REQUEST FOR QUOTATION FOR WORKS TO PROVIDE WATER, GAS, ELECTRICAL AND TELECOMS SUPPLIES TO SCHOOL EXTENSIONS NORTHAMPTONSHIRE COUNTY COUNCIL REF: CBBO130528 Issue Date: Tuesday 28th May 2013 Return Date: Friday 19th July 2013 V11 28-05-12 1 - INTRODUCTION 1. GENERAL REQUIREMENTS Quotations are invited for the provision of; 1. Installation of utilities supplies (gas, water, electric and telecoms) at a point identified by the carrier to a location identified on Schedule 1 of this document. Trenching and provision of utilities housing to be carried out and provided by the client. And 2. Undertaking all necessary trenching and reinstatement plus provision of utilities housing and foundations. The Council requires the contractor at minimum to deliver 1 above element of the works and subject to value of 2 above will either require the contractor to undertake the necessary trenching and reinstatement or will undertake this itself. The Council’s detailed requirements are defined in Part 2 - Specification. The Council reserves the right to select more than one quotation if they receive more than three responses. Please take care in reading this document in particular the Specification; In the event of any questions or queries in relation to this Request for Quotation (RFQ), please contact the named person below. 2. BACKGROUND LGSS is the shared services venture set up by founding partners Cambridgeshire County Council (CCC) and Northamptonshire County Council (NCC), offering a fully integrated support service. The partnership was formed in response to the challenges faced by local authorities, namely, the public sector funding crisis, impact of the recession, rising expectations and growing demand, and seeks to reduce the cost of support services through the consolidation of resources, process redesign and exploitation of technology. LGSS is governed by a joint committee and began operating legally as a shared service in October 2010. Within LGSS there are four directorates: Finance, Human Resources & Organisational Development, Operations and Legal Services. These directorates provide professional and transactional business services to the two founding councils and a range of other public sector customers. Cambridgeshire and Northamptonshire County Council work together in partnership under the name of LGSS. Page 2 of 16 3. PROCUREMENT TIMETABLE 1. Request for Quotation Issued 2. Deadline for Clarification Questions 3. Deadline for Quotation Responses 4. Quotation Evaluation 5. Contract Awarded 6. Works completed by Friday 24th May 2013 Friday 21st June 2013 12 noon Friday 19th July 2013 12 noon Wednesday 24th July 2013 Friday 26th July 2013 21st August 2013 4. CLARIFICATION QUESTIONS Any queries about this document, the procurement process, or the proposed contract itself, should be referred to: [email protected] Please note that the deadline for questions is Friday 21st June 2013 12 noon. 5. QUOTATION RESPONSES Should you wish to take part in the selection process please complete this RFQ and email to: Colin Barrett Strategic Estates Manager [email protected] by 12 noon on Friday 19th July 2013 6. EVALUATION OF QUOTATIONS Any bids not compliant or completed fully will be discarded. Based on the information provided by organisations, each compliant submission will be evaluated based on the following criteria: 30% Quality and Technical Question Responses 70% Pricing. Page 3 of 16 Evaluation Method 3: Weighted combination of Quality and Price Quality Questions at “X (30)”% + Pricing at “Y (70)”% = 100% Y is applied individually to both OPTION 1 and 2 a. Quality Questions (Part 3 Section B) Quality Score % will be calculated as follows: Total sum of (question score × weighting of question) = Potential Provider Quality Score (Potential Provider Quality Score ÷ Max Quality Score Available) × “X” = Potential Provider Quality % E.g.: Bid Bid 1 Bid 2 Bid 3 Potential Provider Quality Score 285 270 225 Max Quality Score Available 300 300 300 Score % (If “X” = 40) 38 36 30 The Quality Questions will be scored using the following scale: Score 4 Criteria to Award Score The Potential Provider's answer enables the evaluator to have a comprehensive understanding of the response given and demonstrates a relevant innovative approach. The evaluator can identify comprehensive evidence that the response given will deliver all stated requirements. 3 The Potential Provider's answer enables the evaluator to have a comprehensive understanding of the response given. The evaluator can identify comprehensive evidence that the response given will deliver all stated requirements. 2 The Potential Provider's answer enables the evaluator to have a clear understanding of the response given. The evaluator can identify sufficient evidence that the response given will deliver all stated requirements. 