Procedure of Boiler Fuel Additives Field Trial Testing (As Required)

GENERATION BUSINESS LINE
Annexure-2
PROCEDURE FOR
FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
FOR QUAFICATION OF SUPPLIERS/MANUFACTURERS/PRODUCTS
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 1 of 19
Revision No. 0
Issue Date:
February, 2012
SCOPE AND APPLICATION:
1.
1.1
1.2
1.3
1.4
1.5
2.
To pre-qualify various brands of Boiler Fuel Additives and their
manufacturers/suppliers for application in Boilers of SEC Power Plants burning
Heavy Fuel Oil. Dosing of the most suitable and appropriate Fuel Additive is
intended to protect the Heat Transfer surfaces from the corrosive and fouling
effects of the impurities present in the Heavy Fuel Oil by maintaining the pH of
ashes produced at the Electrostatic Precipitator (EP) outlet to ~ 3.5 at Air
Heater Outlet and Silo without any impact on the other operational parameters
of the Boiler.
To evaluate the performance of Fuel Additive in reducing Stack Emissions and
increasing combustion efficiency.
To determenie the effect of Fuel Additive on High & Low Tempreture Corrosion,
Rate of Fouling, Emissions (SO3, SO2, NOx, Particulate) and Acid Dew Point.
To determine the optimum Dosage Rate.
To investigate any adverse effects of the Fuel Additive on the Boiler
performance, such as efficiency, Fouling of Burners, Boiler tubes and plugging
of the Air Heaters.
METHOD SUMMARY:
 Supply of adequate quantitie(s) of potential Fuel Additive(s).
 Study of the present Fuel forwarding system and Fuel Additive dosing facility for
preparing arrangement drawings for Trial run set up clearly identifying the
equipment / instruments and temporary connections to the existing system.
 To make necessary arrangements including all measuring instruments and
conduct in situ Field Trial Test on the selected Boiler.
 Analysis of Test results and comparison of performance in repect of:
Maintaining the pH of Fly Ash ~ 3.5.
Free Acidity less than 1.0 % wt as H2SO4.
Improvement in Boiler performance by efficient combustion.
Reduction of fouling in the flue gas path components.
Minimization of emission pollutants.
Reduction of particulate emission
3.
COMMENTS:
 Supplier should submit references about their experience giving list of utilities
where their recommended brands of Fuel Additives are being used and Trial Test
carried out by them prior to the selection of the Fuel Additive. This should include
all details such as capacity / type of Boilers, date of commissioning, Fuel
characteristics, benefits accrued etc.
 It is understood that the expenses for Trial runs in connection with pre-qualification
of Fuel Additive e.g instruments, arrangment of test at site, analysis of results etc.
should be totaly borne by the Fuel Additive supplier. The agreed cost of Fuel
Additive shall be paid on quarterly basis if the test conducted yield successful
results during each quarter. However,
if the supplier has got alternative
options/scheme, the same may be submitted for SEC evaluation and consideration.
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 2 of 19
Revision No. 0
Issue Date:
February, 2012
 All tests and associated works shall be carried out by supplier without causing any
damages to the equipment and perssonel of SEC and shall not anyway affect the
normal operation of the plant.
 The intent of whole exercise is only to pre-qualify Fuel Additive type/brand and
their suppliers. It does not any way confer rights on the Fuel Additive supplier for
the award of purchase order which shall be necessarily based on the merits of the
respective offers received.
 The offers complete in all details as elaborated herein shall be submitted in the
concerned office.
4.
TECHNICAL INPUTS:
 Our Boilers are designed to burn Crude Oil or Heavy Fuel Oil. The specificationn of
Arabian Light Crude and Heavy Fuel Oil, A-962 are attached.
 The chemical and physical properties of the Fuel (Heavy Fuel Oil) being used
currently. All the Trial runs should be designed to suit for the requirement of the
Fuel being used.
 The Boilers are equipped with Fuel Additive dosing facilites. However, supplier
shall arrange his own experts for samples analysis and carrying out the tests in a
reliable manner.
 To the extent possible SEC shall provide the available laboratory facility. However,
supplier shall arrange his own experts for samples analysis and carrying out the
tests in a reliable manner.
 The supplier should contact SEC for obtaining any design and operational details
of the Boiler which they feel deem necessary for the selection of the Fuel Additives
for FTT.
