DC Injector and Space Charge Simulation Status Colwyn Gulliford, Injector Team [email protected] CBETA Technical Review, 30 January 2017 1/1 Injector Status Injector work to date (Dec 2016): • Installed in CBETA experimental hall • All subsystems tested • Initial beam recommissioning [email protected] CBETA Technical Review, 30 January 2017 2/1 Laser 50 MHz System: • 3 ps pulse length • 10 Watts • ~350 fs rms jitter • 10 µm rms pointing stability • Tunable Duty Factor: 5E-6 – 1 • Longitudinal Shaping [email protected] CBETA Technical Review, 30 January 2017 3/1 Cathodes Cathode Growth Chamber Cathode Characterization [email protected] Cathode Load Lock System Example QE Scan of Offset Cathode for High Current Operation CBETA Technical Review, 30 January 2017 4/1 DC Electron Source Status Work to date: • Moved from Electron Source Development Lab • Installed in final position • Baked • HV Conditioned [email protected] CBETA Technical Review, 30 January 2017 5/1 DC Electron Source Status Work to date: • Moved from Electron Source Development Lab • Installed in final position • Baked • HV Conditioned Completed Sept 2016, Stable Operation at 350 kV [email protected] CBETA Technical Review, 30 January 2017 6/1 DC Electron Source Status Work to date: • Moved from Electron Source Development Lab • Installed in final position • Baked • HV Conditioned Completed Sept 2016, Stable Operation at 350 kV [email protected] CBETA Technical Review, 30 January 2017 7/1 Injector Cryomodule (ICM) Status ICM Work: • Installation June 2016 Cool down to 4K (6/9/2016) System check at 2K (6/15/2016) • ICM is fully tested and ready for RF power (October 2016) • Currently operating at 2K (Jan 2017) Active pumping of Insulation Vacuum Vessel Active pumping of beamline UHV Input coupler N2 purge while ICM is idle (RF off) • Tested with beam up to 1000 kV/cavity (Dec 2016) [email protected] CBETA Technical Review, 30 January 2017 8/1 Beamline Components Beamline Installed (Summer 2016) Diagnostics Calibration [email protected] Dump Temperature Buncher Processed (10/13/2016) CBETA Technical Review, 30 January 2017 9/1 Beam Running Summary of results Target, min. • Cathode: 1% QE, offset • Gun: 350 kV • ICM: 1 MeV / cavity • Laser: 5 W @ 50 MHz • Current: 1 mA Achieved 3% 350 kV 1 MeV - CBETA needs further conditioning 10 W 4 mA Achieved all necessary goals for this phase, ran out of time for push to UPP current [email protected] CBETA Technical Review, 30 January 2017 10/1 Current Activities Currently Main Linac Cryomodule (MLC) is being prepared to move to it’s final location for the MLC beam test (Wed) [email protected] CBETA Technical Review, 30 January 2017 11/1 Current Activities Currently Main Linac Cryomodule (MLC) is being prepared to move to it’s final location for the MLC beam test (Wed) For the injector: • Disassembly of diagnostic/dump sections • New switchyard and merge beam pipe • Building 4 additional magnets • Installation of (B1) merger • Installation of (B2) diagnostic line [email protected] CBETA Technical Review, 30 January 2017 12/1 Current Activities Currently Main Linac Cryomodule (MLC) is being prepared to move to it’s final location for the MLC beam test (Wed) For the injector: • Disassembly of diagnostic/dump sections • New switchyard and merge beam pipe • Building 4 additional magnets • Installation of (B1) merger • Installation of (B2) diagnostic line [email protected] CBETA Technical Review, 30 January 2017 13/1 Space Charge Simulations Optimize with (3D) space charge in GPT to match specified beam sizes and divergence at the end of the first pass of MLC. [email protected] CBETA Technical Review, 30 January 2017 14/1 Space Charge Simulations Parameter Optimization Range 125 pC Example Solution Gun Voltage 400 kV 400 kV Buncher Voltage/Phase (0, 90] kV / - 90 deg 73 kV / -90 deg SRF 1 Voltage/Phase (0, 1800] kV / [-45, 45] deg 870 kV / -6 deg SRF 2 Voltage/Phase (0, 1800] kV / [-45, 45] deg 1722 kV / 3 deg SRF 3 Voltage/Phase (0, 1800] kV / [-45, 45] deg 1493 kV / 13 deg SRF 4 Voltage/Phase (0, 1800] kV / [-45, 45] deg 1052 kV / -26 deg SRF 5 Voltage/Phase (0, 1800] kV / [-45, 45] deg 822 kV / -33 deg Solenoid 1 Current (0, 6] Amps 4 Amps Solenoid 2 Current (0, 6] Amps 2.5 Amps A3 Quad Currents [-10, 10] Amps (0.2, 0.3, 1.2, -3.5) Amps B1 Quad Currents [-10, 10] Amps (4.3, 4.3, -0.9) Amps MLC Cavity Voltages/Phases 6 MV / (-2, 0, 0, 0, 0, 0) deg 6 MV / (-2, 0, 0, 0, 0, 0) deg 125 pC [email protected] CBETA Technical Review, 30 January 2017 15/1 Space Charge Simulations Parameter Optimization Range 25 pC Example Solution Gun Voltage [300, 400] kV 350 kV Buncher Voltage/Phase (0, 90] kV / - 90 deg 49.5 kV / -90 deg SRF 1 Voltage/Phase (0, 1800] kV / [-45, 45] deg 1122 kV / -9 deg SRF 2 Voltage/Phase (0, 1800] kV / [-45, 45] deg 1791 kV / 4 deg SRF 3 Voltage/Phase (0, 1800] kV / [-45, 45] deg 1576 kV / 16 deg SRF 4 Voltage/Phase (0, 1800] kV / [-45, 45] deg 834 kV / -33 deg SRF 5 Voltage/Phase (0, 1800] kV / [-45, 45] deg 426 kV / -15 deg Solenoid 1 Current (0, 6] Amps 3.7 Amps Solenoid 2 Current (0, 6] Amps 2.4 Amps A3 Quad Currents [-10, 10] Amps (0.1, 0.4, 1.5, -3.6) Amps B1 Quad Currents [-10, 10] Amps (4.9, 3.1, -0.7) Amps MLC Cavity Voltages/Phases 6 MV / (-2, 0, 0, 0, 0, 0) Deg 6 MV / (-2, 0, 0, 0, 0, 0) deg 25 pC [email protected] CBETA Technical Review, 30 January 2017 16/1 Summary • Optimized Space Charge simulations performed • Have KPP ready injector settings from simulations • Injector rebuilt/recommissioned • Reached KPP current, energy slightly lower than design • Preparing for MLC beam tests [email protected] CBETA Technical Review, 30 January 2017 17/1
© Copyright 2026 Paperzz