DENVER REGIONAL COUNCIL OF GOVERNMENTS We make life better! 2016-2021 Transportation Improvement Program (As Adopted April 15, 2015 ) 2016-2021 TRANSPORTATION IMPROVEMENT PROGRAM April 15, 2015 Denver Regional Council of Governments 1290 Broadway, Suite 700 Denver, Colorado 80203 Preparation of this report has been financed in part through grants from the U.S. Department of Transportation, Federal Transit Administration and Federal Highway Administration ABSTRACT TITLE: 2016-2021 Transportation Improvement Program AUTHOR: Denver Regional Council of Governments SUBJECT: Six-year multimodal transportation program DATE: Adopted $SULO, 2015 TIP AMENDMENTS: This document describes the 2016-2021 Transportation Improvement Program as adopted on $SULO, 2015. SOURCE OF COPIES: Public Information and Communications DRCOG 1290 Broadway Suite 700 Denver, Colorado 80203 (303) 455-1000 NUMBER OF PAGES: ̀ 21 ABSTRACT: The Transportation Improvement Program identifies all federally funded surface transportation projects anticipated for funding in the Denver metropolitan area during fiscal years 2016-2021. This multimodal program includes highway, high-occupancy vehicle, transit, travel demand management, and non-motorized facilities and services. ii TABLE OF CONTENTS Introduction ................................................................................................................... 1 Regional Needs ....................................................................................................... 2 Federal Requirements ............................................................................................. 4 Investment Decision Process .................................................................................. 6 The 2016-2021 Program ................................................................................................. 13 Project Descriptions ...................................................................................................... 19 APPENDIX A TIP Project Funding Summary ............................................................ 137 APPENDIX B Major Projects in the 2012-2017 Transportation Improvement Program Not Yet Completed ............................................................. 189 Rollover List ....................................................................................... 189 APPENDIX C Lookup List of Projects ................................................................... . 193 APPENDIX D Regionally Significant Projects Not Supported by Federal Funds .. 209 APPENDIX E Waiting List ........................................................................................... 215 APPENDIX F Governor’s Approval ........................................................................... 219 iii LIST OF TABLES Table 1. Estimated 2012-2017 Revenues for DRCOG TIP Region ................................... 5 Table 2. 2016-2021 Transportation Improvement Program Project List ........................... 15 Table 3. Regionally Significant Projects Included in the 2016-2021 TIP .......................... 18 Table 4. Eligible Projects for Waiting List(s) for the 2016-2021 TIP .............................. 198 (To be completed at a later date) LIST OF EXHIBITS Exhibit 1 Project Descriptions ........................................................................................ 19 LIST OF FIGURES Figure 1 Geographic Area of the Transportation Improvement Program..........................1 Figure 2 RTP and TIP Relationship ..................................................................................3 Figure 3 Denver Region Transportation Investment Decision Process ............................8 Figure 4 2016-2021 Transportation Improvement Program Project Locations ............... 14 iv Introduction This Transportation Improvement Program (TIP) identifies federally-funded surface transportation projects to be implemented in the Denver region from fiscal years 2016 through 2021. The Denver Regional Council of Governments (DRCOG), the region’s Metropolitan Planning Organization (MPO), is responsible for the preparation of the TIP in cooperation with local governments, the Colorado Department of Transportation (CDOT), and the Regional Transportation District (RTD). The geographic area covered by the TIP includes all or portions of Adams, Arapahoe, Boulder, Broomfield, Denver, Jefferson, Douglas, and Weld counties as shown in Figure 1. Figure 1 Geographic Area of the Transportation Improvement Program 1 Projects are selected through a cooperative process, considering submittals from local governments, CDOT, and RTD. A further description of how TIP projects are selected is presented later, in the Investment Decision Process section. Regional policy 1 provides the basis for the evaluation and ranking of DRCOG-selected projects. The 2016-2021 TIP was approved by the DRCOG Board of Directors on $SULO. The TIP is intended to fulfill the following purposes: To serve as a short-range implementation tool to address the goals of the regional long-range transportation plan. To provide continuity of current transportation improvement projects with those identified in previous TIPs. To identify transportation projects recommended for implementation by transportation mode, type of improvement, funding source(s), and geographic area. To estimate the costs of projects proposed for federal funding. The project allocations are to be consistent with the federal funds reasonably anticipated to be available for such projects in the area. To establish a prioritization of projects to effectively utilize federal funds as they become available. To identify and implement transportation improvements which will maintain the system; improve safety; improve air quality and reduce greenhouse gas emissions; reduce vehicle miles traveled (VMT) and congestion; and enhance the transportation system. Regional Needs Transportation projects support the currently-adopted Metro Vision 2035 Plan (Metro Vision), the regional vision to address future growth. Metro Vision defines a balanced multimodal transportation system that provides mobility and accessibility for people and goods, and contains three key goals for 2035: Reduce the percent of trips made to work by single occupant vehicle to 65% Reduce the regional per capita VMT by 10% Reduce annual per capita greenhouse gas emissions from the transportation sector by 60% 1 Policy on Transportation Improvement Program Preparation, Adopted July 16, 2014 by the Denver Regional Council of Governments Board of Directors. 2 This TIP is also based on the policy direction received to date for the Metro Vision 2040 Plan and the 2040 Metro Vision Regional Transportation Plan (2040 MVRTP) which will be adopted in mid-2015. It is consistent with the Fiscally Constrained 2040 Regional Transportation Plan (RTP) and identifies the regionally significant projects in the RTP scheduled to receive federal surface transportation revenues over the next six years. Figure 2 graphically shows the relationship between the Metro Vision Regional Transportation Plan (MVRTP), the Fiscally Constrained RTP, and the Transportation Improvement Program. Transportation projects in the 2016-2021 TIP support all the elements of Metro Vision, and address other transportation issues including congestion management, safety, multimodal transportation options, regional sustainability, and asset management. Figure 2 RTP and TIP Relationship 3 Federal Requirements Conformity Finding The impact of transportation on the Denver region’s air quality is a component of DRCOG’s regional planning efforts. Under Section 176(c) of the Clean Air Act, as amended in 1990, MPOs are required to show conformity of its TIP with the State Implementation Plan (SIP) for air quality before it can be adopted. The 2016-2021 TIP is consistent with air quality conformity requirements by assuring all regionally significant capacity projects are contained within the applicable stage of the adopted 2040 RTP. The following technical documents which present the conformity findings can be found on DRCOG’s website: DRCOG CO and PM-10 February 2015 Conformity Determination Denver Southern Subarea 8-Hour Ozone February 2015 Conformity Determination Financial Constraint The 2016-2021 TIP is financially constrained and demonstrates, as summarized in Table 1, that projects listed from 2016 to 2019 can be implemented using anticipated revenues (i.e., projects are within committed or reasonably expected funding levels). Most of the funds for the last two years of the TIP (2020-2021) remain unprogrammed for specific projects. The funds will be fully programmed in the next TIP. Appendix A expands this table by presenting funding information by individual project. It shows TIP projects by funding category over the six years of the TIP (collectively for 2020-2021). Prior (before 2016), future (after 2021), and total funding is also displayed in most instances. The totals for each funding source are shown for comparison with available resources. Additional information on the projects is available later in this section, which includes project descriptions. As these funds are programmed by the respective agencies, DRCOG is responsible for assuring the projects meet Metro Vision objectives, are consistent with the RTP, and that the program is fiscally constrained. The DRCOG Board of Directors then adopts the TIP document and the projects are implemented. 4 Table 1 FY2016-2019 Programmed Funding for DRCOG TIP Region (dollars in thousands) Funding Sources 2016 CDOT Programmatic Categories (2) Bridge Off-System Bridge On-System Federal Emergency FASTER Bridge Enterprise FASTER Safety Intelligent Transportation Systems RAMP Safety Surface Treatment Regional Priority Program (RPP) Transportation Alternatives Program (TAP) Sub-Totals DRCOG Federal Allocation Categories (1) (2) STP-Metro Transportation Alternatives Program (TAP) Congestion Mitigation/Air Quality (CMAQ) Sub-Totals Federal and Local Transit Categories (2) Section 5307 Urban Formula Section 5309 New Start Section 5337 State of Good Repair Section 5339 Capital Improvements Innovative Transit Workforce Development Program RTD Funds Only Sub-Totals Additional Match (i.e., local) Grand Total Programmed TIP Programmed 2017 2018 0 14,802 37,603 19,080 36,880 0 64,772 21,098 69,580 19,135 2,366 285,316 0 19,220 11,161 756,324 13,770 9,494 40,875 12,913 67,380 25,351 2,032 958,520 624 9,472 2,444 17,000 19,869 7,400 40,000 5,413 54,180 25,893 0 182,295 36,347 2,282 29,626 68,255 28,789 1,949 26,502 57,240 29,909 2,814 33,252 65,975 56,221 257,000 11,000 5,209 487 446,287 776,204 56,793 192,706 11,000 5,261 0 286,507 552,267 57,372 71,892 11,000 5,314 0 76,308 221,886 39,660 41,133 39,888 1,169,435 1,609,160 510,044 Notes: 1) Based on CDOT OFMB 2040 Revenue Forecast and Resource Allocation (August 2014). Includes rollover funds from previous TIP. 2) Excludes matching funds 5 2019 Total 2016-2019 0 624 0 43,494 0 51,208 54,773 847,177 20,149 90,668 0 16,894 0 145,647 413 39,837 55,400 246,540 13,425 83,804 0 4,398 144,160 1,570,291 36,162 3,359 36,038 75,559 131,207 10,404 125,418 267,029 57,956 228,342 1,141 522,739 11,000 44,000 5,367 21,151 0 487 1,315 810,417 76,779 1,627,136 62,000 182,681 358,498 3,647,137 Project Management The implementation status of major projects funded in the previous 2012-2017 TIP, but not yet completed, is presented in Appendix B. It shows major projects (total cost greater than $5 million) anticipated in the 2012-2017 TIP to be completed by 2015, for which funds have been obligated but construction is not yet substantially complete (in other words, the project is still under construction). It also lists major projects from the 2012-2017 TIP that have been substantially delayed, such that major elements have been moved into the 2016-2021 TIP horizon. Appendix B also lists all projects from previous TIPs that were originally scheduled to be obligated in fiscal year 2015 or earlier, but did not meet that timeline. While these projects were not obligated, CDOT will reserve past obligation authority for them. The other projects from the 2012-2017 TIP not listed have been implemented or are currently being implemented. Public Involvement Public involvement is a continuous process for DRCOG. The TIP project selection considers the concerns of affected citizens at both local and regional levels. Citizen involvement is most significant at the local level as projects are developed for submittal to DRCOG for regional review. Local governments and agencies such as CDOT and RTD, work directly with citizens in the development of transportation projects. In shaping public involvement programs, local governments often consider the size of their community, level of public awareness about transportation issues, and involvement of community based organizations. Setting realistic goals and ensuring accountability between local officials and community organizations promotes successful public involvement activities. Public notice of public involvement activities and time established for public review and comment on the TIP will satisfy the Program of Projects requirements of the FTA Section 5307 Program for RTD’s Program of Projects. A public hearing was conducted on TIP project selection at the DRCOG Board meeting on March 18, 2015. Members of the public had the opportunity to testify verbally at the hearing or in writing during the preceding 30-day comment period. Investment Decision Process Investment decisions for selecting transportation projects to be funded are made by 6 DRCOG, CDOT, RTD, and local agencies through the MPO planning process. Figure 3 illustrates the process that results in a TIP. Decisions begin by identifying federal, state, and local revenue sources available in specific funding categories. DRCOG, RTD, and CDOT follow their own specific project selection procedures and federal guidelines for selecting projects to be included in the regional TIP. The Federal Highway Trust Fund and General Revenue funds are appropriated by Congress and distributed to either the Federal Highway Administration (FHWA) or the Federal Transit Administration (FTA). By law, Colorado Highway Users Tax fund revenues flow annually to CDOT and local governments. State general fund revenues have been forecast to flow to CDOT per the triggers of SB 09-228. The CDOT Transportation Commission combines state and federal revenue sources into different investment categories. CDOT submits selected projects to DRCOG for inclusion in the TIP in several program areas such as: Strategic Projects, Regional Priority Program, Congestion Relief Program, Bridge, Responsible Acceleration of Maintenance and Partnerships (RAMP), Transportation Alternatives Program (TAP), Funding Advancements for Surface Transportation and Economic Recovery Act of 2009 (FASTER), and Safety. Surface Treatment is listed in the TIP as a pool. SB09-108 (FASTER) created the Colorado Bridge Enterprise and the High Performance Transportation Enterprise. Projects from those enterprises are listed under appropriate CDOT program areas. Most FTA funds are allocated to the Regional Transportation District (RTD) through formula grants and discretionary new starts, new bus, and fixed guideway categories. Other sources of RTD funds are sales and use taxes, fare box collection, and miscellaneous revenues. The RTD Board of Directors, through the adoption of the annual six-year Strategic Business Plan, sets priorities for RTD capital improvements. RTD submits the selected projects to DRCOG for inclusion in the TIP. DRCOG selects projects through its MPO committee process for Transportation Alternatives Program (TAP), Surface Transportation Program-Metro (STP-Metro), and Congestion Mitigation/Air Quality (CMAQ) federal funding categories. DRCOG also lists in the TIP local government-funded projects that require a federal approval. DRCOG only allocates a maximum of four years of funding for projects it selects. 7 Figure 3 Denver Region Transportation Investment Decision Process 8 DRCOG TIP Selection Process In selecting projects, DRCOG committees follow eligibility and evaluation criteria defined in the Policy on Transportation Improvement Program Preparation, originally adopted by the Board of Directors on July 16, 2014 (Preparation Policy). The Preparation Policy is amended as needed. It is available here. In August 2014, DRCOG issued a call for projects for the 2016-2021 TIP. Application instructions and details were available through the DRCOG website, and DRCOG staff provided data and assistance to local governments. Project sponsors submitted applications to DRCOG in September 2014. Projects for which DRCOG has selection responsibility (CMAQ, STP-Metro, and TAP) were reviewed for eligibility, scored, and then ranked based on the Preparation Policy. DRCOG selected TIP projects in two phases. In the first phase, new projects were selected directly from ranked lists of projects by score. A maximum of 75 percent of available funding was allocated to projects based on funding targets set for each project type category. In the second phase, the DRCOG Board approved a policy to place additional emphasis during deliberations on projects from Very Small Communities 2 and in “under-equity” counties as defined by the County Funding Equity Status and Ratio criterion. Other criteria considered included TIP Score, Multi-jurisdictional projects, Projects Not Eligible in First Phase, Number of Projects Selected in First Phase, First-Last Mile Connection. Projects selected in second phase were funded with the remaining amount. The following is a description of the allocation of funding types as part of the DRCOG project selection process: STP-Metro The available STP-Metro federal funding for the DRCOG area is estimated to be $131.2 million for both previous and new TIP commitments, as well as new projects in 20162019. This amount includes $10 million of funding carried over from FY 2015. While $17.5 million of the STP-Metro was allocated to previous commitments and setasides, the remaining $113.7 million in STP-Metro funds were directed to new projects in six project types: roadway reconstruction, roadway operational improvements, roadway capacity, transportation-related studies, transit (operational and passenger facilities), and bicycle/pedestrian. Twenty-five “new” projects were selected for the 2016-2021 TIP: 2 Very Small Communities is defined as communities with less than $10 million in annual net sales tax value (based on the most recent data from the CO Dept. of Revenue). 9 5 roadway capacity 2 roadway operational improvements 4 roadway reconstruction 9 transportation studies 4 bicycle/pedestrian 1 transit passenger facility Congestion Mitigation/Air Quality (CMAQ) The available CMAQ federal funding for the DRCOG area is estimated to be about $125.4 million for TIP commitments and new projects in 2016-2019. This amount includes $8.8 million of funding carried over from FY 2015. $48.4 million was allocated to previous commitments and set-asides. The remaining $77 million in CMAQ funds were directed to new projects in four project types: Transit, Bicycle/Pedestrian, Roadway Operational, and air quality. Seventeen “new” projects were selected for the 2016-2021 TIP: 1 air quality 8 bus service projects 5 bicycle/pedestrian 1 roadway reconstruction (to be used on eligible portions of the project only) 2 roadway operational improvements Transportation Alternatives Program (TAP) The available TAP federal funding sub-allocated to the DRCOG area is estimated to be about $10.4 million for new projects in 2016-2019. DRCOG used its allocation to select eight new bicycle/pedestrian projects in the 2016-2021 TIP. Potential Additional Funds Additional STP-Metro, CMAQ, or TAP funds may become available to DRCOG for programming in fiscal years 2016 through 2019, for example through project close-outs or year-end funding reconciliations. In that event, funding for projects identified in the TIP will be advanced, with the concurrence of the sponsor. The project evaluation score for new 2016-2021 projects will be used as the priority basis for advancing project funding. If additional funds still remain, “new” projects may be selected from among those on 10 waiting lists. The waiting lists will be prepared following adoption of the TIP. CDOT TIP Selection Process CDOT has primary responsibility for selecting projects that use federal National Highway System, Bridge, Interstate Maintenance, Safety, TAP (that are not MPO allocated), Transit Small Urban and Rural, and Elderly/Disabled funding. CDOT also has primary responsibility for selecting projects to be funded through the Colorado Transportation Commission’s “Regional Priority Programs”, “Congestion Relief Program”, and “FASTER Programs”, which include state funds and some of Colorado’s share of federal surface transportation funds. The Transportation Commission also selects projects in the Strategic Projects Implementation Program and the Bridge Enterprise Board selects projects using FASTER bridge funds. CDOT held county meetings per their Project Priority Programming Process to receive comments and suggestions, prior to selecting projects. For projects that are not regionally significant from an air quality modeling perspective, CDOT has adopted a philosophy for the Statewide TIP of displaying such funds in pools. For small pools such as Hot Spots, Safety Enhancements, and Traffic Signals, CDOT will not identify the specific projects to use those pool funds. For pools allocated entirely to CDOT (such as bridge on-system, FASTER safety, and surface treatment), the 2016-2021 TIP simply lists the projects CDOT intends to fund, at such a time as those decisions are made. For pools such as hazard elimination or bridge off-system, where sponsors may be entities other than CDOT, the 2016-2021 TIP will identify specific projects at such a time as the decisions are made. RTD TIP Selection Process In November 2004, voters in the RTD service area endorsed a multi-billion dollar transit implementation program called FasTracks by approving a 4/10 cent sales tax increase. The current FasTracks financial plan approved in 2014 assumes a variety of funding sources beyond the regional sales tax, including federal funds (new starts, earmarks, and CMAQ/STP-Metro funds) and local contributions. While federal law does not mandate that RTD include non-federally-funded projects “in” the TIP (such projects are required to be included in the air quality conformity finding), RTD is including the FasTracks corridor projects in the 2016-2021 TIP, as with previous TIP’s, recognizing that the eventual mix of corridor implementation funds may ultimately include some federal funding. RTD has primary responsibility for selecting projects in the Transit Formula and Discretionary Grants (Fixed Guideway, New Bus, and New Starts) federal funding categories. RTD ensures that all projects are in one of its two Strategic Business Plans 11 (SBP) and have fiscal support. The SBPs are six-year overviews of the operating and capital improvement programs for RTD. One is specific to FasTracks, the other to the non-FasTracks RTD services. They are updated and published annually and are fiscally constrained. RTD includes projects in the SBP by considering current and future service needs and the capital improvements required to sustain those needs, and the revenue resources available. The SBPs are developed with input from RTD departments and local governments. In the final stage of adoption, the SBPs are approved by the RTD Board in an open meeting process. Besides the FasTracks projects, the TIP reflects other SBP projects using federal funds. To identify the projects to be included in the TIP, RTD considers both SBP project priority and estimates of historical federal funding levels. Except for FasTracks, RTD does not submit for inclusion in the TIP other construction or operational projects, that are funded solely with regionally-derived revenues. As such, the reader is encouraged to contact RTD directly for a copy of its SBP in order to gain a complete picture of public transit expenditures. Interagency Coordination While the three agencies’ selection processes are independent, the three agencies take appropriate steps to ensure coordination: • • RTD and DRCOG actively participated in CDOT’s county hearings. RTD’s SBP development is a public process. • DRCOG’s Preparation Policy is reviewed by MPO committees (on which RTD and CDOT serve) before adoption by the DRCOG Board. • DRCOG, RTD, and CDOT staffs discuss the potential relationships (synergies or conflicts) between their respective projects. • The entire DRCOG selection process is transparent, with briefings at MPO committees on progress and tentative decisions. • RTD and CDOT are represented on the DRCOG Board as non-voting members and provide comment and advice to the Board. 12 The 2016-2021 Program The remaining pages of this document are dedicated to providing a detailed synopsis of the projects proposed for implementation within the DRCOG area during the timeframe of this TIP. In order to aid the reader, 2016-2021 TIP projects are presented in following formats: 2016-2021 TIP Projects Map (Figure 4) – Presents the geographic location of programmed projects by project type 2016-2021 TIP Project List (Table 2) - A simple look-up table sorted by project name to compliment the projects map and descriptions Regionally Significant Projects Included in the 2016-2021 TIP (Table 3) – Includes roadway and rapid transit projects recognized in the air quality conformity determination documents. All projects are part of the conformity network and are in the applicable staging periods of the 2040 Fiscally Constrained RTP. 2016-2021 TIP Project Descriptions – Provides details of each transportation project proposed for implementation within the DRCOG area during this TIP timeframe. The descriptions are in order by TIP project number. The upper portion of each description sheet includes the project title, TIP and State TIP identification numbers, sponsor, project type, project scope, and location map, as appropriate. The title is a brief descriptor of the project location. For DRCOG-selected projects, the scope identifies all elements for which points were awarded, and what the project must do at a minimum. The center of each project description page indicates the anticipated opening date, affected counties and municipalities, and funding sources. The total project funding is the sum of funds previously programmed before fiscal 2016, funds shown for fiscal 2016 through 2021 in this TIP and projected future funding (allocated or unallocated) beyond that shown in this TIP. The most likely federal funding source for each project is identified. The bottom of the sheet displays the amendment history for projects initiated in previous TIPs. Appendix C contains projects sorted by county, city and project type. 13 Figure 4: 2016-2021 TIP Projects } I Â K 2016-053 ú M ú M 2016-015 O ¤ O ¤ ` ! WELD 2012-051 IBOULDER } O ¤ 2016-050 2016-010 2008-081 í M 2016-011 í M 2016-030 2016-026 Â K 2016-052 2016-048 § I 2016-054 2016-008 Í M 2016-007 O Ì Í M 2016-035 O ¤ 2016-045 2016-054 } I 2016-029 r ^ 2016-033 b ! Í M 2016-055! ` 2016-034 q ^ ADAMS BROOMFIELD 2016-013 2016-014 Â K O ¼ O ¼ 2008-114 p M § I 2012-079 é M Â K Ê M ÿ M e M 2012-063 } I O ¹ b ! r M 2016-037 a ! 2016-047 d % 2007-050 2007-055 a ! 2016-003 2016-020 2008-111 2007-053 2016-028 2016-012 2016-023 2016-022 2016-018 2016-009 1999-052 2016-062 2012-062 ò M a ! s I 2012-080 2016-039 ` ! 2016-025 ¢ I 2016-032 2016-006 2016-061 s I 2016-060 r M ó Q DENVER 2016-019 k M 2007-158 2016-021 2016-017 2007-044 ` ! Ï M ² I O ¹ 2016-040 k M O Ò a M ² I ARAPAHOE c % 2016-038 2016-059 Þ M 2016-005 Þ M 2016-024 2016-049 ÷ Q 2016-016 Ê M Û M Ï M M̀ 2016-044 a ! ¢ I 2016-046 § I k M 2007-058 q ^ 2016-031 2016-042 JEFFERSON 2016-043 2016-036 2007-059 DOUGLAS ` ! h M 2001-154 § I LEGEND O x 2016-027 2016-041 j M Project Type Bike/Ped Studies Transit Roadway Bike/Ped This data is intended for informational purposes only. DRCOG provides this information on an "as is" basis and makes no guarantee, representation or warranty, either express or implied, that the data will be error free. DRCOG further makes no guarantees, representations or warranties, either express or implied, as to the completeness, accuracy or correctness of the data, or as to merchantability or fitness of the data for a particular use or purpose. DRCOG is not responsible to any user for any costs, expenses, liabilities or damages arising from inconsistencies in its data or from any use of the information. Projection: State Plane Colorado Central, NAD 83 (feet) ± Studies Transit 0 2 Miles 4 Initials of map creator & date map made location of map. Example: Kennedy\CRS\GIS\Basemaps\Website_Maps\ MapGallery_Maps\2010_census_urbanized_area Table 2. 