5.
PROCEDURE:
 Supplier should identify, techno-economically, from his product range the most
suitable Fuel Additive for achieving the specified objectives.
 The criteria for arriving at optimized Fuel Additive dosage rate, based on the Fuel
constituents such as Vanadium, Sulphur, Sodium, Potassium etc., should be very
clearly given together with procedures of calculation dosing rate and the theory
underlying behind it.
 Trial runs should be designed to suit the Heavy Fuel Oil currently in use.
 All the measuring instruments shall be calibrated for achieving necessary accuracy
of measurements. All details of instruments, procedures of calibration, actual
methods of measurement at site, measurement frequency together with
applicable standards shall also be provided to SEC.
 The duration of FTT are specified on page 7/11 of this Manual.
 It is foreseen that on use of the selected Fuel Additive for the 1 st quarter,
indications regarding its favorable effects get reflected; failing which test shall be
terminated. In case if the Trial runs prove to be successful with the dozing of the
Fuel Additive used in the first attempt, then the tests shall continue with the same
Fuel Additive till annual inspection.
 During Trial Testing, all the critical operating parameters shall be controlled by
Auto Mode of operation.
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 3 of 19
Revision No. 0
Issue Date:
February, 2012
6.
METHODOLOGY:
During the Field Trial Testing, the following parameters shall be monitored by the
Fuel Additive Supplier / Manufacturer as per format attached .
Gas Analysis:
o




O2, CO2 & CO:
By Orsat Analysis / Portable Combustion Analyzer.
NOx:
USEPA Method # 7/ Portable Combustion Analyzer.
SO2, SO3:
USEPA Method # 6/ Portable Combustion Analyzer.
Moisture:
By Gravimetric method by absorbing known volume of the
Gas by anhydrous Calcium Sulphate
 Particulate:
Actual Quantities Measurement by using ISOKINETIC
sampling.
 Opacity:
o
Ash Analysis:
Unburned Carbon
pH @ 5 minutes and 60 minutes.
Weight, bulk density and moisture content
Magnesium (soluble and insoluble), Vanadium
and unburned carbon
Free Acidity (Total Acidity, Mineral Acidity)
o
o
o
Fuel Analysis: Shall be carried out by the Power plant and Fuel Additive supplier /
manufacturer for all the parameters as specified.
Acid Dew Point and Rate of Acid Build Up (RBU) by using Land Instrument.
Boiler Operation Data: (Daily or per shift basis shall be provided by the Power
Plant).
Steam and Fuel Flow Rates
Temperature of Flue Gases at inlet to the Air Heaters
Air Heater ∆P
Boiler Efficiency
Heat Rate
Soot Blowing Frequency
Emission Level
Particulate Emission
o
o
7.
Corrosion Monitoring: Corrosion coupons OR corrosion online analyzers in
two locations (a) Down Stream Air Heaters (b) Up Stream Air Heaters shall be
installed to investigate the effect of Fuel Additive on corrosion reduction.
Oxygen and Excess Air upstream and downstream of APH.
NORMS OF EVALUATION:
The following norms of Boiler Operating parameters shall be used to evaluate the
performance of Fuel Additive on quarterly basis.
a.
SH and RH steam temperature should be within 538  5 °C.
b.
SH spray water to be as per design values for Normal operation at Auto mode.
c.
RH spray water to be Nil.
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 4 of 19
Revision No. 0
Issue Date:
February, 2012
d.
Exhaust Gas temperature at APH outlet is expected to be 150 – 160 °C.
However the temperature of exhaust gas temperature shall be maintained at 10
°C above the Acid Dew Point temperature at stack. This is to protect the Boiler
Cold End surfaces against Acid Dew Point impact.
e.
To confirm the operation parameters as listed above, SEC shall provide 1st
week data as typical reference of the concerned Unit.
f.
Ash pH at APHs outlet and silo shall be ~ 3.5 @ 5 minutes.
g.
Ash pH @ 60 minutes shall also be checked. Its value shall be 0.2 – 1.0 higher
than the pH value @ 5 minutes of the same sample.
h.
Free Mineral and Total Acidity shall be < 1.0 % as H2SO4.
i.
Burner tilt shall be within the Boiler tuning limits.
j.
