BACKGROUND
 The Expanded Public Works Programme (EPWP) is now in Phase 3 (2014 to 2019)
 The target set by our President is 6million work opportunities
 This was disaggregated by the programme coordinators , the National Department of Public
Works (NDPW) by
 Sphere (National, Provincial, Municipal and Non-state)
 Sector (Infrastructure, Environment & Culture, Social, Non-state)
 Targets where set for Gauteng
 ALL Public Bodies were mandated to:
 Create jobs through various projects being implemented using ALL funding available
to each public body
 Report on the jobs created on a database administered by the NDPW
2
CREATING JOBS
 ALL Public bodies are required to use all available funding (equitable share, Municipal
Infrastructure Grant, Integrated Grant etc) to create jobs through their projects by:
 Ensuring job creation potential is considered at project selection.
 Optimising job creation in projects through the replacement of machines with people
wherever practically and economically possible.
 Ensuring that designers/specifiers produce procurement documentation which
compels implementers (contractors) to utilise people instead of machines
 Ensure that adequate supervision and transfer of skills is undertaken through projects
in order to:
 Upskill participants
 Ensure quality output
3
REPORTING OF JOBS
 ALL Public bodies are required to report jobs created on a nationally administered
database.
 Historically, this was done on a system which required certain basic information including
the names, ID numbers and days worked by the participants.
 This raised several Auditor General findings in that:
 Some participants were deceased
 Fraud was prevalent as there was not validation of people working on the programme
 There was not proof that participants were paid
 Duplication was prevalent
4
REPORTING OF JOBS
 As are result of this, the NDPW, introduced a new reporting system with several validation
requirements in order reduce the potential for fraud. As part of the system, evidence
needed to be captured onto the system including:
 Certified copies of all IDs of participants
 Contracts with all participants
 Proof of payment to participants
 Proof of UIF
 Proof COIDA
 Whilst the legislation requires IDS to be copied for all projects, the requirements for
certified IDS has presented an administrative challenge which was not catered for in tender
documents previously.
5
Gauteng EPWP Targets for Depts and Municipalities 2014 to 2019
Table 1 : Gauteng Provincial departments Targets 2014 - 2019
Gauteng Targets Provincial Sphere
Financial
Year
2014/15
2015/16
2016/17
2017/18
2018/19
Totals
Infrastructure
WO
FTE
18 758
6 117
19 970
6 512
20 522
6 692
21 250
6 929
21 910
7 145
102 410
33 395
Environmental
WO
FTE
460
161
423
157
400
157
380
157
361
157
2 025
790
Social
WO
26 886
27 198
26 591
26 853
26 997
134 525
Total
FTE
17 056
17 268
16 865
17 029
17 138
85 356
WO
46 104
47 591
47 514
48 483
49 268
238 960
FTE
23 334
23 937
23 714
24 115
24 440
119 540
Table 2 : Gauteng Municipal departments Targets 2014 - 2019
Gauteng Targets Municipal Sphere
Financial
Year
2014/15
2015/16
2016/17
2017/18
2018/19
Totals
Infrastructure
WO
FTE
49 524
16 149
53 742
17 524
58 737
19 153
64 324
20 975
70 791
23 084
297 117
96 886
Environmental
WO
FTE
10 304
4 864
9 869
4 749
9 620
4 752
9 393
4 753
9 191
4 755
48 378
23 873
Social
WO
1 361
1 685
2 320
3 003
3 749
12 120
Total
FTE
474
586
807
1 045
1 304
4 215
WO
61 190
65 296
70 677
76 721
83 731
357 615
FTE
21 487
22 860
24 712
26 773
29 143
124 975
6
OVERVIEW OF THE PROGRESS
 The province exceeded it’s target in 2014/15. Whilst this suggests that the work has been
created on the ground, the figure does not take into account data which was invalid.
 The province has underperformed in the 2015/16 & 2016/17 (current year). This may be
attributed to:
 Under-reporting due to the administrative requirement for data capture
 Employment of foreign nationals who cannot currently be captured on the system
 Poor project selection (projects not conducive to Labour)
 Conventional construction without deliberate labour based activities written into
contracts.
 Lack of ownership of the requirement to create and report on job creation.
 As a result of this, the Province has underperformed by 382455 work opportunities.
 The premier has targeted 300’000 Work Opportunities over the next 2 year.