1 The Potential Provider's answer does not enable the evaluator to have a clear understanding that the response given meets all stated requirements e.g. due to insufficient evidence and/ or omissions. The evaluator believes that the Potential Provider has failed to answer the question. 0 b. Pricing (Part 4) Pricing % will be calculated as follows: (Lowest compliant bid price ÷ Potential Provider's price) × “Y” E.g: Bid Bid 1 Bid 2 Bid 3 Lowest Compliant Bid Price (£) £45,000 £45,000 £45,000 Potential Providers Price (£) £45,000 £50,000 £55,000 Score % (If “Y “= 60) Quality Score (%) 38 36 30 Price Score (%) 60 54 49 Total (%) 60 54 49 Total Bid Bid 1 Bid 2 Bid 3 Page 4 of 16 98 90 79 2 - SPECIFICATION The authority is seeking to procure the installation of utilities services in order that it can de-risk the delivery of statutory school accommodation development within Northampton. To identify and seek host distributor utilities (gas, water, electric and telecoms) company approval to connect to a gas, water, electric and telecoms supplies and then to provide from this connection to the location identified on Schedule 1 enclosed new services to loadings specified in this document. The contractor will provide quotes for the following: 1. a quote for the installation of the services with the authority providing the trenching and reinstatement and housing for the utilities, and 2. a quote for providing all trenching and reinstatement plus housing of the supplies provided. The authority will appoint a contractor for either OPTION 1 or OPTION 2 based on the evaluation 30% technical/quality and 70% price. Please see the attached site plan Schedule 2 that indicates the land ownership of the client. The contractor will be expected to provide either OPTION 1 or 2 as outlined above. For clarity; OPTION 1 is providing from the public highway/land a connection for the utilities plus ducting and cabling/pipework to inside the client site to a location with housing supplied by the client. The contractor will provide a meter for both gas and water plus a connection point for telecoms. Whereas OPTION 2 the contractor will provide a total utilities supply package of work including all trenching and reinstatement, cable, ducting, pipe work utilities housing and meters for gas and water plus a connection point for telecoms. OPTION 1 Specification for providing installation of works only: Provide an independent gas, water and electrical supply in accordance with the recognised host distributor installation standards. Liaise with and identify the point of connection for each utility with the host distributor. Provide the installed utilities to the British Standards and best practice standards i.e. ACOP’s The contractor will be cognisant of and adhere to national guidance and legislation on the protection of the environment i.e. arboricutural considerations. Electrical installations must comply with The Electricity (Connections Standards of Performance) Regulations 2010. Page 5 of 16 Gas installations must comply with The Gas (Standards of Performance) Regulations 2005 Connections Guaranteed Standards Payments. Water installations must be provided in accordance with Water Act 2003 and Self Laying of Water Mains and Services, 2nd Edition, A Code of Practice for England and Wales. Water installations must also be provided in accordance with Anglian Water’s Services Limited Policy for the Provision of Self Lay Arrangements for Water Supplies. Including WRc’s Self Lay of Water Mains and Services; A Code of Practice for England and Wales 2 nd Ed and OFWAT’s Competition in Providing New Mains and Service Pipes; Guidance for Water Companies 3.0 2009 and Guidance on Financial Arrangements for Self Lay and Requisitioning Arrangements v2.0 May 2009. Once water services have been installed they pipework should be chlorinated in accordance with the host distributors requirements and a completion certificate provide to the client. The organisation carrying out any works on public highway or land will comply with the Street Works Act 1991 and Traffic Management and will maintain responsibility of the works until the expiration of the NRSWA guarantee period. Client will provide trenching and the reinstatement of, on our land. The Contractor to undertake any trenching and reinstatement on public land/highways. Provide the utilities to the loadings/capacities outlined below: o Gas – 49.3 kW peak load and 4.6 m3/hr o Water – 1.0 l/s flowrate 32mm pipe size o Electric – 40 kva, 3 phase 60 amps per phase Telecoms lines are analogue Provide the utilities in the housing provided ensuring no damage is caused to the housing in providing the services. Provide a termination point within the enclosures and include for gas and water revenue meters in compliance with the recognised host distributor installation standards. Meters to have pulsed output connections. Provide the client with working drawings so that the client can undertake the necessary trenching. Provide the client with a set of as built drawings upon completion within 14 working days. OPTION 