2016-2021 Transportation Improvement Program Project List TIPID 2016-028 2016-018 2016-035 2016-030 2016-002 2016-012 2016-046 2016-054 2016-008 2016-026 2016-014 2016-059 2016-031 2016-019 2012-010 2016-029 2016-048 2007-053 2008-111 2007-056 2007-055 2007-050 2007-044 2007-059 2007-058 2016-011 2016-041 2016-040 2016-038 2016-044 2016-021 2012-063 2016-055 2007-158 2016-003 2016-060 2012-062 2016-024 2016-047 2016-049 2016-022 2016-053 2016-027 2016-005 2016-009 2016-006 2008-081 2012-079 2012-080 Project Name 16th St Mall Reconstruction: Arapahoe St to Lawrence St 23rd Ave. Bike/Ped Path at Fitzsimons Station 30th St and Colorado Ave Bike/Ped Underpass 71st St Multimodal Pathway Connection: Winchester to Idylwild Trail Air Quality Improvements Pool Anschutz Medical Campus Shuttle Arapahoe Rd: I-25 to Parker Rd Next Steps Operations Study Boulder County Bus-then-Bike Shelters Boulder Slough Multiuse Path: 30th St to 3100 Pearl Broadway Reconstruction: Violet Ave to US-36 Broomfield Call-n-Ride C-470 Managed Toll Express Lanes: Kipling to I-25 C-470 Multi-use Trail: Grade Separation at Yosemite St Colfax 15L Transit Improvements: I-225 to I-25 DRCOG Second Commitment to FasTracks Pool East Lafayette Multimodal Path Connection: Commerce Ct to Lafayette Park-n-Ride Erie Pkwy Study: SH-287 to I-25 FasTracks Central Corridor: 30th Ave & Downing St to 38th Ave & Blake St FasTracks Eagle P-3 Corridors (Gold and East Line) FasTracks I-225 LRT Corridor: Parker Rd to East Corridor Commuter Rail FasTracks North Metro: Denver Union Station to 72nd Ave FasTracks Northwest Rail Corridor FasTracks Projects: DRCOG First Commitment Pool FasTracks Southeast Corridor Extension: Lincoln Ave to RidgeGate Pkwy FasTracks Southwest Corridor Extension: Mineral Station to C-470 FLEX Route Extension: Boulder to Longmont Founders Pkwy and Allen Way Intersection Improvements Gun Club Rd and Quincy Ave Operational Improvements High Line Canal Trail Underpass Hwy 79 and Hwy 36 Grade Separation: FA and Design Study I-25 & Broadway Interchange Reconstruction I-25 North PEL Action Items I-25: 120th Ave to E-470 Managed Lanes I-25: Santa Fe Dr to Alameda Ave Interchange Improvements (Valley Hwy Phases I and II) I-70 East Reconstruction I-70/Genesee Bike Path I-70/Kipling: NEPA Study Iliff Ave Operational Improvements: Parker Rd to Quebec St Industrial Area Transportation Study: I-25 to I-270 to 40th Ave/Smith Rd Jeffco Bike Wayfinding Study Martin Luther King Jr. Blvd Extension: Havana St to Peoria St Mead School to School Trail Project Meadows Pkwy Reconstruction: US-85 to Meadows Blvd Metro Center Station Area Bike/Ped Connector Facility MetroRide Service Expansion: DUS to Civic Center Multi-use path on the D10: Wadsworth Blvd to Zephyr St and Kipling St to Oak St North I-25: Front Range EIS North Metro Rail 112th Ave Corridor Improvements North Metro Rail 72nd Ave and Colorado Blvd Station Sidewalks 15 2016-058 2016-036 2016-023 2016-025 2007-078 2008-103 2008-076 2007-073 2007-074 2016-056 2012-112 2012-115 2016-057 2007-096 2007-075 2012-116 2008-028 2007-133 2008-077 2008-106 2007-094 2007-092 2012-109 2007-095 2007-091 2016-051 2012-064 1999-097 2016-004 2016-043 2016-039 2012-108 2007-169 2016-010 1997-084 2012-068 2016-015 2016-050 2012-051 2016-045 2016-062 2016-061 1999-052 2007-089 2016-013 2016-033 2016-034 2016-016 2016-007 2016-042 2008-114 2016-032 Ozone State Implementation Plan (SIP) Modeling Study Parker Rd Sidewalk Connection: Plaza Dr to Sulphur Gulch Trail Quebec St Operational Improvements: 13th Ave to 26th Ave Ralston Rd Reconstruction: Yukon St to Upham St Region 1 Bridge On-System Pool Region 1 FASTER Bridge Enterprise Pool Region 1 FASTER Pool Region 1 Hazard Elimination Pool Region 1 Hot Spot Pool Region 1 ITS Pool Region 1 RAMP Project Pool Region 1 Rockfall Mitigation Region 1 RPP Pool Region 1 Surface Treatment Pool Region 1 Traffic Signals Pool Region 4 2013 Flood-Related Projects Pool Region 4 Bridge Off-System Pool Region 4 Bridge On-System Pool Region 4 FASTER Pool Region 4 FASTER Transit Pool Region 4 Hazard Elimination Pool Region 4 Hot Spot Pool Region 4 RAMP Project Pool Region 4 Surface Treatment Pool Region 4 Traffic Signals Pool Regional BRT Feasibility Study Regional TDM Program: Way to Go Regional Transportation Demand Management (TDM) Program Pool Regional Transportation Operations Pool RidgeGate Pkwy Widening: Havana St to Lone Tree City Limits Route 73 Extension: Smith Rd Station to 60th Ave and Dahlia St RTD Capital Improvements: Bus and Facilities Funding RTD Enhancements - ADA/Ped/Bus Shelter RTD L Route Service Enhancement RTD Preventive Maintenance: Transit Vehicle Overhaul and Maintenance RTD Regional Workforce Initiative Now (WIN) RTD Route #324 Frequency Improvements SH 119 BRT NEPA Analysis: Boulder to Longmont SH-119: South of Hover Bike/Ped Underpass SH-7 BRT Study: Boulder to Brighton Sheridan Blvd Sidewalks: Colfax Ave to 17th Sheridan Blvd Sidewalks: W. 6th Ave to W. 10th Ave State of Good Repair Station Area Master Plan/Urban Center Studies Pool Superior Call-n-Ride Superior Trail: McCaslin BRT Station to Coal Creek Superior Trail: McCaslin BRT to Davidson Mesa Underpass Toll Gate Creek Trail: Chambers Rd to Montview Blvd University of Colorado Boulder East Campus Pedestrian Bridge & Trail Connection US 85: Highlands Ranch Pkwy to Blakeland Dr Capacity Improvements US-36: Boulder to I-25 Managed Lanes/BRT US-6 Shared-Use Path: Colfax Ave to Johnson Rd 16 2001-154 2016-020 2016-037 2016-017 2016-052 US-85: Cook Ranch Rd to Meadows Pkwy Widening Wadsworth Blvd Widening: 35th Ave to 48th Ave Washington Ave Complete Streets Westerly Creek Trail to Toll Gate Creek Trail Connector Williams Fork Trail Multi-use Path: 63rd St to Twin Lakes Rd 17 Table 3. Regionally Significant Projects Included in the 2016-2021 TIP 2001-154 US-85: Cook Ranch Rd to Meadows Pkwy Widening 2007-050 Northwest Rail: Denver Union Station to Westminster; rail, stations, parking 2007-053 Central Corridor; 30 Ave & Downing St to 38 Ave and Blake St; rail, stations 2007-055 North Metro: Denver Union Station to 72 2007-056 I-225 Corridor: Parker Rd to East Corridor Commuter Rail; rail, stations, parking 2007-058 Southwest Corridor Extension: Mineral Station to C-470; rail, stations, parking 2007-059 Southeast Corridor Extension: Lincoln Ave to Ridgegate Pkwy; rail, stations, parking 2007-158 I-25: Santa Fe Dr to Alameda Ave Interchange Improvements 2008-111 Eagle P-3 FasTracks Corridors (Gold and East Line) 2008-114 US-36: Boulder to I-25 Managed Lanes/BRT 2016-003 I-70 East Reconstruction 2016-020 Wadsworth Blvd Widening: 35 Ave to 48 Ave 2016-021 I-25 & Broadway Interchange Reconstruction 2016-022 Martin Luther King Jr. Blvd Extension: Havana St to Peoria St 2016-042 US85: Highlands Ranch Pkwy to Blakeland Dr Capacity Improvements 2016-043 RidgeGate Pkwy Widening: Havana St to Lone Tree City Limits 2016-055 I-25: 120 Ave to E-470 Managed Lanes 2016-059 C-470 Managed Toll Express Lanes: Kipling to I-25 th th nd th Ave; rail, stations parking th th 18 Project Descriptions 19 20 2016-2021 Transportation Improvement Program (Approved TIP) Title: RTD Preventive Maintenance: Transit Vehicle Overhaul and Maintenance TIP-ID: 1997-084 STIP-ID: N/A Project Type: Transit Vehicles Open to Public: Sponsor: R T D Project Scope Ongoing program: Overhaul and maintenance for transit vehicles. A portion of these 5307 funds will be applied to capital cost of contracting. RTD has privatized service on fixed-routes and private carriers provide capital maintenance in addition to fixed-route bus service. In addition to routine capital maintenance, RTD will apply 5307 capital maintenance funds to bus fuel cost and utility cost for LRT vehicles as a result of the Federal Transit Administration expanded definition of allowable cost. Affected County(ies) Regional Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $55,691 $56,248 $56,810 $57,378 $114,756 State $0 $0 $0 $0 $0 Local $11,195 $11,250 $11,365 $11,475 $22,955 $66,886 $67,498 $68,175 $68,853 $137,711 Federal (5307) $0 Total Total Funding $0 $409,123 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 05/16/2013 Amended Add $3,140,000 in FY2013, $140,000 in FY2014, and $140,000 in FY2015 of federal Section 5307 funds and $28,000 in FY2013, $28,000 in FY2014, and $28,000 in FY2015 of local match to correct a previous mistake. Increase total project funds. 07/17/2012 Amended Update project scope to include “In addition to routine capital maintenance, RTD will apply 5307 capital maintenance funds to bus fuel cost and utility cost for LRT vehicles as a result of the Federal Transit Administration expanded definition of allowable cost.” Total project funding remains unchanged. 03/13/2012 Amended Reallocate $5,000,000 of federal Section 5307 funding from FY2013 to FY2012 and add $2,500,000 of local funding in FY2012. Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/22/2007 Amended Add the following to Federal funds; $2,388,000 to FY 2007, $1,457,000 to FY 2008, and $651,000 to FY 2009. Add local match funds in the amounts of $597,000 to FY 2007, $364,000 to FY 2008, and $163,000 to FY 2009. Total project costs increase by $5,620,000 ($4,496,000 in Section 5307 funds and $1,124,000 in local funds). 06/14/2006 Approved Adopted into the 2007-2012 TIP 03/17/2004 Approved Adopted into the 2005-2010 TIP 05/15/2002 Approved Adopted into the 2003-2008 TIP 03/21/2001 Amended Decrease in local funding to reflect actual apportionment 11/15/2000 Approved Adopted into the 2001-2006 TIP 21 2016-2021 Transportation Improvement Program (Approved TIP) Title: State of Good Repair Project Type: Transit Operational Improvements TIP-ID: 1999-052 STIP-ID: SDR3440 Open to Public: Sponsor: R T D Project Scope Funds will be used for upgrades and maintenance of the 16th St Mall from Broadway to Market St. Funds will also be used for RTD's transfer facilities at each end of the 16th St Mall, and other fixed guideway assets. Funds will also go toward on-going maintenance of rail guideways, and preventative maintenance of the Fixed Guideway Rail and assets, including maintenance of the LRT Rolling stock and LRT maintenance support. Includes funds for State of Good Repair funding and high-intensity motor bus. Affected Municipality(ies) Affected County(ies) Denver Denver Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $11,000 $11,000 $11,000 $11,000 $22,000 State $0 $0 $0 $0 $0 Local $2,500 $2,500 $2,500 $2,500 $5,000 $13,500 $13,500 $13,500 $13,500 $27,000 Federal (5337) $0 Total Total Funding $0 $81,000 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 05/16/2013 Amended Change project title from "RTD Fixed Guideway Improvements, Upgrades, and Maintenance" to "State of Good Repair." Update project scope, adding "Includes funds for State of Good Repair funding and high-intensity motor bus." Change all funding from Section 5309 Fixed Guideway to Section 5337 State of Good Repair. Total project funding remains unchanged. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 02/17/2010 Amended Increase Section 5309 Fixed Guideway funds by $10,314,000 and adjust the fiscal years as follows; increase FY 2010 by $8,589,000, FY 2011 by $3,295,000, and decrease FYs 2012-2013 by $1,570,000. Increase local funds by $4,878,000 and adjust the fiscal years as follows; increase FY 2010 by $2,147,000, FY 2011 by $824,000 and FYs 2012-2013 by $1,907,000. Increase total project funding. 12/07/2009 Amended Transfer federal 5309 Fixed Guideway funds in the amounts of $4,935,000 from FY 2008 and $5,453,000 from FY 2009, to FY 2010, and local funds in the amounts of $1,234,000 in FY 2008 and $1,363,000 in FY 2009, to FY 2010. Total funding remains unchanged. 06/23/2009 Amended Add the following language to the existing scope; "preventative maintenance of the Fixed Guideway Rail and assets, including maintenance of the LRT Rolling stock and LRT maintenance support." No changes to funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/14/2006 Approved Adopted into the 2007-2012 TIP 03/17/2004 Approved Adopted into the 2005-2010 TIP 01/08/2004 Amended Specify the following in the scope: constructing central corridor passing trackage and upgrades to fiber optic system, power distribution system, public address message system, and ticket vending machine software. 07/25/2003 Amended Reduce FTA 5309 Guideway funds by $32k and local by $8k in FY03. Change the first part of the project name from "16th Street Mall" to "RTD Fixed Guideway" 05/15/2002 Approved Adopted into the 2003-2008 TIP 03/21/2001 Amended Fund reduction to reflect actual apportionment 11/15/2000 Approved Adopted into the 2001-2006 TIP 22 2016-2021 Transportation Improvement Program (Approved TIP) Title: Regional Transportation Demand Management (TDM) Program Pool TIP-ID: 1999-097 STIP-ID: Project Type: Congestion Management Open to Public: Sponsor: DRCOG Project Scope The Regional TDM Program funds projects that promote alternative transportation mode use, with the intent to reduce mobile source emissions. This pool includes funds for seven TMA regional partnerships and other TDM projects selected through a call for projects. Affected County(ies) Regional Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $3,200 $0 $3,200 $0 $0 State $0 $0 $0 $0 $0 Local $800 $0 $800 $0 $0 $4,000 $0 $4,000 $0 $0 Federal (CMAQ) $0 Total Total Funding $0 $8,000 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 02/19/2014 Amended Remove pool project Downtown Denver Partnership: Let's Go LODO for $145,000 of Federal CMAQ funds in FY2014 and add Community Cycles: Bus-Bike Shelters/BikeStation: Promotion and Services [Boulder] for $80,000 of Federal CMAQ in FY2014. 12/11/2013 Amended Transfer $450,000 of federal STP Metro funds in FY2014 to TIPID #2007-044 and receive $450,000 of federal CAMQ funds in FY2014 from TIPID #2007-044. Total project funding remains unchanged. 09/20/2013 Amended Add $337,000 of federal CMAQ funds and $84,000 of local match in FY2014. Add 11 new pool projects in FY2014 and increase funding to the six Regional TDM Program projects by $160,000 each and add one new Regional TDM Program for $80,000 in FY2015. Increase total project funding. 10/04/2012 Amended Reallocate $1,203,000 of federal CMAQ funds, $225,000 of federal STP Metro funds, and $357,000 of local match from FY2015 to FY2014. Total project funding remains unchanged. 10/18/2011 Amended Reallocate $225,000 in federal STP-Metro funds, $1,203,000 in federal CMAQ funds and $357,000 in local match from FY2013 to FY2012. Total project funding remains unchanged. 10/13/2011 Amended Add the following new projects for FY2012-13: •eGo CarShare- SHIFT Your Mode, Shift Your Mood ($218,566) •Boulder East- Community Investment Program ($150,000) •RTD- Marketing of RTD Region-Wide FlexPass Program ($194,076) •Groundwork Denver- NW Denver Community-based Social Marketing VMT Reduction Program ($145,710) •South I-25 Urban Corridor TMA- Million Mile Challenge ($138,349) •Transportation Solutions- Parker/Leetsdale Corridor Campaign ($64,000) •36 Commuting Solutions- US-36 Transit Incentive Program ($119,218) •Boulder County- Nederland Monthly Pass Program ($108,799) •Community Cycles- Employee Bike Ambassadors ($50,000) •RAQC (Wadsworth Corridor)- Every Trip Counts ($226,082) •Boulder County- Diagonal Highway Vehicle Trip Reduction Program ($51,200) •Stapleton TMA- Building an Active Stapleton ($50,000) •Bike Denver- Denver Special Event Bike Parking ($50,000) •B-cycle (Denver)- Denver B-cycle Winter Warriors Campaign and Marketing ($50,000) •NATA (Thornton)- NATA Transportation Management Organization Start Up ($156,000) Correct previous pool project funding levels to reflect federal only, instead of federal and local match. Total project funding remains unchanged. 06/20/2011 Amended Add the following pool projects: 36 Commuting Solutions Regional TDM Program (FY12-13) ($193,000), Boulder East Community Regional TDM Program (FY12-13) ($193,000), Downtown Denver Partnership Regional TDM Program (FY12-13) ($193,000), Southeast Business Partnership Regional TDM Program (FY12-13) ($193,000), Stapleton Area TMA Regional TDM Program (FY12-13) ($193,000), Transportation Solutions Regional TDM Program (FY12-13) ($193,000), Unallocated FY2012-2013 ($2,257,000), and Unallocated FY2014-2015 ($3,570,000). Total pool funding remains unchanged. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 07/23/2009 Amended Add the following projects and corresponding amounts to the pool; eGo Carshare for $195,000, Groundwork Denver for $160,000, Transportation Solutions for $144,000, Boulder East: E-Marketing Campaign for $180,000, 36 Commuting Solutions: Commute Optimization Program for $154,000, RAQC-Pilot TDM for $200,000, Go Boulder Drive Less for $105,000, South I-25 Pledge Against Pollution Program for $50,000, I-70 Coalition Rec. Trip Planner for $68,000, Boulder County Final Mile for $115,000, DDP-Bicycle Parking Improvements for $61,000, and Transit Alliance: 10 Toes Express for $153,000. Modify two existing projects; delete Skicarpool.com and reduce Stapleton TMA by $135,000 to $15,000. Reduce federal CMAQ funds by $700,000 and local funds by $175,000 in both FY's 2010 and 2011 and transfer to FY 2009. Total funding remains unchanged. 23 Date Status Description 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/08/2007 Amended Add 14 new projects to the pool. 06/14/2006 Approved Adopted into the 2007-2012 TIP 03/17/2004 Approved Adopted into the 2005-2010 TIP 12/17/2002 Amended $300K in CM/AQ funding advanced into FY03 with reductions of $107K in FY04 and $193K in FY05; zero net change in federal funding. Local match amounts redistributed to be 20% of total by year. 05/15/2002 Approved Adopted into the 2003-2008 TIP 11/15/2000 Approved Adopted into the 2001-2006 TIP 24 2016-2021 Transportation Improvement Program (Approved TIP) Title: US-85: Cook Ranch Rd to Meadows Pkwy Widening TIP-ID: 2001-154 STIP-ID: SDR5055 Project Type: Roadway Capacity Open to Public: 2020 Sponsor: CDOT Region 1 Project Scope Design and construct capacity improvements determined by the I-25 / US-85 Corridor EIS Record of Decision (see also TIP-ID 1999-002 in the 2001-2006 TIP). Widen from Cook Ranch Rd to Meadows Pkwy from 2 to 4 lanes. Affected Municipality(ies) Affected County(ies) Castle Rock Douglas Littleton Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State (R P P) $0 $6,500 $8,900 $3,500 $0 Local $0 $0 $0 $0 $0 $0 $6,500 $8,900 $3,500 $0 $65,298 Total $37,300 Total Funding $121,498 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 01/17/2012 Amended Reallocate $4,000,000 of state RPP funds from FY2013 to FY2012. Add $1,000,000 of state Regional Priority Projects (RPP) funding in FY2012. Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 12/22/2010 Amended Add $700,000 of state Regional Priority Project (RPP) funds to FY 2011. Increase total project funding. 05/19/2010 Amended Add $350,000 of state Regional Priority Project (RPP) funds in FY 2010. Increase total project funding. 04/06/2009 Amended Add $451,000 of Section 1117 Transportation, Community and System Preservation (TCSP) funds to FY 2009. Increase total project funding. 03/23/2009 Amended Add $5,400,000 of ARRA (ES9-CDOT) funds, $1,800,000 of Regional Priority Project (RPP) funds, and $1,750,000 of state Surface Treatment Funds to FY 2009 04/21/2008 Amended Add $358,000 of HB-1310 Regional Priority Projects (RPP) funds in FY 2008. Increase total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 11/29/2007 Amended Add $8,000,000 of HB-1310 Regional Priority Projects (RPP) funds to FY 2008 and reduce future funding by $8,000,000. Total funding remains unchanged. 12/19/2006 Approved Decrease prior funds by $7,225,000 and FY2008 RPP by $6,250,000. Add $5,000,000 in FY2007 RPP (Source HB 1310). Total project cost to remain the same. 06/14/2006 Approved Adopted into the 2007-2012 TIP 05/24/2006 Amended Add $194,000 of federal earmark to the $661,000 that was already TIPed. Increase total cost. 03/27/2006 Amended Add $9,625,000 of Regional Priority Program funds (source: $2,400,000 in HB-1310 funds and $7,225,000 in State General Fund dollars) in FY 2006 and delete $500,000 in RPP funds in FY 2007, and $9,125,000 in future. Total project cost remains the same. 04/26/2005 Amended Add $661,000 of federal discretionary funds in FY05. Increase total project cost. 12/21/2004 Amended Add $2,800,000 of Regional Priority Projects funds (source: HB 1310) in FY05. Add $1,300,000 of local match in FY05. Increase total project funding. 10/18/2004 Amended Decrease FY05 Regional Priority Projects funds by $1,275,000 as a result of bid savings. Decrease total funding. 03/17/2004 Approved Adopted into the 2005-2010 TIP 06/04/2002 Amended Transferred $1.983M from Titan Rd (TIPID # 99-002) project to this project due to a TCSP grant for the Titan Rd project. 03/14/2002 Amended Reduce planned funding in FY03 from $8M to 1M. Project will continue with design and delay construction. 11/06/2001 Amended Borrowed $7.2 million from Intermountain TRP to be paid back in FY04. 03/21/2001 Amended Deferment of $3.0M required in order to transfer to Titan Road 11/15/2000 Approved Adopted into the 2001-2006 TIP 25 2016-2021 Transportation Improvement Program (Approved TIP) Title: FasTracks Projects: DRCOG First Commitment Pool TIP-ID: 2007-044 STIP-ID: ST6803 Project Type: Transit Operational Improvements Open to Public: 2017 Sponsor: R T D Project Scope Funding allocated to RTD by DRCOG Board to be used on FasTracks-related projects. 2016-2021 TIP projects provide funding for the following FasTracks projects: • Southeast Corridor (FY2016 & FY2017) • North Metro Corridor (FY2016) 2012-2017 TIP projects provided funding for the following FasTracks projects: • Gold Line - Pecos Station (FY2012) • East/I-225 Corridors- Smith/Peoria Station (FY2012) • Northwest Corridor- 41st and Fox Station (FY2012 & FY2014) • Commuter Rail Vehicles (FY2014) Affected County(ies) Regional Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (CMAQ) $4,000 $0 $0 $0 $0 Federal (STP-M) $4,000 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $2,000 $0 $0 $0 $0 $10,000 $0 $0 $0 $0 $65,000 Total Total Funding $0 $75,000 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 07/15/2014 Amended Update project scope to include 'North Metro Corridor (FY2016)' and 'Southeast Corridor (FY2016 & FY2017).' Total project funding remains unchanged. 04/10/2014 Amended Update the project scope to replace 'Gold Line - 41st and Fox Station (FY2012)' with 'Gold Line - Pecos Station (FY2012).' 02/19/2014 Amended Update the project scope to replace 'Gold Line - Ward Road Station (FY2012)' and 'Denver Union Station - (FY2014)' with 'Gold Line - 41st and Fox Station (FY2012)' and 'Commuter Rail Vehicles - (2014).' 01/07/2014 Amended Move $450,000 of Federal CMAQ funds from FY2015 to FY2014. Move $450,000 of Federal STP-M funds from FY2014 to FY2015. Total project funding remains unchanged. 12/11/2013 Amended Transfer $450,000 of federal CMAQ funds in FY2014 to TIPID #1999-097 and receive $450,000 of federal STP Metro funds in FY2014 from TIPID #1997-097. Total project funding remains unchanged. 05/16/2013 Amended Update project scope to change the use of East Corridor funds in FY2009 and switch the FY2014 use of North Metro federal funds to Denver Union Station, replacing the North Metro corridor’s First Commitment Funds with local RTD. Total project funding remains unchanged. 08/16/2012 Amended Update project scope to read “Project will provide funding for the following FasTracks projects: • Gold Line –Ward Road Station (FY2012) • East/I-225 Corridors- Smith/Peoria Station (FY2012) • Northwest Corridor- 41st and Fox Station (FY2012 & FY2014) • North Metro Corridor- TBD (FY2014)” Total project funding remains unchanged. 12/05/2011 Amended Reallocate $6,000,000 of federal CMAQ funds and $1,500,000 of local match from FY2013 to FY2012. Total project funding remains unchanged. 10/13/2011 Amended Update scope to read:‘2012 funds for the Gold Line will be used for construction of the 41st Ave Station (2011 funds from previous TIP were also used for Gold Line). Remaining 2012 funds and 2013 funds will for the I-225 Corridor's Iliff Station.’Total project funding remains unchanged. 09/15/2011 Amended Update scope to read:‘2012 funds for the Gold Line will be used for construction of the Ward Road Station (2011 funds from previous TIP were also used for Gold Line). Remaining 2012 funds and 2013 funds will for the I-225 Corridor's Iliff Station.’Total project funding remains unchanged. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 12/22/2010 Amended Add specific location (Table Mesa) for one pedestrian crossing. Total funding remains unchanged. 12/07/2009 Amended Adding language to the scope indicating the specific use and expenditure timeframe of CMAQ funds to satisfy federal requirements. Total funding remains unchanged. 03/19/2008 Approved Adopted into the 2008-2013 TIP 03/19/2008 Approved Adopted into the 2008-2013 TIP 26 Date Status Description 02/13/2008 Amended Reduce CMAQ funds in FY 2008 by $200,000 and allocate to prior funding. Total funding remains unchanged. 06/14/2006 Approved Adopted into the 2007-2012 TIP 27 2016-2021 Transportation Improvement Program (Approved TIP) Title: FasTracks Northwest Rail Corridor TIP-ID: 2007-050 Project Type: Rapid Transit STIP-ID: SST7015.007 Open to Public: 2018 Sponsor: R T D Project Scope Completion of Phase I rail to Westminster, and completion of the Longmont Station Transfer Center, which will include a bus transfer facility, 240-space Park -n-Ride, and passenger waiting area. Affected Municipality(ies) Affected County(ies) Denver Adams Westminster Denver Unincorporated Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 $5,362 $1,494 $0 $0 $0 $5,362 $1,494 $0 $0 $0 Local (RTD) $125,640 Total Total Funding $0 $132,496 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 02/21/2013 Amended Reduce local funding by $218,574,000 in Previous Funding, $18,506,000 in FY2012, $110,098,000 in FY2013, $197,015,000 in FY2014, $178,009,000 in FY2015, and $96,119,000 in FY2016-17. Update project scope and title to reflect the change in project termini from Longmont (1st Ave and Terry St) to Westminster (71st Ave). Decrease total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 10/27/2008 Amended Reduce prior funding and local funds in FY 2008 and FY 2009 to $0, and increase local funds in FY 2010 by $111,208,000, FY 2011 by $80,671,000 and future funding by $27,801,000. Reduce FY's 2012-2013 by $73,083,000. Increase total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/14/2006 Approved Adopted into the 2007-2012 TIP 28 2016-2021 Transportation Improvement Program (Approved TIP) Title: FasTracks Central Corridor: 30th Ave & Downing St to 38th Ave & Blake St TIP-ID: 2007-053 STIP-ID: SST7015 Project Type: Rapid Transit Open to Public: Sponsor: R T D Project Scope The Central Corridor Extension begins at the 30th Ave and Downing Station and extends north approximately 0.8 miles to the 38th/Blake Station, which will serve as a transfer station to the East Corridor. The alignment will operate within a traffic lane in each direction along Downing St from 30th Ave and Downing St to 36th Ave. The alignment will continue along 36th Ave from Downing St to the 38th Ave and Blake St station. Affected Municipality(ies) Affected County(ies) Denver Denver Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 $14 $15 $0 $0 $0 $14 $15 $0 $0 $0 Local (RTD) $10,702 Total Total Funding $0 $10,731 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 02/21/2013 Amended Remove all funding for the current TIP and add $10,702,000 to Previous Funding. Decrease total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 10/27/2008 Amended Reduce local funds from prior funding through FY 2011 to $0, increase fiscal years 2012-2013 by $9,012,000, and reduce future funding by $1,442,000. Decrease total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/14/2006 Approved Adopted into the 2007-2012 TIP 29 2016-2021 Transportation Improvement Program (Approved TIP) Title: FasTracks North Metro: Denver Union Station to 72nd Ave TIP-ID: 2007-055 STIP-ID: SST7015.008 Project Type: Rapid Transit Open to Public: 2020 Sponsor: R T D Project Scope Commuter rail corridor from Denver Union Station to 72nd Ave. Alignment generally follows the BNSF rail alignment to near 54th Ave, then further north it joins the UPRR Boulder Branch ROW. Future funds are anticipated expenditures from 2018-2035, and may not represent total build out costs. Affected Municipality(ies) Affected County(ies) Commerce City Adams Denver Denver Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 $172,484 $84,690 $4,740 $0 $0 $172,484 $84,690 $4,740 $0 $0 Local (RTD) $157,680 Total Total Funding $0 $419,594 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 02/21/2013 Amended Increase Previous Funds by $5,456,000. Reduce local funding by $18,000,000 in FY2012, $23,913,000 in FY2013, $29,431,000 in FY2014, $45,432,000 in FY2015, $361,640,000 in FY2016-17, and $64,869,000 in Future Funds. Update project scope and title to reflect the change in project termini from 160th Ave to 72nd Ave. Decrease total project funding. 11/17/2011 Amended Increase total project funds by $7,175,000 and reallocate project funds between fiscal years resulting in local funding of $75,000,000 in Previously Programmed, $18,000,000 in FY2012, $47,000,000 in FY2013, $83,000,000 in FY2014, $83,000,000 in FY2015, $397,000,000 in FY2016-2017 and $239,000,000 in Future Funding. Increase total project funding consistent with the 2011 FasTracks Financial Plan. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 10/27/2008 Amended Reduce prior funding and local funds through FY 2011 to $0. Increase funding in FY 2012-2013 by $145,184,000 and future funding by $145,157,000. Increase total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/14/2006 Approved Adopted into the 2007-2012 TIP 30 2016-2021 Transportation Improvement Program (Approved TIP) Title: FasTracks I-225 LRT Corridor: Parker Rd to East Corridor Commuter Rail TIP-ID: 2007-056 STIP-ID: SST7015 Project Type: Rapid Transit Open to Public: 2016 Sponsor: R T D Project Scope Extend double-track light rail train from the Southeast Corridor Nine Mile Station to Smith/Peoria and intersect the East Corridor. Affected Municipality(ies) Affected County(ies) Aurora Adams Arapahoe Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 $76,508 $0 $0 $0 $0 $76,508 $0 $0 $0 $0 Local (RTD) $684,248 Total Total Funding $0 $760,756 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 02/21/2013 Amended Reduce total project funding by $36,021,000 in local funds and advance funds from FY2015, FY2016-17, and Future Funds resulting in $208,047,000 in Previous Funding, $0 in FY2012, $211,896,000 in FY2013, $168,800,000 in FY2014, $95,505,000 in FY2015, and $2,731,000 in FY16-17 of local funds. Decrease total project funding. 11/17/2011 Amended Increase total project funds by $41,055,000 and reallocate project funds between fiscal years resulting in local funding of $151,000,000 in Previously Programmed, $27,000,000 in FY2012, $27,000,000 in FY2013, $80,000,000 in FY2014, $158,000,000 in FY2015, $280,000,000 in FY2016-2017 and $27,000,000 in Future Funding. Increase total project funding consistent with the 2011 FasTracks Financial Plan. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 10/27/2008 Amended Reduce prior funding and local funds through FY 2010 to $0. Increase local funds in FY 2011 by $49,155,000, FY 2012-2013 by $59,195,000 and future funding by $93,145,000. Increase total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/14/2006 Approved Adopted into the 2007-2012 TIP 31 2016-2021 Transportation Improvement Program (Approved TIP) Title: FasTracks Southwest Corridor Extension: Mineral Station to C-470 TIP-ID: 2007-058 STIP-ID: SST7015 Project Type: Rapid Transit Open to Public: Sponsor: R T D Project Scope Extend the Southwest Corridor light rail from the Mineral Station to C-470/Lucent Blvd in Highlands Ranch. Affected Municipality(ies) Affected County(ies) Littleton Arapahoe Douglas Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local (RTD) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $23,150 Total Total Funding $0 $23,150 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 02/21/2013 Amended Remove all funding for the current TIP and reduce Previous Funding to $23,150,000. Decrease total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 10/27/2008 Amended Reduce local funds through FY 2010 to $0 and future funding by $74,101,000. Increase local funds in FY 2011 by $44,418,000 and FY's 2012-2013 by $75,162,000. Increase total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/14/2006 Approved Adopted into the 2007-2012 TIP 32 2016-2021 Transportation Improvement Program (Approved TIP) Title: FasTracks Southeast Corridor Extension: Lincoln Ave to RidgeGate Pkwy TIP-ID: 2007-059 STIP-ID: SST7015 Project Type: Rapid Transit Open to Public: 2019 Sponsor: R T D Project Scope Extend Southeast Corridor LRT from Lincoln Ave to RidgeGate Pwy in the City of Lone Tree. Affected Municipality(ies) Affected County(ies) Lone Tree Douglas Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $0 $0 $0 $0 $0 $92,000 $42,706 $25,942 $1,141 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $43,190 $58,614 $29,872 $1,315 $0 $135,190 $101,320 $55,814 $2,456 $0 Federal Federal (5309S) Local (RTD) $39,379 Total Total Funding $0 $334,159 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 02/21/2013 Amended Increase total project funds by $29,129,000 in local funds and reallocate funding between fiscal years resulting in $32,606,000 in Previous Funding, $0 in FY2012, $2,216,000 in FY2013, $3,058,000 in FY2014, $1,499,000 in FY2015, $0 in FY2016-17, and $182,041,000 in Future Funds. Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 10/27/2008 Amended Reduce local funds from FY 2008 through FY 2010 to $0, increase FY 2011 by $39,082,000, FY's 12-13 by $73,736,000, and reduce future funding by $89,453,000. Increase total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/14/2006 Approved Adopted into the 2007-2012 TIP 33 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 Hazard Elimination Pool TIP-ID: 2007-073 Project Type: Safety STIP-ID: SR16682 Open to Public: Sponsor: CDOT Region 1 Project Scope CDOT Region 1 Hazard Elimination pool. Specific projects will not be listed. Affected County(ies) Adams Arapahoe Broomfield Denver Douglas Jefferson Amounts in $1,000s Prior Funding FY16 $0 FY19 FY20-21 Future Funding $0 $0 $0 $0 $16,635 $5,850 $0 $0 $0 $0 $0 $0 $0 $0 $16,635 $5,850 $0 $0 $0 Local Total FY18 $0 Federal State (Safety) FY17 Total Funding $0 $22,485 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 09/18/2014 Amended Add $4,504,080 of State Safety funds in FY2015 for US 6 bridges design/build. Increase total project funding. 