7
OVERVIEW OF PROGRESS (CONTINUED)
 This presentation aims to:
 Provide the rationale for a disaggregation of targets
 Recommend a disaggregation process
 Provide recommendations on key interventions that need to be implemented to
achieve the targets
8
Cumulative Performance against NDPW Phase 3 Targets
700000
Deficit
382455
623761
600000
484833
500000
400000
353887
300000
230165
241306
185644
200000
142950
112080
100000
0
2014/15
2015/16
2016/17
Total WO
WO Target
0
0
2017/18
2018/19
9
NDPW Phase 3 Target Splits by Sphere
•
•
•
The nature of work undertaken by provincial departments is not the same as that of the
municipalities.
This has been recognised by NDPW who had split the Gauteng target taking cognisance of
the difference.
The initial province: municipality split appears to be 40:60
Work Opportunities
Provincial Department
Work Opportunities
% of total
Municipal Work
Opportunities
% of total
Total
2014/15
2015/16
2016/17
2017/18
2018/19
Totals
46 104
47 591
47 514
48 483
49 268
238 960
43%
42%
40%
39%
37%
40%
61 190
65 296
70 677
76 721
83 731
357 615
57%
58%
60%
61%
63%
60%
107 294
112 887
118 191
125 203
132 999
596 574
10
SPLITTING THE TARGET BY SPHERE
•
Whilst this was theoretically undertaken, review of the reported jobs on the reporting
system shows that
–
–
241 306 Work Opportunities (WO) were created (39% of the 5 year total & 60% of where we should be at this
time)
A province: municipality split appears to be 40:60
400000
350000
300000
250000
200000
150000
100000
50000
0
2014/15
Provincial Department Target
2015/16
2016/17
Provincial Department Progress
2017/18
Municipal Target
2018/19
Totals
Municipal Progress
11
DISAGGREGATION BY SPHERE
 It is therefore same to assume that the targeted 300’000 work opportunities
could be split by sphere 60:40.
Disaggregated targets
Provincial
Department ,
120000, 40%
Municipality ,
180000, 60%
Municipality
Provincial Department
12
DISAGGEGATION BY YEAR
 It is appreciate that all Public Bodies are not performing optimally but are expected to improve on their
job creation and reporting , year on year.
 The NDWP estimated the increase year on year to be
 3% for Provincial departments
 7% for Municipalities
 This disaggregation was adopted for this purpose.
Municipal
2018-19
31%
Provincial
2017-18
20%
Provincial
2018-19
20%
Municipal
2017-18
29%
13
COST PER JOB/SECTOR
 The cost of a project comprises several components including
 Labour
 Plant
 Equipment
 The proportions of budget allocated for each of these elements varies from project to project depending
on the nature of the project.
 Based on the historical data from the reporting system, the cost per job may be estimated.
2016/2017 Allocated Budget
Gross No. of WO
Rands/job
E&C
R
27 097 611.00
669.00
R
40 504.65
Social Sector
R
437 799 993.00
12540.00
R
34 912.28
The Infrastructure Sector estimated a cost per job of R40 000/job for the 5 year targets. This was adopted
for this exercise.
14
ADJUSTMENT
 Using the budgets allocated to all public bodies, a theoretical job creation target was
calculated.
 The target was adjusted in consideration of:
 Projects not conducive to labour (plant intensive)
 Projects not promoting labour generation
 Challenges with data collection
 Challenges with data capturing onto the system
 Validation failures (fraudulent IDs)
15
300 000 TARGET SUMMARY: Provincial Departments
PROVINCIAL DEPARTMENTS
2017-18
2018-19
Total
Total
Total
Total
308
538
846
8516
4851
13367
825
429
1254
11
0
11
9444
13761
23205
8
8
16
505
397
902
496
100
596
30029
33902
63932
GP - ROADS AND TRANSPORT
8971
6901
15872
TOTAL
59113
60887
120000
DEPARTMENT
GP - DEPT. OF AGRICULTURE AND RURAL DEVELOPMENT