GRF opening shall be within Boiler tuning limits.
k.
Operation of the Unit under Trial Testing should be on AUTO mode of operation.
l.
Boiler Inspection:
i.
Boiler inspection (Furnace, Steam Generation Tubes, SH, RH, Economizer,
APH, Flue Gas Ducts, etc.) prior to start and after completion the Trial Test
shall be carried out jointly for comparison and to evaluate the performance of
the Fuel Additive.
ii. Photographs shall also be taken on both the occasions.
iii. Deposit samples shall be collected form all critical areas such as Furnace, SH,
RH, Economizer, APHs, Ducts etc.
iv. Deposits samples collected during inspection shall be analyzed by the
supplier/manufacturer at their cost and the results shall be incorporated in
the final report to be submitted to SEC.
8.
EVALUATION:
a. The criteria to be used to evaluate the performance of Fuel Additive shall be
based on the findings determined on quarterly basis.
b. Systematic evaluations of results of various analyses and other findings of each
quarter shall be made and compared with the baseline data as specified herein.
c. All critical parameters i.e. SH and RH spray, GRF opening/closing, Burner Tilt,
Delta P across the APHs, Exhaust Gas Temperature shall remain within the normal
operating range at Auto mode of operation.
d. During each quarter, the base line data and normal operating limits of the various
parameters should be consistently maintained.
e. Findings of Boiler internal inspections in comparison to initial inspection.
9.
LIABILITY OF SUPPLIER / MANUFACTURER:
Suppliers/Manufacturer shall be liable to bear damage expenses caused to
equipment/ machinery/ property, personal injury or severe physical or
environmental damage arising out of the non-conformance of the supplied material
or due to inappropriate action of the Supplier/Manufacturer site Engineer.
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 5 of 19
Revision No. 0
Issue Date:
February, 2012
10.
DURATION OF FIELD TRIAL TESTING:
Boiler Fuel Additives: Starting from cleaned / washed condition till Annual Inspection /
~10 -12 Months Operation / As decided by the COMPANY.
11.
MODE OF OPERATION DURING FTT: During FTT, the Units under operation shall be
operated most possible from 75% - Base Load/MCR.
12.
RESPONSIBILITIES OF SUPPLIE/MANUFACTURER:
12.1 During FTT, all the services required (Fuel Additive Dosing pumps, Dosage
Management) shall be the responsibility of Supplier/Manufacturer.
12.2 All arrangements/expenditures, what so ever, shall be arranged/borne by the
Supplier/Manufacturer.
12.3 Samples of Fuel, Fuel Additive, Deposits shall be collected and analyzed by Fuel
Additive Supplier/Manufacturer at their cost and Analysis shall be witnessed by SEC,
if required.
13.
LIABILITY OF SUPPLIER / MANUFACTURER:
Suppliers/Manufacturer shall be liable to bear damage expenses caused to
equipment/ machinery/ property, personal injury or severe physical or
environmental damage arising out of the non-conformance of the supplied material
or due to inappropriate action of the Supplier/Manufacturer site Engineer.
14.
PROGRESS REPORTS:
Product(s) performance report of Field Trial Testing shall be submitted to SEC on
Monthly/Quarterly basis prior the submission of invoice for the material consumed
during this period.
15.
MODE OF PAYMENT OF MATERIAL USED DURING FIELD TRIAL TESTING:
Payment of the quantity of (offered/proposed) product(s) to be used during Field
Trial Testing shall be made after completion of successful and satisfactory FTT.
If any nonconformance is observed by SEC representative on the procedure
followed; SEC would withhold the payment unless and until justified proved within a
time frame of 10 days on the nonconformance date.
16.
TERMINATION OF FIELD TRIAL TESTING:
In case the performance of the product and services required during the Field Trial
Testing at any stage is/are observed unsatisfactory; SEC reserves the right to
terminate the Testing program with/without any prior notice to the party.
Payment of material consumed during the quarter in which the Field Trial Testing
was terminated shall not be paid by SEC.
17.
TECHNICAL ISSUES NOT COVERED IN THIS PROCEDURE:
Suppliers are advised to contact SEC in the event of any technical issues which in
their opinion may not have been covered with full details in this procedure, before
submitting the proposal.
18.