08/21/2013 Amended Add $8,208,000 in FY2014 and $8,954,000 in FY2015 of state Safety funds transferred from project TIPID #2007-081. Increase total project funding. 05/16/2013 Amended Add $63,000 of state Safety funds in FY2013. Increase total project funding. 03/15/2013 Amended Add $327,000 of state Safety funds in FY2013. Increase total project funding. 07/17/2012 Amended Add $229,000 in FY2012 and $337,000 in FY2013 of state Safety funds. Increase total project funding. 03/13/2012 Amended Add $305,000 of state Safety funding in FY2012. Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 01/27/2011 Amended Add $290,000 of state Safety funds to FY2011 and program to US285 west of Conifer for new VMS Installation. Increase total project funding. 09/07/2010 Amended Add $517,000 of state Safety funds in FY 2011. Increase total project funding. 11/12/2008 Amended Add $625,000 of state Safety funds and $77,000 of state Regional Priority Project (RPP) funds in FY 2009. Increase total project funding. 08/15/2008 Amended Reduce state Safety funds in FY 2009 by $177,000. Decrease total project funding. 07/14/2008 Amended Add $201,000 of state Safety funds in FY 2009. Increase total project funding. 06/30/2008 Amended Add $46,000 of State Regional Priority Projects (RPP) funds in FY 2008. Increase total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 11/29/2007 Amended Add $135,000 of RPP funds in FY 2008, and increase line item; Upper Bear Creek Rd. Intersection Project by same amount. Increase total project funding. 09/30/2006 Amended Add $1,785,000 state (safety) in FY07. 07/21/2006 Amended Decrease $800,000 from this pool’s reserves in FY07 in order to fund new project. Total funding remains the same. 06/14/2006 Approved Adopted into the 2007-2012 TIP 34 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 Hot Spot Pool TIP-ID: 2007-074 Project Type: Safety STIP-ID: SR16683 Open to Public: Sponsor: CDOT Region 1 Project Scope CDOT Region 1 Hot Spot Pool. Specific projects will not be listed. Affected County(ies) Adams Arapahoe Broomfield Denver Douglas Jefferson Amounts in $1,000s Prior Funding FY16 FY17 $0 FY20-21 Future Funding $0 $0 $0 $0 $413 $413 $413 $413 $0 $0 $0 $0 $0 $0 $413 $413 $413 $413 $0 Local Total FY19 $0 Federal State (Safety) FY18 Total Funding $0 $1,652 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 08/21/2013 Amended Add $164,000 of state Safety funds in FY2014. Add $360,000 in FY2014 and $376,000 in FY2015 of state Safety funds transferred from TIPID #2001-225. Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 06/23/2009 Amended Reduce state Safety funds in FY 2010 by $54,000. Decrease total project funding. 08/15/2008 Amended Reduce state Safety funds by $85,000 in FY 2009. Decrease total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/14/2006 Approved Adopted into the 2007-2012 TIP 35 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 Traffic Signals Pool TIP-ID: 2007-075 Project Type: Safety STIP-ID: SR16684 Open to Public: Sponsor: CDOT Region 1 Project Scope CDOT Region 1 Traffic Signal Pool. Specific projects will not be listed. Affected County(ies) Adams Arapahoe Broomfield Denver Douglas Jefferson Amounts in $1,000s Prior Funding FY16 FY17 $2,341 FY20-21 Future Funding $0 $0 $0 $0 $1,050 $6,650 $5,000 $0 $0 $0 $0 $0 $0 $0 $1,050 $6,650 $5,000 $0 $0 Local Total FY19 $0 Federal State (Safety) FY18 Total Funding $0 $15,041 Date Status Description 05/04/2015 Proposed Add the following projects and corresponding amounts to the pool for FY2016; SH-224 (E 74th Ave) at Dahlia St for $350,000; SH-287 (W 120th Ave) at Greenway Dr/Lamar St for $350,000; and SH-287 at W 10th Ave $350,000. 04/16/2015 Approved Proposed for adoption into 2016-2021 08/21/2013 Amended Add $245,000 in FY2014 and $255,000 in FY2015 of state Safety funds transferred from TIPID #1999-063. Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 01/27/2011 Amended Add $146,000 of state Safety funds to FY2011 and program to signal replacements at SH-74 and County Road 65. Increase total project funding. 02/23/2010 Amended Add $122,000 of state Safety funds to FY 2010. Increase total project funding. 06/23/2009 Amended Reduce state Safety funds in FY 2010 by $36,000. Decrease total project funding. 04/06/2009 Amended Add $331,000 of state Safety funds to FY 2009. Increase total project funding. 08/15/2008 Amended Reduce state Safety funds in FY 2009 by $58,000. Decrease total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/14/2006 Approved Adopted into the 2007-2012 TIP 36 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 Bridge On-System Pool TIP-ID: 2007-078 Project Type: Bridge STIP-ID: SR16712 Open to Public: Sponsor: CDOT Region 1 Project Scope The Bridge On-System Pool funds various bridge projects throughout CDOT Region 1. Affected County(ies) Adams Arapahoe Broomfield Denver Douglas Jefferson All pool project funding depicts federal and/or state funding only. Cost (1,000s) I-70 Bridge Replacement @Havana BNSF Replacement Study SH-265 $250 I-70 WB Deck Rehab US-40 to DITCH $330 State Highway Repairs $750 SH-105 Bridge Removal Study DRAW $250 US-40 Deck Rehab/Replacement Beaver Brook $100 US Highway Repairs $750 $250 I-70 and I-270 Repairs Ramp to I-25 NB Pedestrian Overpass Removal Study SH-95 Fiber Wrap $2,000 Start-At and End-At I-70 WB to I-225 SB Flyover $3,695 I-25 Repairs I-25 County Line Rd to Bellevue $1,400 I-225 I-25 to Parker Rd I-70 Bridge Replacement Havana St US-6 I-70 to SH-119 $498 Santa Fe Florida to I-25 I-76 96th to US-85 $280 6th Ave Potomac to Airport $263 Colfax I-70 to Kipling $31 C-470 Morrison to Bowles $3,508 Sheridan Hampden to Arizona $178 I-25 Hampden to Evans Federal 92nd to 120th $327 US-85 Hampden to Florida University Arapahoe to Hampden $845 US-85 I-76 to 136th Amounts in $1,000s Prior Funding FY16 FY17 FY18 $56 FY19 FY20-21 $0 $0 $0 State $14,692 $15,920 $9,472 $0 $0 Local $0 $0 $0 $0 $0 $14,692 $15,920 $9,472 $0 $0 $0 $727 $63 I-25 T-Rex Narrows $5,396 I-70 and I-25 $5,381 I-70/I-25 Ramps $10,336 $25 Essential Culvert Repairs (FY16) $2,085 $3,328 Essential Culvert Repairs (FY17) $2,669 $92 Essential Culvert Repairs (FY18) $2,669 Future Funding $0 Total $1,500 $4,110 $0 Federal (BR) $5,894 $1,500 $241 I-25/I-70/I-76 I-70 and I-25 I-76 Repairs US-6 to Beaver Brook $2,207 Start-At and End-At $1,500 US-40 Douglas County Scour Repairs Facility Name (Cont) Cost (1,000s) Start-At and End-At $1,800 Facility Name (Cont) Cost (1,000s) Facility Name Total Funding $0 $40,084 Date Status Description 05/05/2015 Proposed Change "I-70 Bridge Replacement Havana" to "I-70 Bridge Replacement @Havana St (FY16)"; change "I-70 Bridge Replacement @Havana" to "I70 Bridge Replacement @Havana St (FY17)" and adjust funding to $800,000. Total project funding remains unchanged. 04/16/2015 Approved Proposed for adoption into 2016-2021 09/02/2014 Amended Add the following project and corresponding amount to the pool; I-225 Bridge Preventative Maintenance for $2,500,000 in state Bridge On-System funds in FY2015. Increase total project funding. 37 Date Status Description 07/15/2014 Amended Add the following projects and corresponding amounts to the pool in State Bridge On-System funds; 40th Ave (SH33) Bridge Devolution for $1,000,000 in FY2015 and $1,000,000 in FY2016; Hudson Road over Coyote Run for $92,800 in FY2015. Increase total project funding. 01/07/2014 Amended Add 1 new pool project for region-wide preventative maintenance ($8,400,000), using available pool funds. Total project funding remains unchanged. 10/16/2013 Amended Add 1 new pool project in FY2014, US40/Colfax: Federal to Speer ($1,200,000), using available pool funds. Total project funding remains unchanged. 09/20/2013 Amended Add $9,727,000 in FY2014 and $10,121,000 in FY2015 of federal Bridge On-System funds, as well as pool project Bridge Deck Replacement ($9,225,000), transferred from TIPID #2007-080. Add new pool project I-70 East: Smith Rd Structures Replacement ($644,000). Increase total project funding. 05/16/2013 Amended Add $5,255,000 of state Bridge On-System funds in FY2013 allocating to: I-70 East: Frontage Road over Middle Bijou Creek ($3,500,000) and US40: Byers to Deer Trail Overlay & Bridge Rehabilitation ($755,000), and I-25 SB: Surrey Ridge Roud & SH-86 at Founders Pkwy ($1,000,000). Increase total project funding. 01/15/2013 Amended Add $7,900,000 of state Bridge On-System funds in FY2013 allocating to I-70 East: Smith Rd and UPRR ($12,900,000). Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 09/07/2010 Amended Add $471,000 of state Bridge On-System funds to FY 2011. Increase total project funding. 08/18/2010 Amended Add state Bridge On-System funds in the amount of $2,309,000 in FY 2010 and $2,073,000 in FY 2011. Increase total project funding. 04/06/2009 Amended Add state Bridge On-System funds in the amount of $500,000 to FY 2009. Increase total project funding. 08/15/2008 Amended Reduce state Bridge On-System funds in FY 2009 by $806,000. Decrease total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/14/2006 Approved Adopted into the 2007-2012 TIP 38 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 Bridge Off-System Pool TIP-ID: 2007-079 Project Type: Bridge STIP-ID: SR17001 Open to Public: Sponsor: CDOT Region 1 Project Scope The Bridge Off-System Pool funds off-system bridge projects throughout CDOT Region 1. Affected County(ies) Adams Arapahoe Broomfield Denver Douglas Jefferson All pool project funding depicts federal and/or state funding only. Facility Name Start-At and End-At Dartmouth Ave (FY18) @ S Platte River Amounts in $1,000s Prior Funding Cost (1,000s) $524 FY16 Facility Name (Cont) Start-At and End-At 88th Ave (FY18) @ Wolf Creek FY17 FY18 FY19 Cost (1,000s) FY20-21 Future Funding $0 $0 $0 $0 $0 State $0 $0 $624 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $624 $0 $0 $0 Start-At and End-At Cost (1,000s) $100 Federal (BRO) Total Facility Name (Cont) Total Funding $0 $624 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 07/15/2014 Amended Add the following project and corresponding amount to the pool in State Bridge Off-System funds; Evergreen Road over Bear Lake for $632,000 in FY2015. Increase total project funding. 08/21/2013 Amended Add $544,000 of state Bridge-Off System funds and $169,000 of local match in FY2014 allocating to new pool project: Plum Creek Pkwy over Seller's Gulch ($544,000). Add $1,844,000 of state Bridge-Off System funds and $461,000 of local match in FY2013 of state Bridge-Off System funds transferred from TIPID #2007-097 for transferred pool project: 72nd Ave and Raleigh St- Little Dry Creek ($1,844,000). Increase total project funding. 05/16/2013 Amended Add $132,000 of state Bridge funds in FY2014 allocating to new pool project: Hudson Rd Bridge over Box Elder Creek ($132,000). Increase total project funding. 05/16/2013 Amended Add $132,000 of state Bridge funds in FY2014 allocating to new pool project: Hudson Rd Bridge over Box Elder Creek ($132,000). Increase total project funding. 05/16/2013 Amended Add $132,000 of state Bridge funds in FY2014 allocating to new pool project: Hudson Rd Bridge over Box Elder Creek ($132,000). Increase total project funding. 05/16/2013 Amended Add $132,000 of state Bridge funds in FY2014 allocating to new pool project: Hudson Rd Bridge over Box Elder Creek ($132,000). Increase total project funding. 05/16/2013 Amended Add $132,000 of state Bridge funds in FY2014 allocating to new pool project: Hudson Rd Bridge over Box Elder Creek ($132,000). Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 03/15/2011 Amended Add $2,406,000 of state Bridge Off-System funds and $603,000 local match to FY2011 and $59,000 of state Bridge Off-System funds and $15,000 local match in FY2012 allocating to Arapahoe County Structure #ARA-30-26.8 ($501,000), Douglas County Structure #DOU-016-00.55 ($1,700,000), Jefferson County Structure #D-27-MP-010 ($808,000) and Structure #Morr-Park Ave ($74,000). Increase total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/14/2006 Approved Adopted into the 2007-2012 TIP 39 2016-2021 Transportation Improvement Program (Approved TIP) Title: Station Area Master Plan/Urban Center Studies Pool TIP-ID: 2007-089 STIP-ID: N/A Project Type: Station Area/Urban Center Studies Open to Public: Sponsor: DRCOG Project Scope Pool funds for future station area master plans and/or urban center planning studies. Affected County(ies) Regional Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $600 $600 $600 $600 $0 State $0 $0 $0 $0 $0 Local $150 $150 $150 $150 $0 $750 $750 $750 $750 $0 Federal (CMAQ) $0 Total Total Funding $0 $3,000 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 09/02/2014 Amended Switch Littleton Downtown Light Rail Station Area Study from FY2014 to FY2015 and Mineral Light Rail Station Area Study from FY2015 to FY2014. 09/20/2013 Amended Add 11 new pool projects in FY2014 and FY2015 using unallocated funds; increase local funds to match adopted projects. Increase total project funding. 05/16/2013 Amended Update project title from "Station Area Master Plan Studies Reserve" to "Station Area Master Plan/Urban Center Studies Pool." Update project scope to "Pool funds station area master plans and/or urban center planning studies. Pool projects will be depicted individually." Change project type from "Funding Reserves" to "Station Area Master Plan/Urban Studies." Total project funding remains unchanged. 12/05/2011 Amended Add $1,000,000 of federal CMAQ funds and $250,000 of local match in FY2015. Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/08/2007 Amended Remove $100,000 of CMAQ and $25,000 of Local funds from these reserves. 01/24/2007 Amended Defer $185,000 of CMAQ and $47,000 of local funds from FY2007 to FY2008. Remove $400,000 of CMAQ and $100,000 of local funds from these reserves. 08/28/2006 Amended Advance $330,000 of CMAQ and $83,000 of local from FY08 to FY07 06/14/2006 Approved Adopted into the 2007-2012 TIP 40 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 4 Traffic Signals Pool TIP-ID: 2007-091 Project Type: Safety STIP-ID: SR46668 Open to Public: Sponsor: CDOT Region 4 Project Scope Pool funds traffic signal projects in CDOT Region 4 (Boulder and SW Weld Counties). Specific projects will not be listed. Affected County(ies) Boulder Weld Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State (Safety) $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $637 Total Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 04/06/2011 Adopted Adopted into the 2012-2017 TIP 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/08/2007 Amended Reduce State Safety funds by $3,000 in FY 2008 and $6,000 in FY 2009. 06/14/2006 Approved Adopted into the 2007-2012 TIP 41 Total Funding $0 $637 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 4 Hot Spot Pool TIP-ID: 2007-092 Project Type: Safety STIP-ID: SR46667 Open to Public: Sponsor: CDOT Region 4 Project Scope Pool funds hot spot projects in CDOT Region 4 (Boulder and SW Weld Counties). Specific projects will not be listed. Affected County(ies) Boulder Weld Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State (Safety) $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $854 Total Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 04/06/2011 Adopted Adopted into the 2012-2017 TIP 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/08/2007 Amended Reduce State Safety funds in FY 2008 by $4,000 and FY 2009 by $8,000 06/14/2006 Approved Adopted into the 2007-2012 TIP 42 Total Funding $0 $854 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 4 Hazard Elimination Pool TIP-ID: 2007-094 Project Type: Safety STIP-ID: SR46666 Open to Public: Sponsor: CDOT Region 4 Project Scope Pool funds hazard elimination projects in CDOT Region 4 (Boulder and SW Weld Counties). Affected County(ies) Boulder Weld Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State (Safety) $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $15,785 Total Total Funding $0 $15,785 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 05/16/2013 Amended Add $407,000 of local funds in FY2015. Add new pool projects using unallocated funds: SH-119: Ken Pratt Blvd & South Pratt Pkwy ($550,000), Valmont Rd & 29th St ($2,713,000), and 95th St: Isabelle Rd to Valmont Rd ($950,000). Increase total project funds. 11/14/2011 Amended Move SH-66 at East County Line Rd from the 2008-2013 TIP into the 2012-2017 TIP and add $488,000 from existing state Safety funds. Total funding remains unchanged. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 03/02/2011 Amended Add the following new projects: US85 Cable Rail- Brighton North of SH66 for $1,200,000, and East County Line Rd Auxiliary Lanes and signal upgrade for $350,000 from existing funding levels. Total funding remains unchanged. 07/26/2010 Amended Add line item; WCR 34 and WCR 17 Intersection Improvements in the amount of $172,000. Total funding remains unchanged. 10/15/2009 Amended Add line item; SH-287 (Main St. Longmont) and Pike Rd. in the amount of $300,000. Total funding remains unchanged. 06/30/2008 Amended Add SH-42: S. Boulder Rd. to the pool and allocate $400,000 of unallocated Hazard Elimination funds from FY 2008. (Project is also listed in the R4 Congestion Relief Pool.) Total project funding remains unchanged. 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/08/2007 Amended Reduce State Safety funds in FY 2008 by $46,000 and FY 2009 by $107,000. 06/14/2006 Approved Adopted into the 2007-2012 TIP 43 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 4 Surface Treatment Pool TIP-ID: 2007-095 Project Type: Roadway Reconstruction STIP-ID: SR45218 Open to Public: Sponsor: CDOT Region 4 Project Scope Projects in CDOT Region 4 (Boulder and SW Weld Counties) to be approved for pool funding by Region 4 Director. Affected County(ies) Boulder Weld All pool project funding depicts federal and/or state funding only. Facility Name Start-At and End-At SH-119 Monarch Rd to Fordham St Amounts in $1,000s Prior Funding $6,817 FY16 State (Surface) Start-At and End-At SH-119 MM 22.8 to 37.4 FY17 FY18 FY19 Cost (1,000s) $11,000 FY20-21 Facility Name (Cont) Start-At and End-At SH-119 47th St to Monarch Rd Future Funding $0 $0 $0 $0 $14,580 $14,580 $14,580 $0 $0 $0 $0 $0 $0 $0 $14,580 $14,580 $14,580 $0 $0 Local $0 Facility Name (Cont) $0 Federal Total Cost (1,000s) Cost (1,000s) $11,100 Total Funding $0 $43,740 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 02/06/2015 Amended Add the following projects and corresponding amounts to the pool: SH-119 Boulder East Monarch Rd to Fordham St for $6,817,000; and US-85 Brighton to Ft Lupton NB Only for $8,160,000. Remove $1,873,000 of State Surface Treatment funds from FY2012. Add $3,803,000 of State Surface Treatment funds in FY2016-17. Increase total project funding. 02/21/2013 Amended Remove $1,873,000 of state Surface funds in FY2012. Add $2,308,000 to SH-66: MP 39-43 ($5,200,000). Add new pool project: SH-119: MP 5964 ($12,000,000). Remove pool project SH-119: Boulder East MP44.24 ($10,300,000). Reduce total project funding. 05/04/2012 Amended Add pool project SH-172 Chip Seal- SH-119 to SH-17 ($2,000,000) using unallocated pool funding. Total project funding remains unchanged. 12/15/2011 Amended Add $1,500,000 of state Surface funding in FY2012. Increase total project funding. 07/28/2011 Amended Reduce state Surface Treatment funding in FY2012 by $1,873,000 per the adopted budget allocation. Add three new projects to the pool: SH-66: St Vrain Bridge MP 45-48 ($1,000,000), US-85: Ft Lupton to Brighton MP 236-242 ($1,492,000), and SH-66: Boulder/Weld County Line East MP 38.92-42.74 ($2,892,000). Decrease total pool funding.) 04/06/2011 Adopted Adopted into the 2012-2017 TIP 07/26/2010 Amended Remove and transfer the following two projects to the Region 4 FASTER Pool; SH-119 at Jay Rd in the amount of $1,500,000 and SH-119 at Niwot Rd. in the amount of $1,200,000, and reduce SH-119 at Boulder East by $4,200,000. Total funding remains unchanged. 02/17/2010 Amended Add $7,000,000 of state Surface Treatment funds in FY 2010 and allocate to a new project: I-25, mile marker 243.5 to 249. Increase total project funding. 10/15/2009 Amended Remove line item SH-287C (Main St. Longmont) and Pike Rd. in the amount of $300,000 and transfer to the Region 4 Hazard Elimination Pool (TIP ID #2007-094). Total funding remains unchanged. 09/10/2009 Amended Add line item; SH-287C (Main St. Longmont) and Pike Rd. in the amount of $300,000. Total funding remains unchanged. 08/12/2009 Amended Allocate $2,700,000 of unallocated state Surface Treatment funds to new pool projects in the following amounts; $1,500,000 to SH-119: Jay Rd. Concrete Intersection and $1,200,000 to SH-119: Niwot Rd. Concrete Intersection. Total funding remains unchanged. 07/23/2009 Amended Allocate $1,500,000 of unallocated state Surface Treatment funds from FY 2010 to existing pool project; SH-119: Resurfacing [MP46 to MP55], and add the following new projects; SH-157: Boulder South, SH-36 [MP 0 to MP 2.83] for $2,800,000, SH-36: Boulder East [MP 44.3 to 48.1] for $5,200,000, SH-52 and SH-119 East [MP 0 to MP 4.6] for $3,400,000, SH-7: Lyons to Raymond [MP 19.3 to MP 33.47] for $1,500,000, and SH-119: Boulder East [MP44.24 to 54.42] for $14,500,000. Total funding remains unchanged. 06/23/2009 Amended Allocate $3,000,000 of state Surface Treatment funds in FY 2010 to the following new project; SH-119: Resurfacing [MP46 to MP55]. Total funding remains unchanged. 03/23/2009 Amended Add $1,000,000 of ARRA (ES9-CDOT) funds to FY 2009 and allocate to the US-36: Estes Park to Lyons (DRCOG portion) project, replacing $633,000 of Surface Treatment funds allocated to the project. Increase total project funding. 44 Date Status Description 08/15/2008 Amended Reduce SH-93: Boulder by $31,000 to $2,976,000 and add the following projects and corresponding amounts; 1) SH-42 at Boulder Rd. for $100,000, 2) SH-119 at 63rd St. (Louisville) for $147,000, 3) SH-66 Lyons (US-36 to Longmont) for $5,000,000, and 4) US-36: Estes Park to Lyons (DRCOG portion) for $633,000. Total funding remains unchanged. 03/19/2008 Approved Adopted into the 2008-2013 TIP 11/29/2007 Amended Add $215,000 of state Surface Treatment funds to FY 2008. Increase line item, IGA Boulder: US-36 at Arapahoe and Iris by $50,000, and add line item, SH-119 and County Line Rd in the amount of $165,000. Increase total project funding. 07/18/2007 Amended Delete one project; SH-157/Boulder South. Modify funding for SH-170/IGA with Boulder, SH-7 (Lyons), SH-7 at SH-157, SH-93: Boulder, and US36/Boulder North. Add four new projects; IGA-Boulder: US-36 at Arapahoe and Iris, US-36: North St. Vrain Creek Bridge, IGA-Longmont: US-287 Quebec to Ken Pratt, and IGA-Lyons: US-36 downtown. Total funding (control totals) remains the same. 06/08/2007 Amended Reduce State Surface Treatment funds by $180,000 in FY 2008 and $215,000 in FY 2009, reducing overall funding. 06/14/2006 Approved Adopted into the 2007-2012 TIP 45 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 Surface Treatment Pool TIP-ID: 2007-096 Project Type: Roadway Reconstruction STIP-ID: SR15215 Open to Public: Sponsor: CDOT Region 1 Project Scope Projects in CDOT Region 1 to be approved for Pool Funding by Region 1 Director. Affected County(ies) Adams Arapahoe Broomfield Denver Douglas Jefferson All pool project funding depicts federal and/or state funding only. Facility Name Start-At and End-At I-25 @ I-225 I-76 96th to US-85 Colfax Cost (1,000s) Facility Name (Cont) Start-At and End-At US-6 I-70 to SH-119 $6,500 Wadsworth I-70 to Kipling $3,000 Federal 92nd to 120th Kipling SH-128 Cost (1,000s) Cost (1,000s) Facility Name (Cont) Start-At and End-At $2,500 C-470 SH-8 to Bowles Highland to 10th $2,500 I-25 County Line Rd to Belleview I-25 Hampden to Evans $5,000 I-225 I-25 to Parker Rd $7,500 $6,000 6th Potomac to Airport $4,500 Colfax Peoria to Sable $2,500 Jewell to 6th $4,000 Colfax Speer to Clarkson $4,000 Hampden Dahlia to Yosemite $4,000 Eldorado to Wadsworth $3,500 US-85 Hampden to Florida $2,500 US-287 @ 120th Ave Intersection SH-72 SH-93 to Coal Creek Canyon $1,500 Santa Fe Florida to I-25 $3,500 Preventative Maintenance Sheridan Hampden to Arizona $3,500 US-85 I-76 to 136th $8,000 University Arapahoe to Hampden $5,000 Wadsworth Bear Creek to 4th $5,500 Amounts in $1,000s $500 Prior Funding FY16 $0 FY19 FY20-21 Future Funding $0 $0 $0 $0 $55,000 $52,800 $39,600 $43,400 $0 $0 $0 $0 $0 $0 $55,000 $52,800 $39,600 $43,400 $0 Local Total FY18 $0 Federal State (Surface) FY17 $7,500 $12,000 $250 $0 Total Funding $0 $190,800 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 01/23/2015 Amended Add $12,037,000 of state Surface Treatment funds in FY2015. Add the following projects and corresponding amounts to the pool; I-70 Havana St to I-225 for $3,500,000; Preventative Maintenance at Various Locations for $2,000,000; SH-58 from US-6/SH-93 to I-70 for $10,000,000; US-40 from Clarkson St to Colorado Blvd for $4,500,000; US-85 from Blakeland Dr to Crestline Ave for $8,200,000; SH-95 from 25th Ave to 58th Ave for $4,000,000; SH-74 from I-70 to CR-73 for $5,200,000; and SH-86 from I-25 to Woodlands Blvd for $8,000,000. Increase total project funding. 09/18/2014 Amended Add $47,000,000 of state Surface Treatment funds in FY2016. Add the following projects and corresponding amounts to the pool; I-76, 96th to US-85 for $6,500,000; Wadsworth, Highland to 10th for $2,500,000; I-25 @ I-225 for $500,000; SH-72, SH-93 to Coal Creek Canyon for $1,500,000; US-40, Berthoud Pass East for $1,500,000; I-70, EMJT East for $3,000,000, Sheridan, Hampden to Arizona for $3,500,000; Federal, 92nd to 120th for $6,000,000; Kipling, Jewell to 6th for $4,000,000; University, Arapahoe to Hampden for $5,000,000; Colfax, I-70 to Kipling for $3,000,000; SH-128, Eldorado to Wadsworth for $3,500,000; US6 I-70 to SH-119 for $2,500,000; US-40, US-6 to Beaver Brook for $2,000,000; and US-36, Strasburg to Byers for $2,000,000. Increase total project funding. 10/16/2013 Amended Add the following two pool projects transferred from TIPID #2001-214: US 285: Federal to Marion ($4,500,000) and SH 83/Parker: Jewell to Mississippi ($2,000,000). Add $194,000 to pool project US 285: Federal to Marion ($4,694,000 total), $304,000 to SH 83/Parker: Jewell to Mississippi ($2,304,000 total), and remove $1,200,000 from US 40/Colfax: Federal to Speer ($2,200,000 total) from unallocated FY2014 state Surface Treatment funds. Total project funding remains unchanged. 46 Date Status Description 09/20/2013 Amended Add the following two pool projects transferred from TIPID #2001-214: US-40 (Colfax Ave): Federal Blvd to Speer Blvd ($2,000,000) and Federal Blvd & 120th Ave ($550,000). Add $1,400,000 to pool project US-40 (Colfax Ave): Federal Blvd to Speer Blvd ($3,400,000) from unallocated funds. Total project funding remains unchanged. 08/21/2013 Amended Add $2,442,000 of state Surface Treatment funds in FY2014 allocating to pool project: SH-86- Franktown-East (+$2,442,000 = $3,642,000 total). Add $34,813,000 in FY2014 and $35,563,000 in FY2015 of state Surface Treatment funds transferred from project TIPID #2001-214 adding pool project: SH-121 (Wadsworth Blvd)- 10th Ave to Colfax Ave ($2,400,000). Increase total project funding. 06/07/2013 Amended Add $2,000,000 of federal Highways for Life funds in FY2013 allocating to pool project: I-70 East: Tower Rd to Colfax Ave ($18,524,000). Increase total project funding. 05/16/2013 Amended Add $1,200,000 of state Surface Treatment funds in FY2013 allocating to new project: SH-86 Preventative Maintenance: Franktown-East ($1,200,000). Increase total project funding. 04/09/2013 Amended Add $453,000 of state Surface Treatment funds in FY2013 allocating to pool project: US-40: Byers to Deer Trail ($1,953,000). Increase total project funding. 01/15/2013 Amended Add $7,500,000 of state Surface Treatment funds in FY2013 allocating to pool project: I-70 East: Tower Rd to Colfax Ave ($16,524). Increase total project funding. 08/16/2012 Amended Reallocate $4,139,000 of state Surface Treatment funds from FY2013 to FY2012. Reduce state Surface Treatment funds by $3,652,000 in FY2013, $10,371,000 in FY2014, and $5,480,000 in FY2015 based on the revised and updated Region 1 Surface Treatment Program. Add the following new projects: SH-83: Antelope Creek to Castlewood Canyon ($4,139,000), US-36: Kiowa Creek to East of Byers ($4,000,000), US-40: Byers to Deer Trail ($1,500,000), SH-67 at Rampart Range Rd ($2,500,000), US-36 east of Cabin Creek ($500,000), SH-74: Evergreen to Morrison ($3,500,000), SH-79 north of Bennett ($3,000,000), and SH-30/E 6th Ave: S Picadilly Road to N Airport Blvd ($2,000,000). Decrease total project funding. 07/17/2012 Amended Add $350,000 of state Regional Priority Project (RPP) funds in FY2012 allocating to I-70 East: Tower Rd to Colfax Ave ($9,024,000). Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 04/20/2011 Amended Add $150,000 in FY2010 and $50,000 in FY2011 of state Rockfall Mitigation (RFM) funds, allocating to US-285: Turkey Creek Canyon. Increase total project funding. 03/02/2011 Amended Add $2,617,000 of Surface Treatment funds and $2,983,000 of Regional Priority Project (RPP) funds to FY2011 and allocate to SH-83 (Parker Rd): Cottonwood Dr S project ($5,000,000) and US-36: Watkins to Bennett Rehabilitation project ($600,000). Increase total project funding. 12/22/2010 Amended Add $500,000 of state Surface Treatment funds to SH36: West of Watkins to Bennett project in FY2011 and move $6,000,000 to FY2012-13. Increase total project funding. 06/21/2010 Amended Add $200,000 of state Surface Treatment funds to FY 2010 and increase SH-72 Junction @ SH-93 North by corresponding amount. Increase total project funding. 01/15/2010 Amended Add $100,000 of state Regional Priority Project (RPP) funds to FY 2010 and allocate to I-70 East Tower Rd. to Colfax Ave. Increase total project funding. 08/12/2009 Amended Add $2,574,000 of HB-1310 Regional Priority Project (RPP) funds in FY 2010 and increase line item; I-70 East Tower Rd. at Colfax Ave. by the corresponding amount. Increase total project funding. 06/23/2009 Amended Add the following new projects; US-285: Turkey Creek Canyon for $1,250,000, SH-72: Junction of SH-93 North for $900,000, US-285: Pine Junction to Richmond Hill for $4,000,000, SH-36: West of Watkins-Bennett for $3,000,000, and I-70 East: Tower Rd. to Colfax Avenue for $6,000,000. Reduce Pavement Preservation Jobs to $1,701,000 and the Unallocated 08-10 to $0. From 2009, reduce by $95,000 and transfer $8,331,000 to FY 2010 and $100,000 to FY 2011. Decrease total project funding. 04/06/2009 Amended Shift $1,750,000 of state Surface Treatment funds from FY 2010 to FY 2009 and adding a new line item to the pool for the corresponding amount; SH-85 (Louviers to C-470), and reduce the Unallocated balance by this same amount. Add $651,000 of state Surface Treatment funds to FY 2009 (allocating $325,000 to South I-25: Tomah Rd. to Douglas Lane and $326,000 to SH-86: Founders Parkway). Increase total project funding. 01/15/2009 Amended Decrease state Surface Treatment funds in FY 2009 by $554,000 and reduce the Pavement Preservation Jobs project by the corresponding amount to a total of $2,046,000. Decrease total project funding. 