Advanced Process Control A Real World Example Jim English UT Graduate, ChE ‘04 April 27, 2006 Introduction • Who am I? • Who is Air Liquide? Why am I here? • “Real World” example • Some notes from industry So what’s the story? • HyCO = Hydrogen + Carbon Monoxide • How does the HyCO work? (Go to PFD) • Amine System (Go to Amine) HyCO Process Flow Natural Gas + Steam Reformer (Reactions) Hydrogen PSA Amine System Dryers (Details) Cold Box CO Membranes Reformer Reactions Natural Gas Reforming: – CH4 + H2O ↔ 3H2 + CO Water Shift Reaction – CO + H2O ↔ H2 + CO2 • Back to PFD ~60’ Amine System Process Gas Outlet CO2 Reboiler Amine System Stripper (Inside) Process Gas Inlet Absorber Heat Exchanger Pictures Inside Top Wall Reboiler X Reboiler Stripper Pictures Inside Downcomer Tray X Stripper Reboiler Missing Clips Pictures Inside Steam Deflector Plate Reboiler Stripper X So What Next? Form the Team • Research & Development • Engineering & Design • Process Control Experts • Plant Operations • HyCO Personnel What’s our Goal? • Reduce corrosion in the stripper… • While maintaining absorber’s CO2 removal But Why? • If we have to replace stripper packing… – $50,000 for packing – Plant shutdown = lost product revenue – Packing degradation ruined 2 pumps ($$$) What’s Important?... • Constraint Variables • Manipulated Variables • Disturbance Variables Which Allows Us To… CV Target CV Value MVPC MV History Controller DV History MV Setpoint Amine System Revisited Process Gas Outlet CV CO2 CV CV Reboiler MV Stripper CV Absorber Process Gas Inlet DV Heat Exchanger CV CV MV How do these guys interact? MVs Stripper Reboiler Amine Recirc Total CO2 Flow Stripper Ovhd Temp ? ? ? CO2 Slip ? ? ? Rich Liquid Loading ? ? ? Stripper Top DP ? ? ? Stripper Bottom DP ? ? ? Absorber DP ? ? ? CVs Next came the tough part • Test & collect process reaction curves • Import to Excel & Matlab • Fit First Order plus Time Delay models Example Step Response (0.5) G = 0.5 τ = 4.5 θ = 3.0 θ (3.0) τ (7.5) Now we Know MVs CVs Stripper Reboiler Stripper Ovhd Temp Modeled CO2 Slip Modeled Rich Liquid Loading Amine Recirc Total CO2 Flow Modeled Modeled Modeled Modeled Stripper Top DP Modeled Modeled Stripper Bottom DP Modeled Modeled Absorber DP Modeled Modeled Inserting Models into MVPC… Overall Results 235°F Corrision Temperature 235°F 230°F 230°F 225°F 225°F Post Implementation 220°F 215°F 220°F • Reduced average temperature by 5°F (225°F to 220°F) • 215°F Decreased deviation by T standard = 225 ± 10°F T 60% = 220 (10°F ± 4°Fto 4°F) avg avg Miscellaneous • Project Updates • Tools used • Tasks performed Conclusions • Important Factors: – ENTIRE team – We reduced the risk of corrosion! – Project’s success is leading to further MVPC around the plant’s reformer Thanks! Questions?
© Copyright 2026 Paperzz