DIRFT III Initial Earthworks Strategy Involving the Movement of Stored Material from Sainsbury’s, DIRFT II to DIRFT III Requirement 14: Earthworks For Prologis UK Ltd DIRFT III - Initial Earthworks Strategy Involving the Movement of Stored Material from Sainsbury’s, DIRFT II to DIRFT III – Requirement 14: Earthworks Document Control Project: DIRFT III Client: Prologis UK Ltd Job Number: NK018137 Document Reference: NK018137-RPS-D3-XX-RP-C-R14/01 Document Checking: Prepared by: Wayne Llewellyn Signed: Wayne Llewellyn Checked by: Simon Turton Signed: Simon Turton Verified by: John Clayton Signed: John Clayton Issue Date Status comments P01 7th August Preliminary first revision Preliminary paragraph 1.1.3 added; and Appendix 1 drawing replaced. 2015 P02 13th August 2015 Prologis UK Ltd 7 August 2015 DIRFT III - Initial Earthworks Strategy Involving the Movement of Stored Material from Sainsbury’s, DIRFT II to DIRFT III – Requirement 14: Earthworks Contents Page 1.0 2.0 Purpose and Background .................................................................................................... 1 1.1 Purpose ............................................................................................................................ 1 1.2 Background ...................................................................................................................... 1 Earthworks Strategy ........................................................................................................... 2 2.1 Nature of the surplus material ........................................................................................... 2 2.2 Remediation and Transportation ........................................................................................ 2 2.3 Material Quantities ............................................................................................................ 3 2.4 Incorporation of surplus material into the earthworks and overall earthworks strategy .......... 3 Appendix 1 ..................................................................................................................................... 4 RPS Drawing NK018137-RPS-D3-XX-DR-C-SK2200 ........................................................................ 4 Prologis UK Ltd 7 August 2015 DIRFT III - Initial Earthworks Strategy Involving the Movement of Stored Material from Sainsbury’s, DIRFT II to DIRFT III – Requirement 14: Earthworks 1.0 Purpose and Background 1.1 Purpose 1.1.1 The purpose of this report is to provide a summary of the material movements needed to move surplus excavated soil from the Sainsburys development (Project Harrier- located on the DIRFT II Zone 3 site) for use as fill material for the DIRFT III phase 1 and 2 earthworks. 1.1.2 RPS Drawing NK018137-RPS-D3-XX-DR-C-2204 : Phase 1 and 2 Earthworks Phasing Plan indicates the proposed location where the surplus soil will be temporarily stored. 1.1.3 This report is the initial earthworks strategy and as indicated above predominately relates to the movement of surplus excavated soil from the Sainsbury’s site to DIRFT III. A further report will be provided for the wider site. This report is submitted in the context of the requirement to move the Sainsbury’s material before the temporary permission (LPA ref R14/2140) lapses on 30th September 2015. 1.2 Background 1.2.1 RPS have been appointed to provide the relevant details to discharge Requirement 14 of the DIRFT III Development Consent Order (DCO) in respect of the proposals to move and temporarily store surplus soil as described above. 1.2.2 The DIRFT III site comprises approximately 343.70 hectares and is located to the north of the existing DIRFT estate. The site is bounded by the A5 to the west, The M1 to the east and agricultural fields leading to the village of Lilbourne to the north. 1.2.3 Requirement 14 states that no phase of the authorised development, excluding archaeological soil movement and ecological mitigation works, is to commence until details of the earthworks strategy relating to that phase of development including the extent of any material to be temporarily stored within the site and details of any surplus material to be removed for disposal have been agreed in writing with the relevant planning authority. All earthworks must be carried out in accordance with the agreed earthworks strategy. 1.2.4 Based on information shown on published geological maps the DIRFT III site is underlain by a layer of alluvium approximately 2m thick. Topsoil thickness across the site is approximately 200 mm 1 Prologis UK Ltd 7 August 2015 DIRFT III - Initial Earthworks Strategy Involving the Movement of Stored Material from Sainsbury’s, DIRFT II to DIRFT III – Requirement 14: Earthworks thick. These superficial deposits overlay the Charmouth Mudstone Foundation. Future intrusive Ground Investigation will confirm the conditions across the site. 1.2.5 Existing services are present on the site (comprising high pressure gas main, numerous BT cables and a chalk slurry pipeline) –as indicated on AECOM drawing 60051619/010. 