SCHEDULE OF FIELD TRIAL TESTING:
Schedule of "Field Trial Testing" of various products shall be followed as specified,
subject to the availability of Units and SEC policy.
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 6 of 19
Revision No. 0
Issue Date:
February, 2012
19. MERIT OF PREQUALIFICATION / FIELD TRIAL TESTING:
Request of Suppliers/Manufacturer for the product qualification shall be considered
on merit basis from the day of the submittal.
In case the "Preliminary Evaluation" report is not satisfactory,
Supplier/Manufacturer shall be given opportunity to proceed.
the
next
The Supplier/Manufacturer already prequalified by SEC and offering "Free of Cost"
supply of Fuel Additive may be considered on priority basis to meet the urgency.
20. PROCUREMENT OF MATERIAL REQUIRED FOR FIELD TRIAL TESTING:
If the preliminary information regarding the product offered for qualification and the
results of the samples of the same product are satisfactory, the respective Power
Plant shall initiate the process of procurement for the quantity adequate for Field
Trial Testing recommended by the Suppliers/Manufacturer.
Procurement of recommended quantity of proposed Fuel Additive shall be made on
competitive rates basis as per the standard practice of procurement of SEC.
In case, the Supplier/Manufacture offers "Free of Cost" supply of their product to be tested,
the required quantity shall be supplied to the site as per the procedure of SEC.
21.
MODE OF COMMUNICATION:
No verbal answer, clarifications or promises from any of the COMPANY employees
can be considered eligible during prequalification.
Incomplete
results
or
in
appropriate
format
of
reporting
by
the
Suppliers/Manufacturer shall not be considered / entertained by SEC.
22.
DEVIATION / NON-CONFORMITY:
Deviation/non-conformity from the terms and conditions as specified in this Manual
at any stage after the product is prequalified, if any, is noticed by SEC then the
supplier/manufacturer shall be intimated regarding the failure to fulfill the
requirements. In case the supplier fails to rectify the short comings then SEC-WOA
reserves the right to:
 With draw the prequalification declared for that product by SEC.
 With hold the process of procurements.
 Cancel the order placed by SEC.
23.
DATA COMPARISION AND VALIDATION:
As per item-9.2, Supplier/Manufacturer technical experts shall also be responsible to
collect all the data as per attached "DATA SHEET" in coordination with respective
Power Plant for the Unit running in parallel with other qualified Fuel Additive.
24.
FINAL REPORTS:
Supplier/Manufacturer shall submit Final FTT report within "One Month" after the
completion of the FTT, which includes all the Weekly, Monthly, Quarterly Reports,
Analysis of Fuel, Fuel Additive, Deposits etc. and Operational and Chemical Analysis
Data, Inspection Reports with Photographs, All correspondence during Field Trial
Testing and detailed procedure of recommended dosage regime and safety
measures to be followed in future by SEC.
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 7 of 19
Revision No. 0
Issue Date:
February, 2012
25.
RECOMMENDATION:
On the basis of the successful and satisfactory performance of Field Trial Test, the
respective Supplier/Manufacturer/Product shall be declared "Qualified" and shall be
included in the list of SEC.
The Qualified Brand(s) of Boiler Fuel Additive(s) shall be considered during
procurement on "Techno-economical" and competitive "Treatment cost" basis.
In case of change of Supplier/Manufacturer/Product already qualified by SEC, prior
approval and concurrence from SEC shall be obtained by the Supplier/Manufacturer
as per the instruction specified in the "Qualification Package". Otherwise their offer
during the process of procurement shall not be considered.
26. ATTACHMENTS:
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.
Chemical Analysis / Measurements sheet
Operation Data Log Sheet.
Soot Blower Operating Frequency.
Undertaking on Conflict of Interest.
Undertaking / Declaration / Agreement.
Bid Bond.
Heavy Fuel Oil, A-962 Typical Specification
Arabian Light Crude Fuel Typical Specification.
Fuel Additive Analysis Format for Boiler operating on Heavy Fuel Oil.
