3D Geodesy A case Study of Ejpovice Tunnel Radek Fiala University of West Bohemia, Faculty of Applied Sciences, section of Geomatics V-STARS/S technology digital close range photogrammetry Viewfinder Wi-Fi Shutter button External flash Internal flash Lens f = 21 mm Battery high accuracy measurements of deformations or comparison of actual performance of the product against its design. Francis turbine – ČKD Blansko Ejpovice tunnel • Part of railway Athens – Sofia – Wien – Prague – Nuremberg • 2 tubes, each 4150 m long • Tube diameter 9,89 m • Allows travelling speed up to 200km/h • Expected end of bulding: 2017 TBM – the „mole“ Segment manufacturing Segment manufacturing Segment manufacturing Measurement preparation Camera positions Measured points Measured points to CAD model differences Measured points to CAD model differences Measured points to CAD model differences Thank you for attention Follows: Jiří Pék – former student of Geomatics