 2.1.1 Risk Magnitude or Ranking 1 2.1.2 Description Given current class schedules it is hard to find meeting times for all team members. 2.1.3 Impacts This risk may hinder the team’s ability to discuss important topics related to the project. 2.1.4 Mitigation Strategy The team can have meetings with a few members and use the meeting minutes and other communication channels to fill in the absent team members. 2.1.5 Trigger The trigger will be if the team is not finding enough time to meet together. 2.1.6 Contingency Plan The team will not meet as a whole and team members with topics to discuss can meet with a part of the team. 2.2 Clear Information 2.2.1 Risk Magnitude or Ranking 3 <Company Name>, 2017 Page 6 of 15 <Project Name> Risk List Version: 1.1 Date: 1/19/05 2.2.2 Description The initial requirements are not fully understood as it is early in the process, if one person elicits requirements for an aspect of the system, that information must be conveyed correctly to the rest of the team. 2.2.3 Impacts Information regarding requirements or any other aspect of the system may be misunderstood and will cause extra time and resources to be used to correct the misunderstandings 2.2.4 Mitigation Strategy The team will need to use three way communication to ensure that all information is understood. 2.2.5 Trigger The team members note that there is a lack of communication 2.2.6 Contingency Plan The team leader will need to interfere and make sure communication lines stay open. 2.3 Workflow Documentation 2.3.1 Risk Magnitude or Ranking 3 2.3.2 Description The information necessary to create a complete and correct Workflow Document is not fully understood and has not been fully elicited. The document would be a representation of the current ALSTOM process. This must be understood in order to create the new application. 2.3.3 Impacts If the current workflow process is not understood it will be much more difficult to develop a system that will be used within that process. 2.3.4 Mitigation Strategy Create a workflow diagram that will be reviewed by the project sponsors. Revisions will be made to the diagram, until a time at which the team has gained a solid understanding of the current workflow process. 2.3.5 Trigger A misunderstanding of the flow is realized. 2.3.6 Contingency Plan The team may try an alternate way of representing the workflow diagram, such as a textual representation, to better understand the workflow steps. 2.4 Placement Algorithm Rework 2.4.1 Risk Magnitude or Ranking 4 2.4.2 Description Knowledge of the current placement algorithm is not complete. The algorithm may need to be reworked and must first be understood to determine if a new algorithm is necessary. Impacts <Company Name>, 2017 Page 7 of 15 <Project Name> Risk List Version: 1.1 Date: 1/19/05 2.4.3 Impacts In order to better utilize page space, as well as better integrate the placement algorithm into the new system it will be necessary to rework the current algorithm. 2.4.4 Mitigation Strategy Research on placement algorithms has been assigned. Research into the current algorithm must also be done. 2.4.5 Trigger The current algorithm can not be understood. 2.4.6 Contingency Plan The team will need to assign more resources to algorithm rework. 2.5 .dxf Understanding 2.5.1 Risk Magnitude or Ranking 3 2.5.2 Description The .dxf file format has not been used or worked with by any team members and must be researched to gain a greater understanding of the file format. The output of new application will be .dxf and as such the file format must be understood. 2.5.3 Impacts The .dxf file format is the key output format and without a good understanding of the format the output files can not be created correctly. 2.5.4 Mitigation Strategy A team member has been assigned to research this topic. 2.5.5 Trigger Misunderstanding of dxf files are limiting team project progression. 2.5.6 Contingency Plan ALSTOM will be contacted to gain more knowledge on the .dxf topics. 2.6 .dxf Testing 2.6.1 Risk Magnitude or Ranking 5 2.6.2 Description There may be difficulty in testing newly created .dxf files if a CAD system is necessary. The team maynot always have access to such a system and must research alternatives for viewing .dxf files. 2.6.3 Impacts An application that allows for viewing of .dxf files will need to be found and the best way to utilize the application will need to be determined. <Company Name>, 2017 Page 8 of 15 <Project Name> Risk List Version: 1.1 Date: 1/19/05 2.6.4 Mitigation Strategy A team member has been assigned to research applications that can be used, and to determine if there are any free applications that can be used to view the .dxf outputs that will be created. 2.6.5 Trigger .dxf file testing is hindered by lack of ability to view .dxf files. 2.6.6 Contingency Plan Ask the ALSTOM to purchase a non-expensive commercial package or loan a license to the team. 2.7 Symbol Database Access 2.7.1 Risk Magnitude or Ranking 4 2.7.2 Description At the current time it is unclear what access the team will have to the current symbol databases and whether the team will be able to use any part of the database as is. 2.7.3 Impacts The symbol databases will need to be used in some manner, in order to better understand the creation of the output drawings. 