ATO NITR 2014 Conformance Suite Package v1.3 Contents

Standard
Business
Reporting
Australian Taxation Office
ELS2SBR release one
NITR 2014 Conformance Suite
Package v1.3 Contents
Date: 27 February 2015
This document and its attachments are Unclassified
For further information or
questions, contact the SBR
Service Desk at
[email protected] or
call 1300 488 231. International
callers may use +61-2-6216
5577
STANDARD BUSINESS REPORTING
ATO NITR 2014 CONFORMANCE SUITE PACKAGE V1.3 CONTENTS
VERSION CONTROL
Version
Date
Description of change
V1.3
27/2/2014
Release of ELS2SBR R1 NITR 2014 conformance package.
UNCLASSIFIED
PAGE 2 OF 6
STANDARD BUSINESS REPORTING
ATO NITR 2014 CONFORMANCE SUITE PACKAGE V1.3 CONTENTS
ENDORSEMENT
APPROVAL
Chief Solutions Architect
Standard Business Reporting
Michael Ferris
IT Program Manager
e-Commerce Service Delivery
Australian Taxation Office
COPYRIGHT
© Commonwealth of Australia 2015 (see exceptions below).
This work is copyright. Use of this Information and Material is subject to the terms and conditions in the
"SBR Disclaimer and Conditions of Use" which is available at http://www.sbr.gov.au. You must ensure
that you comply with those terms and conditions. In particular, those terms and conditions include
disclaimers and limitations on the liability of the Commonwealth and an indemnity from you to the
Commonwealth and its personnel, the SBR Agencies and their personnel.
You must include this copyright notice in all copies of this Information and Material which you create. If
you modify, adapt or prepare derivative works of the Information and Material, the notice must still be
included but you must add your own copyright statement to your modification, adaptation or derivative
work which makes clear the nature of your modification, adaptation or derivative work and you must
include an acknowledgement that the adaptation, modification or derivative work is based on
Commonwealth or SBR Agency owned Information and Material. Copyright in SBR Agency specific
aspects of the SBR Reporting Taxonomy is owned by the relevant SBR Agency.
UNCLASSIFIED
PAGE 3 OF 6
STANDARD BUSINESS REPORTING
ATO NITR 2014 CONFORMANCE SUITE PACKAGE V1.3 CONTENTS
Table of contents
1
Introduction ........................................................................................................................ 5
1.1
Document purpose .................................................................................................... 5
1.2
Audience.................................................................................................................... 5
1.3
Purpose of this package ............................................................................................ 5
1.4
Summary of impacts on software developers ............................................................. 5
2 Package contents............................................................................................................... 6
UNCLASSIFIED
PAGE 4 OF 6
STANDARD BUSINESS REPORTING
ATO NITR 2014 CONFORMANCE SUITE PACKAGE V1.3 CONTENTS
1 INTRODUCTION
1.1
DOCUMENT PURPOSE
The purpose of this document is to advise software developers of the package contents for
Standard Business Reporting (SBR) ATO NITR 2014 conformance suite package for ELS2SBR
release one provided by the Australian Taxation Office (ATO).
1.2
AUDIENCE
The audience for this Package Content note is software developers who have/ are interested in
developing NITR services on either the SBR Core Services or SBR ebMS3 platforms.
1.3
PURPOSE OF THIS PACKAGE
The purpose of this package is to streamline the way conformance suite artefacts are presented
to software developers.
All relevant conformance suite artefacts that comprise the NITR suite are contained within one
zip file. The package will be versioned up each time artefacts are added or updated.
1.4
SUMMARY OF IMPACTS ON SOFTWARE DEVELOPERS
For each service, the following artefacts have been/will be released under this package title:
 Conformance suite document
 Cover note
 Conformance suite payloads
 Keystore
The table in Section 2 Package Contents reflects the status of artefacts in the Package Status
column and needs to be read in conjunction with the Comments column in order to understand
the scale of change that may be applicable.
The table below describes the terminology used in the Package Status column and the
business description of the package status:
Package
Status
Pending
New
Updated
Present
Removed
UNCLASSIFIED
Business Description
The artefact is currently under development and is expected to be released in a future
package.
The artefact is new for the package and has not been published previously. This would
usually occur when an artefact has previously been marked as Pending (under
development) or a new Government/ATO initiative sees the development of new
services/messages to be deployed.
The artefact has changed since the last public release for this package. It could occur as
a result of refining service/messages due to feedback or defects.
The artefact is within the package and has had no change from the prior package for this
year or a previous/forward year where artefacts cross multiple years.
The artefact was within the package in a prior release but has been removed as it is not
relevant for the service/suite in question. This could occur due to Government
legislation waiting on Royal Assent not being passed or other factors.
PAGE 5 OF 6
STANDARD BUSINESS REPORTING
ATO NITR 2014 CONFORMANCE SUITE PACKAGE V1.3 CONTENTS
2 PACKAGE CONTENTS
The table below outlines the package contents.
Name
ATO CTR.0005 2014 Conformance Suite.docx
ATO CTR.0005 2014 Cover Note.docx
ATO CTR.0005 2014 Sample messages xbrl.zip
ATO FBT.0002 2014 Conformance Suite.docx
ATO FBT.0002 2014 Cover Note.docx
ATO FBT.0002 2014 Sample messages xbrl.zip
ATO FITR.0003 2014 Conformance Suite.docx
ATO FITR.0003 2014 Cover Note.docx
ATO FITR.0003 2014 Sample messages xbrl.zip
ATO PTR.0003 2014 Conformance Suite.docx
ATO PTR.0003 2014 Cover Note.docx
ATO PTR.0003 2014 Sample messages xbrl.zip
ATO SMSFAR.0004 2014 Conformance Suite.docx
ATO SMSFAR.0004 2014 Cover Note.docx
ATO SMSFAR.0004 2014 Sample messages xbrl.zip
ATO TRT.0003 2014 Conformance Suite.docx
ATO TRT.0003 2014 Cover Note.docx
ATO TRT.0003 2014 Sample messages xbrl.zip
ato.keystore.xml
Document
Date
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
27/02/2015
Document
Status
Draft
Draft
Draft
Draft
Draft
Draft
Draft
Draft
Draft
Draft
Draft
Draft
Draft
Draft
Draft
Draft
Draft
Draft
Final
Version
Comments
Package Status
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
n/a
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
Updates for ELS2SBR R1 included
n/a
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Present
Total artefacts in Package: 19
UNCLASSIFIED
PAGE 6 OF 6