All TMs are kindly asked to fill in the information asked for in the template and to present the information at the CORESET II 2/2014 workshop. TMLs are to collect the information, provide it to the Project Manager and present at the workshop or agree with a TMa to present. By 8th September, please provide first drafts to the Project Manager. TMLs are welcome to present other information of interest as well at the workshop, noting that each indicator will be given a maxiumum time of 15 minutes. Please, amend/fill-in sections in orange and delete examples. [indicator title] Short introduction to the concept of the indicator and main parameters [indicator title] Stage of development Indicator type Core/pre-core/candidate State/Pressure/Impact Legislative linkage: BSAP Segment and Objective MSFD Descriptors and Criteria Primary importance Natural Distribution and occurrence of plans and animals Viable populations of species 1.3. Population condition (demography, genetic structure) Other relevant legislation: (e.g. WFD) Secondary importance none stated 1.1 Species distribution (range, pattern, covered area) 1.2 Population size (abundance, biomass) 4.1 Productivity of key species or trophic groups (productivity) 4.3 Abundance/distribution of key trophic groups and species [indicator title] Coordinated monitoring Concept/ design Example Fill in for current situation A ) in place B) under development C ) not available, what needs action level? Monitoring strategy (method, frequency, spatial resolution) in relation to relevant indicator parameters Technical guidelines A ) monitoring in A ) in place place B ) needs revision, B ) monitoring needs what needs doing revision C ) not available, C ) monitoring not what needs - action available, what needs level? - action level? Assessment Geographic scale HELCOM assessment units: A ) identified B) Identified not described C) not identified, what needs - action level? Assessment method A ) available and described B ) available not described C ) not available, what needs action level? B - Harbour porpoise B - clarification of when B - elaboration on B - units to be clarified - A needs to be and how counts are counting methods TM developed - TM made -TM needed - TM, BALSAM GES / assessment criteria (currently all GES are provisional) Data arrangements A ) proposed and described B ) proposed but needs Research needs for more supporting data operationalization (in relation to needs C ) not available, what stated under the needs - action level? coordinated monitoring and assessment columns) A ) in place B ) needs revision, what needs doing C ) not available, what needs - action level? B - harbour porpoise GES Harbour porpoise B - data submission to be determined - TM background data, Harbour arrangements to be porpoise data lacking on incoorporated into the abundance and indicator to be discussed, distribution preliminary strategy and schedual agreed among experts - TM, HELCOM (action level = who needs to complete the task) [indicator title] • Present work on GES so far, briefly describe the concept and who has been involved [indicator title] Example • HELCOM Assessment Unit Level: 3 • The indicator is applicable in: all coastal areas around the Baltic Sea • Currently data is available : however only available for coastal areas of the Gulf of Riga [indicator title] List of issues that still need to be solved for the indicator Describe what is hindering solving the issue e.g. Low confidence in the result Funding for data collection and analysis is still unsecure and the amount of data needed for the analysis has not yet been met. [indicator title] • Any and all other information that TMs would like to present in the following slides
© Copyright 2026 Paperzz