GP - DEPT. OF HEALTH
GP - DEPT. OF SPORT, ARTS, CULTURE AND RECREATION
GP - DEPT. OF COOPERATIVE GOVERNANCE AND
TRADITIONAL AFFAIRS
GP - DEPARTMENT OF EDUCATION
GP - DEPT. OF COMMUNITY SAFETY
GP - DEPT. OF INFRASTRUCTURE DEVELOPMENT
GP - DEPARTMENT OF SOCIAL DEVELOPMENT
GP - DEPARTMENT OF HOUSING AND LOCAL
GOVERNMENT/HUMAN SETTLEMENT
16
300 000 TARGET SUMMARY: Municipalities
Municipalities
2017-18
2018-19
Total
Total
Total
Total
EKURHULENI
25112
26870
51982
CITY OF JOHANNESBURG
28097
30064
58160
CITY OF TSHWANE
21950
23486
45436
EMFULENI
4886
5228
10113
MIDVAAL
1045
1118
2162
LESEDI
412
441
854
SEDIBENG DISTRICT MUNICIPALITY
22
23
45
MOGALE CITY
2961
3168
6129
MERAFONG CITY
875
936
1811
RAND WEST CITY
1475
1578
3053
WEST RAND DISTRICT MUNICIPALITY
123
131
254
TOTAL
86957
93043
180000
MUNICIPALITY
17
300 000 TARGET SUMMARY: Provincial Departments
PROVINCIAL DEPARTMENTS – Infrastructure Only
2017-18
2018-19
Total
Total
Total
Total
83
176
259
GP - DEPT. OF HEALTH
8516
4851
13367
GP - DEPT. OF SPORT, ARTS, CULTURE AND RECREATION
825
429
1254
GP - DEPT. OF COOPERATIVE GOVERNANCE AND
TRADITIONAL AFFAIRS
11
0
11
GP - DEPARTMENT OF EDUCATION
9281
13469
22750
GP - DEPT. OF COMMUNITY SAFETY
8
8
16
GP - DEPT. OF INFRASTRUCTURE DEVELOPMENT
505
397
902
GP - DEPARTMENT OF SOCIAL DEVELOPMENT
435
34
469
29581
33182
62763
GP - ROADS AND TRANSPORT
8971
6901
15872
TOTAL
58216
59447
117663
DEPARTMENT
GP - DEPT. OF AGRICULTURE AND RURAL DEVELOPMENT
GP - DEPARTMENT OF HOUSING AND LOCAL
GOVERNMENT/HUMAN SETTLEMENT
18
300 000 TARGET SUMMARY: Municipalities
Municipalities – Infrastructure Only
2017-18
2018-19
Total
Total
Total
Total
EKURHULENI
24518
26234
50753
CITY OF JOHANNESBURG
27625
29559
57184
CITY OF TSHWANE
21630
23145
44775
EMFULENI
4332
4636
8968
MIDVAAL
1045
1118
2162
LESEDI
412
441
854
SEDIBENG DISTRICT MUNICIPALITY
22
23
45
MOGALE CITY
2514
2690
5204
MERAFONG CITY
875
936
1811
RAND WEST CITY
1475
1578
3053
WEST RAND DISTRICT MUNICIPALITY
23
24
47
TOTAL
84472
90385
174856
MUNICIPALITY
19
Total TARGET SUMMARY: Provincial Departments (300 000 & Phase 3)
PROVINCIAL DEPARTMENTS
DEPARTMENT
GP - DEPT. OF AGRICULTURE AND RURAL DEVELOPMENT
GP - DEPT. OF HEALTH
GP - DEPT. OF SPORT, ARTS, CULTURE AND RECREATION
GP - DEPT. OF COOPERATIVE GOVERNANCE AND
TRADITIONAL AFFAIRS
GP - DEPARTMENT OF EDUCATION
GP - DEPT. OF COMMUNITY SAFETY
GP - DEPT. OF INFRASTRUCTURE DEVELOPMENT
GP - DEPARTMENT OF SOCIAL DEVELOPMENT
GP - DEPARTMENT OF HOUSING AND LOCAL
GOVERNMENT/HUMAN SETTLEMENT
GP - ROADS AND TRANSPORT
TOTAL
2017-18
2018-19
Total
Total
Total
Total
515
748
1263
18137
14632
32769
2465
2097
4562
11
0
11
9492
13810
23302
8
8
16
11150
11220
22371
862
471
1333
54600
58884
113484
9977
7923
17899
107216
109794
217010
20
Total TARGET SUMMARY: Municipalities (300 000 & Phase 3)
Municipalities
2017-18
2018-19
Total
Total
Total
Total
EKURHULENI
47362
51455
98817
CITY OF JOHANNESBURG
52905
56966
109870
CITY OF TSHWANE
44440
47894
92334
EMFULENI
7513
8060
15572
MIDVAAL
1545
1654
3198
LESEDI
763
823
1587
SEDIBENG DISTRICT MUNICIPALITY
257
316
573
MOGALE CITY
4327
4658
8985
MERAFONG CITY
1560
1691
3251
RAND WEST CITY
2599
2798
5397
WEST RAND DISTRICT MUNICIPALITY
407
460
867
TOTAL
163677
176775
340452
MUNICIPALITY
21
Total TARGET SUMMARY: Provincial Departments (300 000 & Phase 3)
PROVINCIAL DEPARTMENTS – Infrastructure Only
2017-18
2018-19
Total
Total
Total
Total
175
270
445
GP - DEPT. OF HEALTH
12766
9233
21999
GP - DEPT. OF SPORT, ARTS, CULTURE AND RECREATION
1549
1177
2726
11
0
11
GP - DEPARTMENT OF EDUCATION
9303
13491
22793
GP - DEPT. OF COMMUNITY SAFETY
8
8
16
GP - DEPT. OF INFRASTRUCTURE DEVELOPMENT
5208
5246
10454
GP - DEPARTMENT OF SOCIAL DEVELOPMENT