2.0 Earthworks Strategy 2.1 Nature of the surplus material 2.1.1 Project Harrier Main Contractors VolkerFitzpatrick have confirmed that the surplus soil comprises site won material from the DIRFT II zone 3 works –which was not incorporated into the new works on account of high moisture content and topsoil content. The material comprises : 2.1.2 Alluvial soft to firm sandy/gravelly clays Alluvial sands and gravels with high silt content. Weathered clay from Lias Clay /Mudstone. Topsoil comprising soft clay with variable organic content. It should be noted that the surplus stockpile does not contain any Made Ground. Waste Acceptance Criteria (WAC) testing has not been undertaken on the material. Testing on the non –topsoil constituents has been carried out to determine some engineering properties ( grading, moisture content and shear strength). 2.2 Remediation and Transportation 2.2.1 In order to ensure that the surplus material can be classified in accordance with the Specification for Highway Works (SHW) screening and sorting of the soil will be undertaken such that the majority of topsoil and other organic material is removed. 2.2.2 Following testing to confirm that the material is inert and receipt of the Environmental Permit (Recovery Permit for the Permanent Deposit of Waste on Land) –the material will be loaded into 30T dumpers and transported to the DIRFT III temporary storage zone shown on RPS drawing NK018137-RPS-D3-XX-DR-C-2204 : Phase 1 and 2 Earthworks Phasing Plan. 2 Prologis UK Ltd 7 August 2015 DIRFT III - Initial Earthworks Strategy Involving the Movement of Stored Material from Sainsbury’s, DIRFT II to DIRFT III – Requirement 14: Earthworks 2.3 Material Quantities 2.3.1 DIRFT II main contractors VolkerFitzpatrick have confirmed that the total volume of surplus material is circa 35,000 cubic meters. It is intended-following removal of topsoil and confirmation of the inert nature of the material –that all the surplus material will be recovered for use on the DIRFT III site. 2.4 Incorporation of surplus material into the earthworks and overall earthworks strategy 2.4.1 It is anticipated that after treatment with lime or cement and GGBS the material will be suitable to be included in the ‘usable cut’ element of the overall phase 1 and 2 earthworks. The phase 1 and 2 earthworks comprise circa 2 million cubic meters of cut and fill. 2.4.2 The overall phase 1 and 2 earthworks strategy requires that material cut from phase 3 and 4 (plateaus ZGP1, ZGP2 and ZFP2) is moved in a general north-westerly direction to provide fill for the phase 1 and 2 plateaus and rolling surcharge program. 3 Prologis UK Ltd 7 August 2015 DIRFT III - Initial Earthworks Strategy Involving the Movement of Stored Material from Sainsbury’s, DIRFT II to DIRFT III – Requirement 14: Earthworks Appendix 1 RPS Drawing NK018137-RPS-D3-XX-DR-C-SK2200 4 Prologis UK Ltd 7 August 2015 Heavily vegetated. Clearance needed for further detail. te rou ve ati ss ce ac Approx. bund height 2.7m; allowing for temporary CROSS OVER POINT Ce ntr eli ne of Cr ick Co ve rt ic ind material from Sainsbury's plot ay sW ne Da A5 PHASE 1 A4 28 PHASE 1 te esta e of road nmen t alig relin gn me nt Cent Ce ntr eli ne of tate es roa li da A5 Rev Description By Ckd Date Notes 1. appointment with its client and is subject to the terms and conditions of that appointment. RPS accepts no liability for any use of this document other than by its client and only for the purposes for which it was prepared and provided. 2. If received electronically it is the recipients responsibility to print to correct scale. Only written dimensions should be used. 3. This drawing should be read in conjunction with all other relevant drawings and specifications. Sherwood House, Sherwood Avenue, Newark, Nottinghamshire, NG24 1QQ Key T:+44 (0)1636 605 700 E: [email protected] - denotes Phase 1 archaeological excavation zone (indicative only) F:+44 (0)1636 610 696 Client - denotes temporary storage area for DIRFT II Z2 Sainsburys surplus material - denotes gravel haul route; in instances where haul road crosses existing hedgerow, BCA / Ecology Solutions to arrange clearing Project DIRFT III Daventry Title Sainsbury's Surplus Material Temporary Storage Area Status Preliminary Scale 1:2500 @ A0 Date Created 13.08.2015 Project Leader DM Drawn By MF Checked by WL Document Number NK018137 Project Number - RPS-D3-XX-DR-C-SK2200 Revision Suitability P01 S2 Originator - Zone - Level - Type - Role - Drawing Number rpsgroup.com
© Copyright 2025 Paperzz