LIFETIME ENGINEERING of Buildings and Civil Infrastructures Objectives of NATIONAL DISSEMINATION GROUPS in Thematic Network Lifetime: National information, demonstration, education and training of lifetime engineering Demonstration project of lifetime engineering in AUSTRIA : CHECKPOINT SYSTEM RISKMATRIX FOR CHOICE OF LOCATION INTRODUCTION The planned withdrawal of the station inspector from the field means an drawback on the organizational and technical level for the system of the railway. With the passage of a train the presence of the train-conclusionboard is examined, as well as apparently recognizable irregularities, as for instance overheated axles. Due to the restructuring also checking of the passing trains at the commercial stations is decreased, and a call for action exists, since these functions must be taken over now by technical systems. Functionality of Checkpoints At the moment, several failure scenarios in the railway system have been identified: Derailed wagons, broken axles or bearings, Flat spot, reweldings and cracks on wheels CHECKPOINT Hot bearings, hot and stuck brakes Displaced cargo, open doors, silhouette violations Fire, overweight, broken pantographs Numerous sensors are available. Combining sensor data provides better and more information about the status of the train. Data can be used for railpricing or for positioning data of cargo, too. The system should follow the following aspects: The whole system is highly modularized. Sensor independent representation of data. Data is merged to a global “Train-Model” Checkpoint Center Sensors Hot box detector (ÖBB) Operation Information Center Train gauge monitoring system (ASE Industry) The local positioning of the sensor technology takes place according to the last retaining possibility before the risky element, which is placed safely with signal box effect on the assigned mandatory-signal. Implementation of Risk-matrix Therefore a team was arranged consisting of experts of the Austrian Federal Railways from different divisions, which should help in the search for the risks in a railway network. Elements were sorted into groups of “infrastructure”, “course” and “surrounding field”. Results from Risk-analysis Design Aspects Dynamic scale (Schenck Process) Local Positioning Controlsystem A combined procedure to define the protection goal and to derive priorities for measures for risk reduction, is e.g. to use a monetary protection goal on an annual risk. Based on this idea, ranges in the matrix can be identified, which are over or under a protection goal. So priorities for a expansion strategy are given by sorting riskyelements over the protection goal because of their annual value. Interlockingsystem Concentrator, Sensoranalysis at the track Maintenance Center CHECKPOINT Operation Workplace Checkpoint System Overview Risk-Matrix with protection goals CHECKPOINT CENTER FUTURE WORK Checkpoint center stores, analyzes, validates, logs, forwards data and decides, which influencing factors have to be taken into account for optimal processing. Alternatives, to get detailed train information from the train operator or techniques to get detailed information about train configuration by new Checkpoint sensors. CONSORTIUM Project partners: Alcatel Austria AG TU Vienna: Institute of Electrical Measurements and Circuit Design TU Vienna: Institute for Railway Engineering, Traffic Economics and Ropeways ÖBB – Infrastructure Operation AG co-founded by DI Andreas Schöbel [[email protected]] Principal contractors of Thematic Network LIFETIME: Thematic Network LIFETIME in figures: • VTT Technical Research Centre of Finland, FI Coordinator Prof. Dr. Asko Sarja, [email protected] • Taylor Woodrow Construction Ltd, UK • CSTB Centre Scientifique et Technique du Bâtiment, FR • Imperial College of Science Technology and Medicine, UK • Universität Karlsruhe, DE • Working period: 1/6/2002 - 31/5/2005 • Participation: 96 partners from 28 countries • Plenary workshops: 2002 Norway, 2003 Finland and 2005 France • 25 National Dissemination Groups • Funding from 5th Framework Programme: Competitive And Sustainable Growth (GROWTH) Programme
© Copyright 2026 Paperzz