GENERATION BUSINESS LINE Annexure-2 PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES FOR QUAFICATION OF SUPPLIERS/MANUFACTURERS/PRODUCTS Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 1 of 19 Revision No. 0 Issue Date: February, 2012 SCOPE AND APPLICATION: 1. 1.1 1.2 1.3 1.4 1.5 2. To pre-qualify various brands of Boiler Fuel Additives and their manufacturers/suppliers for application in Boilers of SEC Power Plants burning Heavy Fuel Oil. Dosing of the most suitable and appropriate Fuel Additive is intended to protect the Heat Transfer surfaces from the corrosive and fouling effects of the impurities present in the Heavy Fuel Oil by maintaining the pH of ashes produced at the Electrostatic Precipitator (EP) outlet to ~ 3.5 at Air Heater Outlet and Silo without any impact on the other operational parameters of the Boiler. To evaluate the performance of Fuel Additive in reducing Stack Emissions and increasing combustion efficiency. To determenie the effect of Fuel Additive on High & Low Tempreture Corrosion, Rate of Fouling, Emissions (SO3, SO2, NOx, Particulate) and Acid Dew Point. To determine the optimum Dosage Rate. To investigate any adverse effects of the Fuel Additive on the Boiler performance, such as efficiency, Fouling of Burners, Boiler tubes and plugging of the Air Heaters. METHOD SUMMARY: Supply of adequate quantitie(s) of potential Fuel Additive(s). Study of the present Fuel forwarding system and Fuel Additive dosing facility for preparing arrangement drawings for Trial run set up clearly identifying the equipment / instruments and temporary connections to the existing system. To make necessary arrangements including all measuring instruments and conduct in situ Field Trial Test on the selected Boiler. Analysis of Test results and comparison of performance in repect of: Maintaining the pH of Fly Ash ~ 3.5. Free Acidity less than 1.0 % wt as H2SO4. Improvement in Boiler performance by efficient combustion. Reduction of fouling in the flue gas path components. Minimization of emission pollutants. Reduction of particulate emission 3. COMMENTS: Supplier should submit references about their experience giving list of utilities where their recommended brands of Fuel Additives are being used and Trial Test carried out by them prior to the selection of the Fuel Additive. This should include all details such as capacity / type of Boilers, date of commissioning, Fuel characteristics, benefits accrued etc. It is understood that the expenses for Trial runs in connection with pre-qualification of Fuel Additive e.g instruments, arrangment of test at site, analysis of results etc. should be totaly borne by the Fuel Additive supplier. The agreed cost of Fuel Additive shall be paid on quarterly basis if the test conducted yield successful results during each quarter. However, if the supplier has got alternative options/scheme, the same may be submitted for SEC evaluation and consideration. Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 2 of 19 Revision No. 0 Issue Date: February, 2012 All tests and associated works shall be carried out by supplier without causing any damages to the equipment and perssonel of SEC and shall not anyway affect the normal operation of the plant. The intent of whole exercise is only to pre-qualify Fuel Additive type/brand and their suppliers. It does not any way confer rights on the Fuel Additive supplier for the award of purchase order which shall be necessarily based on the merits of the respective offers received. The offers complete in all details as elaborated herein shall be submitted in the concerned office. 