Commission on Audit Government Accountancy Sector Accounting Systems Development and Other Services Office Commonwealth Avenue, Quezon City C Enhanced eNGAS and eBudget System Version 2.0 (PPSAS and RCA Compliant) for Local Government Unit TECHNICAL REQUIREMENTS CHECKLIST I. AGENCY NAME Note: Enhanced eNGAS and eBudget System are client-server application systems that require a server and workstations. II. Minimum SERVER Requirements (Higher specifications preferred) Hardware CPU: Memory: Hard Disk: Optical Drive: Network Card: UPS: Minimum Specification (Recommended) Agency’s Actual Configuration (Please indicate on spaces provided) 2.0 GHz 4 GB 500 GB DVD-R / DVD-RW 100 Mbps / 1000 Mbps 500 VA Minimum Specification (Recommended) Operating System: MS Windows 2008 R2 Server Software Agency’s Actual Configuration (Please indicate on spaces provided) Database: MS SQL 2008 R2 Server (Standard Edition) III. Minimum WORKSTATION Requirements (Higher specifications preferred) Hardware CPU: Memory: Hard Disk: Network Card: UPS: Minimum Specification (Recommended) Specifications of Workstations to be used in eNGAS / eBudget System 1.0 GHz 2 GB 500 GB 100Mbps 500 VA Total number of workstations: Software Description Operating System: Windows 7 Home / Professional Edition Microsoft Excel 2003/2007/2010 (optional, Other: to be used in importing/exporting of data) Enhanced eNGAS and eBudget System Technical Requirements Checklist Page 1 of 3 Commission on Audit Government Accountancy Sector Accounting Systems Development and Other Services Office Commonwealth Avenue, Quezon City C IV. Disaster Recovery Plan Disaster Recovery Plan (DRP) is a documented processes or set of procedures to recover and protect a business IT infrastructure in the event of a disaster (such as networking, database backup and other IT infrastructures). It also includes non-IT related aspects such as key personnel, facilities, crisis communication and reputation protection. Select applicable DRP: Preventive measures (keeping data backed up (RAID, Internal/External Media) or off site backup facility, installing generators and conducting routine inspections) Detective measures (installing fire alarms, using up-to-date antivirus software, holding employee training sessions, and installing server and network monitoring software) Corrective measures (keeping critical documents in the Disaster Recovery Plan or securing proper insurance policies) None V. Local Area Network (LAN) Computers to be used in Enhanced eNGAS and eBudget System Version 2.0 must be interconnected to a LAN installed with transmission control protocol/Internet protocol (TCP / IP). VI. IT Personnel System Administrator: Network Administrator: Database Administrator: Function Personnel in-charge In charge of giving access to the eNGAS and eBudget System users and in keeping the latest version of executable in each workstation in case of version upgrade. In charge of maintaining the connectivity between workstations and servers. In charge of database security, updates, backup and restoration in case of server failure. VII. Data For fast assessment of the extent of the implementation, please provide the following information: Existing Information System Description Enhanced eNGAS and eBudget System Technical Requirements Checklist Database Used Page 2 of 3 Commission on Audit Government Accountancy Sector Accounting Systems Development and Other Services Office Commonwealth Avenue, Quezon City C Accounting Records/ Other Data Latest Trial Balance and FARs Status Remarks Subsidiary Ledger - Inventory Subsidiary Ledger – Property, Plant and Equipment (PPE) Subsidiary Ledger – Accounts Receivable/Accounts Payable (AR/AP) Subsidiary Ledger – other accounts (please specify) List of Books/Funds maintained Responsibility Centers List of authorized users and signatories Name: Position and/or Designation: E-mail Address: Telephone/Fax No. Signature: Name: Position and/or Designation: COA Audit Team Leader E-mail Address: Telephone/Fax No. Signature: Submitted by: Agency Head / Authorized Representative Date: Noted by: Date: VIII. Evaluation/Validation of Compliance with the Technical Requirements Findings/Observations Evaluated by: COA, GAS, ASDOSO-TAHDS Comments/Recommendations Name: Position and/or Designation: E-mail Address: Telephone/Fax No. Signature: Date: Note: Agencies may submit the accomplished checklist through the COA Audit Team Leader or directly to COA, GAS, ASDOSO Technical Assistance and Help Desk Services (TAHDS) or email at [email protected], [email protected], [email protected], or [email protected], or fax at Telefax No. (63-02)931-75-77, Attention TAHDS, ASDOSO, GAS Thank You. Enhanced eNGAS and eBudget System Technical Requirements Checklist Page 3 of 3
© Copyright 2026 Paperzz