SPP.org 1 Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Presentation Overview • SERTP/RPSG: Southeast Regional Transmission Planning / Regional Planning Stakeholder Group • • SIRPP: Southeast Inter-Regional Participation Process • • www.southeasternrtp.com www.southeastirpp.com JCSP: Joint Coordinated System Plan SPP.org 3 SERTP / RPSG Meetings • 3/24/2008 • • 6/25/2008 • • Preliminary 10-Year Expansion Plans of SE Region Transmission Owners 9/23/2008 • • Formation of RPSG and Selection of Sensitivity Studies for 2008 Preliminary Results November Transmission Summit • Final Study Results SPP.org 4 RPSG Sensitivity Studies Mobile 1000 MW Atlanta Entergy 2000 MW GITS Alabama 1000 MW Florida Entergy 1000 MW Alabama GITS 1000 MW Santee Cooper SCEG SPP.org 5 Southeastern Region Reliability Planning Inter-Regional Issues Identified Inter-Regional Simultaneous Assessment of System Plans Coordinated Planning Through Reliability Coordination Agreements Generation Resources Regional Assess. & Trans Exp Plans Stakeholder Input Load Forecast External Models Stakeholder Stakeholder Input Input SPP.org 6 SIRPP Activity • April 3, 2008- Stakeholders Organizational Meeting • June 10, 2008 Meeting • • Stakeholder Group was formed • Economic Studies selected • Coordinate on study assumptions October, 2008 Conference Call • • January, 2009 • • Review preliminary study results Review final study results and draft report February, 2009- Final report issued SPP.org 7 SIRPP Step 1 Economic Studies for 2008 Entergy 2000 MW GITS PJM+MISO 2000 MW Southern Southern 3000 MW PJM PJM (classic) 3000 MW Southern 5000 MW Southern (JCSP) SPP SPP.org 8 Joint Coordinated System Plan • Scope of Work • Perform Eastern Interconnect wide study 1. Reliability Study – 2018 model 2. Economic Analysis – 2024 model • Incorporate DOE Eastern Wind Integration & Transmission Study objectives • Future Scenarios 1. Reference (today’s reference values) 2. 20% Wind (by 2024) SPP.org 9 Joint Coordinated System Plan • Timeline • Initial Meeting – November 1, 2007 • Economic Analysis – March 1, 2008 • HV Transmission Overlay Development– December, 2008 • Reliability Assessment – August 2009 • Cost Allocation Analysis – October, 2009 SPP.org 10 Joint Coordinated System Plan • Current Status • Preliminary transmission plans for each future have been completed • Beginning to test transmission plans for robustness • Testing and consolidation of transmission plans to be completed by December, 2008 SPP.org 11 Questions / Comments spp.issuetrak.com Quick Pick: ICT Planning – Base Plan Steve Purdy Lead Engineer, ICT Planning 501-614-3371 [email protected] Doug Bowman Lead Engineer, ICT Planning 501-688-1640 [email protected]
© Copyright 2026 Paperzz