Doing what needs to get done What steps must occur before a Council building is repaired? 2 1 Detailed Engineering Evaluation 3 Conceptual repair and strengthening options developed and costed Full damage assessment 5 6 Full Council makes a decision about the building’s future ie to repair it/rebuild it. 7 Report with recommendations about the building’s future goes to the Council’s Community Recreation and Culture (CRaC) committee for consideration. CRaC committee makes a recommendation to the full Council. 8 Detailed repair and strengthening scheme developed. 4 Insurance discussions finalised 9 Application for building consent lodged where necessary Building consent issued 10 Repair and earthquake strengthening work begins
© Copyright 2024 Paperzz