12/09/2008 Amended Add $436,000 of HB-1310 Regional Priority Projects (RPP) funds in FY 2009 and increase line item; SH-86: Founders Parkway by the corresponding amount to $8,213,000. Increase total project funding. 11/20/2008 Amended Increase state Surface Treatment funds by $4,039,000 in FY 2009, $2,169,000 in FY 2010, and by $3,061,000 in FY 2011. Increase line item I-25: Tomah Rd to Douglas Lane from $5,541,000 to $5,562,000. Add the following new line items: I-70: Tower Rd to Colfax Ave for $6,000,000; US285: Turkey Creek Canyon East for $1,250,000; SH83/Parker Rd: pavement preservation for $1,008,000; SH-72: Junction of SH-93-North for $900,000; US-285: Deer Creek to Richmond Hill for $5,000,000; US-85: Louviers to C-470 (various locations) for $1,750,000; and I-25 South: El Paso County Line-North for $3,000,000. Increase total project funding. 10/15/2008 Amended Add state Surface Treatment funds in the amounts of $6,119,000 in FY 2008 and $2,298,000 in FY 2009, and add state Regional Priority Projects (RPP) funds in the amount of $837,000 in FY 2008. Modify line items as follows; PE & Design from $1,600,000 to $600,000, SH-79: North of Bennett from $500,000 to $3,200,000, SH-86: Founders Parkway from $7,000,000 to $7,777,000, South I-25: Tomah Rd. from $5,500,000 to $5,541,000, and Unallocated 08-10 from $941,000 to $12,831,000. Add the following line items; US-6: Golden-West for $1,629,000 and I-70: Hogback West for $282,000. Increase total project funding. 09/29/2008 Amended Add $351,000 of state Surface Treatment funds to FY 2009 and increase the US-285: Foxton-Richmond Hill project by the corresponding amount to total $1,791,000. Increase total project funding. 06/30/2008 Amended Reduce state RPP funds in FY 2008 in the amount of $381,000 and return to the state pool and add $381,000 of state Surface Treatment funds in FY 2009. Total project funding remains unchanged. 04/21/2008 Amended Add $381,000 of HB-1310 Regional Priority Projects (RPP) funds and $181,000 of Surface Treatment funds in FY 2008. Increase total project funding. 03/19/2008 Approved Adopted into the 2008-2013 TIP 02/13/2008 Amended Add $296,000 of Regional Priority Projects (RPP) funds to FY 2008 and allocate same amount to new line item; SH 86: Founders Parkway. Increase total project funding. 12/19/2007 Amended Add $273,000 of RPP funds to FY 2008 and increase line items; SH-79: North of Bennett by $100,000, and the I-70 Hogback West project by $173,000. Total funding increases by $273,000. 11/29/2007 Amended Add $29,000 of RPP funds to FY 2008 and increase line item, I-70 Hogback West project by the same amount. Transfer $41,000 from I-25: Larkspur-North to Tomah Rd/Douglas Lane. Total funding increases by $29,000. 09/12/2007 Amended Add $80,000 of state Regional Priority Project (RPP) funds to FY 2008 from Region 1 Safety TSM Pool. Increase line item project I-70 Hogback West by this amount. 47 Date Status Description 08/10/2007 Amended Add $41,000 of state Surface Treatment funds in FY 2008. Increase line item project, South I-25: Larkspur-North by this amount. 07/18/2007 Amended Reduce funding for US-6: Golden West Overlay project. Add funding to the SH-79 Pavement Preservation: North of Bennett project. Add two new projects; Foxton Road to Richmond Hill Road, and Tomah Road to Douglas Lane. Delay the SH-86: Founders Parkway project until FY 2010. Unallocated funding amount will change respectively. Total project costs remain unchanged. 06/21/2007 Amended Delete two projects; I-25: Tomah Rd to Douglas and I-70: Tower Rd. to Colfax. Add one new project US-6: Golden-West Overlay. Modify funding for Pavement Preservation, I-25 Larkspur-North, I-70 Hogback West and the Unallocated 2007-2009. Total funding is unchanged. 04/13/2007 Amended Add $492,000 to State Surface Treatment funds and add $107,000 of Maintenance Level of Service (MLOS) /System Quality funds to Federal/State (80/20 split) in FY 2007. 03/07/2007 Amended 1) Additional $4,790,000 awarded to the pool comprised of HB1310 "RSL=0" funds ($4,200,000), Safety funds ($450,000 state), and Maintenance Level of Service (MLOS) funds ($140,000). This funding is to be allocated to 3 existing projects: $730,000 to the I-70 Hogback West project, $660,000 to the SH-86 Franktown East project, and $1,500,000 to the SH 86: Founders Parkway project, and one new project: SH-83: El Paso County Line-North Resurfacing project, $1,900,000. 06/14/2006 Approved Adopted into the 2007-2012 TIP 48 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 4 Bridge On-System Pool TIP-ID: 2007-133 Project Type: Bridge STIP-ID: SR46598 Open to Public: Sponsor: CDOT Region 4 Project Scope Pool funds Region 4 On-System bridge projects. Affected County(ies) Boulder Weld All pool project funding depicts federal and/or state funding only. Facility Name Start-At and End-At Bridge Asset Management I-25, US-157, US-287 Amounts in $1,000s Prior Funding Cost (1,000s) Facility Name (Cont) Cost (1,000s) Start-At and End-At FY16 FY17 FY18 FY19 FY20-21 Future Funding $0 $0 $0 $0 $0 State $110 $3,300 $0 $0 $0 Local $0 $0 $0 $0 $0 $110 $3,300 $0 $0 $0 $0 Start-At and End-At Cost (1,000s) $3,410 Federal (BR) Total Facility Name (Cont) Total Funding $0 $3,410 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 03/19/2015 Amended Add the following project and corresponding amount to the pool: I-25, SH-157 and US-287 bridge overlay and repair for $1,442,000. Add $1,442,000 of State Bridge funds in FY2015. Increase total project funding. 02/09/2015 Amended Add the following project and corresponding amount to the pool; I-25, US-157 and US-287 bridge overlay maintenance for $1,442,000. Add $1,442,000 of state Bridge funds in FY2015. 12/11/2013 Amended Remove $1,187,000 of state Bridge-On funds in FY2014 replacing with state RPP funds in the same amount. Add $158,000 of state Regional Priority Projects (RPP) funds in FY2014 allocating to new pool project: I-25, SH-157, and US-287- Bridge Maintenance ($158,000). Increase total project funding. 05/04/2012 Amended Add pool project SH-7- CBC between Ferncliff and Allenspark ($250,000) using unallocated pool funding. Total project funding remains unchanged. 03/13/2012 Amended Add $470,000 to SH-157 at US-36. Total project funding remains unchanged. 10/13/2011 Amended Add the following new project: SH-157 at US-36 (E-16-W) Bridge Deck Replacement ($1,710,000) from existing unallocated pool funds. Total project funding remains unchanged. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 03/02/2011 Amended Add the following new project: Design of bridge deck replacement for structure E-16-HW for $200,000 from existing funding levels. Total funding remains unchanged. 11/12/2010 Amended Add I-25 North: Mead Structures D-17-DA and D-14-DB with $500,000 of existing FY2011 funds to the project and increase the SH-93: Critical Culvert Repair project by $250,000 with existing FY2011 funding. Total funding remains unchanged. 06/21/2010 Amended Add SH-93 Critical Culvert Repair and allocate $100,000 of existing state Bridge On-System funds to project. Total funding remains unchanged. 07/23/2009 Amended Increase state Bridge On-System funds in FY 2010 by $210,000 and add line item; SH-66: St. Vrain Bridge by the corresponding amount. 05/22/2008 Amended $3,793,000 of State Bridge On-System funds are allocated in FY 2008. Total project funding increases. 03/19/2008 Approved Adopted into the 2008-2013 TIP 11/29/2007 Amended Add $5,181,000 of new Regional Priority Projects (RPP) funds and $200,000 of Region 4 Bridge On-System funds in FY 2008. Total funding increases by $5,381,000. 06/08/2007 Amended Reduce State Bridge On-System funding by $335,000 in FY 2008 and by $384,000 in FY 2009. 06/14/2006 Approved Adopted into the 2007-2012 TIP 49 2016-2021 Transportation Improvement Program (Approved TIP) Title: I-25: Santa Fe Dr to Alameda Ave Interchange Improvements (Valley Hwy Phases I and II) TIP-ID: 2007-158 STIP-ID: SDR7047 Project Type: Interchange Reconstruction Open to Public: 2016 Sponsor: CDOT Region 1 Project Scope Reconstruct interchanges at I-25/Santa Fe Dr and I-25/Alameda Ave as Phases 1 and 2 of the Valley Highway ROD (TIPID 1999-009). Affected Municipality(ies) Affected County(ies) Denver Denver Amounts in $1,000s Prior Funding FY16 $119,724 FY19 FY20-21 Future Funding $0 $0 $0 $0 $11,156 $11,346 $2,000 $0 $0 $0 $0 $0 $0 $0 $11,156 $11,346 $2,000 $0 $0 Local Total FY18 $0 Federal State (Faster-S) FY17 Total Funding $0 $144,226 Date Status Description 04/16/2015 Approved Adopted into 2016-2021 TIP 09/20/2013 Amended Add $4,350,000 in FY2014, $2,275,000 in FY2015, and $7,375,000 in FY2016-17 of state FASTER Safety funds (Also show in TIPID #2008-076) and add $2,000,000 of state Bridge On-System funds in FY2014. Reduce state Regional Priority Project (RPP) funds by $8,250,000 in FY2014 and $5,850,000 in FY2015. Increase total project funding. 10/13/2011 Amended Add $3,300,000 of state Regional Priority Project (RPP) funding and remove $1,925,000 of state Congestion Relief funding in FY2012. Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 08/18/2010 Amended Add $39,000,000 of state Regional Priority Project (RPP) funds in FY 2011 and reduce future funding by the corresponding amount. Total funding remains unchanged. 06/21/2010 Amended In FY 2010, reduce ARRA (ES9-CDOT) funds by $1,000,000, increase state Regional Priority Project (RPP) funds by $1,000,000, and decrease state Congestion Relief funds by $681,000. In FY 2011, reduce state Regional Priority Project funds by $10,178,000 and increase state Congestion Relief funds by $20,000. Reduce total project funding. 02/17/2010 Amended Add $500,000 of state Regional Priority Project (RPP) funds in FY 2010. Increase total project funding. 10/15/2009 Amended Add $2,000,000 of state Regional Priority Project (RPP) funds in FY 2010. Increase total project funding. 08/28/2009 Amended Decrease Surface Treatment funds by $3,900,000 in FY 2010. Decrease total project funding. 08/19/2009 Amended Reduce state Congestion Relief funds by $681,000 in FY 2010 and add $20,000 in FY 2011, and reduce state Regional Priority Project (RPP) funds by $10,072,000 in FY 2010 and add $235,000 in FY 2011. Decrease total project funding. 08/12/2009 Amended Add $14,300,000 of ARRA (ES9-CDOT) funds in FY 2010. Increase total project funding. 07/15/2009 Amended Add $4,900,000 of state Surface Treatment funds in FY 2010 from Surface Treatment Pool (TIP ID # 2001-214). Increase total project funding. 07/06/2009 Amended Reduce state Congestion Relief funds by $681,000 in FY 2010 and add $20,000 in FY 2011, and reduce state Regional Priority Project (RPP) funds by $10,072,000 in FY 2010 and add $235,000 in FY 2011. Decrease total project funding. 03/23/2009 Amended Add $22,100,000 of ARRA (ES9-CDOT) funds to FY 2009. Increase total project funding. 06/30/2008 Amended Transfer $1,925,000 of state Congestion Relief funds from FY 2009 to FY's 2012-2013. Total project funding remains unchanged. 03/19/2008 Approved Adopted into the 2008-2013 TIP 11/29/2007 Amended Add $11,000,000 of HB-1310 Regional Priority Project (RPP) funds to FY 2008 and reduce future funding by $11,000,000. Total funding remains unchanged. 01/31/2007 Amended Add $8,000,000 in Regional Priorities Program funds (Source HB 1310) in FY2007 and set total costs at amount defined from 1999-009. 50 2016-2021 Transportation Improvement Program (Approved TIP) Title: RTD Enhancements - ADA/Ped/Bus Shelter TIP-ID: 2007-169 Project Type: Transit Passenger Facilities STIP-ID: SST6741.018 Open to Public: Sponsor: R T D Project Scope ADA upgrades and pedestrian improvements at the LRT stations; shelter kits including canopies, bike accessory upgrades, and landscaping upgrades at the Transit Centers and Park-n-Rides; digital signage installations along the LRT corridors; ADA bus announcement upgrades at station boarding areas, and public art projects at the stations. Affected County(ies) Regional Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $530 $545 $562 $578 $1,156 State $0 $0 $0 $0 $0 Local $106 $109 $113 $116 $232 $636 $654 $675 $694 $1,388 Federal (5307) $0 Total Total Funding $0 $4,047 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 04/10/2014 Amended Add $360,000 in federal Section 5307 funds and $97,000 in local match in FY2013, $375,000 federal and $101,000 in local match in FY2014, $390,000 federal and $105,000 in local match in FY2015 and $1,093,000 federal and $273,000 in local match in FY2016-17. Increase total project funding. 06/12/2012 Amended Update project scope to include “ADA bus announcement upgrades at station boarding areas.” Total project funding remains unchanged. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 03/15/2011 Amended Add $364,000 of federal Section 5307 funds and $91,000 local match to FY2011 and modify project scope to add ‘New enhancement funds will be used for fixed-route ADA automatic annuciators, shelter enhancements and bicycle upgrades.’ Increase total project funding.) 03/19/2008 Approved Adopted into the 2008-2013 TIP 06/08/2007 Amended Allocate Section 5307 funds as follows; $1,409,000 to FY 2007, $400,000 to FY 2008, $404,000 to FY 2009 and $408,000 to FY 2010-2012; and local match of $352,000 to FY 2007, $100,000 to FY 2008, $101,000 to FY 2009 and $102,000 to FY 2010-2012. 51 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 4 Bridge Off-System Pool TIP-ID: 2008-028 Project Type: Bridge STIP-ID: SR46601 Open to Public: Sponsor: CDOT Region 4 Project Scope Bridge Off-System Pool funds off-system bridge projects throughout CDOT Region 4 (Boulder and SW Weld Counties). Affected County(ies) Boulder Weld Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (BRO) $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Total Funding $0 $0 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 08/21/2013 Amended Add $159,000 of federal Bridge Off-System funds and $40,000 of local match in FY2014 allocating to: County Rd 5 Over Sullivan Ditch ($159,000). Increase total project funding. 02/15/2012 Amended Add $830,000 of federal Bridge-off System funding and $207,000 of local match in FY2012 allocating to Boulder County Rd 49 over St. Vrain Canal. Increase total project funding. 12/15/2011 Amended Add $261,000 of state Regional Priority Project (RPP) funding in FY2012 allocating to Lefthand Creek Bridge- 63rd St ($221,000) and Weld County Bridge ($40,000). Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 07/26/2010 Amended Add $320,000 of state Bridge Off-System funds and $80,000 of local funds in FY 2010 and allocate to the Bridge Rehabilitation Project: Weld County Road (WCR) 6 and US-85. Increase total project funding. 52 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 FASTER Pool TIP-ID: 2008-076 Project Type: Safety STIP-ID: SR17002 Open to Public: Sponsor: CDOT Region 1 Project Scope Pool contains safety-related improvements and upgrades based on the new FASTER funding program (Colorado Senate Bill 108) in CDOT Region 1. Affected County(ies) Adams Arapahoe Broomfield Denver Douglas Jefferson All pool project funding depicts federal and/or state funding only. Facility Name Start-At and End-At Cost (1,000s) Facility Name (Cont) Start-At and End-At Cost (1,000s) Facility Name (Cont) Start-At and End-At Cost (1,000s) I-76 and C-470 Cable Barrier $1,224 SH-95 Intersection Improvements 64th Ave $851 High Line Canal Trail Underpass Parker/Mississippi $3,201 I-70 PPSL $3,000 SH-121/72nd Ave Right turn accel lanes $961 Cable Median Barrier 104th to 168th Ave $2,000 C-470 Path Separations $1,572 SH-121 Intersection Improvements Waterton Rd $2,050 US-85 and Kuner Rd Barrier Replacement Bromley to Bridge Founders Pkwy Intersection Reconstruct Crowfoot Valley Rd Girton, Eastman and Yale I-70 at 32nd Ave and C- Chain Station Lighting 470 $594 SH-177 Sidewalks Mineral Ave to Orchard Rd SH-391 $570 I-70/US-6 Chain station lighting improvements $1,000 Wadsworth TOD left turn protection $440 I-76 Curve Reconstruction and Lane Balancing US-85 $6,150 Region 1 TSM Study Outcomes $5,000 $200 I-76 Roundabouts at ramp terminals Bromley Ln $2,164 FASTER Safety Design $4,000 Jefferson County Schools Access SH-2 Traffic Signal Upgrades SH-75 and Mineral Ave Amounts in $1,000s Curb ramp and B/P crossing improvements Prior Funding FY16 $86,453 FY19 FY20-21 Future Funding $0 $0 $0 $0 $20,724 $2,424 $17,869 $19,869 $0 $0 $0 $0 $0 $0 $20,724 $2,424 $17,869 $19,869 $0 Local Total FY18 $0 Federal State (Faster-S) FY17 $521 $560 $1,602 $200 Total Funding $0 $147,339 Date Status Description 05/05/2015 Proposed Increase US-85 and Kuner Rd Barrier Replacement cost from $560,000 to $700,000 to reflect sponsor"s original request. Total project funding remains unchanged. 04/16/2015 Approved Proposed for adoption into 2016-2021 09/20/2013 Amended Transfer pool project I-25/Santa Fe (#2007-158) and add $13,000,000 from unallocated (total=$29,500,000) and transfer US-85: Santa Fe Dr and Oxford UPRR Crossing Surface Replacement and add $230,000 from unallocated (total=$730,000) from TIPID #2008-078. Add new pool project: US-285: Shaffers Crossing Interchange ($500,000) using unallocated funds. Total project funding remains unchanged. 08/21/2013 Amended Add $260,000 of state Bridge On-System funds in FY2014 substituting out the FASTER Safety funds to pool project: I-25 SB at Surry Ridge RdConcrete Approach Slab Replacements ($260,000). Add $24,315,000 in FY2014 and $25,204,000 in FY2015 of state FASTER Safety funds and pool project "Signal Upgrades- Various Locations (+$150,000 = $3,400,000 total)" transferred from project TIPID #2008-078. Increase total project funding. 08/21/2013 Amended Add $260,000 of state Bridge On-System funds in FY2014 substituting out the FASTER Safety funds to pool project: I-25 SB at Surry Ridge RdConcrete Approach Slab Replacements ($260,000). Add $24,315,000 in FY2014 and $25,204,000 in FY2015 of state FASTER Safety funds and pool project "Signal Upgrades- Various Locations (+$150,000 = $3,400,000 total)" transferred from project TIPID #2008-078. Increase total project funding. 07/24/2013 Amended Add $917,000 of state FASTER Safety funds, allocating to: I-25 SB at Surrey Ridge Rd: Concrete Approach Slab Replacements ($1,460,000) and US -40: Byers to Deer Trail- Asphalt and Bridge Repair ($657,000). Increase total project funding. 53 Date Status Description 04/09/2013 Amended Add $300,000 of state FASTER Safety funds in FY2013 allocating to: I-25: US-85/SH-86 Interchange Improvements ($1,500,000). Increase total project funding. 12/05/2012 Amended Add $4,000 of state FASTER Safety funds in FY2013 allocating to: SH-83: Access Improvements in Franktown ($504,000). Increase total project funding. 11/07/2012 Amended Reallocate $3,900,000 of state FASTER Safety funds from FY2012 to FY2013. Add $2,000,000 of state FASTER Safety funds in FY2013 allocating to new pool project: US-40: Type 3 W-Beam Guardrail Replacement. Increase total project funding. 10/15/2012 Amended Delete the I-70 East: Tower-Colfax pool project and reduce state FASTER Safety funds in FY2013 by $3,900,000. Decrease total project funding. 09/18/2012 Amended Add $200,000 of state FASTER Safety funds in FY2013 allocating to I-25: Allen Way Intersection/I-25 intersection improvements and rename the project I-25: US-85/SH-86 Interchange Improvements. Increase total project funding. 08/13/2012 Amended Add $600,000 of state FASTER Safety funds in FY2013 allocating to: SH-74: Culverts Relining & Repairs ($400,000) and US-285: Windy Point Underdrain Removal & Replacement ($200,000). Increase total project funding. 05/04/2012 Amended Project awarded additional funding and adds a new pool project. Add $187,000 in FY2012 of additional state FASTER funds to SH-83 (Parker Rd)N. Russelville Rd ($687,000) and $1,200,000 in FY2013 of state FASTER funds allocating to a new project: I-25 SB at Surrey Ridge Road 12/15/2011 Amended Add $28,000 of state FASTER Saftey funds in FY2012 allocating to pool project US-285: Truck Warning System Aspen Park to Morrison ($28,000). Increase total project funding. 11/14/2011 Amended Project awarded $121,000 of state FASTER funds in FY2012, allocating to pool project SH-86 at Deerpath Road, and $500,000 of state FASTER funds in FY2013, allocating to the new pool project I-70 West: Floyd Hill Wildlife Mitigation. Increase total project funding. 08/15/2011 Amended Shift $1,522,000 of state FASTER funding from FY2012 to FY2013 and reduce state FASTER funding in FY2012 by $1,255,000. Add $200,000 to SH -83: North Russelville Rd Intersection improvements. Add the following new projects: SH 83 Access Improvements in Franktown ($500,000), US85/ North Meadows Extension: New Interchange ($4,600,000), US-285 Truck Warning System: Aspen Park to Morrison ($400,000), I-70 West: Recreational Path/Non-motorized Highway Bypass from El Rancho to Genesee ($700,000), I-25 & SH 86: Allen Way Intersection/I-25 Interchange Improvements ($1,000,000), I-70 West: Active Traffic Management - Mt.Vernon Canyon-East ($2,500,000). Decrease total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 06/20/2011 Amended Add $62,000 of state FASTER safety funding to FY2011 allocating to South I-25 Frontage Road Cable Rail Installation ($887,000). Increase total project funding. 04/20/2011 Amended Add $95,000 of FASTER Safety funds in FY2011, allocating to SH-86 at Deerpath Rd. Increase total project funding. 03/15/2011 Amended Reallocate $322,000 of state FASTER Safety funds from US-285: Bailey to Richmond Hill in FY2010 to FY2011 allocating to US-285: Turkey Creek Canyon. Total funding remains unchanged. 12/22/2010 Amended Add $13,000 to I-70 West: Delineator Upgrades project in FY2011 and move $4,200,000 to FY2012-13. Increase total project funding. 11/10/2010 Amended Remove $500,000 from US-285: Turkey Creek Canyon project and $275,000 from I-25 South: near Tomah Road project, and reduce FY2011 amount by corresponding amounts. Decrease total project funding. 05/21/2010 Amended Add $620,000 to the US-285: Turkey Creek Median Rockfall project from US-285 Overlay: Bailey-Richmond Hill project. Total funding remains unchanged. 02/23/2010 Amended Add $7,075,000 of Faster Safety funds to FY 2011 and allocate to new projects as follows; SH-83 (Parker Road): North Russelville Rd Intersection Improvements ($300,000), SH-83 (Parker Road): Indian Pipe Decel Lane NB ($400,000), SH-86 and Deerpath Rd: Widening EB Left Turn Lane ($400,000), I-70 West (Jeff Co): Delineator Lanes ($175,000), US-285: Turkey Creek- Median Updgrades/Rockfall Mitigation ($500,000), I-70 East: Tower to Colfax- Shoulder Improve. ($3,900,000), I-70 East (near Bennett): VMS Install. ($300,000), I-25 South (near Tomah Rd): Cable Rail Maintenance ($1,100,000). Increase total project funding. 54 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 4 FASTER Pool TIP-ID: 2008-077 Project Type: Safety STIP-ID: SR460606 Open to Public: Sponsor: CDOT Region 4 Project Scope Pool contains safety-related improvements and upgrades based on the FASTER funding program (Colorado Senate Bill 108) in CDOT Region 4. Affected County(ies) Boulder Weld All pool project funding depicts federal and/or state funding only. Cost (1,000s) Facility Name Start-At and End-At SH-7 Shoulder Gaps and Safety (Flood) Amounts in $1,000s Prior Funding FY16 State (Faster-S) SH-119 Gilpin CL to Boulder City Limits FY18 FY19 Cost (1,000s) Facility Name (Cont) Start-At and End-At Cost (1,000s) $2,000 FY20-21 Future Funding $0 $0 $0 $0 $0 $5,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000 $0 $0 $0 $0 Local $0 Start-At and End-At FY17 Federal Total $3,000 Facility Name (Cont) Total Funding $0 $5,000 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 11/07/2012 Amended Reduce funding for SH-119 at Jay Rd and SH-119 at Niwot Rd by $700, returning funds to unallocated. Total project funding remains unchanged. 02/15/2012 Amended Add the following pool project using existing pool funds: SH-93: SH-170 to SH-128 Shoulders Project ($2,100,000). Total project funding remains unchanged. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 05/19/2011 Amended Add the following new project: design and Right-of-way for SH93 shoulders from Hwy 170 to Hwy 128 for $400,000 from existing state FASTER safety funding. Total funding remains unchanged. 08/17/2010 Amended Decrease SH-7 Lengthen Culverts project by $300,000 in FY 2011. Decrease total project funding. 07/26/2010 Amended Add $8,000,000 of FASTER Safety funds in FY's 2012-2013 and allocate as follows; New projects: SH-119 at WCR 5.5 (signal improvements) for $350,000, Baseline at US-36: Bike/Ped Underpass for $500,000, SH-42 at Paschal Underpass for $650,000, and US-287 at SH-119 (Longmont intersection improvements) for $1,250,000. Allocate the following amounts to existing projects; SH-119 at Jay Rd. for $1,500,000, SH-119 at Niwot Rd. for $1,500,000, and SH-66 WCR 17-19 for $2,250,000. Increase total project funding. 03/16/2010 Amended Add $4,600,000 of FASTER Safety funds in FY 2011, allocating $2,250,000 to SH-52 at WCR 11 Intersection, and adding the following projects: SH119 at WCR 7.5 Signal for $350,000, SH-7: Lengthen Culverts for $1,000,000, and SH-66, WCR 17-09 surface treatment, shoulders, and turn lanes for $1,000,000. Increase total project funding. 55 2016-2021 Transportation Improvement Program (Approved TIP) Title: North I-25: Front Range EIS TIP-ID: 2008-081 Project Type: Roadway/Transit Studies STIP-ID: SSP4028 Open to Public: Sponsor: CDOT Region 4 Project Scope Funds will be used to complete the Final Environmental Impact Statement, the Record of Decision for Phase I of North I-25 (MP 214 - 269), and for design and Right of Way for phase I elements. Project funding shown is for DRCOG portion only. Affected County(ies) Weld Amounts in $1,000s Prior Funding FY16 FY17 $21,317 FY20-21 Future Funding $0 $0 $0 $0 $465 $451 $438 $425 $0 $0 $0 $0 $0 $0 $465 $451 $438 $425 $0 Local Total FY19 $0 Federal State (R P P) FY18 Total Funding $0 $23,096 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 03/19/2015 Amended Add $60,000 of state RPP funds in FY2015 for additional evaluation at SH-7. Increase total project funding. 03/19/2015 Amended Add State RAMP funding type. Add $10,000,000 of State RAMP funds in FY2015 for preconstruction activities. Increase total project funds. 01/07/2014 Amended Add $1,200,000 in state Regional Priority Program (RPP) funds in FY2014. Increase total project funding. 12/11/2013 Amended Add $1,200,000 of state Regional Priority Project (RPP) funds in FY2014. Increase total project funds. 05/16/2013 Amended Add $150,000 of state 7th Pot funds in FY2013. Increase total project funding. 05/09/2013 Amended Add $2,303,000 in FY2014, $2,303,000 in FY2015, and $5,852,000 in FY2016-17 of state RPP funds. Increase total project funding. 10/15/2012 Amended Reduce state Regional Priority Projects (RPP) funding by $450,000 in FY2013 and add $450,000 of 7th Pot funds in FY2013. Total project funding remains unchanged. 02/15/2012 Amended Add $1,035,000 of state Regional Priority Project (RPP) funding in FY2015. Increase total project funding. 12/15/2011 Amended Add $1,900,000 in FY2012, $1,035,000 in FY2013, and $1,035,000 in FY2014 of state Regional Priority Project (RPP) funding. Increase total project funding. 10/13/2011 Amended Update scope to read:‘Funds will be used to complete Final Environmental Impact Statement, the Record of Decision for Phase I of North I-25 (MP 214 - 269), and design and Right of Way for Phase I elements. Project funding shown is for DRCOG portion only.’Total project funding remains unchanged.) 04/20/2011 Amended Add $1,000,000 in state Regional Priority Project (RPP) funds to FY2012. Increase total project funding. 04/12/2011 Adopted Adopted into the 2012-2017 TIP 03/16/2010 Amended Add $1,200,000 of Regional Priority Project (RPP) funds to FY 2010. 56 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 FASTER Bridge Enterprise Pool TIP-ID: 2008-103 Project Type: Bridge STIP-ID: SST8102 Open to Public: Sponsor: CDOT Region 1 Project Scope Pool contains bridge-related improvements and repairs based on the new FASTER Bridge Enterprise funding program (Colorado Senate Bill 108) in CDOT Region 1. Affected County(ies) Adams Arapahoe Broomfield Denver Douglas Jefferson All pool project funding depicts federal and/or state funding only. Facility Name Start-At and End-At I-70 Over UPRR York St Cost (1,000s) Cost (1,000s) Facility Name (Cont) Start-At and End-At $11,934 US-287 (Federal) Over BNFN at 69th Ave Over I-270 $17,380 County Rd Over I-70 $7,296 I-70 WB Over US 6, Clear Creek $30,000 US-36 Over Draw $3,379 I-70 Frontage Rd Over Clear Creek $3,910 SH-9 Over Platte Gulch Amounts in $1,000s Prior Funding FY16 $113 FY19 FY20-21 I-70 Viaduct (see TIP ID-2016-003) US-85 Sand Creek Future Funding $0 $0 $0 $0 $11,000 $4,154 $17,000 $54,773 $0 $0 $0 $0 $0 $0 $11,000 $4,154 $17,000 $54,773 $0 Local Total FY18 Start-At and End-At Cost (1,000s) $113 $874 $0 Federal State (FASTER-B) FY17 $12,154 Facility Name (Cont) Total Funding $0 $87,040 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 02/21/2013 Amended Add $113,000 of state FASTER Bridge funds in FY2013 allocating to new project: US-85 over Sand Creek ($113,000). Increase total project funding. 03/13/2012 Amended Add $3,600,000 of state FASTER Bridge Enterprise funding in FY2012 allocating to: US-85 over Oxide Draw ($1,500,000) and US-85 over Highlands Gulch ($2,100,000). Increase total project funding. 12/15/2011 Amended Add $1,617,000 of state FASTER Bridge funding in FY2012 allocating to pool project SH-36 Bridge over Comanche Creek. Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 03/15/2011 Amended Add $240,000 of state FASTER Bridge Enterprise funds to FY2011 allocating to SH-36 Bridge over Comanche Creek. Increase total project funding. 09/14/2010 Amended Add one project to the pool under state Bridge Enterprise funds in FY 2011; SH-36 over Comanche Creek (Design) for $216,000. 57 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 FASTER Transit Pool TIP-ID: 2008-105 Project Type: Transit Operational Improvements STIP-ID: SR17004 Open to Public: Sponsor: CDOT Region 1 Project Scope Pool contains transit-related projects based on the new FASTER Transit program (Colorado Senate Bill 108) in CDOT Region 1 (DRCOG TIP-area only). Affected County(ies) Adams Arapahoe Douglas Jefferson All pool project funding depicts federal and/or state funding only. Facility Name Start-At and End-At Seniors Resource Center purchase vehicles (FY12) RTD US-285/Pine Junction park-nRide (FY12) Castle Rock Senior Center Shuttle Bus Replacement (FY13) Seniors Resource Center Cost (1,000s) Cost (1,000s) Facility Name (Cont) Start-At and End-At Seniors Resource Center Evergreen Vehicle Purchase (FY14) Arvada Olde Towne Arvada Bus Transfer phase 2 $50 RTD Civic Center Station Phase II $595 “Fix it First” Improvements to Evergreen Transit Facility (FY13) $41 Seniors Resource Center Vehicle Replacements - SRC Urban and A-Lift $48 Douglas County Transit To the Rescue (TTR) Transit Solutions (FY14) $227 RTD Thornton Park-n-Ride Expansion Amounts in $1,000s Prior Funding $26 $960 FY16 FY17 FY18 FY19 $1,339 FY20-21 Superior/Louisville DDI Transit Improvements $464 Thornton SH 7 at I-25 Carpool Lot $522 RTD Church Ranch P-n-R Boarding Platforms Relocation Future Funding $0 $0 $0 $0 $0 State (Faster-T) $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,493 Start-At and End-At $1,266 $997 Federal Total $26 Cost (1,000s) Facility Name (Cont) Total Funding $0 $8,493 Date Status Description 05/05/2015 Proposed Add $1,240,000 of state FASTER Transit funds in FY2016. Add the following projects in FY2016 and corresponding amounts; East Colfax/15L Transit Enhancements Project (RTD) for $770,000 and Speer Blvd Light Rail Crossing Repair and Replacement (RTD) for 470,000. Increase total project funding. 