4. TECHNICAL INPUTS: Our Boilers are designed to burn Crude Oil or Heavy Fuel Oil. The specificationn of Arabian Light Crude and Heavy Fuel Oil, A-962 are attached. The chemical and physical properties of the Fuel (Heavy Fuel Oil) being used currently. All the Trial runs should be designed to suit for the requirement of the Fuel being used. The Boilers are equipped with Fuel Additive dosing facilites. However, supplier shall arrange his own experts for samples analysis and carrying out the tests in a reliable manner. To the extent possible SEC shall provide the available laboratory facility. However, supplier shall arrange his own experts for samples analysis and carrying out the tests in a reliable manner. The supplier should contact SEC for obtaining any design and operational details of the Boiler which they feel deem necessary for the selection of the Fuel Additives for FTT. 5. PROCEDURE: Supplier should identify, techno-economically, from his product range the most suitable Fuel Additive for achieving the specified objectives. The criteria for arriving at optimized Fuel Additive dosage rate, based on the Fuel constituents such as Vanadium, Sulphur, Sodium, Potassium etc., should be very clearly given together with procedures of calculation dosing rate and the theory underlying behind it. Trial runs should be designed to suit the Heavy Fuel Oil currently in use. All the measuring instruments shall be calibrated for achieving necessary accuracy of measurements. All details of instruments, procedures of calibration, actual methods of measurement at site, measurement frequency together with applicable standards shall also be provided to SEC. The duration of FTT are specified on page 7/11 of this Manual. It is foreseen that on use of the selected Fuel Additive for the 1 st quarter, indications regarding its favorable effects get reflected; failing which test shall be terminated. In case if the Trial runs prove to be successful with the dozing of the Fuel Additive used in the first attempt, then the tests shall continue with the same Fuel Additive till annual inspection. During Trial Testing, all the critical operating parameters shall be controlled by Auto Mode of operation. Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 3 of 19 Revision No. 0 Issue Date: February, 2012 6. METHODOLOGY: During the Field Trial Testing, the following parameters shall be monitored by the Fuel Additive Supplier / Manufacturer as per format attached . Gas Analysis: o O2, CO2 & CO: By Orsat Analysis / Portable Combustion Analyzer. NOx: USEPA Method # 7/ Portable Combustion Analyzer. SO2, SO3: USEPA Method # 6/ Portable Combustion Analyzer. Moisture: By Gravimetric method by absorbing known volume of the Gas by anhydrous Calcium Sulphate Particulate: Actual Quantities Measurement by using ISOKINETIC sampling. Opacity: o Ash Analysis: Unburned Carbon pH @ 5 minutes and 60 minutes. Weight, bulk density and moisture content Magnesium (soluble and insoluble), Vanadium and unburned carbon Free Acidity (Total Acidity, Mineral Acidity) o o o Fuel Analysis: Shall be carried out by the Power plant and Fuel Additive supplier / manufacturer for all the parameters as specified. Acid Dew Point and Rate of Acid Build Up (RBU) by using Land Instrument. Boiler Operation Data: (Daily or per shift basis shall be provided by the Power Plant). Steam and Fuel Flow Rates Temperature of Flue Gases at inlet to the Air Heaters Air Heater ∆P Boiler Efficiency Heat Rate Soot Blowing Frequency Emission Level Particulate Emission o o 7. Corrosion Monitoring: Corrosion coupons OR corrosion online analyzers in two locations (a) Down Stream Air Heaters (b) Up Stream Air Heaters shall be installed to investigate the effect of Fuel Additive on corrosion reduction. Oxygen and Excess Air upstream and downstream of APH. NORMS OF EVALUATION: The following norms of Boiler Operating parameters shall be used to evaluate the performance of Fuel Additive on quarterly basis. a. SH and RH steam temperature should be within 538 5 °C. b. SH spray water to be as per design values for Normal operation at Auto mode. c. RH spray water to be Nil. Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 4 of 19 Revision No. 0 Issue Date: February, 2012 d. Exhaust Gas temperature at APH outlet is expected to be 150 – 160 °C. However the temperature of exhaust gas temperature shall be maintained at 10 °C above the Acid Dew Point temperature at stack. This is to protect the Boiler Cold End surfaces against Acid Dew Point impact. e. To confirm the operation parameters as listed above, SEC shall provide 1st week data as typical reference of the concerned Unit. f. Ash pH at APHs outlet and silo shall be ~ 3.5 @ 5 minutes. g. Ash pH @ 60 minutes shall also be checked. Its value shall be 0.2 – 1.0 higher than the pH value @ 5 minutes of the same sample. h. Free Mineral and Total Acidity shall be < 1.0 % as H2SO4. i. Burner tilt shall be within the Boiler tuning limits. j. GRF opening shall be within Boiler tuning limits. k. Operation of the Unit under Trial Testing should be on AUTO mode of operation. l. Boiler Inspection: i. Boiler inspection (Furnace, Steam Generation Tubes, SH, RH, Economizer, APH, Flue Gas Ducts, etc.) prior to start and after completion the Trial Test shall be carried out jointly for comparison and to evaluate the performance of the Fuel Additive. ii. Photographs shall also be taken on both the occasions. iii. Deposit samples shall be collected form all critical areas such as Furnace, SH, RH, Economizer, APHs, Ducts etc. iv. Deposits samples collected during inspection shall be analyzed by the supplier/manufacturer at their cost and the results shall be incorporated in the final report to be submitted to SEC. 8. EVALUATION: a. The criteria to be used to evaluate the performance of Fuel Additive shall be based on the findings determined on quarterly basis. b. Systematic evaluations of results of various analyses and other findings of each quarter shall be made and compared with the baseline data as specified herein. c. All critical parameters i.e. SH and RH spray, GRF opening/closing, Burner Tilt, Delta P across the APHs, Exhaust Gas Temperature shall remain within the normal operating range at Auto mode of operation. d. During each quarter, the base line data and normal operating limits of the various parameters should be consistently maintained. e. Findings of Boiler internal inspections in comparison to initial inspection. 9. LIABILITY OF SUPPLIER / MANUFACTURER: Suppliers/Manufacturer shall be liable to bear damage expenses caused to equipment/ machinery/ property, personal injury or severe physical or environmental damage arising out of the non-conformance of the supplied material or due to inappropriate action of the Supplier/Manufacturer site Engineer. Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 5 of 19 Revision No. 0 Issue Date: February, 2012 10. DURATION OF FIELD TRIAL TESTING: Boiler Fuel Additives: Starting from cleaned / washed condition till Annual Inspection / ~10 -12 Months Operation / As decided by the COMPANY. 11. MODE OF OPERATION DURING FTT: During FTT, the Units under operation shall be operated most possible from 75% - Base Load/MCR. 12. RESPONSIBILITIES OF SUPPLIE/MANUFACTURER: 12.1 During FTT, all the services required (Fuel Additive Dosing pumps, Dosage Management) shall be the responsibility of Supplier/Manufacturer. 12.2 All arrangements/expenditures, what so ever, shall be arranged/borne by the Supplier/Manufacturer. 12.3 Samples of Fuel, Fuel Additive, Deposits shall be collected and analyzed by Fuel Additive Supplier/Manufacturer at their cost and Analysis shall be witnessed by SEC, if required. 13. LIABILITY OF SUPPLIER / MANUFACTURER: Suppliers/Manufacturer shall be liable to bear damage expenses caused to equipment/ machinery/ property, personal injury or severe physical or environmental damage arising out of the non-conformance of the supplied material or due to inappropriate action of the Supplier/Manufacturer site Engineer. 