597
201
797
40435
44374
84809
GP - ROADS AND TRANSPORT
9415
7358
16774
TOTAL
79466
81357
160823
DEPARTMENT
GP - DEPT. OF AGRICULTURE AND RURAL DEVELOPMENT
GP - DEPT. OF COOPERATIVE GOVERNANCE AND
TRADITIONAL AFFAIRS
GP - DEPARTMENT OF HOUSING AND LOCAL
GOVERNMENT/HUMAN SETTLEMENT
22
Total TARGET SUMMARY: Municipalities (300 000 & Phase 3)
Municipalities – Infrastructure Only
2017-18
2018-19
Total
Total
Total
Total
EKURHULENI
45916
49771
95688
CITY OF JOHANNESBURG
47726
51670
99396
CITY OF TSHWANE
39054
42312
81366
EMFULENI
6260
6769
13029
MIDVAAL
1408
1519
2926
LESEDI
713
775
1489
SEDIBENG DISTRICT MUNICIPALITY
22
23
45
MOGALE CITY
3683
3983
7666
MERAFONG CITY
1536
1668
3204
RAND WEST CITY
2454
2661
5115
WEST RAND DISTRICT MUNICIPALITY
23
24
47
TOTAL
148796
161176
309971
MUNICIPALITY
23
Proposed Disaggregated Targets by Spheres (300 000)
2017/18
2018/19
Total
Provincial
59 113
60 887
120 000
Municipal
86 957
93 043
180 000
Total
146 070
153930
300 000
24
Proposed Disaggregated Targets by Spheres (300 000 & Phase 3)
2017/18
2018/19
Total
Provincial
107 216
109 794
217 010
Municipal
163 677
176 775
340 452
Total
270 893
286 569
557 462
25
KEY INTERVENTIONS
Item
Action
Deliverable
By Whom
Accountability
All political and operation
principles are take responsibility
for their targets
KPIs to include job
delivery
Premier
MECs
Mayors
HoD
MMs
EPWP added to the agenda of all
key forums
Progress to be reported
at all forums
All Public Bodies to commit to
EPWP targets through signing of
Protocol Agreements
Revised signed Protocol
Agreements
Premier
MEC
HODs and Mayors
Develop a project selection criteria
Selection criteria
includes job creation
Technical Managers
Perform Labour intensive
construction workshops for all PMs
LI Workshops
GDID
Align all tender documents to
EPWP requirements
EPWP aligned pro forma
tender documents
Public Bodies
Increase job
creation
26
KEY INTERVENTIONS
Item
Action
Deliverable
By Whom
Reporting
Ensure that all contracts include
EPWP requirements for reporting
Aligned procurement
documents
Technical Managers
Develop capacity to collect data
Collected data
All Public Bodies
Establish clear data flow processes
Data Flow Process
All Public Bodies
Establish Data Capturing capacity
Data Capture Centre
All Public Bodies
Enhance data management
capability to reduce inefficiency
Data Managers
All Public Bodies
27
KEY INTERVENTIONS
Item
Action
Deliverable
By Whom
Foreign
Nationals
Reduce the number of illegal
immigrants working on EPWP
Increased jobs reported
All Public Bodies
Liaise with NDPW to allow
capturing of legal foreign nationals
Increased jobs reported
GDID
Metros
Mayors to be engaged to improve
reporting on all projects in all
Sectors
Increased jobs reported
Premier
MEC GDID
Human
Settlements
MEC to be engaged to improve job
creation and reporting
Increased jobs reported
Premier
MEC GDID
Social Sector
Ensure that all Programmes are
reported for all Municipalities
Increased jobs reported
MEC GDID
Sector Manager
28
Conclusion
 The 300,000 work opportunities have been disaggregated across public bodies in
the province
 This is achievable by all public bodies, provided that the identified interventions
are in place
 Interventions are required at various levels to achieve these targets
 Each public body must look at the targets, consider their budgets and
programme and develop a detailed estimate of output for the next 2 years
 It is recommended that a detailed action plan be created for the numerous
interventions which must take place in order to achieve the target
 Monthly monitoring of the action plan and the progress must take place and
must be reported at all key meetings