05/05/2015 Amended Proposed for adoption into 2016-2021 06/26/2014 Amended Add $5,660,277 of state FASTER Transit funds in FY2015 and $1,132,055 in local safety funds in FY2015. Add the following projects and corresponding state funding amounts to the pool; Arvada Olde Towne Arvada Bus Transfer Facility phase 2 for $1,338,521; RTD Civic Center Station Phase II for $594,879; Seniors Resource Center Vehicle Replacements – SRC Urban and A-Lift for $48,000; RTD Thornton Park-n-Ride Expansion for $997,404; Superior/Louisville DDI Transit Improvements for $463,610; Thornton SH 7 at I-25 Carpool Lot for $521,988; and RTD Church Ranch P-n-R Boarding Platforms Relocation for $1,265,863. Increase total project funding. 03/15/2013 Amended Add $253,000 of state FASTER Transit funds and $63,000 of local match in FY2014 allocating to the following new pool projects: Seniors' Resource Center- Evergreen Vehicle Purchase ($26,000), and Douglas County Transit Solutions- To the Rescue (TTR) Transit ($227,000). Increase total project funding. 03/13/2012 Amended Add $91,000 of state FASTER Transit funding and $22,000 of local match in FY2013 allocating to: Castle Rock Senior Center Shuttle Bus Replacement ($50,000) and Seniors’ Resource Center (SRC) “Fix it First” Improvements to Evergreen Transit Facility ($41,000). Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 12/22/2010 Amended Add 3 projects to the pool under FASTER Transit funds in FY2011 and FY2012 totaling $1,272,000, including local match. Specific projects listed in the scope. Increase total project funding. 58 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 4 FASTER Transit Pool TIP-ID: 2008-106 Project Type: Transit Operational Improvements STIP-ID: SR47005 Open to Public: Sponsor: CDOT Region 4 Project Scope Pool contains transit-related projects based on the FASTER Transit program (Colorado Senate Bill 108) in CDOT Region 4 (DRCOG-TIP area only). Affected County(ies) Boulder Weld All pool project funding depicts federal and/or state funding only. Facility Name Start-At and End-At Boulder 14th/Walnut Tran. Center Improv. (Prior Funding) Boulder Transit Stop Enhancements (Prior Funding) Boulder County Bus Stop Improvements (Prior Funding) RTD US-287 and Niwot pnR Expansion (Prior Funding) Amounts in $1,000s Prior Funding Cost (1,000s) FY16 Cost (1,000s) Facility Name (Cont) Start-At and End-At $370 RTD Tantra Dr pnR upgrades (Prior Funding) $230 Boulder County Special Transit Mountain Service (Prior Funding) $84 eGO Car Share $280 36 Commuting Solutions FY17 FY18 Start-At and End-At City of Boulder Broadway Euclid Transit Stop Improvements (Prior Funding) $350 $54 CDOT DTR Service Development Plan for Front Range Commuter Rail (Prior Funding) $352 “SHIFT” (Shared Hubs Integrated for Transp CMAQ Match (Prior Funding) $18 CDOT Region 4 DDI Transit Improvements (Prior Funding) $964 Prepaid Pass Kiosks for US36 BRT (Prior Funding) $781 FY19 FY20-21 $0 $0 $0 $0 $0 State (Faster-T) $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,374 $284 Future Funding Federal Total Cost (1,000s) Facility Name (Cont) Total Funding $0 $5,374 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 03/15/2013 Amended Add $1,017,000 in FY2014 and $579,000 in FY2015 of state FASTER Transit funds and $255,000 in FY2014 and $144,000 in FY2015 of local match, allocating to the following new projects: CDOT DTR - Service Development Plan for Front Range Commuter Rail ($352,000), CDOT Region 4- DDI Transit Improvements (statewide funds) ($964,000); as well as additional funding for the following existing projects: Boulder- 14th/Walnut Tran. Center Improvements (statewide funds) ($370,000- removing $200,000 of FY11 funds and adding $170,000 of FY14 funds), and Boulder- Transit Stop Enhancements ($230,000- removing $120,000 of FY11 funds and adding $110,000 of FY14 & 15 funds). Reduce state FASTER Transit funds by $16,000 and local match by $4,000 in FY2012 to reconcile with pool project totals. Transfer $240,000 of state FASTER Transit funds and $60,000 of local match in FY2012 to TIPID #2012-051 and remove pool project Boulder County- SH119 Ped Underpass. Increase total project funding. 03/13/2012 Amended Add $1,767,000 of state FASTER Transit funding and $355,000 of local match in FY2013 allocating to: US-287 and Niwot pnR Expansion (statewide funds) ($280,000), Tantra Dr pnR upgrades (statewide funds) ($284,000), Boulder County Special Transit Mountain Service ($54,000), eGO Car Share “SHIFT” CMAQ Match TIP-ID #1997-097 ($18,000), 36 Commuting Solutions Prepaid Pass Kiosks for US-36 BRT (statewide funds) ($781,000), and Boulder Broadway Euclid Transit Stop Improvements ($350,000). Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 12/22/2010 Amended Add 6 projects to the pool under FASTER Transit funds in FY2011 and FY2012 totaling $1,577,000, including local match. Specific projects listed in the scope. Increase total project funding. 59 2016-2021 Transportation Improvement Program (Approved TIP) Title: FasTracks Eagle P-3 Corridors (Gold and East Line) TIP-ID: 2008-111 STIP-ID: Project Type: Rapid Transit Open to Public: 2016 Sponsor: R T D Project Scope Build electrified commuter rail line running from Denver Union Station to Denver International Airport (East Line) and Denver Union Station to Ward Rd (Gold Line). Projects being combined at the request of FTA due to outcome of P-3 process. Former East Corridor TIP-ID 2007-052 and Gold Line Corridor TIP-ID 2007-054. FasTracks Second Commitment in Principal STP-Metro funding for I-225 in FY16 will support double tracking in portions of the East Corridor. Affected Municipality(ies) Affected County(ies) Arvada Adams Aurora Denver Denver Jefferson Wheat Ridge Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $0 $0 $0 $0 $0 Federal (5309S) $165,000 $150,000 $45,950 $0 $0 Federal (STP-M) $3,650 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $913 $0 $0 $0 $0 $140,729 $140,856 $41,696 $0 $0 $310,292 $290,856 $87,646 $0 $0 Federal Local (RTD) Total $1,224,211 Total Funding $0 $1,913,005 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 09/18/2014 Amended Add language to scope and add $984,000 in federal STP-Metro funds transferred from TIP ID 2012-084 in FY2014 for the North Metro Corridor's FasTracks Second Commitment in Principle funding, which will support Gold Line 60th Avenue improvements. Increase total project funding. 06/26/2014 Amended Revise 8/16/2012 amendment to move the I-225 Second Commitment in Principal project location from the Peoria/Smith station to double tracking in portions of the East Corridor. Add additional language to the scope to reflect this. Total project funding remains unchanged. 10/15/2012 Amended Reduce local match by $8,951,000 in FY2013, $3,650,000 in FY2014, and $3,600,000 in FY2015 which should have been removed previously with the addition of new federal funds. Decrease total project funding. 08/16/2012 Amended Add $3,600,000 in FY2015 and $3,650,000 in FY2016-17 of federal CMAQ funds for the I-225 Corridor's FasTracks Second Commitment in Principle funding, which will support the Peoria/Smith Station. Increase total project funding. 08/06/2012 Amended Add $7,161,000 of federal CMAQ funds and $1,790,000 of local match in FY2013 representing $700,000 of the North West Corridor's federal funds and all ($6,461,000) of the Gold Corridor's federal funds from FasTracks: DRCOG Second Commitment in Principle Pool (TIP ID 2012-010). Increase total project funding. 12/05/2011 Amended Reallocate $2,000,000 of federal CMAQ funds and $500,000 of local match from FY2014 to FY2012 and $2,000,000 of federal CMAQ funds, $3,000,000 of STP Metro and $1,250,000 of local match from FY2013 to FY2012. Total project funding remains unchanged. 11/17/2011 Amended Add $2,000,000 in FY2012, $2,000,000 in FY2013, and $2,000,000 in FY2014 of federal Congestion Mitigation / Air Quality (CMAQ) funds and $3,000,000 in FY2012, $3,000,000 in FY2013, and $1,350,000 in FY2014 of federal STP Metro funds. Increase total project funding. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 12/22/2010 Amended Transfer prior Gold Line (2007-054) and East Line (2007-052) federal Section 5309 New Starts and RTD local funding into single project. 60 2016-2021 Transportation Improvement Program (Approved TIP) Title: US-36: Boulder to I-25 Managed Lanes/BRT TIP-ID: 2008-114 Project Type: Roadway Capacity STIP-ID: SDR2073 Open to Public: 2016 Sponsor: HPTE Project Scope Construction of managed lanes/BRT on US-36 from Table Mesa Dr to I-25 Express Lanes. 2016-2021 TIP funding will construct ancillary enhancements. 2012-2017 TIP funding constructed an extension of the Managed Lane/BRT Facilities/US-36 Bikeway from the current terminus west to Table Mesa. Affected Municipality(ies) Affected County(ies) Broomfield Adams Westminster Boulder Broomfield Jefferson Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 $8,000 $838 $0 $0 $0 $8,000 $838 $0 $0 $0 Local (RTD) $452,278 Total $264,184 Total Funding $725,300 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 12/20/2013 Amended Add $71,800,000 of local Private funds in FY2014. Increase total project funding. 08/21/2013 Amended Add $3,000,000 of State Transportation Committee (STC) Discretionary funds in FY2014. Increase total project funding. 12/05/2012 Amended Transfer $1,500,000 of state Regional Priority Project (RPP) funds from Future Funds to FY2013. Total project funding remains unchanged. 10/04/2012 Amended Add $3,805,000 of federal STP Metro funds, $9,742,000 of federal CMAQ funds, and $67,637,000 of local match in FY2013 and $1,453,000 of federal STP Metro funds and $363,000 of local match in FY2015. Increase total project funding. 09/18/2012 Amended Reallocate $4,000,000 of state STC Discretionary funds from Future Funds to FY2013. Update project scope by changing the project terminus from Interlocken to Table Mesa. Total project funding remains unchanged. 05/04/2012 Amended Reallocate $2,000,000 of state Regional Priority Project (RPP) funding from Future Funding to FY2012. Total project funding remains unchanged. 04/10/2012 Amended Reallocate $2,500,000 of state Regional Priority Project (RPP) funding from Future Funding to FY2012. Total project funding remains unchanged. 03/13/2012 Amended Reallocate $2,000,000 of state Regional Priority Project (RPP) funding from Future Funding to FY2012. Total project funding remains unchanged. 10/18/2011 Amended Reallocate $410,000 in federal STP-Metro funds and $1,467,000 in federal CMAQ funds from FY2013 to FY2012 and $9,408,000 in federal STPMetro and $730,000 in federal CMAQ funds from FY2014 to FY2012. Total project funding remains unchanged. 08/18/2011 Amended Advance $60,000,000 from future funding to FY2012 per FHWA request and show $6,000,000 as federal TIGER funds and $54,000,000 as federal TIFIA funds. Total funding remains unchanged. 04/20/2011 Amended 1) Advance project funds. Decrease future funding by $90,000,000 and allocate $30,000,000 to FY2012, $30,000,000 to FY2013, and $30,000,000 to FY2014 as RTD local funds. 2) Change scope from “…west of Wadsworth Blvd to E. Flatirons Cir.” to “…from the current terminus west to Interlocken or further, if funding allows.” 3) Shift project funds. Shift $3,125,000 of Prior Funding to FY2012 and distribute $2,500,000 in state FASTER Transit funds and $625,000 in local match (RTD). 4) Correct previous mistake by removing local match for CMAQ and STP Metro funding. FASTER Transit and RTD funds will be used for matching these two federal funds. Total funding remains unchanged. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 04/20/2011 Amended Shift $2,500,000 in state FASTER Transit funds and $625,000 in local match from FY2011 to FY2012-13. Total funding remains unchanged. 03/02/2011 Amended 61 2016-2021 Transportation Improvement Program (Approved TIP) Title: DRCOG Second Commitment to FasTracks Pool TIP-ID: 2012-010 STIP-ID: Project Type: Transit Operational Improvements Open to Public: Sponsor: DRCOG Project Scope Set aside to fund second commitment in principle to FasTracks corridors not yet allocated. Individual projects will be TIP’d upon approval of Policy Amendments per the process and requirements of DRCOG Resolution 20-2008 (July, 2008). Corridor projects previously approved using second commitment funds include: - West Corridor (TIP ID 2007-042)- July 2010, $7,422,000 - US-36 Corridor (TIP ID 2008-114)- Feb 2011, $2,755,000 - Denver Union Station (TIP ID 2007-057)- July 2010, $2,519,000 - East Corridor (TIP ID 2008-111)- Nov 2011, $13,350,000. - Gold Corridor (TIP ID 2008-111)- May 2012, $6,461,000. - Northwest Corridor (TIP ID 2007-050)- May 2012, $1,200,000. - North Metro Corridor (TIP ID 2007-055)- May 2012, $7,451,000. - I-225 Corridor (TIP ID 2007-056)- July 2012, $7,250,000. Remaining allocations include: - Northwest Corridor $6,803,000 - Southeast Extension $1,928,000 - Southwest Extension $2,089,000 - Central Corridor $771,000 Affected County(ies) Regional Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (CMAQ) $4,073 $0 $0 $0 $0 Federal (STP-M) $6,518 $1,000 $0 $0 $0 State $0 $0 $0 $0 $0 Local $2,648 $250 $0 $0 $0 $13,239 $1,250 $0 $0 $0 $0 Total Total Funding $0 $14,489 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 11/07/2012 Amended Transfer funds to new TIP Projects TIP ID 2012-100 and 2012-101. Remove all funds in FY2016-17 and reduce Future Funding to $16,165,000 to reflect amount remaining after Board Action on July 27, 2012. Update project scope, increasing North Metro Corridor's approved funding to $7,451,000. Decrease total project funding. 08/06/2012 Amended Transfer $600,000 from FY2013, $200,000 from FY2014, $1,200,000 from FY2015 and $3,650,000 from FY2016-17 of federal CMAQ funds, $1,650,000 from FY2014 and $3,000,000 from FY2015 of federal STP-Metro funds, and $150,000 from FY2013, $463,000 from FY2014 , $1,050,000 from FY2015, and $913,000 from FY2016-17 of local match to projects receiving Second Commitment in Principal funds for the Gold, Northwest, North Metro, and I-225 Corridors. Decrease total project funding. 12/05/2011 Amended Reallocate $600,000 of federal CMAQ funds and $150,000 of local match from FY2015 to FY2013 and $200,000 of federal CMAQ funds and $50,000 of local match from FY2015 to FY2014. Total project funding remains unchanged. 11/17/2011 Amended Transfer $2,000,000 in FY2012, $2,000,000 in FY2013, and $2,000,000 in FY2014 of federal Congestion Mitigation / Air Quality (CMAQ) funds, and $3,000,000 in FY2012, $3,000,000 in FY2013, and $1,350,000 in FY2014 of federal STP Metro funds to TIP ID #2008-111 and remove $1,250,000 in FY2012, $1,250,000 in FY2013, and $837,500 in FY2014 of local match. Update title, scope, and funding to reflect pool as only showing remaining unallocated funds. Decrease total project funding 04/06/2011 Adopted Adopted into the 2012-2017 TIP 62 2016-2021 Transportation Improvement Program (Approved TIP) Title: SH-119: South of Hover Bike/Ped Underpass TIP-ID: 2012-051 Project Type: Bicycle and Pedestrian Projects (New) STIP-ID: SDR7007.009 Open to Public: 2017 Sponsor: Longmont Project Scope Project constructs a new multi-use underpass at least 8 ft wide and sidewalk connection under SH-119 south of the Hover St intersection. Additionally includes easements for a walkway, access to transit stops, and a midblock crossing of Hover south of SH-119, completing a gap between the multi-use trail along Hover with a similar trail on SH-119. The project will provide 20 bicycle parking spaces (10 of the spaces covered) as well as new ADA/AASHTO compliant lighting. Affected Municipality(ies) Affected County(ies) Longmont Boulder Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $955 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $746 $0 $0 $0 $0 $1,701 $0 $0 $0 $0 Federal (CMAQ) $295 Total Total Funding $0 $1,996 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 12/11/2013 Amended Transfer $955,000 of federal CMAQ funds and $746,000 of local match from FY2015 to FY2016. Total project funding remains unchanged. 04/09/2013 Amended Transfer $120,000 in FY2012 and $490,000 in FY2014 of state FASTER Transit funds and $30,000 in FY2012 and $123,000 in FY2014 of local match to TIPID #2012-058. Decrease total project funding. 03/15/2013 Amended Add $490,000 of state FASTER Transit funds and $123,000 of local match in FY2014. Receives $240,000 of state FASTER funds and $60,000 of local match in FY2012 transferred from TIPID #2008-106. Increase total project funding 10/18/2011 Amended Reallocate $10,000 in federal CMAQ funds and $100,000 in local match from FY2013 to FY2012. Total project funding remains unchanged. 04/06/2011 Adopted Adopted into the 2012-2017 TIP 63 2016-2021 Transportation Improvement Program (Approved TIP) Title: I-70/Kipling: NEPA Study TIP-ID: 2012-062 Project Type: Roadway/Transit Studies STIP-ID: Open to Public: Sponsor: CDOT Region 1 Project Scope Funding for activities post PEL. Affected Municipality(ies) Affected County(ies) Wheat Ridge Jefferson Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State (R P P) $0 $1,600 $500 $0 $0 Local $0 $0 $0 $0 $0 $0 $1,600 $500 $0 $0 $1,000 Total Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 04/06/2011 Adopted Adopted into the 2012-2017 TIP 64 Total Funding $0 $3,100 2016-2021 Transportation Improvement Program (Approved TIP) Title: I-25 North PEL Action Items TIP-ID: 2012-063 Project Type: Roadway Operational Improvements STIP-ID: SDR7067.999 Open to Public: Sponsor: CDOT Region 1 Project Scope The PEL Study will look at operational and safety improvements on I-25 from US -36 to SH-7 to provide relief to the existing general purpose lanes. Affected County(ies) Adams Amounts in $1,000s Prior Funding FY16 FY17 $15,500 FY20-21 Future Funding $0 $0 $0 $0 $900 $1,100 $0 $0 $0 $0 $0 $0 $0 $0 $900 $1,100 $0 $0 $0 Local Total FY19 $0 Federal State (R P P) FY18 Total Funding $0 $17,500 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 06/20/2011 Amended Project receives transfer of $2,000,000 in FY2013, $1,400,000 in FY2014, and $5,500,000 in FY2015 of state FASTER Safety funds from TIP ID #2008-078, $1,100,000 in state Congestion Relief funds in FY2014 from TIP ID #2007-093, and $5,500,000 in state Surface Treatment funds in FY2013 from TIP ID #2001-214 ($2,300,000 of which was previously unprogrammed). Increase total project funding. 65 2016-2021 Transportation Improvement Program (Approved TIP) Title: Regional TDM Program: Way to Go TIP-ID: 2012-064 Project Type: Congestion Management STIP-ID: SST6803.069 Open to Public: Sponsor: DRCOG Project Scope DRCOG will partner with transportation management agencies in the region to cooperatively carry out a comprehensive and coordinated program to mitigate traffic congestion and poor air quality through reducing travel demand. As part of The Program, DRCOG will offer: (a) Web-accessible CarPool matching programs for individuals and employers (b) SchoolPool programs with web-accessible matching software (c) Vanpool Services with web-accessible matching software (d) Telework programs (e) Regional Bike to Work Day Coordination (f) Guaranteed Ride Home programs (g) Support, Assistance, Materials, and Collateral for DRCOG services (h) Regional TDM web-page, portal, and web-applications supportive of The Program (i) Regional TDM services telephone numbers (j) Customer service staff for written, telephone, or email referrals, inquiries or issues (k) Developing and maintaining a marketing program to efficiently and effectively meet Program goals (l) Conducting surveys to determine the benefits of The Program (m) Reporting Program outcomes (n) Business Outreach (o) Maintaining an employer outreach database for shared use (p) Providing training and facilitating professional development opportunities Affected County(ies) Regional Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $3,600 $0 $3,600 $0 $0 State $0 $0 $0 $0 $0 Local $226 $0 $226 $0 $0 $3,826 $0 $3,826 $0 $0 Federal (CMAQ) $0 Total Total Funding $0 $7,652 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 10/04/2012 Amended Reallocate $1,800,000 of federal CMAQ funds, and $113,000 of local match from FY2015 to FY2014. Total project funding remains unchanged. 10/18/2011 Amended Reallocate $1,800,000 in federal CMAQ funds and $113,000 in local match from FY2013 to FY2012. Total project funding remains unchanged. 06/20/2011 Amended Project receives transfer of $1,800,000 in FY2012, $1,800,000 in FY2013, $1,800,000 in FY2014, and $1,800,000 in FY2015 of federal CMAQ funds and $113,000 in FY2012, $113,000 in FY2013, $113,000 in FY2014, and $113,000 in FY2015 of local match from TIP ID #1997-044. Increase total project funding. 66 2016-2021 Transportation Improvement Program (Approved TIP) Title: RTD Regional Workforce Initiative Now (WIN) TIP-ID: 2012-068 Project Type: Rapid Transit STIP-ID: SST7041.001 Open to Public: Sponsor: R T D Project Scope The Workforce Initiative Now (WIN) program is a sector-based workforce partnership that leverages existing training providers to assess, train and place community members into careers in transportation and transit construction. WIN helps businesses attain qualified local workers, supports regional job creation by connecting Colorado contractors with federally funded transit infrastructure projects and provides local residents with skills development training, jobs, and career pathways related to occupations within transportation and transitconstruction. Affected County(ies) Regional Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $487 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $487 $0 $0 $0 $0 $974 $0 $0 $0 $0 Federal (WIN) $584 Total Total Funding $0 $1,558 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 01/23/2012 Amended Add $487,000 of federal Workforce Initiative Now (WIN) funds and $97,000 of local match to Previous Funds. 67 2016-2021 Transportation Improvement Program (Approved TIP) Title: North Metro Rail 112th Ave Corridor Improvements TIP-ID: 2012-079 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2018 Sponsor: Northglenn Project Scope Project constructs a new 10 ft multi-use trail on the north side of 112th Ave from Washington St to York St, a new 10 ft multi-use trail from 112th Ave, north along the west side of York St leading to the 112th Ave FasTracks Station, and ADA compliant access at all road crossings. Additionally, project widens 112th Ave including the installation of box-culverts to direct the existing drainage into “underground” facilities, allowing the trail system to pass unobstructed on the surface at 112th Ave/Larson Dr and 112th Ave/Irma Dr. Also includes all right of way, easements, design and environmental clearance. Affected Municipality(ies) Affected County(ies) Northglenn Adams Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $99 $728 $0 $0 $0 State $0 $0 $0 $0 $0 Local $25 $207 $0 $0 $0 $124 $935 $0 $0 $0 Federal (STP-M) $0 Total Total Funding $0 $1,059 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 08/06/2012 Amended Add $99,000 of STP-Metro and $25,000 of local match in FY2016-17 and $728,000 of STP-Metro and $207,000 of local match in Future Funds. 68 2016-2021 Transportation Improvement Program (Approved TIP) Title: North Metro Rail 72nd Ave and Colorado Blvd Station Sidewalks TIP-ID: 2012-080 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2018 Sponsor: Commerce City Project Scope Project constructs the following facilities on Colorado Blvd from East 68th Ave to East 72nd Ave: 1. Curb, gutter, and a 5-foot wide (minimum) sidewalk along both sides of the street. 2. Drainage improvements, including inlets, manholes and RCP piping 3. Street lighting spaced at 300 foot intervals on both sides of the street. Affected Municipality(ies) Affected County(ies) Unincorporated Adams Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $185 $1,357 $0 $0 $0 State $0 $0 $0 $0 $0 Local $46 $339 $0 $0 $0 $231 $1,696 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 08/06/2012 Amended Add $1,542,000 of federal STP-Metro funds and $385,000 of local match in FY2016-17. 69 Total Funding $0 $1,927 2016-2021 Transportation Improvement Program (Approved TIP) Title: RTD Capital Improvements: Bus and Facilities Funding TIP-ID: 2012-108 STIP-ID: Project Type: Transit Vehicles Open to Public: Sponsor: R T D Project Scope Funds will be directed to capital improvements including the following: 1 - Civic Center Station infrastructure improvements including improvements to the building, access areas, boarding areas, shelters, and overall accessibility through reconfiguration of adjacent park area; 2 - Funds will also be used to purchase fuel efficient buses and vans equipped with ADA-compliant lifts. Affected County(ies) Regional Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $5,209 $5,261 $5,314 $5,367 $10,743 State $0 $0 $0 $0 $0 Local $1,042 $1,053 $1,063 $1,074 $2,147 $6,251 $6,314 $6,377 $6,441 $12,890 Federal (5339) $0 Total Total Funding $0 $38,273 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 12/19/2013 Amended Add federal Section 5339 funding of $5,106,000 in both FY2013 and FY2014, $5,158,000 in FY2015, and $10,470,000 in FY2016-2017. Add corresponding local match of $1,277,000 in both FY2013 and FY2014, $1,289,000 in FY2015, and $2,617,000 in FY2016-2017. 70 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 4 RAMP Project Pool TIP-ID: 2012-109 Project Type: Other STIP-ID: Open to Public: Sponsor: CDOT Region 4 Project Scope Pool contains projects selected under the RAMP program in CDOT Region 4 (DRCOG-TIP area only). Projects selected under RAMP that are Regionally Significant will be depicted individually. Affected Municipality(ies) Affected County(ies) Boulder Boulder Longmont Weld All pool project funding depicts federal and/or state funding only. Cost (1,000s) Facility Name Start-At and End-At SH-119: Boulder Canyon Trail Extension (MP 39.1-37.8) Amounts in $1,000s Prior Funding FY16 $3,498 Facility Name (Cont) Start-At and End-At US-287 (Main St. Longmont) Adaptive Signals MP 313.8-318.7 FY17 FY18 FY19 Cost (1,000s) FY20-21 Future Funding $0 $0 $0 $0 State (RMP) $3,723 $875 $0 $0 $0 Local $1,316 $219 $0 $0 $0 $5,039 $1,094 $0 $0 $0 $8,513 Total Start-At and End-At Cost (1,000s) $1,100 $0 Federal Facility Name (Cont) Total Funding $0 $14,646 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 03/19/2015 Amended Change funding source from State RPP funds to State RAMP funds. 12/19/2013 Amended Add 4 new projects selected from the RAMP program in FY2014-2017 totaling $14,646,000, including local match. Specific projects are listed in the pool. 71 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 RAMP Project Pool TIP-ID: 2012-112 Project Type: Other STIP-ID: Open to Public: Sponsor: CDOT Region 1 Project Scope Pool contains projects selected under the RAMP program in CDOT Region 1. Projects selected under RAMP that are Regionally Significant will be depicted individually. Affected County(ies) Adams Arapahoe Broomfield Denver Douglas Jefferson All pool project funding depicts federal and/or state funding only. Facility Name Cost (1,000s) Start-At and End-At New ramp meters and upgrades Amounts in $1,000s Facility Name (Cont) Cost (1,000s) Start-At and End-At Facility Name (Cont) Start-At and End-At Cost (1,000s) $999 Prior Funding FY16 FY17 $2,745 FY20-21 Future Funding $0 $0 $0 $0 $999 $0 $0 $0 $0 $0 $0 $0 $0 $0 $999 $0 $0 $0 $0 Local Total FY19 $0 Federal State (RMP) FY18 Total Funding $0 $3,744 Date Status Description 04/16/2015 Approved Proposed for adoption into 2016-2021 TIP 12/19/2013 Amended Add 9 new projects selected from the RAMP program in FY2014-2017 totaling $5,680,000, including local match. Specific projects are listed in the pool. 72 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 Rockfall Mitigation TIP-ID: 2012-115 Project Type: Safety STIP-ID: SDN6678 Open to Public: Sponsor: CDOT Region 1 Project Scope Rockfall mitigation in multiple locations within CDOT Region 1. Affected County(ies) Jefferson Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State (Safety) $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,500 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 03/10/2014 Amended Allocate $1,500,000 in state Safety funds in FY2015. 73 Total Funding $0 $1,500 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 4 2013 Flood-Related Projects Pool TIP-ID: 2012-116 Project Type: Roadway Reconstruction STIP-ID: Open to Public: Sponsor: CDOT Region 4 Project Scope Pool contains flood-related repair projects from the fall of 2013 flood event. Affected County(ies) Boulder Weld All pool project funding depicts federal and/or state funding only. Facility Name Start-At and End-At ERLA 47th St Cost (1,000s) Facility Name (Cont) Start-At and End-At @ Fourmile Canyon Creek ERLA Sunset Bridge ERLA 55th St/Cypress Ave @ Big Dry Creek ERLA Table Mesa Dr ERLA Lehigh Cost (1,000s) Facility Name (Cont) Start-At and End-At @ St. Vrain Creek T19 ER SH 7 St. Malo MP 11 ERLA Boston Bridge @ St Vrain Creek T17 ER US36 MP21 Lehigh To Broadway ERLA 57th St @ Fourmile Canyon Creek T22 PR US36 D-15-X D-15-I Table Mesa to Cragmoor ERLA 75th Ave St Repairs T24 PR SH7 Flood Repair MP 19-33 $0 ERLA Violet Ave Bridge @ Fourmile Canyon Creek $0 ERLA Kenosha Rd T25 in Erie PR SH 119A Boulder Canyon 19th St @ Fourmile Canyon Creek $0 ERLA Valmont Rd Bridge @ S. Boulder Creek PR SH 119B MP 52.9 to 60.0 26th St @ Fourmile Canyon Creek $0 ERLA 95th St @ Left Hand Creek PR SH 170 MP 1.08 to 3.64 ERLA Baseline Rd @ S Boulder Creek Path $0 ERLA Airport Rd @ Left Hand Creek PR SH 72B Resurfacing ERLA Pike Rd @ Lefthand Creek Longmont PR SH 52 Flood Repair MP 6.9 to 7.2 ERLA Airport Rd @ BNSF RR ERLA Bella Rosa Pkwy/WCR 20 Repairs ERLA WCR 7 Repairs ERLA Lefthand Canyon Drive T01 ERLA 63rd St @ Lefthand Creek $0 ERLA 73rd St @ Lefthand Creek T11 ERLA 9th Ave (Ss) E Hayden Ct ERLA Dillon Rd Over Rock Creek T28 ERLA 95th St Over Coal Creek Bridge Repl $0 ERLA Godding Hollow Parkway/WCR 18 ERLA Sunshine Canyon Drive Detour T29 ERLA Dillon Rd Underpass Repairs ERLA Ecl/WCR1 Bridge @ Bldr Creek T20 ERLA Left Hand Canyon Dr. MP 16.2 - 16.8 ER SH119 DelCamino D-16-CG ERLA 95th St ER SH 7 Lyons to Raymond MDB ER SH66 @ CR17 ERLA 71st St Pipe T23 ER SH119 MP 26-41 PR SH 119 MP 61.5-63.9 ERLA Valmont At Dry Creek T09 ER US36 Just South of SH66 PR SH66B Permanent Flood Repairs ERLA South Boulder Road Repair T27 ER US36 MP 28 D-15-X @ Boulder Creek T14 ERLA Ecl Rd/WCR 1 Amounts in $1,000s @ St Vrain Creek T19 Prior Funding ERLA WCR 13 CR 26A Over St Vrain Bridge ER CROOK FLOOD FY16 FY17 FY18 FY19 FY20-21 Future Funding $37,603 $11,161 $2,444 $0 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $37,603 $11,161 $2,444 $0 $0 Federal (EMR) $78,304 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 74 Total Funding $0 $129,512 Cost (1,000s) Date Status Description 09/18/2014 Amended Create a new pool for permanent repair projects related to the 2013 floods. Transfer $20,098,000 in federal Emergency funds from TIP ID 2012114 in FY2014. Allocate $11,020,000 of federal Emergency funds in FY2014; $47,186,000 in FY2015; $48,764,000 in FY2016-17; and $2,444,000 in future years. Add 55 projects to the pool. 75 2016-2021 Transportation Improvement Program (Approved TIP) Title: Air Quality Improvements Pool TIP-ID: 2016-002 Project Type: Air Quality Improvement Projects STIP-ID: Open to Public: 2016 Sponsor: R A Q C Project Scope Funding for three specialized air quality improvement activities: 1 - Conduct a Call for Projects for local agency air quality projects, as allocated and administered by RAQC 2 - Advance Fleet Technology. Implements a large vehicle retrofit, repair, and replacement program targeting older, higher polluting vehicles. 