14. PROGRESS REPORTS: Product(s) performance report of Field Trial Testing shall be submitted to SEC on Monthly/Quarterly basis prior the submission of invoice for the material consumed during this period. 15. MODE OF PAYMENT OF MATERIAL USED DURING FIELD TRIAL TESTING: Payment of the quantity of (offered/proposed) product(s) to be used during Field Trial Testing shall be made after completion of successful and satisfactory FTT. If any nonconformance is observed by SEC representative on the procedure followed; SEC would withhold the payment unless and until justified proved within a time frame of 10 days on the nonconformance date. 16. TERMINATION OF FIELD TRIAL TESTING: In case the performance of the product and services required during the Field Trial Testing at any stage is/are observed unsatisfactory; SEC reserves the right to terminate the Testing program with/without any prior notice to the party. Payment of material consumed during the quarter in which the Field Trial Testing was terminated shall not be paid by SEC. 17. TECHNICAL ISSUES NOT COVERED IN THIS PROCEDURE: Suppliers are advised to contact SEC in the event of any technical issues which in their opinion may not have been covered with full details in this procedure, before submitting the proposal. 18. SCHEDULE OF FIELD TRIAL TESTING: Schedule of "Field Trial Testing" of various products shall be followed as specified, subject to the availability of Units and SEC policy. Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 6 of 19 Revision No. 0 Issue Date: February, 2012 19. MERIT OF PREQUALIFICATION / FIELD TRIAL TESTING: Request of Suppliers/Manufacturer for the product qualification shall be considered on merit basis from the day of the submittal. In case the "Preliminary Evaluation" report is not satisfactory, Supplier/Manufacturer shall be given opportunity to proceed. the next The Supplier/Manufacturer already prequalified by SEC and offering "Free of Cost" supply of Fuel Additive may be considered on priority basis to meet the urgency. 20. PROCUREMENT OF MATERIAL REQUIRED FOR FIELD TRIAL TESTING: If the preliminary information regarding the product offered for qualification and the results of the samples of the same product are satisfactory, the respective Power Plant shall initiate the process of procurement for the quantity adequate for Field Trial Testing recommended by the Suppliers/Manufacturer. Procurement of recommended quantity of proposed Fuel Additive shall be made on competitive rates basis as per the standard practice of procurement of SEC. In case, the Supplier/Manufacture offers "Free of Cost" supply of their product to be tested, the required quantity shall be supplied to the site as per the procedure of SEC. 21. MODE OF COMMUNICATION: No verbal answer, clarifications or promises from any of the COMPANY employees can be considered eligible during prequalification. Incomplete results or in appropriate format of reporting by the Suppliers/Manufacturer shall not be considered / entertained by SEC. 22. DEVIATION / NON-CONFORMITY: Deviation/non-conformity from the terms and conditions as specified in this Manual at any stage after the product is prequalified, if any, is noticed by SEC then the supplier/manufacturer shall be intimated regarding the failure to fulfill the requirements. In case the supplier fails to rectify the short comings then SEC-WOA reserves the right to: With draw the prequalification declared for that product by SEC. With hold the process of procurements. Cancel the order placed by SEC. 23. DATA COMPARISION AND VALIDATION: As per item-9.2, Supplier/Manufacturer technical experts shall also be responsible to collect all the data as per attached "DATA SHEET" in coordination with respective Power Plant for the Unit running in parallel with other qualified Fuel Additive. 