Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS nd Bohol 2 District Engineering Office Regional Office VII Ubay, Bohol INVITATION TO BID March 7, 2017 A) Contract ID No. Contract Name : 17HC0036 : Construction and Maint. of Bridges along National Roads-Rehabilitation/Major Repair of Permanent Bridges, Taongon Bridge (B00184BH) along Tagbilaran North Road (Tagbilaran-Getafe Section), Talibon, Bohol Brief Description of Work/Scope of Work A.1.1(8) B.5 B.7 B.9 101(6) 103(1)a 105(1) 302(2) 310(a.3) 311(1)a.3 411(a) 505(5) 506 740(1) 8-1 903(1) 612(1) 612(2) 605(2)q2 1016(2) Location of the Contract Total Approved Budget for the Contract (ABC) Contract Duration Cost of Bidding Documents 1. 2. - Provision of Field Office for the Engineer (Rental Basis) Project Billboard/ Signboard Occupational Safety and Health Program Mobilization/Demobilization Removal of Structures and Obstruction (Grouted riprap) Structure Excavation (Common soil) for concrete shoulder pavement Subgrade preparation (common materials) Bituminous Tack Coat (Emulsified asphalt) Bituminous Concrete surface course (thk= 50mm) Portland cement concrete pavement (plain), 230mm thk. Bridge Paint (Concrete Structures) Grouted riprap, class A Stone Masonry Structural Concrete Injection and Crack Repair Asphaltic Plug Joint Forms and falsework Reflectorized Thermoplastic pavement markings, white Reflectorized Thermoplastic pavement markings, yellow Regulatory Signs (900 mm Circle) R3-16B Built-up and preformed membrane (Waterproofing on Bridge Deck) : Talibon, Bohol : P 5,733,000.00 : 166 Calendar Days : P 10,000.00 The DPWH, Bohol 2nd District Engineering Office, Ubay, Bohol, through the Regular Infra CY 2017, intends to apply the sum stated above being the Approved Budget for the Contract (ABC) to payments under contract for the abovementioned contract projects. Bids received in excess of the ABC shall be automatically rejected at bid opening. nd The DPWH, Bohol 2 District Engineering Office, Ubay, Bohol, now invites bids for the above-mentioned works description. Completion of the Works is required for the above-stated contract duration. Bidders should have completed within ten (10) years from the date of submission and receipt of bids, a contract similar to the Project. The description of an eligible bidder is contained in the Bidding Documents, particulary, in Section II, Instruction to Bidders. Page 1 of 2 3. Bidding will be conducted through open competitive bidding procedures using non-discretionary pass/fail criterion as specified in the Implementing Rules and Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the "Government Procurement Reform Act". Bidding is restricted to Filipino Citizens/sole proprietorships, partnerships or organizations with at least seventy five (75%) interest or oustanding capital stock belonging to citizens of the Philippines. nd 4. Interested bidders may obtain further information from the DPWH, Bohol 2 District Engineering Office, Ubay, Bohol and inspect the Bidding Documents at the address given below from 8:00 A.M. to 5:00 P.M. 5. A complete set of Bidding Documents may be purchased by interested Bidders from the address given below and upon payment of a non-refundable fee for the Bidding Documents in the amount stated above. It may also be downloaded free of charge from the website of the Philippine Government Electronic Procurement System (PhilGEPS) and the website of the Procuring Entity, provided that bidders shall pay the fee for Bidding Documents not later than the submission of their bids. 6. The DPWH Bohol 2 District Engineering Office, Ubay, Bohol will hold a Pre-Bid Conference on March 14, 2017 at 2:00 P.M. at the Conference Room, DPWH Bohol 2nd District Engineering Office, Ubay, Bohol which shall be open only to all interested parties who have purchased the Bidding Documents. nd 7. Contract Profile Eligibility Processing will be on March 27, 2017 at 10:00 A.M. Bids must be delivered to the address below on or before March 27, 2017 at 2:00 P.M. at the DPWH Bohol 2nd District Engineering Office, Ubay, Bohol. All bids must be accompanied by a bid security in any of the acceptable forms and in the amount stated in the ITB Clause 18. Bids will be opened on March 27, 2017 at 2:00 P.M. in the presence of the bidder's representative who choose to attend at the address below. Late bids shall not be accepted. 8. To bid for this contract, a contractor must submit a Net Financial Contracting Capacity (NFCC) at least equal to ABC and the Original Receipt (OR) for payment of bidding documents before dropping of bids. Bidders shall likewise submit their bids through their duly Authorized Liaison Officers as specified in the Contractor's Information (CI). Submission of Letter of Intent (LOI) is no longer required pursuant to Item C.3 of D.O. 64 S. 2012, dated September 17, 2012. 9. The DPWH, Bohol 2nd District Engineering Office, Ubay, Bohol reserves the right to accept or reject any bid, to annul the bidding process, and the reject all bids at any time prior to contract award, without thereby incurring any liability to the affected bidder or bidders. 10. For further information, please refer to: GORGONIA D. BERNIDO Engineer III Chief, Quality Assurance BAC Chairman NONITO A. NAMBATAC Administrative Officer V BAC Vice-Chairman Attention: BAC Secretariat DPWH - Bohol II DEO,Ubay, Bohol Telefax No. (038) 518-8051 Email add: [email protected] NOTED: MARIO M. MONTEJO, DM., MNSA District Engineer Publication: The Manila Times Publishing Corporation March 9 and 11, 2017 Page 2 of 2
© Copyright 2026 Paperzz