3 - Ozone Aware. A public outreach program to increases awareness of groundlevel ozone pollution. Amounts in $1,000s Affected County(ies) Project Phases Regional Year Phase 2016 Initiate Study 2017 Initiate Study 2018 Initiate Study 2019 Initiate Study Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $1,320 $1,800 $1,800 $1,800 $0 State $0 $0 $0 $0 $0 Local $330 $450 $450 $450 $0 $1,650 $2,250 $2,250 $2,250 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 76 Total Funding $0 $8,400 2016-2021 Transportation Improvement Program (Approved TIP) Title: I-70 East Reconstruction TIP-ID: 2016-003 Project Type: Roadway Reconstruction STIP-ID: Open to Public: Sponsor: CDOT Region 1 Project Scope Project reconstructs portions of I-70 East in Denver. Affected Municipality(ies) Affected County(ies) Denver Denver Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 Federal (CMAQ) $0 $6,000 $3,000 $16,000 $0 State $0 $0 $0 $0 $0 $8,080 $752,170 $0 $0 $0 $0 $1,500 $750 $4,000 $0 $8,080 $759,670 $3,750 $20,000 $0 State (FASTER-B) Local $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 77 Total Funding $0 $791,500 2016-2021 Transportation Improvement Program (Approved TIP) Title: Regional Transportation Operations Pool TIP-ID: 2016-004 Project Type: Congestion Management STIP-ID: Open to Public: Sponsor: DRCOG Project Scope A pool to fund capital improvements to traffic signal systems, traffic signal timing and coordination work, traffic signal system engineering and design, and intelligent transportation systems projects. Affected County(ies) Regional Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $4,839 $4,200 $4,200 $4,200 $0 State $0 $0 $0 $0 $0 Local $1,210 $1,050 $1,050 $1,050 $0 $6,049 $5,250 $5,250 $5,250 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 78 Total Funding $0 $21,799 2016-2021 Transportation Improvement Program (Approved TIP) Title: Metro Center Station Area Bike/Ped Connector Facility TIP-ID: 2016-005 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2017 Sponsor: Aurora Project Scope This project constructs a new 10 ft wide multi-use bi-directional path near the Aurora Municipal Center Complex for the following segments: 1) from the south end of the pond to Alameda Pkwy. 2) from Alameda Pkwy southwestwardly to the Metro Center Bus/Light Rail Station located at Sable Blvd and Centrepoint Dr. 3) from the pond and the Aurora Municipal Center Complex; and 4) replaces an existing 6-ft. wide concrete sidewalk that extends along the east side of a pond from the base of the High Line Canal embankment near the north end of the pond to a point near the south end of the pond. The project will also construct an underpass at Alameda Pkwy, modify existing pavement striping and traffic signals as needed, install pedestrian-scale ADA/AASHTO compliant lighting, way-finding signage with destination and distance information, and 20 or more bicycle parking spaces within 1/2 mile of the project. Affected Municipality(ies) Affected County(ies) Project Phases Aurora Arapahoe Year Phase 2016 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $1,832 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $459 $0 $0 $0 $0 $2,291 $0 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 79 Total Funding $0 $2,291 2016-2021 Transportation Improvement Program (Approved TIP) Title: Multi-use path on the D10: Wadsworth Blvd to Zephyr St and Kipling St to Oak St TIP-ID: 2016-006 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2019 Sponsor: Lakewood Project Scope The project will construct two segments of the D10 bike path. • a 10 ft multi-use path from Kipling St to Oak St, with MSE retaining walls. Relocation of the existing sound wall and fences at the rear and side property lines will be required. • a 10 ft multi-use path from Zephyr St to Wadsworth Blvd. This segment will be at grade with a 6" curb to separate the path and the apartment parking lot. There will be down cast light wall packs attached to the retaining wall. • land acquisitions will be required in both segments, and include signage/wayfinding with destinations and distances. Affected Municipality(ies) Affected County(ies) Project Phases Lakewood Jefferson Year Phase 2016 Initiate Environmental 2016 Initiate Design 2017 Initiate ROW 2018 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $320 $536 $1,064 $0 $0 State $0 $0 $0 $0 $0 Local $80 $134 $266 $0 $0 $400 $670 $1,330 $0 $0 Federal (TAP) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 80 Total Funding $0 $2,400 2016-2021 Transportation Improvement Program (Approved TIP) Title: University of Colorado Boulder East Campus Pedestrian Bridge & Trail Connection TIP-ID: 2016-007 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2018 Sponsor: University of ColoradoBoulder Project Scope Project constructs a 10 ft wide multi-use path and pedestrian/bike bridge from parking lot 560 on East Campus across Boulder Creek to connect to the existing Boulder Creek multi-use path. ADA/AASHTO compliant lighting, signage/wayfinding with destinations and distances, and 70 bicycle parking spaces within 1/2 mile of the project will also be constructed as part of the project. Affected Municipality(ies) Affected County(ies) Project Phases Boulder Boulder Year Phase 2016 Initiate Environmental 2016 Initiate Design 2017 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $132 $254 $0 $0 $0 State $0 $0 $0 $0 $0 Local $33 $64 $0 $0 $0 $165 $318 $0 $0 $0 Federal (TAP) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 81 Total Funding $0 $483 2016-2021 Transportation Improvement Program (Approved TIP) Title: Boulder Slough Multiuse Path: 30th St to 3100 Pearl TIP-ID: 2016-008 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2019 Sponsor: Boulder Project Scope Project constructs a 10 ft wide multi-use path along the Boulder Slough from 30th St to 3100 Pearl, including a bicycle/pedestrian bridge crossing the Boulder Slough. Signage and wayfinding with destinations and distances, along with 20 bicycle parking spaces within 1/2 mile of the project will also be constructed as part of the project. Affected Municipality(ies) Affected County(ies) Project Phases Boulder Boulder Year Phase 2016 Initiate Environmental 2016 Initiate Design 2017 Initiate ROW 2018 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $96 $96 $288 $0 $0 State $0 $0 $0 $0 $0 Local $24 $24 $72 $0 $0 $120 $120 $360 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 82 Total Funding $0 $600 2016-2021 Transportation Improvement Program (Approved TIP) Title: MetroRide Service Expansion: DUS to Civic Center TIP-ID: 2016-009 STIP-ID: Project Type: Bus Service Projects (Expanded) Open to Public: 2016 Sponsor: R T D Project Scope This project will expand the existing service hours and frequencies for the Free MetroRide. Hours will be extended by approximately four hours (2 hours in the morning and 2 hours in the afternoon) and the frequency will be increased to approximately 4.5 to 6-minute intervals. Affected Municipality(ies) Affected County(ies) Project Phases Denver Denver Year Phase 2016 Initiate Bus Service - Year 1 2017 Initiate Bus Service - Year 2 2018 Initiate Bus Service - Year 3 Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $400 $400 $400 $0 $0 State $0 $0 $0 $0 $0 Local $100 $100 $100 $0 $0 $500 $500 $500 $0 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 83 Total Funding $0 $1,500 2016-2021 Transportation Improvement Program (Approved TIP) Title: RTD L Route Service Enhancement TIP-ID: 2016-010 Project Type: Bus Service Projects (Expanded) STIP-ID: Open to Public: 2016 Sponsor: Boulder County Project Scope This project will expand the existing service on RTD’s L Route between Longmont and Denver. Service frequency on the route will be enhanced from two-hour to one-hour headways during the mid-day on weekdays. One additional late-night trip will be added on weekdays. Saturday service frequency will be enhanced from three-hour to ninety-minute headways. Affected Municipality(ies) Affected County(ies) Project Phases Broomfield Adams Year Phase Denver Boulder 2016 Initiate Bus Service - Year 1 Erie Broomfield 2017 Initiate Bus Service - Year 2 Lafayette Denver 2018 Initiate Bus Service - Year 3 Longmont Jefferson Westminster Unincorporated Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $536 $548 $580 $0 $0 State $0 $0 $0 $0 $0 Local $134 $137 $145 $0 $0 $670 $685 $725 $0 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 84 Total Funding $0 $2,080 2016-2021 Transportation Improvement Program (Approved TIP) Title: FLEX Route Extension: Boulder to Longmont TIP-ID: 2016-011 Project Type: Bus Service Projects (Expanded) STIP-ID: Open to Public: 2016 Sponsor: Boulder County Project Scope This project will extend the existing FLEX route by providing service from Longmont to Boulder. This extension will create up to five, round-trip, weekday trips. These trips will run as a complement to the existing FLEX trips between Ft. Collins and Longmont, which will remain with their existing run times and with the same destinations. Destinations for the route within Boulder include: Boulder Junction (30th & Pearl), Boulder Transit Center/ downtown Boulder (14th & Walnut), and the University of Colorado at Boulder campus. Affected Municipality(ies) Affected County(ies) Project Phases Boulder Boulder Year Phase Longmont 2016 Initiate Bus Service - Year 1 Unincorporated 2017 Initiate Bus Service - Year 2 2018 Initiate Bus Service - Year 3 Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $380 $384 $392 $0 $0 State $0 $0 $0 $0 $0 Local $95 $96 $98 $0 $0 $475 $480 $490 $0 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 85 Total Funding $0 $1,445 2016-2021 Transportation Improvement Program (Approved TIP) Title: Anschutz Medical Campus Shuttle TIP-ID: 2016-012 Project Type: Bus Service Projects (New) STIP-ID: Open to Public: 2016 Sponsor: University of ColoradoDenver Project Scope This project will create new bus service from the Fitzsimons Pkwy Light Rail Station into the Anschutz Medical Campus. Stops will be at key locations on campus near University Hospital, Children's Hospital of Colorado, and the University of Colorado Anschutz Medical Campus. Operating hours for the bus service will include: • BUS 1: early AM to late PM, 7 days per week • BUS 2: early AM to late PM, Monday through Friday • BUS 3: AM peak and PM peak, Monday through Friday Affected Municipality(ies) Affected County(ies) Project Phases Aurora Adams Year Phase 2016 Initiate Bus Service - Year 1 2017 Initiate Bus Service - Year 2 2018 Initiate Bus Service - Year 3 Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $867 $316 $326 $0 $0 State $0 $0 $0 $0 $0 Local $372 $136 $140 $0 $0 $1,239 $452 $466 $0 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 86 Total Funding $0 $2,157 2016-2021 Transportation Improvement Program (Approved TIP) Title: Superior Call-n-Ride TIP-ID: 2016-013 Project Type: Bus Service Projects (New) STIP-ID: Open to Public: 2016 Sponsor: Superior Project Scope This project adds a new Call-n-Ride servicing an area generally from McCaslin Blvd to 96th St, and US 36 to south of Interlocken Loop. Service hours will be approximately 5:30am to 7pm Monday through Friday. Affected Municipality(ies) Affected County(ies) Project Phases Superior Boulder Year Phase 2016 Initiate Bus Service - Year 1 2017 Initiate Bus Service - Year 2 2018 Initiate Bus Service - Year 3 Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $215 $102 $106 $0 $0 State $0 $0 $0 $0 $0 Local $54 $26 $27 $0 $0 $269 $128 $133 $0 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 87 Total Funding $0 $530 2016-2021 Transportation Improvement Program (Approved TIP) Title: Broomfield Call-n-Ride TIP-ID: 2016-014 Project Type: Bus Service Projects (Expanded) STIP-ID: Open to Public: 2016 Sponsor: Broomfield Project Scope This project expands the geographic area served by the existing Broomfield Calln-Ride to include an area generally from Sheridan to Zuni, and 120th to 144th/Dillon, with the same service hours, Monday through Friday, from 5:30 AM until 7:00 PM. The project includes the purchase of two additional buses. Affected Municipality(ies) Affected County(ies) Project Phases Broomfield Broomfield Year Phase 2016 Initiate Bus Service - Year 1 2017 Initiate Bus Service - Year 2 2018 Initiate Bus Service - Year 3 Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $188 $89 $92 $0 $0 State $0 $0 $0 $0 $0 Local $80 $38 $40 $0 $0 $268 $127 $132 $0 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 88 Total Funding $0 $527 2016-2021 Transportation Improvement Program (Approved TIP) Title: RTD Route #324 Frequency Improvements TIP-ID: 2016-015 Project Type: Bus Service Projects (Expanded) STIP-ID: Open to Public: 2016 Sponsor: Longmont Project Scope This project will increase the weekday frequency on RTD route #324 from 30 minutes to 15 minutes during peak operating times. Affected Municipality(ies) Affected County(ies) Project Phases Longmont Boulder Year Phase 2016 Initiate Bus Service - Year 1 2017 Initiate Bus Service - Year 2 2018 Initiate Bus Service - Year 3 Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $392 $392 $392 $0 $0 State $0 $0 $0 $0 $0 Local $98 $98 $98 $0 $0 $490 $490 $490 $0 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 89 Total Funding $0 $1,470 2016-2021 Transportation Improvement Program (Approved TIP) Title: Toll Gate Creek Trail: Chambers Rd to Montview Blvd TIP-ID: 2016-016 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2018 Sponsor: Aurora Project Scope This project constructs a 10 ft wide concrete multi-use bi-directional trail along Toll Gate Creek between Montview Blvd/Fitzsimons Pkwy and Chambers Rd. Retaining walls, bike railing, pedestrian-scale ADA/AASHTO compliant lighting, way-finding signage with destination and distance information, and 20 or more bicycle parking spaces within 1/2 mile of the project will be included. A new 10' wide bicycle and pedestrian bridge at East 13th Ave across Toll Gate Creek will also be constructed. Affected Municipality(ies) Affected County(ies) Project Phases Aurora Adams Year Phase Arapahoe 2016 Initiate Environmental 2016 Initiate Design 2016 Initiate ROW 2017 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $1,136 $4,547 $0 $0 $0 State $0 $0 $0 $0 $0 Local $285 $1,137 $0 $0 $0 $1,421 $5,684 $0 $0 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 90 Total Funding $0 $7,105 2016-2021 Transportation Improvement Program (Approved TIP) Title: Westerly Creek Trail to Toll Gate Creek Trail Connector TIP-ID: 2016-017 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2019 Sponsor: Aurora Project Scope This project provides bike/pedestrian inter-connections between Westerly Creek trail, Toll Gate Creek trail, and the Florida LRT Station. The project includes two major segments: East of the Florida Station: • A Florida LRT Station 3-car kiss-n-ride area on both the north and south sides of Abilene St. • A diagonal bike/pedestrian crossing at Florida Ave. and Abilene St. • Reconfigure Florida Ave. to include an 11ft barrier separated (with candle stick delineators), bi-directional cycle track between the Florida LRT Station and Chambers Rd. Bulb-outs will also be constructed at the intersections. • East of Chambers Rd, the cycle track will transition to sharrows on Helena Cir to Idalia Ct. • From there, a 12 ft wide concrete path will be constructed along the west bank of Toll Gate Creek southward to Mexico Ave. • The existing Mexico Ave. overpass over Toll Gate Creek will be upgraded to include a 12 ft concrete path, connecting to the existing Toll Gate Creek trail with a pedestrian/cyclist activated signal. • Replacement of sidewalks less than 6 ft to 6 ft. West of the Florida Station: • Construction a 12 ft wide multi-use bi-directional bike/pedestrian path between the Florida Station west landing and Potomac St. • Consolidation of two existing crossings to one controlled HAWK signal crossing of Potomac St. • Construction of a new elevated 12 ft wide two-way cycle track on the west side of Potomac St between the HAWK signal south to the northeast corner of the Jewell Wetlands and on the north side of Jewell Ave between the west end of the Jewell Wetlands and Tucson St. • Install on-street bicycle lanes between the HAWK signal and Louisiana Ave. • Way finding signage with distance and destination information and bike racks for at least 20 bikes within 1/2 mile of the project. • Potomac St will be converted from four lanes to two, with a two-way left turn lane (TWLTL). • Traffic signal improvements and pedestrian-scale ADA/AASHTO compliant lighting will also be constructed as part of the project. Affected Municipality(ies) Affected County(ies) Project Phases Aurora Arapahoe Year Phase 2017 Initiate Environmental 2017 Initiate Design 2017 Initiate ROW 2018 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (CMAQ) $0 $2,501 $6,006 $0 $0 State $0 $0 $0 $0 $0 Local $0 $626 $2,502 $0 $0 $0 $3,127 $8,508 $0 $0 $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 91 Total Funding $0 $11,635 2016-2021 Transportation Improvement Program (Approved TIP) Title: 23rd Ave. Bike/Ped Path at Fitzsimons Station TIP-ID: 2016-018 Project Type: Bicycle and Pedestrian Projects (New) STIP-ID: Open to Public: 2017 Sponsor: Aurora Project Scope The project constructs a new 12 ft wide concrete multi-use, bi-directional, physically-protected bicycle/pedestrian facility (use of curbs) along the south side of Fitzsimons Pkwy extending from the Light Rail Station to Ursula St and then south to East 23rd Ave. A HAWK signal and crosswalk with ADA ramps will also be provided at the station. The project will also install pedestrian-scale ADA/AASHTO compliant lighting, way-finding signage with destination and distance information, and 20 or more bicycle parking spaces within 1/2 mile of the project. Project Phases Amounts in $1,000s Prior Funding FY16 FY17 Year Phase 2016 Initiate Construction FY18 FY19 FY20-21 Future Funding $1,492 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $374 $0 $0 $0 $0 $1,866 $0 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 92 Total Funding $0 $1,866 2016-2021 Transportation Improvement Program (Approved TIP) Title: Colfax 15L Transit Improvements: I-225 to I-25 TIP-ID: 2016-019 Project Type: Transit Passenger Facilities STIP-ID: Open to Public: 2018 Sponsor: R T D Project Scope Project will replace or add existing bus stop amenities for stops along the 15L bus route servicing Colfax Ave, from I-225 to I-25. Improvements include new shelters, station furniture, lighting, and security cameras. Affected Municipality(ies) Affected County(ies) Project Phases Aurora Adams Year Phase Denver Arapahoe 2018 Initiate Construction Denver 2019 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (STP-M) $0 $0 $1,300 $1,300 $0 State $0 $0 $0 $0 $0 Local $0 $0 $325 $325 $0 $0 $0 $1,625 $1,625 $0 $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 93 Total Funding $0 $3,250 2016-2021 Transportation Improvement Program (Approved TIP) Title: Wadsworth Blvd Widening: 35th Ave to 48th Ave TIP-ID: 2016-020 Project Type: Roadway Capacity STIP-ID: Open to Public: 2020 Sponsor: Wheat Ridge Project Scope This project will widen Wadsworth Blvd from W 35th Ave to W 48th Ave from 4 to 6 lanes. Features include: • 10 ft wide sidewalks along both sides of the corridor separated from the street with 10 ft wide tree lawns • An 11 ft wide two-way cycle track on the east side of Wadsworth Blvd between 35th and 44th • Street and pedestrian-level lighting • Landscaped center medians, raised crosswalks, and access consolidation • Double left turns at 38th and 44th; additional left turn lanes will also be constructed at up to four additional signalized intersections • Traffic signals upgrades and bicycle detection • Transit stop enhancements including shelters, benches, and kiosks Affected Municipality(ies) Affected County(ies) Project Phases Wheat Ridge Jefferson Year Phase 2016 Initiate Environmental 2017 Initiate Design 2018 Initiate ROW 2019 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $2,000 $4,000 $8,000 $11,280 $0 State $0 $0 $0 $0 $0 Local $500 $1,000 $2,000 $2,820 $0 $2,500 $5,000 $10,000 $14,100 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 94 Total Funding $0 $31,600 2016-2021 Transportation Improvement Program (Approved TIP) Title: I-25 & Broadway Interchange Reconstruction TIP-ID: 2016-021 Project Type: Roadway Capacity STIP-ID: Open to Public: 2020 Sponsor: Denver Project Scope This project modifies the S. Broadway/I-25 interchange and will include the following features: • Reconstructs E. Exposition Ave, from S. Lincoln St to S. Broadway • Reconstructs S. Broadway, from E. Exposition Ave to south of E. Ohio Ave. in concrete pavement • Constructs a new southbound I-25 on-ramp from the Broadway/Ohio intersection, travel under the existing I-25 viaduct, and extends over Broadway before it gains vertical elevation to connect to SB I-25 • Adds paved parking at the RTD I-25/Broadway Station; a water quality pond adjacent to the paved parking • Adds new or modified traffic signals, with new or improved signal interconnect and ITS infrastructure • Adds new 8 ft. minimum width sidewalks, a detached multi-use trail extending from the Lincoln /Ohio intersection directly into the RTD I-25/Broadway Station area, bicycle racks, streetscaping, and pedestrian and street lighting Affected Municipality(ies) Affected County(ies) Project Phases Denver Denver Year Phase 2016 Initiate Design 2016 Initiate ROW 2017 Initiate Environmental 2018 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $6,540 $4,000 $6,833 $0 $0 State $0 $0 $0 $0 $0 Local $2,971 $1,000 $6,624 $0 $0 $9,511 $5,000 $13,457 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 95 Total Funding $0 $27,968 2016-2021 Transportation Improvement Program (Approved TIP) Title: Martin Luther King Jr. Blvd Extension: Havana St to Peoria St TIP-ID: 2016-022 STIP-ID: Project Type: Roadway Capacity Open to Public: 2018 Sponsor: Denver Project Scope This project adds two additional lanes to Martin Luther King Jr. Blvd. (MLK) from Havana St/Iola St, and a new 4-lane roadway from where MLK turns south into Moline St to the Fitzsimons Pkwy/Peoria St intersection. The project will also include: • 18 ft landscaped medians, turn lanes, and a 16.5 ft landscaped tree lawn • A detached 10 ft wide multi-use concrete path on each side, and a 10 ft wide multi-use concrete and 5 ft parallel soft trail outside of a 30 ft buffer from the Bluff Lake Nature Center area • Several existing access consolidations, bus pads, new or improved traffic signal interconnection, bicycle detection, and a median pedestrian refuge at Peoria St. Affected Municipality(ies) Affected County(ies) Project Phases Denver Denver Year Phase 2016 Initiate Environmental 2016 Initiate Design 2017 Initiate ROW 2017 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $1,793 $5,379 $0 $0 $0 State $0 $0 $0 $0 $0 Local $1,957 $5,871 $0 $0 $0 $3,750 $11,250 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 96 Total Funding $0 $15,000 2016-2021 Transportation Improvement Program (Approved TIP) Title: Quebec St Operational Improvements: 13th Ave to 26th Ave TIP-ID: 2016-023 STIP-ID: Project Type: Roadway Operational Improvements Open to Public: 2020 Sponsor: Denver Project Scope This project constructs additional lanes and other operational improvements on Quebec St from south of 13th Ave to 26th Ave and will include the following: • One additional lane in each direction from 13th Ave to Montview Blvd • One additional northbound lane from Montview Blvd to 23rd Ave • Receiving and/or turning lanes at intersections of 13th Ave, 14th Ave, Colfax Ave, 17th Ave, Montview, and E. 23rd Ave • A continuous 5 ft sidewalk facility with a 3 ft buffer • New concrete bus pads, transit amenities, and bike parking • New or improved traffic signal interconnection and ITS infrastructure Affected Municipality(ies) Affected County(ies) Project Phases Denver Denver Year Phase 2016 Initiate Environmental 2017 Initiate Design 2018 Initiate ROW 2019 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $820 $3,560 $3,810 $3,310 $0 State $0 $0 $0 $0 $0 Local $820 $3,560 $3,810 $3,310 $0 $1,640 $7,120 $7,620 $6,620 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 97 Total Funding $0 $23,000 2016-2021 Transportation Improvement Program (Approved TIP) Title: Iliff Ave Operational Improvements: Parker Rd to Quebec St TIP-ID: 2016-024 STIP-ID: Project Type: Roadway Operational Improvements Open to Public: 2020 Sponsor: Arapahoe County Project Scope This project constructs operational and multimodal improvements on Iliff Ave from Parker Rd to Quebec St and will include the following: • Separate 8 ft minimum wide pedestrian and bike paths • Add turn and accelerations lanes at several intersections, with some also serving as queue jumps • Widening the bridge over Cherry Creek to accommodate bike lanes and a turn lane • Drainage upgrades through the corridor, water quality ponds on S. Cherry Creek Dr and Valentia St, and burial of utilities • Medians, protected roadway crossings, access consolidation, new or improved traffic signal interconnection, bus pads, and bicycle counters and amenities (racks/lockers) Affected Municipality(ies) Affected County(ies) Project Phases Denver Arapahoe Year Phase Unincorporated Denver 2016 Initiate Environmental 2017 Initiate Design 2018 Initiate ROW 2019 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $1,500 $3,000 $6,000 $6,846 $0 State $0 $0 $0 $0 $0 Local $500 $1,000 $2,000 $2,673 $0 $2,000 $4,000 $8,000 $9,519 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 98 Total Funding $0 $23,519 2016-2021 Transportation Improvement Program (Approved TIP) Title: Ralston Rd Reconstruction: Yukon St to Upham St TIP-ID: 2016-025 STIP-ID: Project Type: Roadway Reconstruction Open to Public: 2019 Sponsor: Arvada Project Scope This project reconstructs Ralston Rd from Upham St to Yukon St. The project will also include the following: • Widening the existing sidewalks to a minimum width of 8 ft with a landscaped buffer where feasible • protected roadway crossings, new or improved traffic signal interconnections, ITS infrastructure, and bicycle detection and racks/lockers • Transit amenities and bus pads Affected Municipality(ies) Affected County(ies) Project Phases Arvada Jefferson Year Phase 2016 Initiate Environmental 2016 Initiate Design 2018 Initiate ROW 2018 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $286 $0 $1,617 $0 $0 State $0 $0 $0 $0 $0 Local $72 $0 $404 $0 $0 $358 $0 $2,021 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 99 Total Funding $0 $2,379 2016-2021 Transportation Improvement Program (Approved TIP) Title: Broadway Reconstruction: Violet Ave to US-36 TIP-ID: 2016-026 Project Type: Roadway Reconstruction STIP-ID: Open to Public: 2020 Sponsor: Boulder Project Scope Project will reconstruct Broadway St, from Violet Ave to US 36. New curb and gutter, underground utility upgrades, including new or improved traffic signal interconnection and bicycle detection, and bicycle, pedestrian, and transit stop facilities and amenities will also be included as part of the project. Affected Municipality(ies) Affected County(ies) Project Phases Boulder Boulder Year Phase 2016 Initiate Design 2017 Initiate Environmental 2018 Initiate ROW 2019 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $1,000 $400 $1,000 $3,825 $0 State $0 $0 $0 $0 $0 Local $250 $100 $250 $1,475 $0 $1,250 $500 $1,250 $5,300 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 100 Total Funding $0 $8,300 2016-2021 Transportation Improvement Program (Approved TIP) Title: Meadows Pkwy Reconstruction: US-85 to Meadows Blvd TIP-ID: 2016-027 STIP-ID: Project Type: Roadway Reconstruction Open to Public: 2018 Sponsor: Castle Rock Project Scope Project will reconstruct Meadows Pkwy from US 85 to Meadows Blvd in asphalt, along with repairing or replacing any damaged curb/gutter along the center median, roadway edge, and sidewalk. Bike lanes will be added to the outside of the roadway. Affected Municipality(ies) Affected County(ies) Project Phases Castle Rock Douglas Year Phase 2017 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (STP-M) $0 $1,333 $0 $0 $0 State $0 $0 $0 $0 $0 Local $0 $334 $0 $0 $0 $0 $1,667 $0 $0 $0 $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 101 Total Funding $0 $1,667 2016-2021 Transportation Improvement Program (Approved TIP) Title: 16th St Mall Reconstruction: Arapahoe St to Lawrence St TIP-ID: 2016-028 STIP-ID: Project Type: Roadway Reconstruction Open to Public: 2017 Sponsor: R T D Project Scope Project will reconstruct one block of the 16th Street Mall between Lawrence St and Arapahoe St. The project will reconstruct the sub –base and rehab the existing pavers, along with improvements to intersection bulb-outs, utilities, and amenities, including fountains and tree pits/tree replacement, and urban design upgrades to existing furnishings (e.g., fresh paint, powdercoating, and wayfinding upgrades). Affected Municipality(ies) Affected County(ies) Project Phases Denver Denver Year Phase 2016 Initiate Design 2017 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $2,399 $2,400 $0 $0 $0 State $0 $0 $0 $0 $0 Local $600 $600 $0 $0 $0 $2,999 $3,000 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 102 Total Funding $0 $5,999 2016-2021 Transportation Improvement Program (Approved TIP) Title: East Lafayette Multimodal Path Connection: Commerce Ct to Lafayette Park-n-Ride TIP-ID: 2016-029 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2020 Sponsor: Lafayette Project Scope This project widens existing sidewalks and constructs new 10 ft wide concrete multi-use paths along South Boulder Rd from City Center Dr east to 120th St, and then continuing south along 120th St, connecting to existing sidewalks at Commerce Ct. Two additional connections will be made to the north from South Boulder Rd; one on Merlin Dr to Sanchez Elementary School, and another on City Center Dr to west of Strathmore Ln. A physically-protected crossing at Avalon St, 20 bicycle parking spaces, AASHTO compliant lighting, and way-finding signage with destination and distance information will also be included. Affected Municipality(ies) Affected County(ies) Project Phases Lafayette Boulder Year Phase 2019 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (TAP) $0 $0 $0 $999 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $250 $0 $0 $0 $0 $1,249 $0 $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 103 Total Funding $0 $1,249 2016-2021 Transportation Improvement Program (Approved TIP) Title: 71st St Multimodal Pathway Connection: Winchester to Idylwild Trail TIP-ID: 2016-030 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2020 Sponsor: Boulder County Project Scope This project constructs a new 10-foot wide concrete multi-use path from the existing sidewalk in the Winchester Business Park to the Longmont-to-Boulder Trail crossing of 71st St, and to the transit services along Lookout Rd. A new physically-protected crossing for the Lobo Trail across 71st St will be built and the multiuse path along Lookout Rd will be widened. The project will provide two grade-separated crossings over the Boulder and Lefthand Ditch and over the Boulder and Whiterock Ditch. At least 10 uncovered bike racks with a capacity for 20 bicycles, ADA/AASHTO compliant lighting, and way-finding