2 Provide as in OPTION 1 above plus additional the requirements (as outlined below) for undertaking trenching and reinstatement works on the clients land. The contractor to undertake any necessary site investigations in accordance with HSG 47. Provide the installed utilities to the British Standards and best practice standards i.e. ACOP’s Page 6 of 16 The contractor will be cognisant of and adhere to national guidance and legislation on the protection of the environment i.e. arboricutural considerations. Undertake any necessary excavations to install the supplies expected and then reinstate to best practice, British Standards and customer satisfaction. Provide a suitable and compliant housing for all utilities (gas, electric and water). Water to be provided within a suitable low ground chamber. Gas and Electric to be provided in a single suitable robust enclosure in compliance with the service utilities standards. Provide a suitable foundation/base for the above enclosure. GENERAL It is expected that if the contractor provides only the installation that the latest deadline for the completion of works will be Wednesday 21st August 2013. If the contractor is providing both option 1 and 2 then the latest works be completed by Wednesday 4th September 2013. The contractor must provide sufficient time for the client and it representatives to snag the works and be able to undertake any remedial actions to put right to the client satisfaction. Any notifiable works will be the duty of the contractor to organise and manage. The client is aware of their responsibilities but the contractor must ensure they fulfil theirs. The contractor will be responsible for all and any damage to public highways and land and will provide the client with the necessary documentation to confirm the works have been undertaken to highways authority’s requirements. The client withholds the right to at will and at all times be able to inspect works undertaken to ensure it fulfils statutory requirements and self interests. The works will be inspected and snagged and the contractor will undertake any works to meet the clients and representatives satisfaction. . The contractor will undertake site mobilisation meetings and seek to ensure that the schools are appropriately powered down and up to minimise any disruption to school operations. Page 7 of 16 3 - SUPPORTING INFORMATION Note to Potential Providers– You may adjust the size of the following text boxes to suit your response. SECTION A Organisation and Contact Details A-1 Name of your organisation A-2 Registered office (if applicable) A-3 Trading address (if different from registered office) A-4 Organisation Registration Number (if applicable) A-5 Is your organisation a: Sole Trader Partnership Public Limited Company Private Ltd Company Voluntary & Community Sector Charity SME (Small and Medium Enterprise) Other If you selected other, please specify A-6 What, if any, local connections do you have with the County A-7 If the Company is a member of a group of companies, please give the name and Page 8 of 16 address of the ultimate holding company A-8 Name of person to whom any queries relating to this quote should be addressed A-9 Telephone A-10 Email A-11 Address (if different to the Address above) Page 9 of 16 SECTION B Technical and Quality Questions Please see section 6 for details on the weighting and scoring criteria. Please note that by answering no to any of the following the following mandatory questions the organisation will not be evaluated. Answering FALSE to any of the following question may lead to the quote not being evaluated. TRUE FALSE a is NOT in a state of bankruptcy, insolvency, compulsory winding up, administration, receivership, composition with creditors or any analogous state, or subject to relevant proceedings b has NOT been convicted of a criminal offence related to business or professional conduct c has NOT committed an act of grave misconduct in the course of business d has fulfilled obligations relating to payment of social security contributions e has fulfilled obligations relating to payment of tax f is NOT guilty of serious misrepresentation in supplying information g Is in possession of relevant licences i.e. waste transfer license or membership of Safe Contractors or CSCS and appropriate organisation as required by law of the State in which your Company is established Page 10 of 16 Please provide an answer to all the following questions. These are mandatory. Question Number 1 Potential Provider’s Response 2 Potential Provider’s Response 3 Potential Provider’s Response 4 Potential Provider’s Response 5 Question Please confirm the following – that pass/fail the organisation conducting water installations is accredited with the Water Industry Registration Scheme (WIRS) YES/NO Please confirm that the organisation pass/fail conducting the installation of the electrical supply is registered with Lloyds Register EMEA under the National Electricity Registration Scheme (NERS). YES/NO Please confirm that the organisation pass/fail conducting the installation of the gas supply is registered with the Lloyds Register Gas Industry Registration Scheme (GIRS) YES/NO Please provide a method statement for the installation of the services required including trenching and reinstatement 20 points i.e. score (0-4) x 5 Having read the specification what community benefits, will your organisation provide as part of your proposal? Examples include: 1) subcontracting locally. 