27. ACRONYMS:
SEC: Saudi Electricity Company
FTT: Field Trial Testing
HFO: Heavy Fuel Oil
LAC: Light Arabian Crude
D: Diesel
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 8 of 19
Revision No. 0
Issue Date:
February, 2012
CHEMICAL ANALYSIS / MEASUREMENTS SHEET
Attachment-I
Unit No.: _____
Sheet No.: _______
Analysis /
Measurements
FUEL ANALYSIS
(Quarterly)
FUEL
ADDITIVE
ANALYSIS
(Quarterly)
ASH
(Weekly)
ASH
(Quarterly)
Item
All Physical &
Chemical
Parameters as per
Specification Format
All Physical &
Chemical
Parameters as per
Specification
Formats
PH @ 5 minutes
PH @ 60 minutes
Free Acidity as
H2SO4
Unburned Carbon
Units
Sulfate (as SO4)
Particle Size
Distribution
Ash Fusion Temp.
°C
Vanadium (V)
Magnesium (Mg)
Calcium (Ca)
Aluminum (Al)
Nickel (Ni)
Silicon (Si)
1
During Testing 1st Quarter
Weeks
2 3 4
5
6
7
8
9
10
--% wt
% wt
PPM
PPM
PPM
PPM
PPM
PPM
PPM
PPM
Iron (Fe)
Baseline
Data
Mg / V Ratio
Oxygen (O2) (L)
Oxygen (O2) (R)
Carbon Dioxide (L)
FLUE GAS
ANALYSIS
(Weekly)
Carbon Dioxide (R)
Carbon Mono Oxide (L)
Carbon Mono Oxide (R)
NOx
SO2 / SO3
Acid Dew Point
%V
%V
%V
%V
%V
%V
PPM
PPM
°C
Rate of Acid Build Up
QTY. OF ASH
PRODUCED
SOOT
BLOWING
Truck / Day
Nos.
Frequency
Per
Shift
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 9 of 19
Revision No. 0
Issue Date:
February, 2012
11
12
BURNER
NOZZLE
CLEANING
HIGH
PRESSURE
FILTER
CLEANING
∆P
AMBIENT AIR
TEMPERATURE
HEAT RATE
Frequency
Per
Shift
Frequency
Per
Shift
Frequency
Per
Shift
Per
Shift
Frequency
Btu/kWh,
kJ/kWh
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 10 of 19
Revision No. 0
Issue Date:
February, 2012
OPERATION DATA LOG SHEET
Date: _____________
ITEM
Unit NO.
Load
Sheet No.:
UNITS
Limits
MHI
Tuning Data
Baseline
Data
Attachment-II
__________
Remarks
No.
MW
FEED WATER & STEAM:
FLOW
Steam Flow
SH Spray Flow
RH Steam Flow
RH Spray Flow
PRESSURE
Eco Inlet
Drum
Boiler Outlet
TEMPERATURE
Eco Inlet
Eco Out (L)
Eco Out (R)
DeSH Inlet (L)
DeSH Inlet (R)
DeSH Outlet (L)
DeSH Outlet (R)
3RY SH Out (L)
3RY SH Out (R)
RH Inlet (L)
RH Inlet (R)
RH Outlet (L)
RH Outlet (R)
FUEL OIL
Flow A/B
Fuel Flow
Burner Pressure
Atom Steam Pressure
Supply Temperature
T/H
T/H
T/H
T/H
Kg/cm²
Kg/cm²
Kg/cm²
°C
°C
°C
°C
°C
°C
°C
°C
°C
°C
°C
°C
°C
%
T/H
Kg/cm²
Kg/cm²
°C
AIR
Flow
Temperature
A-FDF Outlet
B-FDF Outlet
A-AH Inlet
B-AH Inlet
M3/H
°C
°C
°C
°C
°C
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 11 of 19
Revision No. 0
Issue Date:
February, 2012
A-AH Outlet
B-AH Outlet
°C
°C
PRESSURE
A-FDF Outlet
mm Hg
B-FDF Outlet
A-AH Inlet
B-AH Inlet
A-AH Outlet
B-AH Outlet
A-Wind Box
B-Wind Box
mm
mm
mm
mm
mm
mm
mm
Hg
Hg
Hg
Hg
Hg
Hg
Hg
GAS TEMPERATURE
A-AH
B-AH
A-AH
B-AH
A-GR
B-GR
inlet
Inlet
Outlet
Outlet
Out
Out
°C
°C
°C
°C
°C
°C
PRESSURE
Furnace
SH Out
RH Out
A-AH Inlet
B-AH Inlet
A-AH Outlet
B-AH Outlet
A-IDF Outlet
B-IDF Outlet
A-GR Out
B-GR Out
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
Hg
Hg
Hg
Hg
Hg
Hg
Hg
Hg
Hg
Hg
Hg
GRF & BURNER TILT
GRF Opening
Burner Tilt
%
°
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 12 of 19
Revision No. 0
Issue Date:
February, 2012
SOOT BLOWER OPERATING FREQUENCY
Attachment-III
SHIFT
S.H
(Primary)
S.H
(Secondary)
R.H
ECO
MORNING
EVENING
NIGHT
Note: Soot blowing frequency is applicable as per request of Supplier/manufacturer during
Field Trial Testing.