signage with destination and distance information will be included. Affected Municipality(ies) Affected County(ies) Project Phases Boulder Boulder Year Phase 2019 Initiate Construction Unincorporated Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (TAP) $0 $0 $0 $860 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $215 $0 $0 $0 $0 $1,075 $0 $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 104 Total Funding $0 $1,075 2016-2021 Transportation Improvement Program (Approved TIP) Title: C-470 Multi-use Trail: Grade Separation at Yosemite St TIP-ID: 2016-031 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2020 Sponsor: Douglas County Project Scope This project constructs two bike/ped bridges: one over Yosemite St and another over the C-470 WB On-Ramp. Twenty or more bicycle parking spaces, at least 10 of which will be covered, ADA/AASHTO compliant lighting, landscaping, and way-finding signage with destination and distance information will also be included. Affected Municipality(ies) Affected County(ies) Project Phases Lone Tree Douglas Year Phase 2018 Initiate ROW 2019 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (TAP) $0 $0 $500 $1,500 $0 State $0 $0 $0 $0 $0 Local $300 $300 $350 $1,050 $0 $300 $300 $850 $2,550 $0 $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 105 Total Funding $0 $4,000 2016-2021 Transportation Improvement Program (Approved TIP) Title: US-6 Shared-Use Path: Colfax Ave to Johnson Rd TIP-ID: 2016-032 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2018 Sponsor: Jefferson County Project Scope This project will construct an 8 ft wide detached multi-use path along the north side of US-6 between Colfax Ave and Johnson Rd. ADA/AASHTO compliant lighting and way-finding signage with destination and distance information will be included. Affected Municipality(ies) Affected County(ies) Project Phases Golden Jefferson Year Phase 2016 Initiate Design 2017 Initiate Construction Unincorporated Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $50 $539 $0 $0 $0 State $0 $0 $0 $0 $0 Local $13 $135 $0 $0 $0 $63 $674 $0 $0 $0 Federal (TAP) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 106 Total Funding $0 $737 2016-2021 Transportation Improvement Program (Approved TIP) Title: Superior Trail: McCaslin BRT Station to Coal Creek TIP-ID: 2016-033 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2018 Sponsor: Superior Project Scope This project constructs a 10 ft wide concrete multi-use trail from the McCaslin BRT/Park-n-Ride Station to the existing McCaslin Blvd pedestrian underpass, continuing east to the Coal Creek Regional Trail/US-36 Bikeway intersection. A Bus-then-Bike Shelter with 31 covered bicycle parking spaces, lighting, landscaping, and way-finding signage with destination and distance information will also be included. Affected Municipality(ies) Affected County(ies) Project Phases Superior Boulder Year Phase 2016 Initiate Design 2017 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $280 $320 $0 $0 $0 State $0 $0 $0 $0 $0 Local $70 $80 $0 $0 $0 $350 $400 $0 $0 $0 Federal (TAP) $0 Total Total Funding $0 $750 Date Status Description 05/07/2015 Proposed Transfer $320,000 of federal TAP funds and associated local match from FY2017 to FY2016. Total project funding remains unchanged 04/16/2015 Approved Adopted into the 2016-2021 TIP 107 2016-2021 Transportation Improvement Program (Approved TIP) Title: Superior Trail: McCaslin BRT to Davidson Mesa Underpass TIP-ID: 2016-034 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2020 Sponsor: Superior Project Scope This project constructs a 10 ft wide concrete multi-use trail between US 36 and Marshall Rd, from the McCaslin BRT Station to the US 36 pedestrian and bicycle underpass at Davidson Mesa. A Bus-then-Bike Shelter with 31 covered bicycle parking spaces, lighting, landscaping, and way-finding signage with destination and distance information will also be included. Affected Municipality(ies) Affected County(ies) Project Phases Superior Boulder Year Phase 2017 Initiate Design 2018 Initiate ROW 2019 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (CMAQ) $0 $200 $147 $350 $0 State $0 $0 $0 $0 $0 Local $0 $50 $37 $191 $0 $0 $250 $184 $541 $0 $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 108 Total Funding $0 $975 2016-2021 Transportation Improvement Program (Approved TIP) Title: 30th St and Colorado Ave Bike/Ped Underpass TIP-ID: 2016-035 Project Type: Bicycle and Pedestrian Projects (New) STIP-ID: Open to Public: 2020 Sponsor: Boulder Project Scope This project constructs an underpass at 30th St and Colorado Ave. Additional items as part of the project include 10 ft wide multi-use path connections, ADA/AASHTO compliant lighting, way-finding signage with destination and distance information, and 20 bicycle parking spaces. Affected Municipality(ies) Affected County(ies) Project Phases Boulder Boulder Year Phase 2016 Initiate Design 2017 Initiate Environmental 2018 Initiate ROW 2019 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $400 $400 $600 $3,350 $0 State $0 $0 $0 $0 $0 Local $100 $100 $700 $2,350 $0 $500 $500 $1,300 $5,700 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 109 Total Funding $0 $8,000 2016-2021 Transportation Improvement Program (Approved TIP) Title: Parker Rd Sidewalk Connection: Plaza Dr to Sulphur Gulch Trail TIP-ID: 2016-036 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2019 Sponsor: Parker Project Scope This project constructs a new 10 ft-wide sidewalk along the east side of Parker Rd between the Sulphur Gulch Trail and north of Plaza Dr. Way-finding signage with destination and distance information will be included. Affected Municipality(ies) Affected County(ies) Project Phases Parker Douglas Year Phase 2016 Initiate Design 2017 Initiate ROW 2018 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $72 $72 $360 $0 $0 State $0 $0 $0 $0 $0 Local $24 $24 $120 $0 $0 $96 $96 $480 $0 $0 Federal (CMAQ) $0 Total Total Funding $0 $672 Date Status Description 05/04/2015 Proposed Add $26,000 of local CMAQ funds in FY2016 and FY2017 and add $6,000 of local CMAQ funds in FY2018. Transfer $72,000 of federal CMAQ funds from FY2016 and FY2017 to FY2018. Increase total project funding. 04/16/2015 Approved Adopted into the 2016-2021 TIP 110 2016-2021 Transportation Improvement Program (Approved TIP) Title: Washington Ave Complete Streets TIP-ID: 2016-037 Project Type: Bicycle and Pedestrian Projects (New) STIP-ID: Open to Public: 2018 Sponsor: Golden Project Scope This project reconstructs Washington Ave from CO 93 to 10th St to include a curb-separated 4 ft wide bike facility and 8 ft wide sidewalk, where permitted. Intersection safety improvements, ADA/AASHTO compliant lighting, transit supporting amenities, and way-finding signage with destination and distance information will be included. Affected Municipality(ies) Affected County(ies) Project Phases Golden Jefferson Year Phase 2016 Initiate Environmental 2016 Initiate Design 2017 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $345 $2,700 $0 $0 $0 State $0 $0 $0 $0 $0 Local $90 $686 $0 $0 $0 $435 $3,386 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 111 Total Funding $0 $3,821 2016-2021 Transportation Improvement Program (Approved TIP) Title: High Line Canal Trail Underpass at Hampden and Colorado TIP-ID: 2016-038 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2019 Sponsor: Cherry Hills Village Project Scope This project constructs two multi-use underpasses: one under Hampden Ave 1,500’ west of Colorado Blvd, and another under Colorado Blvd 200’ north of Hampden Ave. The 14’ box culverts will accommodate new 10 ft multi-use trails from the existing pedestrian bridge at Monroe St to the underpass, along the north side of Hampden Ave to the other underpass and to the existing multi-use path on the east side of Colorado Blvd. At least 10 covered bicycle parking spaces, ADA/AASHTO compliant lighting, and way-finding signage with destination and distance information will be included. CDOT awarded TAP funding of $1,000,000 in FY17. Affected Municipality(ies) Affected County(ies) Project Phases Cherry Hills Village Arapahoe Year Phase Denver Denver 2016 Initiate Environmental 2016 Initiate Design 2017 Initiate ROW 2018 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $1,500 $1,300 $1,250 $0 $0 State $0 $0 $0 $0 $0 Local $500 $350 $500 $0 $0 $2,000 $1,650 $1,750 $0 $0 Federal (TAP) $0 Total Total Funding $0 $5,400 Date Status Description 05/07/2015 Proposed Transfer $37,000 of federal TAP funds and associated local match from FY2016 to FY2017. Total project funding remains unchanged. 04/16/2015 Approved Adopted into the 2016-2021 TIP 112 2016-2021 Transportation Improvement Program (Approved TIP) Title: Route 73 Extension: Smith Rd Station to 60th Ave and Dahlia St TIP-ID: 2016-039 STIP-ID: Project Type: Bus Service Projects (Expanded) Open to Public: 2016 Sponsor: Commerce City Project Scope This project will extend RTD Route 73 north from Central Park Station to the 60th/Dahlia Transfer Station, generally along Central Park Blvd, Prairie Pkwy Ave, E. 60th Ave, Holly St, 62nd Ave, and Parkway Dr. The extension will be for 12 service hours Monday through Saturday (approximately 6:30 a.m. to 6:30 p.m.), with 30 minute weekday headways and hourly headways on Saturday. The extension also will provide special event service at Dicks Sporting Goods Park. Affected Municipality(ies) Affected County(ies) Project Phases Commerce City Adams Year Phase Denver Denver 2016 Initiate Bus Service - Year 1 2017 Initiate Bus Service - Year 2 2018 Initiate Bus Service - Year 3 Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $453 $451 $451 $0 $0 State $0 $0 $0 $0 $0 Local $114 $113 $113 $0 $0 $567 $564 $564 $0 $0 Federal (CMAQ) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 113 Total Funding $0 $1,695 2016-2021 Transportation Improvement Program (Approved TIP) Title: Gun Club Rd and Quincy Ave Operational Improvements TIP-ID: 2016-040 STIP-ID: Project Type: Roadway Operational Improvements Open to Public: 2020 Sponsor: Arapahoe County Project Scope This project constructs a four through lane Partial Continuous Flow Intersection (PCFI), with legs extending 1,200 feet in each direction. Features include: • A box culvert crossing that will accommodate the Quincy Avenue Trail • New and improved signal interconnection, and ITS infrastructure • Bike amenities and bike counters • Street trees and/or a landscaped buffer • A new bike lane or shoulders • Depressed medians on all legs of the intersection Affected Municipality(ies) Affected County(ies) Project Phases Aurora Arapahoe Year Phase 2016 Initiate Design 2017 Initiate Environmental 2018 Initiate ROW 2019 Initiate Construction Unincorporated Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $500 $500 $1,000 $2,892 $0 State $0 $0 $0 $0 $0 Local $500 $500 $1,000 $6,475 $0 $1,000 $1,000 $2,000 $9,367 $0 Federal (CMAQ) $0 Total Total Funding $0 $13,367 Date Status Description 05/04/2015 Proposed Add $500,000 of local CMAQ funds in FY2017, add $1,000,000 of local CMAQ funds in FY2018 and remove $2,167,000 of local CMAQ funds in FY2019. Decrease total project funding to reflect sponsor"s original funding request. 04/16/2015 Approved Adopted into the 2016-2021 TIP 114 2016-2021 Transportation Improvement Program (Approved TIP) Title: Founders Pkwy and Allen Way Intersection Improvements TIP-ID: 2016-041 STIP-ID: Project Type: Roadway Operational Improvements Open to Public: 2020 Sponsor: Castle Rock Project Scope Project will widen Founders Pkwy (SH-86) to accommodate a second eastbound left turn lane, and a dedicated westbound right turn lane. The new left turn lane will extend to the I-25 / Founders northbound ramp intersection. Project will also add a second southbound right turn lane at Founders and a second through lane at the Allen Way and Allen St intersection. The existing roadside trail will be replaced with a new 8-ft trail. Affected Municipality(ies) Affected County(ies) Project Phases Castle Rock Douglas Year Phase 2017 Initiate Environmental 2017 Initiate Design 2018 Initiate ROW 2019 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 Federal (STP-M) $0 $284 $269 $1,447 $0 State $0 $0 $0 $0 $0 State (Faster-S) $0 $0 $0 $280 $0 Local $0 $71 $68 $905 $0 $0 $355 $337 $2,632 $0 $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 115 Total Funding $0 $3,324 2016-2021 Transportation Improvement Program (Approved TIP) Title: US 85: Highlands Ranch Pkwy to Blakeland Dr Capacity Improvements TIP-ID: 2016-042 STIP-ID: Project Type: Roadway Capacity Open to Public: 2020 Sponsor: Douglas County Project Scope This project will widen Santa Fe Blvd (US-85) from 4 to 6 lanes. Features include: • Intersection improvements at Blakeland Dr, Norwood Dr, Carder Ct, Town Center Dr, and Branden Dr, including adding or improving left turn lanes and auxiliary lanes, where warranted • Reconstructing and/or repaving existing lanes, adding shoulders, where feasible • New and improved signal interconnection, and ITS infrastructure • 10 ft wide detached multi-use path, bike amenities, and bike counters • Transit stop enhancements including bus pads, shelters, benches, and sidewalk connections • Landscaped center medians, and access consolidation Affected Municipality(ies) Affected County(ies) Project Phases Unincorporated Douglas Year Phase 2018 Initiate ROW 2019 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 Federal (STP-M) $0 $0 $5,000 $10,000 $0 State $0 $0 $0 $0 $0 State (R P P) $0 $0 $2,000 $1,000 $0 $2,500 $2,500 $1,250 $5,750 $0 $2,500 $2,500 $8,250 $16,750 $0 Local $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 116 Total Funding $0 $30,000 2016-2021 Transportation Improvement Program (Approved TIP) Title: RidgeGate Pkwy Widening: Havana St to Lone Tree City Limits TIP-ID: 2016-043 STIP-ID: Project Type: Roadway Capacity Open to Public: 2020 Sponsor: Lone Tree Project Scope This project will widen Ridgegate Pkwy from Havana St to the Lone Tree city limits from 2 to 4 lanes. Features include: • Raised medians • Left turn lanes at signalized intersections • A separated cycle track bike detection • Bike and transit amenities • New sidewalks of a minimum width of 8 ft Affected Municipality(ies) Affected County(ies) Project Phases Lone Tree Douglas Year Phase 2018 Initiate Design 2019 Initiate Construction Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (STP-M) $0 $0 $1,400 $5,000 $0 State $0 $0 $0 $0 $0 Local $0 $0 $3,400 $12,200 $0 $0 $0 $4,800 $17,200 $0 $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 117 Total Funding $0 $22,000 2016-2021 Transportation Improvement Program (Approved TIP) Title: Hwy 79 and Hwy 36 Grade Separation: FA and Design Study TIP-ID: 2016-044 STIP-ID: Project Type: Roadway/Transit Studies Open to Public: 2019 Sponsor: Bennett Project Scope This study undertakes environmental clearances and Final Design for grade separating Hwy 79 and the Union Pacific Railroad north of Bennett at Old Victory Rd. Phase 1 will conduct the necessary NEPA analysis and preliminary design. Phase 2 will develop a final design. Affected Municipality(ies) Affected County(ies) Project Phases Bennett Adams Year Phase 2016 Initiate Study 2018 Initiate Design Unincorporated Amounts in $1,000s Prior Funding FY16 FY17 $0 Future Funding $0 $0 $0 $392 $392 $392 $0 $0 $0 $0 $0 $0 $0 $108 $108 $108 $0 $0 $0 $0 $0 $0 $0 $500 $500 $500 $0 $0 Local Total FY20-21 $0 State State (R P P) FY19 $0 Federal Federal (STP-M) FY18 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 118 Total Funding $0 $1,500 2016-2021 Transportation Improvement Program (Approved TIP) Title: SH-7 BRT Study: Boulder to Brighton TIP-ID: 2016-045 Project Type: Roadway/Transit Studies STIP-ID: Open to Public: 2017 Sponsor: Boulder County Project Scope This project will continue PEL analysis and recommendations for SH-7 between 75th Street in Boulder County and SH 287, as well as develop a cohesive plan for Bus Rapid Transit operations on SH 7 from downtown Boulder to the terminus of RTD’s North Metro Rail Line at 162nd in the City of Thornton. The study will: • Identify traffic operation and safety problems • Perform a passenger demand analysis for BRT • Develop level of transit service scenarios and vehicle procurement needed for the new service • Identify capital needs and improvements, including queue jump lanes, TSP, stop enhancements, buses, etc • Define any possible revenue opportunities to support capital, operations, and maintenance • Identify First and Final mile opportunities in the corridor Affected Municipality(ies) Affected County(ies) Project Phases Boulder Adams Year Phase Brighton Boulder 2016 Initiate Study Broomfield Broomfield 2017 Initiate Study Erie Weld Lafayette Thornton Unincorporated Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $80 $120 $0 $0 $0 State $0 $0 $0 $0 $0 Local $20 $30 $0 $0 $0 $100 $150 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 119 Total Funding $0 $250 2016-2021 Transportation Improvement Program (Approved TIP) Title: Arapahoe Rd: I-25 to Parker Rd Next Steps Operations Study TIP-ID: 2016-046 STIP-ID: Project Type: Roadway/Transit Studies Open to Public: 2017 Sponsor: Centennial Project Scope This study will reevaluate and prioritize operational improvements at major intersections on Arapahoe Rd between I-25 and Parker Rd. This study will also incorporate context sensitive solutions that consider development and redevelopment potential; perceptible corridor width due to the wide paved median, landscaping, beautification, and other urban design considerations. Affected Municipality(ies) Affected County(ies) Project Phases Aurora Arapahoe Year Phase 2016 Initiate Study Centennial Greenwood Village Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $400 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $100 $0 $0 $0 $0 $500 $0 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 120 Total Funding $0 $500 2016-2021 Transportation Improvement Program (Approved TIP) Title: Industrial Area Transportation Study: I-25 to I-270 to 40th Ave/Smith Rd TIP-ID: 2016-047 STIP-ID: Project Type: Roadway/Transit Studies Open to Public: 2017 Sponsor: Commerce City Project Scope This project will conduct a planning level connectivity study to identify critical travel sheds on the local arterial and major collector street system west-to-east from I-25 to Quebec, and then south-to-north from Smith Road/40th to I270/U.S. 85 & 60th. The study will emphasize key connections to I-70 and I-270 and include specific feasibility/ alternatives analysis /concept design for the following elements: • BNSF Bridge over SH 265 (conceptual design) • 60th Ave & US 85 (feasibility/alternatives analysis) • Union Pacific Railroad grade separation in the vicinity of 47th Ave/49th Ave (feasibility/alternatives analysis) Affected Municipality(ies) Affected County(ies) Project Phases Commerce City Adams Year Phase Denver Denver 2016 Initiate Study Unincorporated Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $700 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $300 $0 $0 $0 $0 $1,000 $0 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 121 Total Funding $0 $1,000 2016-2021 Transportation Improvement Program (Approved TIP) Title: Erie Pkwy Study: SH-287 to I-25 TIP-ID: 2016-048 Project Type: Roadway/Transit Studies STIP-ID: Open to Public: 2017 Sponsor: Erie Project Scope This project will evaluate the improvements needed to Erie Parkway from SH287 to I-25. Components of this study include the following: • Utilizing existing topography and supplement with field survey. • Review traffic studies for existing developments, obtain additional traffic counts and prepare updated traffic study. • Review drainage reports for existing developments and existing outfall plans. Prepare conceptual hydraulic design and preliminary drainage memorandum. • Prepare conceptual roadway design report, plan set, and cost estimate. The design report will include timing for improvements based on existing and projected traffic volume. Affected Municipality(ies) Affected County(ies) Project Phases Erie Boulder Year Phase Unincorporated Weld 2016 Initiate Study Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $160 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $40 $0 $0 $0 $0 $200 $0 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 122 Total Funding $0 $200 2016-2021 Transportation Improvement Program (Approved TIP) Title: Jeffco Bike Wayfinding Study TIP-ID: 2016-049 Project Type: Roadway/Transit Studies STIP-ID: Open to Public: 2018 Sponsor: Lakewood Project Scope This project will study and make recommendations for a unified county bike/ped wayfinding signage program. Specific tasks include: • Public involvement • Development of a wayfinding brand/signage design and a standards manual and placement guidelines • Review of current signage, plans and best practices • Network mapping Amounts in $1,000s Affected County(ies) Project Phases Jefferson Year Phase 2016 Initiate Study 2017 Initiate Study Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $80 $40 $0 $0 $0 State $0 $0 $0 $0 $0 Local $20 $10 $0 $0 $0 $100 $50 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 123 Total Funding $0 $150 2016-2021 Transportation Improvement Program (Approved TIP) Title: SH 119 BRT NEPA Analysis: Boulder to Longmont TIP-ID: 2016-050 STIP-ID: Project Type: Roadway/Transit Studies Open to Public: 2018 Sponsor: R T D Project Scope This project will conduct the next level of NEPA clearances, route planning, and preliminary engineering necessary to implement BRT in the SH 119 Corridor. Affected Municipality(ies) Affected County(ies) Project Phases Boulder Boulder Year Phase 2016 Initiate Study Longmont Unincorporated Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $1,000 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $250 $0 $0 $0 $0 $1,250 $0 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 124 Total Funding $0 $1,250 2016-2021 Transportation Improvement Program (Approved TIP) Title: Regional BRT Feasibility Study TIP-ID: 2016-051 Project Type: Roadway/Transit Studies STIP-ID: Open to Public: 2018 Sponsor: R T D Project Scope This project will analyze arterial corridors region-wide to determine those that could be suitable for establishing a regional arterial BRT network and establish a prioritization for implementation. Amounts in $1,000s Affected County(ies) Project Phases Regional Year Phase 2017 Initiate Study Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (STP-M) $0 $1,000 $0 $0 $0 State $0 $0 $0 $0 $0 Local $0 $500 $0 $0 $0 $0 $1,500 $0 $0 $0 $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 125 Total Funding $0 $1,500 2016-2021 Transportation Improvement Program (Approved TIP) Title: Williams Fork Trail Multi-use Path: 63rd St to Twin Lakes Rd TIP-ID: 2016-052 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2018 Sponsor: Boulder County Project Scope This project will construct a 10 ft wide concrete multi use path for 3,800 ft along Williams Fork Trail between N 63rd St and Twin Lakes Rd. The project will install pedestrian-scale ADA/AASHTO compliant lighting, way-finding signage with destination and distance information and 20 or more bike parking spaces within 1/2 miles of the project. Selected using CDOT TAP funds. Affected Municipality(ies) Affected County(ies) Boulder Boulder Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal (TAP) $0 $632 $0 $0 $0 State $0 $0 $0 $0 $0 Local $0 $158 $0 $0 $0 $0 $790 $0 $0 $0 $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 126 Total Funding $0 $790 2016-2021 Transportation Improvement Program (Approved TIP) Title: Mead School to School Trail Project TIP-ID: 2016-053 Project Type: Bicycle and Pedestrian Projects (New) STIP-ID: Open to Public: 2016 Sponsor: Mead Project Scope This project will construct an 8 ft wide trail from Mead Middle School to Mead High School. Selected using CDOT TAP funds. Affected Municipality(ies) Affected County(ies) Mead Weld Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $400 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $100 $0 $0 $0 $0 $500 $0 $0 $0 $0 Federal (TAP) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 127 Total Funding $0 $500 2016-2021 Transportation Improvement Program (Approved TIP) Title: Boulder County Bus-then-Bike Shelters TIP-ID: 2016-054 Project Type: Bicycle and Pedestrian Projects (New) STIP-ID: Open to Public: 2016 Sponsor: Boulder County Project Scope This project will construct Bus-then-Bike shelters at four transit stops. Selected using CDOT TAP funds. Affected County(ies) Boulder Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $226 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $57 $0 $0 $0 $0 $283 $0 $0 $0 $0 Federal (TAP) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 128 Total Funding $0 $283 2016-2021 Transportation Improvement Program (Approved TIP) Title: I-25: 120th Ave to E-470 Managed Lanes TIP-ID: 2016-055 Project Type: Roadway Capacity STIP-ID: Open to Public: 2020 Sponsor: CDOT Region 4 Project Scope This project will extend the existing and under construction managed lanes project (TIPID 2012-073), utilizing existing and new ROW. The project will result in one new managed lane in each direction from the current project's northern terminus near 120th Ave to E-470. Project will resurface the entire stretch, add traffic management, sound wall, and tolling/ITS equipment. Affected Municipality(ies) Affected County(ies) Broomfield Adams Thornton Broomfield Westminster Unincorporated Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $0 $0 $0 $0 $0 $40,000 $0 $0 $0 $0 $3,000 $0 $0 $0 $0 State (Surface) $0 $0 $0 $12,000 $0 Local $0 $0 $0 $0 $0 $43,000 $0 $0 $12,000 $0 Federal State (RMP) State (Safety) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 129 Total Funding $0 $55,000 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 ITS Pool Project Type: Congestion Management TIP-ID: 2016-056 STIP-ID: Open to Public: Sponsor: CDOT Region 1 Project Scope CDOT Region 1 ITS Pool. Specific projects will not be listed. Affected County(ies) Adams Arapahoe Broomfield Denver Douglas Jefferson Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State (ITS) $0 $9,494 $7,400 $0 $0 Local $0 $0 $0 $0 $0 $0 $9,494 $7,400 $0 $0 $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 130 Total Funding $0 $16,894 2016-2021 Transportation Improvement Program (Approved TIP) Title: Region 1 RPP Pool Project Type: Other TIP-ID: 2016-057 STIP-ID: Open to Public: 2016 Sponsor: CDOT Region 1 Project Scope CDOT Region 1 RPP Pool. Funds projects with RPP funds. Affected County(ies) Adams Arapahoe Broomfield Denver Douglas Jefferson All pool project funding depicts federal and/or state funding only. Facility Name Start-At and End-At Cost (1,000s) Facility Name (Cont) Start-At and End-At 1-70 PPSL Cost (1,000s) Start-At and End-At $4,000 US 85 design Sedalia to Meadows $2,900 $16,000 Small projects/consultants/clo seouts $20,000 Montgomery settlement $200 I-25 S PEL $1,500 US 85 Louviers to Sedalia I-25 N Post-PEL I-70 Tower to Colfax $2,600 C470 Study $1,000 C470 West PEL $2,100 I-270 Interchange Study (TIP ID 2016-047) $1,000 120th Ave Connection Broomfield TIP ID 2007-029 $1,400 I-25 Operational Study $1,000 Amounts in $1,000s Prior Funding FY16 $0 FY19 FY20-21 Future Funding $0 $0 $0 $0 $17,600 $15,700 $13,900 $8,500 $0 $0 $0 $0 $0 $0 $17,600 $15,700 $13,900 $8,500 $0 Local Total FY18 $0 Federal State (R P P) FY17 Date Status Description 04/16/2015 Approved Proposed for adoption into the 2016-2021 TIP 131 Cost (1,000s) Facility Name (Cont) Total Funding $0 $55,700 $2,000 2016-2021 Transportation Improvement Program (Approved TIP) Title: Ozone State Implementation Plan (SIP) Modeling Study TIP-ID: 2016-058 STIP-ID: Project Type: Air Quality Improvement Projects Open to Public: 2018 Sponsor: R A Q C Project Scope Conduct modeling and strategy analysis to ensure that the region will be able to meet anticipated new standards by the mandated deadlines for tighter standards for ozone. Amounts in $1,000s Affected County(ies) Project Phases Regional Year Phase 2016 Initiate Study Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $480 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $120 $0 $0 $0 $0 $600 $0 $0 $0 $0 Federal (STP-M) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 132 Total Funding $0 $600 2016-2021 Transportation Improvement Program (Approved TIP) Title: C-470 Managed Toll Express Lanes: Kipling to I-25 TIP-ID: 2016-059 STIP-ID: Project Type: Roadway Capacity Open to Public: Sponsor: CDOT Region 1 Project Scope Adds one managed lane in each direction on C-470, from Kipling to I-25. Affected County(ies) Arapahoe Douglas Amounts in $1,000s Prior Funding FY16 $0 FY19 FY20-21 Future Funding $0 $0 $0 $0 $20,000 $40,000 $40,000 $0 $0 $0 $0 $0 $0 $0 $20,000 $40,000 $40,000 $0 $0 Local Total FY18 $0 Federal State (RMP) FY17 Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 133 Total Funding $0 $100,000 2016-2021 Transportation Improvement Program (Approved TIP) Title: I-70/Genesee Bike Path TIP-ID: 2016-060 Project Type: Bicycle and Pedestrian Projects (New) STIP-ID: Open to Public: Sponsor: CDOT Project Scope Project constructs a 10 ft wide concrete multi-use path on the northerly side of I70 between the Genesee Exit and Evergreen Pkwy Exit (Exit 251 and 254). The project will also construct a pedestrian bridge over the buffalo herd culvert crossing at approximate milepost 253.5. This project will be constructed in CDOT and Denver Parks Right-of-Way. Affected County(ies) Jefferson Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $700 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $175 $0 $0 $0 $0 $875 $0 $0 $0 $0 Federal (TAP) $88 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 134 Total Funding $0 $963 2016-2021 Transportation Improvement Program (Approved TIP) Title: Sheridan Blvd Multiuse Path: W. 6th Ave to W. 10th Ave TIP-ID: 2016-061 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2017 Sponsor: Lakewood Project Scope Construct multiuse path on the west side of Sheridan Blvd from north of W. 6th Ave to W. 10th Ave. Awarded with CDOT Region 1 TAP funds. Affected Municipality(ies) Affected County(ies) Lakewood Jefferson Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $400 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $100 $0 $0 $0 $0 $500 $0 $0 $0 $0 Federal (TAP) $500 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 135 Total Funding $0 $1,000 2016-2021 Transportation Improvement Program (Approved TIP) Title: Sheridan Blvd Sidewalks: W. 8th Ave to W. 10th Ave and Colfax Ave to W. 17th Ave TIP-ID: 2016-062 STIP-ID: Project Type: Bicycle and Pedestrian Projects (New) Open to Public: 2018 Sponsor: Denver Project Scope Complete planning, design, and environmental phases for detached sidewalks on the east side of Sheridan Blvd (5 ft wide landscaping and 5 ft wide sidewalk) from W. 8th Ave to W. 10th Ave and north of Colfax Ave to W. 17th Ave. Awarded with CDOT Region 1 TAP funds. Affected Municipality(ies) Affected County(ies) Denver Denver Amounts in $1,000s Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Funding $400 $400 $0 $0 $0 State $0 $0 $0 $0 $0 Local $100 $100 $0 $0 $0 $500 $500 $0 $0 $0 Federal (TAP) $0 Total Date Status Description 04/16/2015 Approved Adopted into the 2016-2021 TIP 136 Total Funding $0 $1,000 APPENDIX A TIP Project Funding Summary 13 138 Appendix A: 2016-2021 Transportation Improvement Program - Project Funding Summary STP Metro TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 2007-044 RTD FasTracks Projects: DRCOG First Commitment Pool $0 State $0 $0 $0 $0 $0 Local $1,000 $0 $0 $0 $0 $5,000 $0 $0 $0 $0 $65,000 Prior