Nonattainment NSR Permitting Process Nancy Mayer EPA–OAQPS Topics 2 Find technical resources for permit review Describe how permits are constructe. Describe what to look for when reviewing a permit Useful Areas of Expertise Air pollution modeling Air pollution control – – 3 Equipment Practices Law Typical Permit Format 4 General source identification Source location Emissions information Offsets obtained from existing sources Control technology analysis Alternative Site Analysis General Source Information Name Source classification – Generally what construction/modification is being proposed? – 5 On list to count fugitive emissions? Reason for construction Other sources with same owner in state? Source ID– Things to look for 6 Is source classification correct? Is list of other sources owned by same owner in state complete? Are other sources owned by same owner in compliance? Source Location 7 Location Source site diagram (not all permit applications have site diagrams) Source location–what to look for 8 Is location accurate? Does permit application ID all nonattainment areas for all pollutants? Does site diagram clearly explain what is being proposed? Are there unexplained buildings in the diagram? Emissions Data 9 Existing emissions baseline Change in emissions Netting calculation, if any Emissions Data–what to look for What method is used to measure emissions? – – – – – 10 Stack tests – when, how often? Correct emission factors? Do assumptions make sense? Is baseline year the correct year? Is averaging done correctly? Is the calculation for the emissions change clearly shown and explained? Emissions offsets Identification of all sources providing emission offsets – – – – 11 Amount and location Calculations for emission decreases Every relevant pollutant How reduction is federally enforceable Emissions Offsets–what to look for 12 Are all emissions increases offset with emission reductions? Were offsets calculated correctly? Were they real or “paper” reductions? Are all emission changes reflected in emissions inventory used for attainment demonstration? Will not slow down the attainment progress Are reductions enforceable against source providing offsets? Control technology 13 Proposed Lowest Achievable Emission Rate How decision was made Describe other alternatives For each relevant pollutant Control Technology–what to look for 14 Has source researched for best? Does the application propose using the best technology? (For LAER – must use best technology; no exceptions) Does it have the technology from the BACT/LAER Clearinghouse? Does it have technology for all relevant pollutants? Public Participation/Notice 15 Date, time documentation Notice in readily available local newspaper Contacted nearby tribes Public comment–what to look for 16 Was the public notice clear and well publicized? Were there any public comments? Were these addressed? Formalities 17 Did source submit the permit application before commencing construction? Has the state been working with the source? Is the permit easy to follow? How to submit comments? 18 30-day public comment period Send to issuing party Can request hearing and provide verbal comments at hearing
© Copyright 2026 Paperzz