Grand Calumet River/Indiana Harbor Canal Feasibility Study East Chicago Waterway Management District Jim Wescott April 23, 2015 Grand Calumet River & Indiana Harbor Canal • East Chicago Waterway Management District and EPA are funding an investigation and study of the GCR/IHC to develop a remedial design • ECWMD, EPA, and their consultant, Tetra Tech, want stakeholder feedback on remedial options, funding priorities, future end use, and other stakeholder groups not represented here today. GCR/IHC Progress Completed/In Progress • • • • • • • EBGCR USS Steel Section: Hydraulic Dredging WBGCR Reaches 3-5: Mechanical Excavation and Capping WBGCR Reaches 1&2:Hydraulic Dredging, Mechanical Excavation, Capping, and Habitat Restoration EBGCR Reaches 4A&4B: Hydraulic Dredging, Mechanical Excavation, Capping, and Habitat Restoration WBGCR Reaches 6&7:Mechanical Excavation and Capping EBGCR Gary Section: Feasibility Study/Remedial Design WB/EB GCR, Indiana Harbor Canal, and Lake George Canal Remedial Investigation and Feasibility Study Current Project Area – GCR/IHC Grand Calumet River Junction Indiana Harbor Canal Lake George Canal RI/FS Tasks Remedial Investigation • Sediment Sampling • Pore Water Sampling • Source Control Evaluation Feasibility Study • Bathymetric and Topographic Surveys • Geotechnical Sampling • Clean Up Goals Development • Remedial Alternative Screening and Evaluation GCR Surface Sediment Total 16 PAH GCR Subsurface Sediment Total 16 PAH GCR Surface Sediment PCBs GCR Subsurface Sediment PCBs GCR Surface Sediment Metals IHC Surface Sediment Total 16 PAH IHC Subsurface Sediment Total 16 PAH IHC Surface Sediment PCBs IHC Subsurface Sediment PCBs IHC Surface Sediment Metals LGC Surface Sediment Total 16 PAH LGC Subsurface Sediment Total 16 PAH LGC Surface Sediment PCBs LGC Subsurface Sediment PCBs LGC Surface Sediment Metals Remedial Options • No Action • Monitored Natural Recovery • In Situ Capping • Environmental Dredging or Excavation Grand Calumet River Options Sediment 1.Dredge 10 feet of River (Majority of Impacted Sediment) and place 2 feet of sand over remaining sediment. Estimated $43,000,000 2.Dredge 3 feet of West Branch. Place active cap material over West and East Branches. Estimated $16,000,000. 3.Option 2 with targeted dredging in East Branch. Estimated $17,500,000 Habitat 1.Dredge and rebuild/restore Junction Marsh and the USS Lead Marsh. Estimated $13,000,000 2.Invasive Species control and replant both marshes. Estimated $1,000,000 3.Option 2 with partial dredging along river boundary. Estimated $7,500,000 Indiana Harbor Canal Options Sediment 1.Dredge 8 feet of Canal (Majority of Impacted Sediment) and place 2 feet of sand over remaining sediment. Estimated $48,000,000 2.Option 1 with 1 foot sand. Estimated $44,000,000 3.Partial dredging for PCB areas and place 2 feet of sand over remaining sediment. Estimated $15,000,000 4.Option 3 with 1 foot sand. Estimated $11,000,000 Lake George Canal Options Lake George Canal East of Railroad Bridge 1.Dredge area to navigation channel depth (10 feet) Estimated $8,000,000 2.Partial dredge to reduce resuspension (5 feet) Estimated $4,000,000 Lake George Canal between Railroad Bridge and Land Bridge 1.Partial dredge (5 feet) and 2 feet sand cap. Estimated $8,500,000 2.Six (6) foot sand cap. Estimated $4,500,000 Lake George Canal west of Land Bridge 1.Dredge 6 feet and 1 foot sand cap. Estimated $ 18,000,000 2.No Action Selection Considerations • • • • • • • • • Cost Permits Site Access Utilities and other Debris Sediment Characteristics Long Term Effectiveness Potential for Recontamination Future End Use Stakeholder and Community Acceptance Typical Remedial Tasks Time Frame and Costs • Begin Dredging spring 2016 • Complete remedial action 2018-2020 • Cost Ranges from $40 Mil to $145 Mil • Schedule heavily dependent on non-federal and federal funding • Construction could be broken into smaller pieces to facilitate funding and stakeholder priorities • Seeking Project Partners Questions? Jim Wescott Tetra Tech [email protected] 312.201.7781
© Copyright 2026 Paperzz