24. FINAL REPORTS: Supplier/Manufacturer shall submit Final FTT report within "One Month" after the completion of the FTT, which includes all the Weekly, Monthly, Quarterly Reports, Analysis of Fuel, Fuel Additive, Deposits etc. and Operational and Chemical Analysis Data, Inspection Reports with Photographs, All correspondence during Field Trial Testing and detailed procedure of recommended dosage regime and safety measures to be followed in future by SEC. Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 7 of 19 Revision No. 0 Issue Date: February, 2012 25. RECOMMENDATION: On the basis of the successful and satisfactory performance of Field Trial Test, the respective Supplier/Manufacturer/Product shall be declared "Qualified" and shall be included in the list of SEC. The Qualified Brand(s) of Boiler Fuel Additive(s) shall be considered during procurement on "Techno-economical" and competitive "Treatment cost" basis. In case of change of Supplier/Manufacturer/Product already qualified by SEC, prior approval and concurrence from SEC shall be obtained by the Supplier/Manufacturer as per the instruction specified in the "Qualification Package". Otherwise their offer during the process of procurement shall not be considered. 26. ATTACHMENTS: I. II. III. IV. V. VI. VII. VIII. IX. Chemical Analysis / Measurements sheet Operation Data Log Sheet. Soot Blower Operating Frequency. Undertaking on Conflict of Interest. Undertaking / Declaration / Agreement. Bid Bond. Heavy Fuel Oil, A-962 Typical Specification Arabian Light Crude Fuel Typical Specification. Fuel Additive Analysis Format for Boiler operating on Heavy Fuel Oil. 27. ACRONYMS: SEC: Saudi Electricity Company FTT: Field Trial Testing HFO: Heavy Fuel Oil LAC: Light Arabian Crude D: Diesel Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 8 of 19 Revision No. 0 Issue Date: February, 2012 CHEMICAL ANALYSIS / MEASUREMENTS SHEET Attachment-I Unit No.: _____ Sheet No.: _______ Analysis / Measurements FUEL ANALYSIS (Quarterly) FUEL ADDITIVE ANALYSIS (Quarterly) ASH (Weekly) ASH (Quarterly) Item All Physical & Chemical Parameters as per Specification Format All Physical & Chemical Parameters as per Specification Formats PH @ 5 minutes PH @ 60 minutes Free Acidity as H2SO4 Unburned Carbon Units Sulfate (as SO4) Particle Size Distribution Ash Fusion Temp. °C Vanadium (V) Magnesium (Mg) Calcium (Ca) Aluminum (Al) Nickel (Ni) Silicon (Si) 1 During Testing 1st Quarter Weeks 2 3 4 5 6 7 8 9 10 --% wt % wt PPM PPM PPM PPM PPM PPM PPM PPM Iron (Fe) Baseline Data Mg / V Ratio Oxygen (O2) (L) Oxygen (O2) (R) Carbon Dioxide (L) FLUE GAS ANALYSIS (Weekly) Carbon Dioxide (R) Carbon Mono Oxide (L) Carbon Mono Oxide (R) NOx SO2 / SO3 Acid Dew Point %V %V %V %V %V %V PPM PPM °C Rate of Acid Build Up QTY. OF ASH PRODUCED SOOT BLOWING Truck / Day Nos. Frequency Per Shift Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 9 of 19 Revision No. 0 Issue Date: February, 2012 11 12 BURNER NOZZLE CLEANING HIGH PRESSURE FILTER CLEANING ∆P AMBIENT AIR TEMPERATURE HEAT RATE Frequency Per Shift Frequency Per Shift Frequency Per Shift Per Shift Frequency Btu/kWh, kJ/kWh Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 10 of 19 Revision No. 0 Issue Date: February, 2012 OPERATION DATA LOG SHEET Date: _____________ ITEM Unit NO. Load Sheet No.: UNITS Limits MHI Tuning Data Baseline Data Attachment-II __________ Remarks No. MW FEED WATER & STEAM: FLOW Steam Flow SH Spray Flow RH Steam Flow RH Spray Flow PRESSURE Eco Inlet Drum Boiler Outlet TEMPERATURE Eco Inlet Eco Out (L) Eco Out (R) DeSH Inlet (L) DeSH Inlet (R) DeSH Outlet (L) DeSH Outlet (R) 3RY SH Out (L) 3RY SH Out (R) RH Inlet (L) RH Inlet (R) RH Outlet (L) RH Outlet (R) FUEL OIL Flow A/B Fuel Flow Burner Pressure Atom Steam Pressure Supply Temperature T/H T/H T/H T/H Kg/cm² Kg/cm² Kg/cm² °C °C °C °C °C °C °C °C °C °C °C °C °C % T/H Kg/cm² Kg/cm² °C AIR Flow Temperature A-FDF Outlet B-FDF Outlet A-AH Inlet B-AH Inlet M3/H °C °C °C °C °C Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 11 of 19 Revision