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 13 of 19
Revision No. 0
Issue Date:
February, 2012
UNDERTAKING ON CONFLICT OF INTEREST
Attachment-IV
Having full understanding of all the terms and conditions of the applicable "Qualification
Package" and "Procedure of Field Trial Testing" and other related documents, Exhibits,
Schedules, Attachments and Specifications, we, __________(Name of Supplier/Manufacturer)
_________________________ do hereby undertake to strictly observe, obey and/or comply
with the Company’s policy on conflict of interest; more specifically, but not limited to:
1. Not to give, offer or accept and to warrant that we have not given, offered or accepted,
directly or indirectly, any money, personal favor or services, credit or anything of value to
or from the Company or any of its agents, independent contractors, subcontractors or its
employees and staff or officers in order to influence the award of this prequalification
process that has been or may be awarded by the Company, or their terms, performance,
administration, extension or termination.
2. To avoid situations in which any personal interest could conflict with the interest of
Company and to avoid receipt of any material and/or services in whatsoever type and
nature from the Company employees including, but not limited to, leasing of land and
buildings owned by the Company employees, staff or officers and their dependents, in
particular; parents, spouses and children.
3. To inform the Company in writing, should we become aware that any such conflict of
interest has arisen.
4. We further undertake to disclose any employment of our family members (parents,
spouses and children) with the Company and to also disclose any ownership interest other
than a permitted passive investment held by any of the Company’s personnel, staff or
officers.
5. We understand and accept that any violation of these provisions shall constitute a
substantial breach of this Contract which, without prejudice to the Company's right to
enforce any other remedy provided by law, shall empower the Company to terminate this
Contract for default unless we remedy the situation to the full satisfaction of the
Company.
IN WITNESS WHEREOF, we have hereunto signed this undertaking this ____________
day of ____________________ year----------, in _________________, Saudi Arabia.
Signature Over Printed Name And Designation
Bidder’s Seal
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 14 of 19
Revision No. 0
Issue Date:
February, 2012
Undertaking / Declaration / Agreement
Attachment-V
This undertaking / Declaration is an Agreement between me (Supplier / Manufacturer) and Saudi
Electric Company. I acknowledge/declare that:

All disputes and differences that may arise between the two parties hereof shall be settled
amicably. In the event of failure to settle any dispute amicably the decision of SEC-WOA
towards such disputes shall prevail.

On completion of the Field Trial Test, a technical report containing all the relevant data,
important conclusions and recommendations shall be prepared and submitted to SEC-WOA
within one (01) month.

SEC reserves the right to suspend or terminate the Field Trial Test at its own discretion with
no recourse from the Supplier / Manufacturer. On such ocassion the payment of the material
consumed during this quarter shall be paid by SEC if the performance at the time of
termination of Field Trial Testing is satisfactory .

All expenditures related to Field Trial Testing e.g Staff and representatives, Cost of analysis,
Dosage system, Analytical services, Cost of reports, Cost of toxicity certification of the product
by a competent Saudi Arabian authority, Delivery and construction of the infrastructure
required for conducting Field Trial Testing etc shall be born by the Supplier / Manufacturer.

Supplier / Manufacturer shall arrange Technical presentation by them self OR their authorized
representative and also submit the agreement and permission of manufacturing / blending the
product under the brand name every year (Preferably in the 1st week of Gregorian year) to
SEC-WOA from the original manufacturer or licence by the OEM.

Supplier / Manufacturer shall provide local technical support and all Fuel Additive / Product
management services free of cost when ever their product is used.