2.7.4 Mitigation Strategy Research will need to be done to determine the team’s access level to the symbol database, as well as the extent of reuse that will be available for the symbol database. 2.7.5 Trigger The team has no access a dxf symbol library. 2.7.6 Contingency Plan The team will need to create each of the symbols that will be used within the system. 2.8 .dxf Library Structures 2.8.1 Risk Magnitude or Ranking 3 2.8.2 Description The .dxf library structure and creation mechanism are not understood by the team and research must be done in order to determine the effectiveness of using such a library structure. 2.8.3 Impacts The team will need to have knowledge in the library structure that can be used when creating .dxf files. The team may need to use libraries to customize output files for specific customers. 2.8.4 Mitigation Strategy A team member has been assigned to research .dxf related areas. 2.8.5 Trigger Lack of understanding of the dxf library hinders team progress. <Company Name>, 2017 Page 9 of 15 <Project Name> Risk List Version: 1.1 Date: 1/19/05 2.8.6 Contingency Plan The team will need to ask ALSTOM to provide a better interface to the libraries that the team will need to utilize. 2.9 Border Implementation 2.9.1 Risk Magnitude or Ranking 4 2.9.2 Description The design of borders to be placed on the output drawings and their format is not fully understood and must be researched. 2.9.3 Impacts Borders will need to be placed around the output drawings and will need to have a mechanism to customize their information. 2.9.4 Mitigation Strategy Research must be done to determine the best implementation method for dealing with the borders. 2.9.5 Trigger Implementation of the borders is not understood and becomes unclear. 2.9.6 Contingency Plan The borders will be designed in the same manner that they are designed right now, with no modification to the current process. 2.10 Input File Format 2.10.1 Risk Magnitude or Ranking 5 2.10.2 Description The current input file descriptions and exactly which files will be used as inputs have not been defined. The description and the definition of which files will be used is an important part of the application that must be researched to continue with other aspects of the system. The team will also need to look into parsing of the files and if there are toolkits that can be used when doing so. 2.10.3 Impacts The input files are how the teams system will begin its interaction with the ALSTOM systems. The input files may also become a factor when determining the amount of integration (if any) with the CAAPE system. 2.10.4 Mitigation Strategy A team member has been assigned to research file parsing toolkits, as well as researching the current file formats and their definitions. 2.10.5 Trigger It is determined that the input files are not being read correctly. <Company Name>, 2017 Page 10 of 15 <Project Name> Risk List Version: 1.1 Date: 1/19/05 2.10.6 Contingency Plan The team will ask ALSTOM to give the team a utility that allows the team to parse input files. 2.11 CAAPE Integration 2.11.1 Risk Magnitude or Ranking 1 2.11.2 Description Integration with the CAAPE system (depth of integration, methods for integration, interfaces, APIs) are not understood by the team at the current time and must be researched. 2.11.3 Impacts The amount of integration with the CAAPE system will determine some requirements and can change the team’s overall project plan. 2.11.4 Mitigation Strategy Team member(s) will be assigned to research integration and interfaces with the CAAPE system. 2.11.5 Trigger Integration is not being address. 2.11.6 Contingency Plan There will be no integration with CAAPE and the team’s system will run separate from CAAPE. 2.12 .dxf Versions 2.12.1 Risk Magnitude or Ranking 4 2.12.2 Description The .dxf output files must be saved into various formats, in order to be used in conjunction with a number of different CAD versions or other .dxf viewing packages. The amount of support in regard to the number of versions must be researched and documented. 2.12.3 Impacts The amount of support in regard to the number of versions must be researched and documented. The differences in the versions may need to be limited in regard to the input and output aspects of the system. 2.12.4 Mitigation Strategy A team member has been assigned to research the aspects of .dxf files in regard to this project. 2.12.5 Trigger The dxf files that are created are not created in correct or compatible versions. 2.12.6 Contingency Plan The team will specify support for only a few versions of .dxf. <Company Name>, 2017 Page 11 of 15 <Project Name> Risk List 2.13 Version: 1.1 Date: 1/19/05 Implementation Language 2.13.1 Risk Magnitude or Ranking 2 2.13.2 Description The team has not set an implementation language, and must elicit the language that will best suit this system. 2.13.3 Impacts The implementation language must be set at some point and must be approved by the project sponsors. The usage of development software such as Microsoft’s Visual Studio must also be approved by project sponsors. 