RPC HV efficiency scan 2011 HV scan SF6 flow-meter accident 2011 Results 2010-2011 comparison Pigi Paolucci on behalf of RPC collaboration RPC – Why an HV scan ? In 2010 we had not enough statistic to make a full efficiency scan RPC system worked with 2 common HV working point 9.35 & 9.55 kV RPC performance depends on P and T We decided to do an HV scan per year: ΔP = 20 mbar To define a WP per chamber in order to improve the performance and avoid to stress the detector. Choose a WP in the plateau region in order to avoid instability with pressure 2010 efficiency Δε=10% RPC monitor stream is vital. 2 2010 pressure Very high statistic in 1 hour at present L Pigi - RPC project - XEB 12 April 11/04/11 HV scan – first 8 points 18-19 March: HV scan (8 points – HV corrected with pressure) plateau curves repository 27 March: full analysis completed About 60% of the rolls have a very good efficiency sigmoid fit – more points needed ! An overall efficiency decrease of 3% seen in the only run comparable with 2011 WP !!! endcap barrel 3 RPC project - CMS GM 4 May 2011 endcap barrel Pigi on behalf of RPC group endcap barrel HV scan – preliminary results Working Point defined as Knee + 150 V taking into account the DP of 2010 We can reduce to 100 in case of rate problem and even less when we will correct the Effective HV with the pressure variations. Defined plateau region Knee 95% Working = knee + 150 V HV scan fit ε(HV) = εmax/(1 + eSlope (HV-HV50%)) 4 Pigi - RPC project - XEB 12 April 11/04/11 HV scan – 11 points 15 April: 3 more points taken – scan completed (3.3 pb-1 BAD) 95% of the rolls have now a very good efficiency sigmoid fit endcap barrel 5 RPC project - CMS GM 4 May 2011 endcap barrel Pigi on behalf of RPC group endcap barrel HV scan – Chi2 distribution 6 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group HV scan – all curves shifted it is now clear that was not an overall efficiency decrease but that all curves were shifted forward about 120 ± 10 V (respect 2010) ?? We double checked HV, pressure, temperature, timing, Trigger, m selection checked Everything seems to be ok – what about the GAS ? 2010 Artificial shift of 110 Volts 7 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group HV scan – curve shifted HV scan 2010 Fit HV Scan 2011 8 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group HV scan – SF6 shift measurement 16 April: Gas expert called SF6 mass flow-meter replaced after few hours 18 April: System came back at nominal gas mixture SF6 mass flow-control analyzed by Gas Group: not working properly - 30% more !!! 0.39% not 0.30% (flow-meter monitoring was stable and at 0.3%) Only way to detect the failure was an external measurement with chromatograph 24 April: mini-scan in 2 sectors (39 rolls) to calibrate the shift due to the SF6 DHV (0.39% SF6 – 0.30% SF6) at 50% eff HV50% shifted of 100 Volts RMS is 19 Volts 100 Volts renormalization will be applied to all the curves 9 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group HV scan – working points 30 April: Rolls WP merged in chamber and then in HV channel (1 HV ch. 4 bi-gap rolls) 2011 final HV working point table is ready (average of 4 rolls WP) System should be now more stable .vs. pressure About 65% were working closer to the knee in the 2010 Nominal voltage 2010 Nominal voltage 2010 2011 2011 2010 DP 2010 DP 10 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group HV scan – final results I 2172 (99%) fits are good (51 recovered deleting 1-2 bad points) Only 23 OFF rolls are without plateau All Barrel HV scan 2011 HV value at 50% eff Barrel RMS 64 Volts 11 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group Endcap RMS 84 Volts 12 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group Public results on WEB page Cluster size 13 RPC project - CMS GM 4 May 2011 noise Pigi on behalf of RPC group HV scan – final results I Also low efficiency rolls have a very nice plateau 1 Front End board broken barrel 14 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group HV scan – final results II 2010 Average Effective voltage over 1 month <9.35 & 9.55> kV PTcut > 0 GeV Systematic error of about 1% 2011 Effective voltage in 1 hour 9.35 & 9.55 kV PTcut > 7 GeV 15 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group 2010 Average Effective voltage over 1 month <9.35 & 9.55> kV PTcut > 0 GeV Cluster Size Barrel 2011 Effective voltage in 1 hour 9.35 & 9.55 kV PTcut > 7 GeV 16 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group Cluster size distribution at WP • Cluster size distribution at the 2011 HV channel WP • Measurement will be re-done in 1 day after the TS <CS> = 1.6 RMS 0.23 17 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group HV scan – gas monitoring improvements Central gas group is helping a lot in understanding the SF6 flow-meter failure and in improving the monitoring of this crucial component – Thanks SF6 flow-meter is today monitored by the gas group with a gas chromatograph until the automatic procedure will be ready (June)” RPC Gas system review 3 May (today): Gas Gain Monitor could be used to monitor the gas mixture (under study) Gas monitor parameters alarm/warning have been reviewed Instructions for the RPC shifter will be updated 18 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group Conclusions Barrel Gaps have been produced from 2003 and after 8 years Stability and uniformity of 2172 bi-gap rolls is now evident: All the efficiency curve fits are good – 23 (1%) rolls are OFF Average efficiency ≈ 95% - stable in time (2010-2011) Efficiency RMS = 5% HV50% distribution has RMS = 64 Volts and 84 Volts (very uniform set) HV working point table is now ready. It will be uploaded after TS Expected <efficiency> at WP are 95-96 % and more stable .vs. P & T SF6 is a critical component for RPC detector 30% more corresponds to 110 Volts Gas chromatograph automatic measurement needed to control the gas mixture Online HV correction with pressure is needed to reduce the operating voltage and keep safe the detector (under-study) Final results WEB page 19 RPC project - CMS GM 4 May 2011 Pigi on behalf of RPC group
© Copyright 2026 Paperzz