I have read and understood the contents of SEC applicable "Qualification Package" and
"Procedure of Field Trial Testing" and fully agree to abide by all the terms and conditions
pertaining to technical, non technical and other aspects contained in the Manual.
Supplier
Manufacturer
Signature: ………………………….
Signature: ………………………….
Name: ……………………………….
Name: ……………………………….
Date: …………………………………
Date: …………………………………
Stamp:
Stamp:
Company Seal:
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Company Seal:
Page 15 of 19
Revision No. 0
Issue Date:
February, 2012
Warranties / Insurance
ATTACHMENT-IV
As per the conditions specified in the applicable "Qualification Package" and "Procedure of Field
Trial Testing", the Suppliers/Manufacturers/Contractors shall have the liability to bear all the
expenses for any damage to equipment/machinery/property, personal injury or severe physical or
environmental damage arising out of the non-conformance of the supplied material during Trial
Testing or at the time of final inspection of the respective unit.
To meet the above clause the supplier shall ensure and submit their acceptance for the below
mentioned Clauses-I & II along with the offer to SEC on their "Letter Head" and attested by the
Saudi Chamber of Commerce:
Clause-I:
All matter related to "Warranties" shall be dealt as per "Schedule-A, Clause-18
applicable to Power Plants of SEC Contract Documents ".
Clause-II: All matter related to "Insurance" shall be dealt as per "Schedule-A, Clause-21
applicable to Power Plants of SEC Contract Documents ".
Note: Evaluation of incidental damages during performance of FTT or noticed at the time of
inspection after completion of FTT with the recommended product, SEC assessment
regarding damage evaluation shall prevail in case of any conflict.
Cost of damage shall be evaluated jointly by Supplier, Manufacturer, Contractor, SEC and cost
shall be paid by the Suppliers/Manufacturers/Contractor. During evaluation of the damages
noticed while using of any product or at the time of inspection of equipment, the decision of SEC
shall supersede for deciding the cost of damage(s), if any.
Receipt of insurance document and bid bond shall be recorded as follows:
1. Warrantee No.: ------------------------ Issue Date: ------------------Validity Date:-----------2. Insurance Policy No.:-------------------------- Amount:--------------SR:---------------------Issue Date: ---------------------------- Validity Date:---------------------------------Note:
1. Definitions: Following definitions may be read and considered instead of as in Schedule-A:
Company: SEC
Contractor: Supplier/Manufacturer.
Project: Field Trial Testing (FTT).
Material/Equipment: Product under Field Trial Testing.
2. Schedule-A shall be referred for the items not covered in the "Qualification Package" and Field
Trial Testing procedure.
3. Warranties / Insurance (Attachment-IV) is applicable for the products having no pertinent
references and OEM recommendations.
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 16 of 19
Revision No. 0
Issue Date:
February, 2012
Heavy Fuel Oil, A-962 (SAUDI ARAMCO)
Typical Specification
Sr.
No.
PARAMETER
Attachment-VII
UNIT
SPECIFICATION
Kg/M3
978.6
--
To be Reported
1
Density @ 15 ºC
2
API Gravity @ 60 ºF
3
Ash
wt %
Max. 0.1
4
Carbon Residue
wt %
Max. 20.0
5
Explosive Rating
Vol. %
Max. 50
6
Flash Point Closed
ºF (ºC)
Min. 150 (65.5)
7
Pour Point
ºF (ºC)
Max. 75 (24)
8
Thermal Value Gross
BTU/Lb
(MJ/Kg)
Min.18500
(43.0)
9
Sediment by Extraction
wt %
Max. 0.12
10
Sulfur
wt %
Max. 3.7
11
Kinematic Viscosity @ 122 ºF (50 ºC)
cSt
Max. 380
12
Water and Sediment by Centrifuge
Vol. %
MAX. 0.50
13
Water by Distillation
Vol. %
Max. 0.50
14
Vanadium as V
ppm
Max. 200
15
Nickel as Ni
PPM
Max. 50
16
Sodium as Na
ppm
Max. 50
17
Aluminum as Al
ppm
Max. 50
18
Asphaltene
wt %
Max. 05
19
Stability by Hot Filtration
wt %
wt %
Max. 0.10
Max. 0.10
Existent
Accelerated
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 17 of 19
Revision No. 0
Issue Date:
February, 2012
ARABIAN LIGHT CRUDE OIL
TYPICAL SPECIFICATION
Attachment-VIII
SPECIFICATION
SR.