No. 0 Issue Date: February, 2012 A-AH Outlet B-AH Outlet °C °C PRESSURE A-FDF Outlet mm Hg B-FDF Outlet A-AH Inlet B-AH Inlet A-AH Outlet B-AH Outlet A-Wind Box B-Wind Box mm mm mm mm mm mm mm Hg Hg Hg Hg Hg Hg Hg GAS TEMPERATURE A-AH B-AH A-AH B-AH A-GR B-GR inlet Inlet Outlet Outlet Out Out °C °C °C °C °C °C PRESSURE Furnace SH Out RH Out A-AH Inlet B-AH Inlet A-AH Outlet B-AH Outlet A-IDF Outlet B-IDF Outlet A-GR Out B-GR Out mm mm mm mm mm mm mm mm mm mm mm Hg Hg Hg Hg Hg Hg Hg Hg Hg Hg Hg GRF & BURNER TILT GRF Opening Burner Tilt % ° Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 12 of 19 Revision No. 0 Issue Date: February, 2012 SOOT BLOWER OPERATING FREQUENCY Attachment-III SHIFT S.H (Primary) S.H (Secondary) R.H ECO MORNING EVENING NIGHT Note: Soot blowing frequency is applicable as per request of Supplier/manufacturer during Field Trial Testing. Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 13 of 19 Revision No. 0 Issue Date: February, 2012 UNDERTAKING ON CONFLICT OF INTEREST Attachment-IV Having full understanding of all the terms and conditions of the applicable "Qualification Package" and "Procedure of Field Trial Testing" and other related documents, Exhibits, Schedules, Attachments and Specifications, we, __________(Name of Supplier/Manufacturer) _________________________ do hereby undertake to strictly observe, obey and/or comply with the Company’s policy on conflict of interest; more specifically, but not limited to: 1. Not to give, offer or accept and to warrant that we have not given, offered or accepted, directly or indirectly, any money, personal favor or services, credit or anything of value to or from the Company or any of its agents, independent contractors, subcontractors or its employees and staff or officers in order to influence the award of this prequalification process that has been or may be awarded by the Company, or their terms, performance, administration, extension or termination. 2. To avoid situations in which any personal interest could conflict with the interest of Company and to avoid receipt of any material and/or services in whatsoever type and nature from the Company employees including, but not limited to, leasing of land and buildings owned by the Company employees, staff or officers and their dependents, in particular; parents, spouses and children. 3. To inform the Company in writing, should we become aware that any such conflict of interest has arisen. 4. We further undertake to disclose any employment of our family members (parents, spouses and children) with the Company and to also disclose any ownership interest other than a permitted passive investment held by any of the Company’s personnel, staff or officers. 5. We understand and accept that any violation of these provisions shall constitute a substantial breach of this Contract which, without prejudice to the Company's right to enforce any other remedy provided by law, shall empower the Company to terminate this Contract for default unless we remedy the situation to the full satisfaction of the Company. IN WITNESS WHEREOF, we have hereunto signed this undertaking this ____________ day of ____________________ year----------, in _________________, Saudi Arabia. Signature Over Printed Name And Designation Bidder’s Seal Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 14 of 19 Revision No. 0 Issue Date: February, 2012 Undertaking / Declaration / Agreement Attachment-V This undertaking / Declaration is an Agreement between me (Supplier / Manufacturer) and Saudi Electric Company. I acknowledge/declare that: All disputes and differences that may arise between the two parties hereof shall be settled amicably. In the event of failure to settle any dispute amicably the decision of SEC-WOA towards such disputes shall prevail. On completion of the Field Trial Test, a technical report containing all the relevant data, important conclusions