Standard Business Reporting Australian Taxation Office ELS2SBR release one NITR 2014 Conformance Suite Package v1.3 Contents Date: 27 February 2015 This document and its attachments are Unclassified For further information or questions, contact the SBR Service Desk at [email protected] or call 1300 488 231. International callers may use +61-2-6216 5577 STANDARD BUSINESS REPORTING ATO NITR 2014 CONFORMANCE SUITE PACKAGE V1.3 CONTENTS VERSION CONTROL Version Date Description of change V1.3 27/2/2014 Release of ELS2SBR R1 NITR 2014 conformance package. UNCLASSIFIED PAGE 2 OF 6 STANDARD BUSINESS REPORTING ATO NITR 2014 CONFORMANCE SUITE PACKAGE V1.3 CONTENTS ENDORSEMENT APPROVAL Chief Solutions Architect Standard Business Reporting Michael Ferris IT Program Manager e-Commerce Service Delivery Australian Taxation Office COPYRIGHT © Commonwealth of Australia 2015 (see exceptions below). This work is copyright. Use of this Information and Material is subject to the terms and conditions in the "SBR Disclaimer and Conditions of Use" which is available at http://www.sbr.gov.au. You must ensure that you comply with those terms and conditions. In particular, those terms and conditions include disclaimers and limitations on the liability of the Commonwealth and an indemnity from you to the Commonwealth and its personnel, the SBR Agencies and their personnel. You must include this copyright notice in all copies of this Information and Material which you create. If you modify, adapt or prepare derivative works of the Information and Material, the notice must still be included but you must add your own copyright statement to your modification, adaptation or derivative work which makes clear the nature of your modification, adaptation or derivative work and you must include an acknowledgement that the adaptation, modification or derivative work is based on Commonwealth or SBR Agency owned Information and Material. Copyright in SBR Agency specific aspects of the SBR Reporting Taxonomy is owned by the relevant SBR Agency. UNCLASSIFIED PAGE 3 OF 6 STANDARD BUSINESS REPORTING ATO NITR 2014 CONFORMANCE SUITE PACKAGE V1.3 CONTENTS Table of contents 1 Introduction ........................................................................................................................ 5 1.1 Document purpose .................................................................................................... 5 1.2 Audience.................................................................................................................... 5 1.3 Purpose of this package ............................................................................................ 5 1.4 Summary of impacts on software developers ............................................................. 5 2 Package contents............................................................................................................... 6 UNCLASSIFIED PAGE 4 OF 6 STANDARD BUSINESS REPORTING ATO NITR 2014 CONFORMANCE SUITE PACKAGE V1.3 CONTENTS 1 INTRODUCTION 1.1 DOCUMENT PURPOSE The purpose of this document is to advise software developers of the package contents for Standard Business Reporting (SBR) ATO NITR 2014 conformance suite package for ELS2SBR release one provided by the Australian Taxation Office (ATO). 1.2 AUDIENCE The audience for this Package Content note is software developers who have/ are interested in developing NITR services on either the SBR Core Services or SBR ebMS3 platforms. 1.3 PURPOSE OF THIS PACKAGE The purpose of this package is to streamline the way conformance suite artefacts are presented to software developers. All relevant conformance suite artefacts that comprise the NITR suite are contained within one zip file. The package will be versioned up each time artefacts are added or updated. 1.4 SUMMARY OF IMPACTS ON SOFTWARE DEVELOPERS For each service, the following artefacts have been/will be released under this package title: Conformance suite document Cover note Conformance suite payloads Keystore The table in Section 2 Package Contents reflects the status of artefacts in the Package Status column and needs to be read in conjunction with the Comments column in order to understand the scale of change that may be applicable. The table below describes the terminology used in the Package Status column and the business description of the package status: Package Status Pending New Updated Present Removed UNCLASSIFIED Business Description The artefact is currently under development and is expected to be released in a future package. The artefact is new for the package and has not been published previously. This would usually occur when an artefact has previously been marked as Pending (under development) or a new Government/ATO initiative sees the development of new services/messages to be deployed. The artefact has changed since the last public release for this package. It could occur as a result of refining service/messages due to feedback or defects. The artefact is within the package and has had no change from the prior package for this year or a previous/forward year where artefacts cross multiple years. The artefact was within the package in a prior release but has been removed as it is not relevant for the service/suite in question. This could occur due to Government legislation waiting on Royal Assent not being passed or other factors. PAGE 5 OF 6 STANDARD BUSINESS REPORTING ATO NITR 2014 CONFORMANCE SUITE PACKAGE V1.3 CONTENTS 2 PACKAGE CONTENTS The table below outlines the package contents. Name ATO CTR.0005 2014 Conformance Suite.docx ATO CTR.0005 2014 Cover Note.docx ATO CTR.0005 2014 Sample messages xbrl.zip ATO FBT.0002 2014 Conformance Suite.docx ATO FBT.0002 2014 Cover Note.docx ATO FBT.0002 2014 Sample messages xbrl.zip ATO FITR.0003 2014 Conformance Suite.docx ATO FITR.0003 2014 Cover Note.docx ATO FITR.0003 2014 Sample messages xbrl.zip ATO PTR.0003 2014 Conformance Suite.docx ATO PTR.0003 2014 Cover Note.docx ATO PTR.0003 2014 Sample messages xbrl.zip ATO SMSFAR.0004 2014 Conformance Suite.docx ATO SMSFAR.0004 2014 Cover Note.docx ATO SMSFAR.0004 2014 Sample messages xbrl.zip ATO TRT.0003 2014 Conformance Suite.docx ATO TRT.0003 2014 Cover Note.docx ATO TRT.0003 2014 Sample messages xbrl.zip ato.keystore.xml Document Date 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 27/02/2015 Document Status Draft Draft Draft Draft Draft Draft Draft Draft Draft Draft Draft Draft Draft Draft Draft Draft Draft Draft Final Version Comments Package Status 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 n/a Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included Updates for ELS2SBR R1 included n/a Updated Updated Updated Updated Updated Updated Updated Updated Updated Updated Updated Updated Updated Updated Updated Updated Updated Updated Present Total artefacts in Package: 19 UNCLASSIFIED PAGE 6 OF 6
© Copyright 2026 Paperzz