NO.
PARAMETER
UNIT
1
2
3
4
5
Kinematic Viscosity, 21ºC
Kinematic Viscosity, 38ºC
Kinematic Viscosity, 54ºC
API Gravity
Specific Gravity, 15ºC
cSt
cSt
cSt
-----
6
7
8
9
10
11
Specific Gravity, 38ºC
Reid Vapor Pressure
Net Heating Value
High Heating Value
Flash Point
Carbon
--psi
12
13
14
15
16
17
SAUDI
ARAMCO
(TYPICAL)
---32 - 35
--
UNTREATED
TREATED
11.2
7.0
4.8
31.8
0.867
11.2
7.0
4.8
31.8
0.867
0.852
-41 – 42
--<-5 (64-71)
83.5
MJ/Kg
-2.0 – 8.5
--
BTU/LB
19000-19600
ºC
wt %
---
0.852
-41 – 42
--<-5 (64-71)
83.5
Nitrogen
Oxygen
Sulphur
Hydrogen Sulfide (H2S)
Hydrogen
Carbon Residue
wt %
wt %
wt %
ppm
wt %
wt %
--1.6 – 2.0
0 - 120
-3.5 – 4.0
0.1
1.6
1.90
-12.90
4.46
0.1
1.6
1.90
-12.90
4.46
18
19
20
21
22
23
Nitrogen
Water
BS&W
Salt
Filterable Dirt
Ash
ppm
wt %
wt %
PPTB
wt %
700 - 900
-0.0 – 0.1
0-9
-0.001 - 0. 028
0.1
--6.9
0.016
ND
--ND
0.016
24
25
26
27
28
29
Vanadium
Nickel
Sodium and Potassium
Calcium
Lead
Pour Point
ppm
ppm
ppm
ppm
ppm
ºC
3 - 30
2-6
0-3
--(- 20 to +5ºF)
14.0 - 20.0
4-6
15
5.7
1.0
< -15
14.0 - 20.0
4-6
< 1.0
ND
1.0
< -15
30
31
Wax Content
Wax Solution Temperature
Melting Point of Extracted
Wax
wt %
ºC
---
5.0
46
5.0
46
ºC
--
57
57
32
mg/1000 ml
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 18 of 19
Revision No. 0
Issue Date:
February, 2012
FUEL ADDITIVE SPECIFICATION FOR BOILERS
OPERATING ON HEAVY FUEL OIL
Attachment-IX
SR.
NO.
1
2
3
4
PARAMETERS
UNITS
Fuel Additive Brand Name
Fuel Additive Type
Make / Origin
Magnesium Base Compound
---------
5
6
7
8
9
10
Appearance
Color
Solvent (MSDS) with FTIR
Miscibility in Fuel
Particulate Matter
Density @ 15.5ºC (60ºF)
--------%
gm/cc
11
12
13
14
15
16
Kinematic Viscosity @ 40ºC
Pour Point
Flash Point
Water by Centrifuge
Hydrolytic Stability with Turbiscan
Shelf Life
cSt
ºC
ºC
% Vol.
-----
17
18
19
20
21
22
FTIR – Curve
Particle Size distribution
Magnesium (Mg)
Chromium (Cr)
Silicon (Si)
Catalyst(s)
--µ
% wt
% wt
%wt
%wt
23
24
25
26
27
28
Sodium (Na) + Potassium (K)
Calcium (Ca)
Vanadium (V)
Lead (Pb) + Zinc (Zn)
Nickel (Ni)
Aluminum (Al)
ppm
ppm
ppm
ppm
ppm
ppm
SPECIFICATION
Carboxylate
Min. 20 - 22
Fe (4 – 5 % for Rabigh Power Plant)
Max.
Max.
Max.
Max.
Max.
Max.
Note: The product shall be transparent and stable on dilution with various solvents to be used.
Annexure-2: PROCEDURE FOR FIELD TRIAL TESTING OF BOILER FUEL ADDITIVES
For SAUDI ELECTRICITY COMPANY (SEC)
Page 19 of 19
Revision No. 0
Issue Date:
February, 2012