and recommendations shall be prepared and submitted to SEC-WOA within one (01) month. SEC reserves the right to suspend or terminate the Field Trial Test at its own discretion with no recourse from the Supplier / Manufacturer. On such ocassion the payment of the material consumed during this quarter shall be paid by SEC if the performance at the time of termination of Field Trial Testing is satisfactory . All expenditures related to Field Trial Testing e.g Staff and representatives, Cost of analysis, Dosage system, Analytical services, Cost of reports, Cost of toxicity certification of the product by a competent Saudi Arabian authority, Delivery and construction of the infrastructure required for conducting Field Trial Testing etc shall be born by the Supplier / Manufacturer. Supplier / Manufacturer shall arrange Technical presentation by them self OR their authorized representative and also submit the agreement and permission of manufacturing / blending the product under the brand name every year (Preferably in the 1st week of Gregorian year) to SEC-WOA from the original manufacturer or licence by the OEM. Supplier / Manufacturer shall provide local technical support and all Fuel Additive / Product management services free of cost when ever their product is used. I have read and understood the contents of SEC applicable "Qualification Package" and "Procedure of Field Trial Testing" and fully agree to abide by all the terms and conditions pertaining to technical, non technical and other aspects contained in the Manual. Supplier Manufacturer Signature: …………………………. Signature: …………………………. Name: ………………………………. Name: ………………………………. Date: ………………………………… Date: ………………………………… Stamp: Stamp: Company Seal: Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Company Seal: Page 15 of 19 Revision No. 0 Issue Date: February, 2012 Warranties / Insurance ATTACHMENT-IV As per the conditions specified in the applicable "Qualification Package" and "Procedure of Field Trial Testing", the Suppliers/Manufacturers/Contractors shall have the liability to bear all the expenses for any damage to equipment/machinery/property, personal injury or severe physical or environmental damage arising out of the non-conformance of the supplied material during Trial Testing or at the time of final inspection of the respective unit. To meet the above clause the supplier shall ensure and submit their acceptance for the below mentioned Clauses-I & II along with the offer to SEC on their "Letter Head" and attested by the Saudi Chamber of Commerce: Clause-I: All matter related to "Warranties" shall be dealt as per "Schedule-A, Clause-18 applicable to Power Plants of SEC Contract Documents ". Clause-II: All matter related to "Insurance" shall be dealt as per "Schedule-A, Clause-21 applicable to Power Plants of SEC Contract Documents ". Note: Evaluation of incidental damages during performance of FTT or noticed at the time of inspection after completion of FTT with the recommended product, SEC assessment regarding damage evaluation shall prevail in case of any conflict. Cost of damage shall be evaluated jointly by Supplier, Manufacturer, Contractor, SEC and cost shall be paid by the Suppliers/Manufacturers/Contractor. During evaluation of the damages noticed while using of any product or at the time of inspection of equipment, the decision of SEC shall supersede for deciding the cost of damage(s), if any. Receipt of insurance document and bid bond shall be recorded as follows: 1. Warrantee No.: ------------------------ Issue Date: ------------------Validity Date:-----------2. Insurance Policy No.:-------------------------- Amount:--------------SR:---------------------Issue Date: ---------------------------- Validity Date:---------------------------------Note: 1. Definitions: Following definitions may be read and considered instead of as in Schedule-A: Company: SEC Contractor: Supplier/Manufacturer. Project: Field Trial Testing (FTT). Material/Equipment: Product under Field Trial Testing. 