2) improvements to the county 3) Use of apprenticeships, etc... 10 points i.e. score (0-4) x 2.5 Potential Provider’s Response 6 The level of insurance required is Employers 10 million Public 5 million Professional indemnity 2 million Can you confirm that your organisation has the required level of Page 11 of 16 Weighting PASS/FAIL question. Potential Providers who answer ‘No have not got cover or is prepared to obtain the level of cover prior to award? cover and won't provide Authority’s level of cover’ will fail the RFQ process. Potential Provider’s Yes - have levels of cover already Response and will continue to for this contract No - but will provide the Authority‘s level of cover requested if awarded contract No - have not got cover and won't provide Authority’s level of cover PLEASE ENSURE YOU UPLOAD WATER, GAS, ELECTRIC AND TELECOMS INTENDED CONNECTION POINTS AND LAY PLANS Page 12 of 16 4 – PRICING SHEET Pricing and Costs Please insert your costs in the table below. The costs should be broken down into components with a full description of each component and its associated time and costs. Please provide the following fixed lump sum excluding VAT quotes for QUOTE 1 and 2 as specified previously. Please ensure that the following are included in each of the quotes: OPTION 1 – must at a minimum include cost of non-contestable works, trenching and reinstatement on public highways and land, cost of any way leaves etc/statutory notices, provision of meters as specified. OPTION 2 – must at a minimum include contestable costs of OPTION 1 plus trenching and reinstatement to the customers satisfaction, cost of providing a suitable and robust foundation for any external meter housing/s. Provisional sums will be excluded from any evaluation and are not valid. [Component ] OPTION 1 OPTION 2 [Component description] [Delivery by] Providing gas, water and electrical supplies to the location specified Undertake the necessary trenching and reinstatement of grounds plus provide a robust suitable housing at the locations identified. Please show both the costs of OPTION 1 and 2 separately. Wednesday 21st August 2013 [Costs (£)] Wednesday 4th September 2013 Total Costs (£): OPTION 1 – is based on 30% technical and 70% price. The price will be the total (OPTION 1) net costs i.e. without VAT OPTION 2 – is based on 30% technical and 70% price. The price will be the total (OPTION 1 and 2) net costs i.e. without VAT Page 13 of 16 5 – FREEDOM OF INFORMATION Information in relation to this RFQ may be made available on demand in accordance with the requirements of the Freedom of Information Act 2000 (“The Act”) and your organisation details will be disclosed where the expenditure is over £500 as per the Government Transparency agenda. Organisations should state if any of the information supplied by them is confidential and commercially sensitive or should not be disclosed in response for the Information under the Act. Organisations should state why they consider the information to be confidential or commercially sensitive. Please state here any specific information in this RFQ that you do not wish to be disclosed under Freedom of information Act. This will not guarantee that the information will not be disclosed but will be examined in the light of the exemptions provided in the Act. Insert specific Information here if applicable Page 14 of 16 6 – SIGNATURE AND DATE Request for Quotation for providing gas, water, electrical and telecoms utility supplies. I the undersigned hereby declare by marking an X in the box: (i) that the information provided is complete and accurate; (ii) that the price in Part 4 is our best offer; a. that no collusion with other organisations has taken place in order to fix the price; (iii) to be subjected to the terms and conditions set out in Conditions of Contract identified in Appendix 1; (iv) that no works/goods/supplies/services will be delivered or undertaken until both parties have executed the formal contract documentation as identified in Appendix 1 and an instruction to proceed has been given by the Council in writing. Name ............................................................... Position Held ........................................................... Dated ............................................................... Page 15 of 16 APPENDIX 1: CONDITIONS OF CONTRACT RFQ Works Contract - 11.10.12 Page 16 of 16
© Copyright 2026 Paperzz