2.13.4 Mitigation Strategy The team must research implementation strategies as well as elicit implementation decisions from the project sponsors. 2.13.5 Trigger Language choice begins to hinder progress. 2.13.6 Contingency Plan The team will use the implementation strategy suggested by ALSTOM. 2.14 CAAPE Understanding 2.14.1 Risk Magnitude or Ranking 4 2.14.2 Description The team will need gain a working knowledge of the CAAPE system that is currently being used by ALSTOM. This system is used to produce the input files that the team’s system will use. 2.14.3 Impacts In order to better understand the input files and their format, a better understanding of the CAAPE system is necessary. 2.14.4 Mitigation Strategy Team members will be assigned to research the CAAPE system. 2.14.5 Trigger The CAAPE system is not understood at a point when it is necessary to integrate with or use CAAPE. 2.14.6 Contingency Plan Ask ALSTOM for more documentation on the CAAPE system and/or have more one on one’s with ALSTOM to better learn CAAPE. 2.15 Hardware/Software Cross References 2.15.1 Risk Magnitude or Ranking 1 <Company Name>, 2017 Page 12 of 15 <Project Name> Risk List Version: 1.1 Date: 1/19/05 2.15.2 Description The Hardware/Software Cross References are not fully understood and must be researched to determine the extent that the new system will have to account for them and how they will integrate into the process. 2.15.3 Impacts The team will need to determine if this risk is an issue and if it will have to be dealt with at all. 2.15.4 Mitigation Strategy The team will need to talk with the project sponsor to determine what impact, if any, this risk will have. 2.15.5 Trigger When this issues begins to hinder the project. 2.15.6 Contingency Plan Begin research into the cross reference topic and talk with ALSTOM more regarding how to integrate it into the system. 2.16 Hardware Requirements 2.16.1 Risk Magnitude or Ranking 2 2.16.2 Description The team does not fully know all of the hardware requirements and what the full range of hardware compatibility must be. 2.16.3 Impacts Hardware requirements will need to be understood once implementation begins in order to be able to support the necessary systems that ALSTOM will set. 2.16.4 Mitigation Strategy Elicit and documents hardware requirements during the requirements gathering process. 2.16.5 Trigger Trigger when the requirements become unclear. 2.16.6 Contingency Plan Have ALSTOM set the hardware requirements for this project. 2.17 User Manual/Online Help 2.17.1 Risk Magnitude or Ranking 3 2.17.2 Description The creation of user manuals and online help functionality may be resource intensive and will need to be looked into. 2.17.3 Impacts The project plan and schedule may need to be reevaluated based upon the amount of resources that are needed for the creation of these artifacts. <Company Name>, 2017 Page 13 of 15 <Project Name> Risk List Version: 1.1 Date: 1/19/05 2.17.4 Mitigation Strategy The team will need to incorporate time into their project plans to deal with the creation of these artifacts as well as beginning to think about information to place in these artifacts. 2.17.5 Trigger When manual/Help file creation is not being done on schedule. 2.17.6 Contingency Plan Adjust project plan to place more resources into creating the User Manual/Online Help portions of the project. 2.18 Windows Printing 2.18.1 Risk Magnitude or Ranking 5 2.18.2 Description The System must be able to print drawings by using windows native printing environment. 2.18.3 Impacts One of the major requirements is printing and therefore this topic needs to be addressed at all iterations. If printing can not be done then the project can not be completed. 2.18.4 Mitigation Strategy A team member has been assigned to research the printing topic. 2.18.5 Trigger Triggered when printing can not be done correctly within the confines of the project scope. 2.18.6 Contingency Plan Add more resources to work on printing and integrating printing into the system. 2.19 Intermediate Representation of Input file 2.19.1 Risk Magnitude or Ranking 5 2.19.2 Description The System must be able to accurately represent the data within the input files after it is parsed. 2.19.3 Impacts The grid creation can not take place until there is an intermediate representation in place. The printing and dxf creations will rely on the internal representation. 2.19.4 Mitigation Strategy Two team members have been assigned to research this topic. 2.19.5 Trigger This risk will be triggered if it begins to hinder progress. <Company Name>, 2017 Page 14 of 15 <Project Name> Risk List 2.20 Version: 1.1 Date: 1/19/05 Cell Rendering 2.20.1 Risk Magnitude or Ranking 4 2.20.2 Description The cells that are read in from the dxf library must be rendered to be printed 2.20.3 Impacts The cell rendering must take place in order to print the internal representations of the cells. 2.20.4 Mitigation Strategy Three team members have been assigned to work on this area. 2.20.5 Trigger Triggered when cells are not being rendered and it is causing progress to be halted or slowed. 2.20.6 Contingency Plan Cell rendering will be worked on with more resources instead of lower risks area. <Company Name>, 2017 Page 15 of 15
© Copyright 2026 Paperzz