2. Schedule-A shall be referred for the items not covered in the "Qualification Package" and Field Trial Testing procedure. 3. Warranties / Insurance (Attachment-IV) is applicable for the products having no pertinent references and OEM recommendations. Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 16 of 19 Revision No. 0 Issue Date: February, 2012 Heavy Fuel Oil, A-962 (SAUDI ARAMCO) Typical Specification Sr. No. PARAMETER Attachment-VII UNIT SPECIFICATION Kg/M3 978.6 -- To be Reported 1 Density @ 15 ºC 2 API Gravity @ 60 ºF 3 Ash wt % Max. 0.1 4 Carbon Residue wt % Max. 20.0 5 Explosive Rating Vol. % Max. 50 6 Flash Point Closed ºF (ºC) Min. 150 (65.5) 7 Pour Point ºF (ºC) Max. 75 (24) 8 Thermal Value Gross BTU/Lb (MJ/Kg) Min.18500 (43.0) 9 Sediment by Extraction wt % Max. 0.12 10 Sulfur wt % Max. 3.7 11 Kinematic Viscosity @ 122 ºF (50 ºC) cSt Max. 380 12 Water and Sediment by Centrifuge Vol. % MAX. 0.50 13 Water by Distillation Vol. % Max. 0.50 14 Vanadium as V ppm Max. 200 15 Nickel as Ni PPM Max. 50 16 Sodium as Na ppm Max. 50 17 Aluminum as Al ppm Max. 50 18 Asphaltene wt % Max. 05 19 Stability by Hot Filtration wt % wt % Max. 0.10 Max. 0.10 Existent Accelerated Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 17 of 19 Revision No. 0 Issue Date: February, 2012 ARABIAN LIGHT CRUDE OIL TYPICAL SPECIFICATION Attachment-VIII SPECIFICATION SR. NO. PARAMETER UNIT 1 2 3 4 5 Kinematic Viscosity, 21ºC Kinematic Viscosity, 38ºC Kinematic Viscosity, 54ºC API Gravity Specific Gravity, 15ºC cSt cSt cSt ----- 6 7 8 9 10 11 Specific Gravity, 38ºC Reid Vapor Pressure Net Heating Value High Heating Value Flash Point Carbon --psi 12 13 14 15 16 17 SAUDI ARAMCO (TYPICAL) ---32 - 35 -- UNTREATED TREATED 11.2 7.0 4.8 31.8 0.867 11.2 7.0 4.8 31.8 0.867 0.852 -41 – 42 --<-5 (64-71) 83.5 MJ/Kg -2.0 – 8.5 -- BTU/LB 19000-19600 ºC wt % --- 0.852 -41 – 42 --<-5 (64-71) 83.5 Nitrogen Oxygen Sulphur Hydrogen Sulfide (H2S) Hydrogen Carbon Residue wt % wt % wt % ppm wt % wt % --1.6 – 2.0 0 - 120 -3.5 – 4.0 0.1 1.6 1.90 -12.90 4.46 0.1 1.6 1.90 -12.90 4.46 18 19 20 21 22 23 Nitrogen Water BS&W Salt Filterable Dirt Ash ppm wt % wt % PPTB wt % 700 - 900 -0.0 – 0.1 0-9 -0.001 - 0. 028 0.1 --6.9 0.016 ND --ND 0.016 24 25 26 27 28 29 Vanadium Nickel Sodium and Potassium Calcium Lead Pour Point ppm ppm ppm ppm ppm ºC 3 - 30 2-6 0-3 --(- 20 to +5ºF) 14.0 - 20.0 4-6 15 5.7 1.0 < -15 14.0 - 20.0 4-6 < 1.0 ND 1.0 < -15 30 31 Wax Content Wax Solution Temperature Melting Point of Extracted Wax wt % ºC --- 5.0 46 5.0 46 ºC -- 57 57 32 mg/1000 ml Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 18 of 19 Revision No. 0 Issue Date: February, 2012 FUEL ADDITIVE SPECIFICATION FOR BOILERS OPERATING ON HEAVY FUEL OIL Attachment-IX SR. NO. 1 2 3 4 PARAMETERS UNITS Fuel Additive Brand Name Fuel Additive Type Make / Origin Magnesium Base Compound --------- 5 6 7 8 9 10 Appearance Color Solvent (MSDS) with FTIR Miscibility in Fuel Particulate Matter Density @ 15.5ºC (60ºF) --------% gm/cc 11 12 13 14 15 16 Kinematic Viscosity @ 40ºC Pour Point Flash Point Water by Centrifuge Hydrolytic Stability with Turbiscan Shelf Life cSt ºC ºC % Vol. ----- 17 18 19 20 21 22 FTIR – Curve Particle Size distribution Magnesium (Mg) Chromium (Cr) Silicon (Si) Catalyst(s) --µ % wt % wt %wt %wt 23 24 25 26 27 28 Sodium (Na) + Potassium (K) Calcium (Ca) Vanadium (V) Lead (Pb) + Zinc (Zn) Nickel (Ni) Aluminum (Al) ppm ppm ppm ppm ppm ppm SPECIFICATION Carboxylate Min. 20 - 22 Fe (4 – 5 % for Rabigh Power Plant) Max. Max. Max. Max. Max. Max. Note: The product shall be transparent and stable on dilution with various solvents to be used. Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES For SAUDI ELECTRICITY COMPANY (SEC) Page 19 of 19 Revision No. 0 Issue Date: February, 2012
© Copyright 2026 Paperzz