Funding FY16 FY18 FY20-21 FY19 $0 $0 $0 State $0 $0 $0 $0 $0 Local $913 $0 $0 $0 $0 $4,563 $0 $0 $0 $0 $1,224,211 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $1,000 $0 $0 $0 State $0 $0 $0 $0 $0 Local $1,630 $250 $0 $0 $0 $8,148 $1,250 $0 $0 $0 $0 139 $0 $70,000 Total Funding $0 Future $6,518 Total Total Funding Future $0 Federal DRCOG Second Commitment to FasTracks Pool FY17 $3,650 Amounts in $1,000s DRCOG Future $0 Total 2012-010 FY20-21 $0 Federal FasTracks Eagle P-3 Corridors (Gold and East Line) FY19 $0 Amounts in $1,000s RTD FY18 $4,000 Total 2008-111 FY17 $1,228,774 Total Funding $0 $9,398 Amounts in $1,000s Prior Funding FY16 Federal 2012-079 Northglenn North Metro Rail 112th Ave Corridor Improvements State $0 $0 $0 $0 $0 Local $25 $207 $0 $0 $0 $124 $935 $0 $0 $0 $0 Prior Funding FY16 FY18 FY19 FY20-21 $0 $0 $0 State $0 $0 $0 $0 $0 Local $46 $339 $0 $0 $0 $231 $1,696 $0 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $459 $0 $0 $0 $0 $2,291 $0 $0 $0 $0 $0 140 $0 $1,059 Total Funding $0 Future $1,832 Total Total Funding Future $1,357 Federal Metro Center Station Area Bike/Ped Connector Facility FY17 $185 Amounts in $1,000s Aurora Future $0 Total 2016-005 FY20-21 $0 Federal North Metro Rail 72nd Ave and Colorado Blvd Station Sidewalks FY19 $0 Amounts in $1,000s Commerce City FY18 $728 Total 2012-080 FY17 $99 $1,927 Total Funding $0 $2,291 Amounts in $1,000s Prior Funding FY16 Federal 2016-008 Boulder Boulder Slough Multiuse Path: 30th St to 3100 Pearl State $0 $0 $0 $0 $0 Local $24 $24 $72 $0 $0 $120 $120 $360 $0 $0 $0 Prior Funding FY16 Colfax 15L Transit Improvements: I225 to I-25 FY17 FY18 FY19 FY20-21 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $374 $0 $0 $0 $0 $1,866 $0 $0 $0 $0 $0 Prior Funding FY16 FY17 FY19 FY18 FY20-21 $0 $0 $1,300 $1,300 $0 State $0 $0 $0 $0 $0 Local $0 $0 $325 $325 $0 $0 $0 $1,625 $1,625 $0 $0 141 $0 $600 Total Funding $0 Future Federal Total Total Funding Future $1,492 Amounts in $1,000s RTD Future $0 Total 2016-019 FY20-21 $0 Federal 23rd Ave. Bike/Ped Path at Fitzsimons Station FY19 $288 Amounts in $1,000s Aurora FY18 $96 Total 2016-018 FY17 $96 $1,866 Total Funding $0 $3,250 Amounts in $1,000s Prior Funding FY16 Federal 2016-020 Wheat Ridge Wadsworth Blvd Widening: 35th Ave to 48th Ave State $0 $0 $0 $0 $0 Local $500 $1,000 $2,000 $2,820 $0 $2,500 $5,000 $10,000 $14,100 $0 $0 Prior Funding FY16 FY18 FY19 FY20-21 $6,833 $0 $0 State $0 $0 $0 $0 $0 Local $2,971 $1,000 $6,624 $0 $0 $9,511 $5,000 $13,457 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $5,379 $0 $0 $0 State $0 $0 $0 $0 $0 Local $1,957 $5,871 $0 $0 $0 $3,750 $11,250 $0 $0 $0 $0 142 $0 $31,600 Total Funding $0 Future $1,793 Total Total Funding Future $4,000 Federal Martin Luther King Jr. Blvd Extension: Havana St to Peoria St FY17 $6,540 Amounts in $1,000s Denver Future $0 Total 2016-022 FY20-21 $11,280 Federal I-25 & Broadway Interchange Reconstruction FY19 $8,000 Amounts in $1,000s Denver FY18 $4,000 Total 2016-021 FY17 $2,000 $27,968 Total Funding $0 $15,000 Amounts in $1,000s Prior Funding FY16 Federal 2016-023 Denver Quebec St Operational Improvements: 13th Ave to 26th State $0 $0 $0 $0 $0 Local $820 $3,560 $3,810 $3,310 $0 $1,640 $7,120 $7,620 $6,620 $0 $0 Prior Funding FY16 FY18 FY19 FY20-21 $1,617 $0 $0 State $0 $0 $0 $0 $0 Local $72 $0 $404 $0 $0 $358 $0 $2,021 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $400 $1,000 $3,825 $0 State $0 $0 $0 $0 $0 Local $250 $100 $250 $1,475 $0 $1,250 $500 $1,250 $5,300 $0 $0 143 $0 $23,000 Total Funding $0 Future $1,000 Total Total Funding Future $0 Federal Broadway Reconstruction: Violet Ave to US-36 FY17 $286 Amounts in $1,000s Boulder Future $0 Total 2016-026 FY20-21 $3,310 Federal Ralston Rd Reconstruction: Yukon St to Upham St FY19 $3,810 Amounts in $1,000s Arvada FY18 $3,560 Total 2016-025 FY17 $820 $2,379 Total Funding $0 $8,300 Amounts in $1,000s 2016-027 Castle Rock Meadows Pkwy Reconstruction: US85 to Meadows Blvd Prior Funding FY16 $0 State $0 $0 $0 $0 $0 Local $0 $334 $0 $0 $0 $0 $1,667 $0 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $2,400 $0 $0 $0 State $0 $0 $0 $0 $0 Local $600 $600 $0 $0 $0 $2,999 $3,000 $0 $0 $0 $0 Prior Funding Federal FY16 FY17 FY18 FY19 Total Funding $0 Future $2,399 Amounts in $1,000s Golden Future $0 Total 2016-037 FY20-21 $0 Federal 16th St Mall Reconstruction: Arapahoe St to Lawrence St FY19 $1,333 Amounts in $1,000s RTD FY18 $0 Total 2016-028 FY17 Federal FY20-21 Total Funding $0 Future $345 $2,700 $0 $0 $0 State $0 $0 $0 $0 $0 Local $90 $686 $0 $0 $0 $435 $3,386 $0 $0 $0 $1,667 $5,999 Total Funding Washington Ave Complete Streets $0 Total 144 $0 $3,821 Amounts in $1,000s 2016-041 Castle Rock Founders Pkwy and Allen Way Intersection Improvements Prior Funding US 85: Highlands Ranch Pkwy to Blakeland Dr Capacity RidgeGate Pkwy Widening: Havana St to Lone Tree City Limits FY20-21 Future $1,447 $0 State $0 $0 $0 $0 $0 Local $0 $71 $68 $905 $0 $0 $355 $337 $2,352 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $0 $5,000 $10,000 $0 State $0 $0 $0 $0 $0 Local $2,500 $2,500 $1,250 $5,750 $0 $2,500 $2,500 $6,250 $15,750 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $0 $1,400 $5,000 $0 State $0 $0 $0 $0 $0 Local $0 $0 $3,400 $12,200 $0 $0 $0 $4,800 $17,200 $0 $0 145 $0 $3,044 Total Funding $0 Future Federal Total Total Funding Future Federal Amounts in $1,000s Lone Tree FY19 $269 Total 2016-043 FY18 $284 Amounts in $1,000s Douglas County FY17 $0 Total 2016-042 FY16 Federal $27,000 Total Funding $0 $22,000 Amounts in $1,000s Prior Funding FY16 Federal 2016-044 Bennett Hwy 79 and Hwy 36 Grade Separation: FA and Design Study State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $392 $392 $392 $0 $0 $0 Prior Funding FY16 FY18 FY19 FY20-21 $0 $0 $0 State $0 $0 $0 $0 $0 Local $20 $30 $0 $0 $0 $100 $150 $0 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $100 $0 $0 $0 $0 $500 $0 $0 $0 $0 $0 146 $0 $1,176 Total Funding $0 Future $400 Total Total Funding Future $120 Federal Arapahoe Rd: I-25 to Parker Rd Next Steps Operations Study FY17 $80 Amounts in $1,000s Centennial Future $0 Total 2016-046 FY20-21 $0 Federal SH-7 BRT Study: Boulder to Brighton FY19 $392 Amounts in $1,000s Boulder County FY18 $392 Total 2016-045 FY17 $392 $250 Total Funding $0 $500 Amounts in $1,000s Prior Funding FY16 Federal 2016-047 Commerce City Industrial Area Transportation Study: I-25 to I-270 to 40th Future $0 State $0 $0 $0 $0 $0 Local $300 $0 $0 $0 $0 $1,000 $0 $0 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 Total Funding $0 Future $160 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $40 $0 $0 $0 $0 $200 $0 $0 $0 $0 $1,000 Total Funding Erie Pkwy Study: SH-287 to I-25 $0 Total Amounts in $1,000s Prior Funding Federal Lakewood FY20-21 $0 Federal 2016-049 FY19 $0 Amounts in $1,000s Erie FY18 $0 Total 2016-048 FY17 $700 FY16 FY17 FY18 FY19 FY20-21 $0 Future $80 $40 $0 $0 $0 State $0 $0 $0 $0 $0 Local $20 $10 $0 $0 $0 $100 $50 $0 $0 $0 $200 Total Funding Jeffco Bike Wayfinding Study $0 Total 147 $0 $150 Amounts in $1,000s Prior Funding FY16 Federal 2016-050 RTD SH 119 BRT NEPA Analysis: Boulder to Longmont Future $0 State $0 $0 $0 $0 $0 Local $250 $0 $0 $0 $0 $1,250 $0 $0 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 Total Funding $0 Future Federal $0 $1,000 $0 $0 $0 State $0 $0 $0 $0 $0 Local $0 $500 $0 $0 $0 $0 $1,500 $0 $0 $0 $1,250 Total Funding Regional BRT Feasibility Study $0 Amounts in $1,000s Prior Funding FY16 Federal RAQC Ozone State Implementation Plan (SIP) Modeling Study Prior Funding Federal FY17 FY18 FY19 $0 $0 $0 State $0 $0 $0 $0 $0 Local $120 $0 $0 $0 $0 $600 $0 $0 $0 $0 FY16 $0 FY17 FY18 FY19 FY20-21 Future Funding $29,591 $30,013 $36,162 $0 State $0 $0 $0 $0 $0 Local $13,273 $12,855 $15,435 $30,553 $0 $48,714 $42,446 $46,876 $69,287 $0 $1,289,211 148 $0 $0 Future $0 $35,441 Total FY20-21 $480 Total STP Metro Project Allocation Totals FY20-21 $0 Total 2016-058 FY19 $0 Amounts in $1,000s RTD FY18 $0 Total 2016-051 FY17 $1,000 Total Funding $1,496,534 $1,500 Total Funding $0 $600 Congestion Mitigation / Air Quality TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 1999-097 DRCOG Regional Transportation Demand Management (TDM) Program Pool State $0 $0 $0 $0 $0 Local $800 $0 $800 $0 $0 $4,000 $0 $4,000 $0 $0 $0 Prior Funding FY16 FY19 FY18 FY20-21 $0 $0 $0 State $0 $0 $0 $0 $0 Local $1,000 $0 $0 $0 $0 $5,000 $0 $0 $0 $0 $65,000 Prior Funding FY16 FY17 FY19 FY18 FY20-21 $600 $600 $600 $0 State $0 $0 $0 $0 $0 Local $150 $150 $150 $150 $0 $750 $750 $750 $750 $0 $0 149 $0 $8,000 Total Funding $0 Future $600 Total Total Funding Future $0 Federal Station Area Master Plan/Urban Center Studies Pool FY17 $4,000 Amounts in $1,000s DRCOG Future $0 Total 2007-089 FY20-21 $0 Federal FasTracks Projects: DRCOG First Commitment Pool FY19 $3,200 Amounts in $1,000s RTD FY18 $0 Total 2007-044 FY17 $3,200 $70,000 Total Funding $0 $3,000 Amounts in $1,000s Prior Funding FY16 Federal 2012-010 DRCOG DRCOG Second Commitment to FasTracks Pool State $0 $0 $0 $0 $0 Local $1,018 $0 $0 $0 $0 $5,091 $0 $0 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $746 $0 $0 $0 $0 $1,701 $0 $0 $0 $0 $295 Prior Funding Federal FY16 FY17 FY18 FY19 Total Funding $0 Future $955 Amounts in $1,000s DRCOG Future $0 Total 2012-064 FY20-21 $0 Federal SH-119: South of Hover Bike/Ped Underpass FY19 $0 Amounts in $1,000s Longmont FY18 $0 Total 2012-051 FY17 $4,073 FY20-21 Total Funding $0 Future $3,600 $0 $3,600 $0 $0 State $0 $0 $0 $0 $0 Local $226 $0 $226 $0 $0 $3,826 $0 $3,826 $0 $0 $5,091 $1,996 Total Funding Regional TDM Program: Way to Go Total $0 150 $0 $7,652 Amounts in $1,000s Prior Funding FY16 Federal 2016-002 RAQC Future $0 State $0 $0 $0 $0 $0 Local $330 $450 $450 $450 $0 $1,650 $2,250 $2,250 $2,250 $0 Total Funding Air Quality Improvements Pool $0 Prior Funding FY16 FY17 FY18 FY20-21 FY19 $0 Future Federal $0 $6,000 $3,000 $16,000 $0 State $0 $0 $0 $0 $0 Local $0 $1,500 $750 $4,000 $0 $0 $7,500 $3,750 $20,000 $0 $8,400 Total Funding I-70 East Reconstruction Amounts in $1,000s $0 Prior Funding Federal DRCOG FY20-21 $1,800 Total 2016-004 FY19 $1,800 Amounts in $1,000s CDOT Region 1 FY18 $1,800 Total 2016-003 FY17 $1,320 Regional Transportation Operations Pool FY16 FY17 FY18 FY20-21 FY19 Future $4,839 $4,200 $4,200 $4,200 $0 State $0 $0 $0 $0 $0 Local $1,210 $1,050 $1,050 $1,050 $0 $6,049 $5,250 $5,250 $5,250 $0 Total $0 151 $0 $31,250 Total Funding $0 $21,799 Amounts in $1,000s Prior Funding FY16 Federal 2016-009 RTD MetroRide Service Expansion: DUS to Civic Center Future $0 State $0 $0 $0 $0 $0 Local $100 $100 $100 $0 $0 $500 $500 $500 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 Total Funding $0 Future $536 $548 $580 $0 $0 State $0 $0 $0 $0 $0 Local $134 $137 $145 $0 $0 $670 $685 $725 $0 $0 $1,500 Total Funding RTD L Route Service Enhancement $0 Total Amounts in $1,000s Prior Funding Federal Boulder County FY20-21 $0 Federal 2016-011 FY19 $400 Amounts in $1,000s Boulder County FY18 $400 Total 2016-010 FY17 $400 FLEX Route Extension: Boulder to Longmont FY16 FY17 FY18 FY19 FY20-21 Future $380 $384 $392 $0 $0 State $0 $0 $0 $0 $0 Local $95 $96 $98 $0 $0 $475 $480 $490 $0 $0 Total $0 152 $0 $2,080 Total Funding $0 $1,445 Amounts in $1,000s Prior Funding FY16 Federal 2016-012 University of Anschutz Medical Campus Shuttle Colorado-Denver Future $0 State $0 $0 $0 $0 $0 Local $372 $136 $140 $0 $0 $1,239 $452 $466 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY20-21 FY19 Total Funding $0 Future $215 $102 $106 $0 $0 State $0 $0 $0 $0 $0 Local $54 $26 $27 $0 $0 $269 $128 $133 $0 $0 $2,157 Total Funding Superior Call-n-Ride Total Amounts in $1,000s $0 Prior Funding Federal Broomfield FY20-21 $0 Federal 2016-014 FY19 $326 Amounts in $1,000s Superior FY18 $316 Total 2016-013 FY17 $867 FY16 FY17 FY18 FY20-21 FY19 $0 Future $188 $89 $92 $0 $0 State $0 $0 $0 $0 $0 Local $80 $38 $40 $0 $0 $268 $127 $132 $0 $0 $530 Total Funding Broomfield Call-n-Ride Total $0 153 $0 $527 Amounts in $1,000s Prior Funding FY16 Federal 2016-015 Longmont RTD Route #324 Frequency Improvements State $0 $0 $0 $0 $0 Local $98 $98 $98 $0 $0 $490 $490 $490 $0 $0 $0 Prior Funding FY16 Westerly Creek Trail to Toll Gate Creek Trail Connector FY17 FY18 FY20-21 FY19 $4,547 $0 $0 $0 State $0 $0 $0 $0 $0 Local $285 $1,137 $0 $0 $0 $1,421 $5,684 $0 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY20-21 FY19 $0 $2,501 $6,006 $0 $0 State $0 $0 $0 $0 $0 Local $0 $626 $2,502 $0 $0 $0 $3,127 $8,508 $0 $0 $0 154 $0 $1,470 Total Funding $0 Future Federal Total Total Funding Future $1,136 Amounts in $1,000s Aurora Future $0 Total 2016-017 FY20-21 $0 Federal Toll Gate Creek Trail: Chambers Rd to Montview Blvd FY19 $392 Amounts in $1,000s Aurora FY18 $392 Total 2016-016 FY17 $392 $7,105 Total Funding $0 $11,635 Amounts in $1,000s Prior Funding FY16 Federal 2016-024 Arapahoe County Iliff Ave Operational Improvements: Parker Rd to Quebec St Superior Trail: McCaslin BRT to Davidson Mesa Underpass State $0 $0 $0 $0 $0 Local $500 $1,000 $2,000 $2,673 $0 $2,000 $4,000 $8,000 $9,519 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $200 $147 $350 $0 State $0 $0 $0 $0 $0 Local $0 $50 $37 $191 $0 $0 $250 $184 $541 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $400 $600 $3,350 $0 State $0 $0 $0 $0 $0 Local $100 $100 $700 $2,350 $0 $500 $500 $1,300 $5,700 $0 $0 155 $0 $23,519 Total Funding $0 Future $400 Total Total Funding Future Federal Federal 30th St and Colorado Ave Bike/Ped Underpass Future $0 Amounts in $1,000s Boulder FY20-21 $6,846 Total 2016-035 FY19 $6,000 Amounts in $1,000s Superior FY18 $3,000 Total 2016-034 FY17 $1,500 $975 Total Funding $0 $8,000 Amounts in $1,000s Prior Funding FY16 FY17 Federal 2016-036 Parker Parker Rd Sidewalk Connection: Plaza Dr to Sulphur Gulch Trail $0 State $0 $0 $0 $0 $0 Local $24 $24 $120 $0 $0 $96 $96 $480 $0 $0 $0 Prior Funding FY16 FY17 $0 State $0 $0 $0 $0 $0 Local $114 $113 $113 $0 $0 $567 $564 $564 $0 $0 $0 Prior Funding FY16 FY17 Federal FY18 FY19 $1,000 $2,892 $0 State $0 $0 $0 $0 $0 Local $500 $500 $1,000 $6,475 $0 $1,000 $1,000 $2,000 $9,367 $0 FY16 FY17 FY18 FY19 FY20-21 Future Funding $26,502 $33,252 $36,038 $0 State $0 $0 $0 $0 $0 Local $7,936 $7,331 $10,546 $17,339 $0 $37,562 $33,833 $43,798 $53,377 $0 $65,295 156 $0 $0 $0 Total Funding $233,865 $672 Total Funding Future $500 $29,626 Total FY20-21 $500 $0 Total Funding Future $0 Total Prior Funding FY20-21 $451 Federal Congestion Mitigation / Air Quality Project Allocation Totals FY19 $451 Amounts in $1,000s Arapahoe County Gun Club Rd and Quincy Ave Operational Improvements FY18 $453 Total 2016-040 Future $0 Federal Route 73 Extension: Smith Rd Station to 60th Ave and Dahlia St FY20-21 $360 Amounts in $1,000s Commerce City FY19 $72 Total 2016-039 FY18 $72 $1,695 Total Funding $0 $13,367 Bridge On-System TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 2007-078 CDOT Region 1 FY17 FY18 FY19 FY20-21 Future $0 $0 $0 $0 $0 State $14,692 $15,920 $9,472 $0 $0 Local $0 $0 $0 $0 $0 $14,692 $15,920 $9,472 $0 $0 Total Funding Region 1 Bridge On-System Pool $0 Total Facility Name Start-At and End-At 6th Ave Potomac to Airport BNSF Replacement Study C-470 SH-265 Colfax I-70 to Kipling Morrison to Bowles Cost (1,000s) Facility Name Start-At and EndAt $263 I-70 Bridge Replacement @Havana $1,800 $250 I-70 Bridge Replacement Havana St $1,400 I-70 WB Deck Rehab US-40 to DITCH $3,508 $31 Cost (1,000s) $330 I-70 WB to I-225 SB Flyover $3,695 $10,336 Douglas County Scour Repairs Essential Culvert Repairs (FY16) $2,207 I-70/I-25 Ramps $2,085 I-76 Essential Culvert Repairs (FY17) $2,669 I-76 Repairs Essential Culvert Repairs (FY18) $2,669 Ramp to I-25 NB Pedestrian Overpass Removal Study 96th to US-85 $280 $1,500 $250 Federal 92nd to 120th $327 Santa Fe Florida to I-25 $56 I-225 I-25 to Parker Rd $63 SH-105 Bridge Removal Study DRAW $250 I-25 Hampden to Evans $25 SH-95 Fiber Wrap I-25 County Line Rd to Bellevue $727 Sheridan I-25 Repairs $1,500 State Highway Repairs I-25 T-Rex Narrows $5,396 University I-25/I-70/I-76 $4,110 US Highway Repairs I-70 and I-225 $5,894 US-40 I-70 and I-25 $5,381 I-70 and I-270 Repairs $1,500 $2,000 Hampden to Arizona $178 $750 Arapahoe to Hampden $845 $750 $241 US-40 Deck Rehab/Replacement US-6 to Beaver Brook Beaver Brook US-6 I-70 to SH-119 $498 US-85 Hampden to Florida $3,328 US-85 I-76 to 136th $92 157 $100 $0 $40,084 Amounts in $1,000s Prior Funding FY16 Federal 2007-133 CDOT Region 4 FY18 FY19 Future $0 $0 $0 State $110 $3,300 $0 $0 $0 Local $0 $0 $0 $0 $0 $110 $3,300 $0 $0 $0 Total Funding Region 4 Bridge On-System Pool Facility Name Start-At and End-At Cost (1,000s) Bridge Asset Management I-25, US-157, US-287 $3,410 Prior Funding FY16 Federal $0 FY17 FY18 FY19 FY20-21 Future Funding $0 $0 $0 $0 $0 State $14,802 $19,220 $9,472 $0 $0 Local $0 $0 $0 $0 $0 $14,802 $19,220 $9,472 $0 $0 Total FY20-21 $0 Total Bridge On-System Project Allocation Totals FY17 $0 $0 158 $0 Total Funding $43,494 $0 $3,410 Bridge Off-System TIP-ID Sponsor Project Name Funding Amounts in $1,000s 2008-028 CDOT Region 4 Prior Funding Sponsor FY19 FY20-21 Future $0 $0 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Funding Region 4 Bridge Off-System Pool Project Name CDOT Region 1 FY18 $0 $0 $0 $0 Funding Amounts in $1,000s 2007-079 FY17 $0 Total TIP-ID FY16 Federal Prior Funding FY16 FY17 FY19 FY18 FY20-21 Future Federal $0 $0 $0 $0 $0 State $0 $0 $624 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $624 $0 $0 Total Funding Region 1 Bridge Off-System Pool Total $0 159 $0 $624 Safety TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 2007-073 CDOT Region 1 Future $0 State $16,635 $5,850 $0 $0 $0 Local $0 $0 $0 $0 $0 $16,635 $5,850 $0 $0 $0 Total Funding Region 1 Hazard Elimination Pool $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 Future $0 $0 $0 $0 $0 State $413 $413 $413 $413 $0 Local $0 $0 $0 $0 $0 $413 $413 $413 $413 $0 $22,485 Total Funding Region 1 Hot Spot Pool $0 Total Amounts in $1,000s Prior Funding Federal CDOT Region 1 FY20-21 $0 Federal 2007-075 FY19 $0 Amounts in $1,000s CDOT Region 1 FY18 $0 Total 2007-074 FY17 $0 FY16 FY17 FY18 FY19 FY20-21 $0 Future $0 $0 $0 $0 $0 State $1,050 $6,650 $5,000 $0 $0 Local $0 $0 $0 $0 $0 $1,050 $6,650 $5,000 $0 $0 $1,652 Total Funding Region 1 Traffic Signals Pool Total $2,341 160 $0 $15,041 Amounts in $1,000s 2007-091 CDOT Region 4 Prior Funding FY20-21 Future $0 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Funding Region 4 Traffic Signals Pool $637 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 Future Federal $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $637 Total Funding Region 4 Hot Spot Pool Amounts in $1,000s CDOT Region 4 FY19 $0 $854 Total 2007-094 FY18 $0 Amounts in $1,000s CDOT Region 4 FY17 $0 Total 2007-092 FY16 Federal Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 Future Federal $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $854 Total Funding Region 4 Hazard Elimination Pool Total $15,785 161 $0 $15,785 Amounts in $1,000s 2012-115 CDOT Region 1 Prior Funding FY16 FY17 Future $0 $0 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Funding Region 1 Rockfall Mitigation $1,500 Prior Funding FY16 FY17 Federal I-25: 120th Ave to E-470 Managed Lanes Prior Funding Safety Project Allocation Totals FY18 FY19 $0 $0 $0 State $3,000 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $3,000 $0 $0 $0 $0 FY16 $0 FY17 FY18 FY19 FY20-21 Future Funding $0 $0 $0 $0 State $21,098 $12,913 $5,413 $413 $0 Local $0 $0 $0 $0 $0 $21,098 $12,913 $5,413 $413 $0 $2,341 162 $0 $0 Future Funding $0 $0 Federal FY20-21 $0 Total Total FY20-21 $0 Amounts in $1,000s CDOT Region 4 FY19 $0 Total 2016-055 FY18 Federal Total Funding $42,178 $1,500 Total Funding $0 $3,000 Regional Priority Projects TIP-ID Sponsor Project Name Funding Amounts in $1,000s 2001-154 CDOT Region 1 US-85: Cook Ranch Rd to Meadows Pkwy Widening Prior Funding FY16 Future $0 $0 State $0 $6,500 $8,900 $3,500 $0 Local $0 $0 $0 $0 $0 $0 $6,500 $8,900 $3,500 $0 $65,298 Prior Funding FY16 FY17 FY18 FY19 FY20-21 Total Funding $37,300 Future $0 $0 $0 $0 $0 State $465 $451 $438 $425 $0 Local $0 $0 $0 $0 $0 $465 $451 $438 $425 $0 $121,498 Total Funding North I-25: Front Range EIS Total Amounts in $1,000s CDOT Region 6 FY20-21 $0 Federal 2012-062 FY19 $0 Amounts in $1,000s CDOT Region 4 FY18 $0 Total 2008-081 FY17 Federal $21,317 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 Future Federal $0 $0 $0 $0 $0 State $0 $1,600 $500 $0 $0 Local $0 $0 $0 $0 $0 $0 $1,600 $500 $0 $0 $23,096 Total Funding I-70/Kipling: NEPA Study Total $1,000 163 $0 $3,100 Amounts in $1,000s Prior Funding FY16 Federal 2012-063 CDOT Region 6 Future $0 State $900 $1,100 $0 $0 $0 Local $0 $0 $0 $0 $0 $900 $1,100 $0 $0 $0 Total Funding I-25 North PEL Action Items US 85: Highlands Ranch Pkwy to Blakeland Dr Capacity $15,500 Prior Funding FY17 FY18 FY19 FY20-21 $0 $0 $0 $0 State $0 $0 $2,000 $1,000 $0 Local $0 $0 $0 $0 $0 $0 $0 $2,000 $1,000 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $0 $0 $0 State $108 $108 $108 $0 $0 Local $0 $0 $0 $0 $0 $108 $108 $108 $0 $0 $0 164 $17,500 Total Funding $0 Future $0 Total $0 Future $0 Federal Hwy 79 and Hwy 36 Grade Separation: FA and Design Study FY16 Federal Amounts in $1,000s Bennett FY20-21 $0 Total 2016-044 FY19 $0 Amounts in $1,000s Douglas County FY18 $0 Total 2016-042 FY17 $0 $3,000 Total Funding $0 $324 Amounts in $1,000s Prior Funding FY16 Federal 2016-057 CDOT Region 1 FY18 FY19 Future $0 $0 $0 State $17,600 $15,700 $13,900 $8,500 $0 Local $0 $0 $0 $0 $0 $17,600 $15,700 $13,900 $8,500 $0 Total Funding Region 1 RPP Pool Prior Funding Federal FY16 $0 FY18 FY17 FY19 FY20-21 Future Funding $0 $0 $0 $0 $0 State $19,135 $25,351 $25,893 $13,425 $0 Local $0 $0 $0 $0 $0 $19,135 $25,351 $25,893 $13,425 $0 Total FY20-21 $0 Total Regional Priority Projects Project Allocation Totals FY17 $0 $96,159 165 $37,300 Total Funding $217,263 $0 $55,700 Surface Treatment TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 2007-095 CDOT Region 4 FY19 FY20-21 Future $0 $0 $0 State $14,580 $14,580 $14,580 $0 $0 Local $0 $0 $0 $0 $0 $14,580 $14,580 $14,580 $0 $0 Total Funding Region 4 Surface Treatment Pool Facility Name Start-At and End-At SH-119 Monarch Rd to Fordham St $6,817 SH-119 MM 22.8 to 37.4 $11,000 SH-119 47th St to Monarch Rd $11,100 $0 $0 $43,740 Cost (1,000s) Amounts in $1,000s Prior Funding Federal CDOT Region 1 FY18 $0 Total 2007-096 FY17 $0 FY16 FY17 FY18 FY19 FY20-21 Future $0 $0 $0 $0 $0 State $55,000 $52,800 $39,600 $43,400 $0 Local $0 $0 $0 $0 $0 $55,000 $52,800 $39,600 $43,400 $0 Total Funding Region 1 Surface Treatment Pool $0 Total Facility Name Start-At and End-At Cost (1,000s) Facility Name Start-At and End- Cost (1,000s) At 6th Potomac to Airport $4,500 Preventative Maintenance C-470 SH-8 to Bowles $7,500 Santa Fe Florida to I-25 $3,500 Colfax I-70 to Kipling $3,000 SH-128 $3,500 Colfax Speer to Clarkson $4,000 SH-72 Colfax Peoria to Sable $2,500 Sheridan Federal 92nd to 120th $6,000 University Hampden Dahlia to Yosemite $4,000 US-287 I-225 I-25 to Parker Rd $7,500 US-6 Eldorado to Wadsworth SH-93 to Coal Creek Canyon Hampden to Arizona Arapahoe to Hampden @ 120th Ave Intersection I-70 to SH-119 I-25 Hampden to Evans $5,000 US-85 Hampden to Florida $2,500 I-25 County Line Rd to Belleview $12,000 US-85 I-76 to 136th $8,000 I-25 @ I-225 $500 Wadsworth Highland to 10th $2,500 I-76 96th to US-85 $6,500 Wadsworth Bear Creek to 4th $5,500 Kipling Jewell to 6th $4,000 166 $0 $1,500 $3,500 $5,000 $250 $2,500 $0 $190,800 Amounts in $1,000s 2016-055 CDOT Region 4 I-25: 120th Ave to E-470 Managed Lanes Prior Funding Prior Funding FY18 FY19 $0 $0 State $0 $0 $0 $12,000 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $12,000 $0 $0 FY17 FY18 FY19 FY20-21 Future Funding $0 $0 $0 $0 State $69,580 $67,380 $54,180 $55,400 $0 Local $0 $0 $0 $0 $0 $69,580 $67,380 $54,180 $55,400 $0 $0 Future $0 $0 Total FY20-21 $0 FY16 Federal FY17 $0 Total Surface Treatment Project Allocation Totals FY16 Federal 167 $0 Total Funding $246,540 Total Funding $0 $12,000 Intelligent Transportation System TIP-ID Sponsor Project Name Funding Amounts in $1,000s 2016-056 CDOT Region 1 Prior Funding FY17 FY18 FY19 Future $0 $0 $0 $0 State $0 $9,494 $7,400 $0 $0 Local $0 $0 $0 $0 $0 $0 $9,494 $7,400 $0 $0 Total Funding Region 1 ITS Pool Prior Funding $0 FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $0 $0 $0 $0 $0 State $0 $9,494 $7,400 $0 $0 Local $0 $0 $0 $0 $0 $0 $9,494 $7,400 $0 $0 Total FY20-21 $0 Total Intelligent Transportation System Project Allocation Totals FY16 Federal $0 168 $0 Total Funding $16,894 $0 $16,894 Section 5307 TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 1997-084 RTD RTD Preventive Maintenance: Transit Vehicle Overhaul and Maintenance Prior Funding State $0 $0 $0 $0 $0 Local $11,195 $11,250 $11,365 $11,475 $22,955 $66,886 $67,498 $68,175 $68,853 $137,711 $0 Prior Funding FY16 FY17 FY18 FY19 $562 $578 $1,156 State $0 $0 $0 $0 $0 Local $106 $109 $113 $116 $232 $636 $654 $675 $694 $1,388 $0 FY17 FY18 FY19 FY20-21 Future Funding $56,793 $57,372 $57,956 $115,912 State $0 $0 $0 $0 $0 Local $11,301 $11,359 $11,478 $11,591 $23,187 $67,522 $68,152 $68,850 $69,547 $139,099 $0 169 $0 Total Funding $0 Future Funding $545 $56,221 Total FY20-21 $530 FY16 Federal Future $114,756 Total Section 5307 Project Allocation Totals FY20-21 $57,378 Federal RTD Enhancements - ADA/Ped/Bus Shelter FY19 $56,810 Amounts in $1,000s RTD FY18 $56,248 Total 2007-169 FY17 $55,691 Total Funding $413,170 $409,123 Total Funding $0 $4,047 Section 5309 New Start TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 2007-059 RTD FasTracks Southeast Corridor Extension: Lincoln Ave to RidgeGate Pkwy Prior Funding Federal State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $92,000 $42,706 $25,942 $1,141 $0 $39,379 FY16 Prior Funding FY17 FY18 $45,950 $0 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $165,000 $150,000 $45,950 $0 $0 $1,224,211 FY16 FY18 FY17 FY19 FY20-21 Future Funding $71,892 $1,141 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $150,000 $192,706 $71,892 $1,141 $0 170 $0 Total Funding $0 Future $150,000 $192,706 $1,263,590 FY20-21 FY19 $165,000 $150,000 Total Future $0 Total Section 5309 New Start Project Allocation Totals FY20-21 $1,141 Federal FasTracks Eagle P-3 Corridors (Gold and East Line) FY19 $25,942 Amounts in $1,000s RTD FY18 $42,706 Total 2008-111 FY17 $92,000 Total Funding $1,679,329 $201,171 Total Funding $0 $1,585,161 RTD Funds Only TIP-ID Sponsor Project Name Funding Amounts in $1,000s 2007-050 RTD FY19 FY20-21 Future $0 $0 State $0 $0 $0 $0 $0 Local $5,362 $1,494 $0 $0 $0 $5,362 $1,494 $0 $0 $0 Total Funding FasTracks Northwest Rail Corridor FasTracks Central Corridor: 30th Ave & Downing St to 38th Ave & FasTracks North Metro: Denver Union Station to 72nd Ave $125,640 Prior Funding FY16 FY17 FY19 FY18 FY20-21 $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $14 $15 $0 $0 $0 $14 $15 $0 $0 $0 $10,702 Prior Funding FY16 FY17 FY19 FY18 FY20-21 $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $172,484 $84,690 $4,740 $0 $0 $172,484 $84,690 $4,740 $0 $0 $157,680 171 $132,496 Total Funding $0 Future Federal Total $0 Future Federal Amounts in $1,000s RTD FY18 $0 Total 2007-055 FY17 $0 Amounts in $1,000s RTD FY16 $0 Total 2007-053 Prior Funding Federal $10,731 Total Funding $0 $419,594 Amounts in $1,000s 2007-056 RTD FasTracks I-225 LRT Corridor: Parker Rd to East Corridor FasTracks Southwest Corridor Extension: Mineral Station to C-470 FasTracks Southeast Corridor Extension: Lincoln Ave to FY19 FY20-21 Future $0 $0 State $0 $0 $0 $0 $0 Local $76,508 $0 $0 $0 $0 $76,508 $0 $0 $0 $0 $684,248 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $23,150 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $43,190 $58,614 $29,872 $1,315 $0 $43,190 $58,614 $29,872 $1,315 $0 $39,379 172 $0 $760,756 Total Funding $0 Future Federal Total Total Funding Future Federal Amounts in $1,000s RTD FY18 $0 Total 2007-059 FY17 $0 Amounts in $1,000s RTD FY16 $0 Total 2007-058 Prior Funding Federal $23,150 Total Funding $0 $172,370 Amounts in $1,000s 2008-111 RTD FasTracks Eagle P-3 Corridors (Gold and East Line) Prior Funding US-36: Boulder to I-25 Managed Lanes/BRT Prior Funding FY19 $0 State $0 $0 $0 $0 $0 Local $140,729 $140,856 $41,696 $0 $0 $140,729 $140,856 $41,696 $0 $0 $1,224,211 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $8,000 $838 $0 $0 $0 $8,000 $838 $0 $0 $0 FY16 $452,278 FY17 FY18 FY19 FY20-21 Future Funding $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $446,287 $286,507 $76,308 $1,315 $0 $446,287 $286,507 $76,308 $1,315 $0 173 $264,184 Total Funding $0 Future Federal $0 $2,694,138 Future $0 Federal Total FY20-21 $0 Total RTD Funds Only Project Allocation Totals FY18 $0 Amounts in $1,000s HPTE FY17 $0 Total 2008-114 FY16 Federal $264,184 Total Funding $3,768,739 $1,547,492 Total Funding $725,300 Faster Safety TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 CDOT Region 1 I-25: Santa Fe Dr to Alameda Ave Interchange Improvements (Valley Future $0 $0 State $11,156 $11,346 $2,000 $0 $0 Local $0 $0 $0 $0 $0 $11,156 $11,346 $2,000 $0 $0 $119,724 Prior Funding FY16 Federal FY17 FY18 FY20-21 FY19 $0 $0 $0 $0 $0 State $20,724 $2,424 $17,869 $19,869 $0 Local $0 $0 $0 $0 $0 $20,724 $2,424 $17,869 $19,869 $0 $144,226 Total Funding Region 1 FASTER Pool Start-At and End-At C-470 Path Separations Cost (1,000s) $1,572 Cable Median Barrier $0 $86,453 Facility Name I-76 Curve Reconstruction and Lane Balancing Start-At and EndAt US-85 I-76 Roundabouts at ramp terminals Bromley Ln FASTER Safety Design $4,000 Region 1 TSM Study Outcomes Founders Pkwy Crowfoot Valley Rd Intersection Reconstruct $1,602 SH-121 Intersection Improvements Waterton Rd $0 SH-121/72nd Ave $594 SH-177 Sidewalks Right turn accel lanes Mineral Ave to Orchard Rd Cost (1,000s) $6,150 $2,164 $5,000 $2,050 Highline Canal Trail Underpass I-70 at 32nd Ave and C- Chain Station Lighting 470 I-70 PPSL $3,000 SH-2 Traffic Signal Upgrades I-70/US-6 $1,000 SH-391 Jefferson County Schools Access $570 $1,224 SH-75 and Mineral Ave $200 SH-95 Intersection Improvements Curb ramp and B/P crossing 64th Ave US-85 and Kuner Rd Barrier Replacement Bromley to Bridge $560 Wadsworth TOD left turn protection Girton, Eastman and Yale $200 I-76 and C-470 Cable Barrier Total Funding Future $0 Total Facility Name FY20-21 $0 Amounts in $1,000s CDOT Region 1 FY19 $0 Total 2008-076 FY18 $0 Federal 2007-158 FY17 Chain station lighting improvements 174 $961 $521 $440 $851 $0 $147,339 Amounts in $1,000s Prior Funding FY16 FY17 Federal 2008-077 CDOT Region 4 Start-At and End-At SH-119 Gilpin CL to Boulder City Limits Shoulder Gaps and Safety (Flood) $0 State $5,000 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $5,000 $0 $0 $0 $0 $0 $0 $5,000 $2,000 $3,000 Founders Pkwy and Allen Way Intersection Improvements Prior Funding Prior Funding FY16 FY17 FY18 FY19 Future $0 $0 $0 $0 $0 State $0 $0 $0 $280 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $280 $0 FY16 $0 FY17 FY19 FY18 FY20-21 Future Funding $0 $0 $0 $0 State $36,880 $13,770 $19,869 $20,149 $0 Local $0 $0 $0 $0 $0 $36,880 $13,770 $19,869 $20,149 $0 $206,177 FY20-21 Federal $0 Federal Total Total Funding Cost (1,000s) Total Faster Safety Project Allocation Totals Future $0 Amounts in $1,000s Castle Rock FY20-21 $0 Region 4 FASTER Pool Facility Name 2016-041 FY19 $0 Total SH-7 FY18 $0 175 $0 Total Funding $296,845 Total Funding $0 $280 FASTER Br. Enterprise TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 FY17 Federal 2008-103 CDOT Region 1 Region 1 FASTER Bridge Enterprise Pool Start-At and End-At County Rd Over I-70 $7,296 I-70 Over UPRR $11,934 I-70 Frontage Rd Over Clear Creek $3,910 I-70 Viaduct (see TIP ID-2016-003) I-70 WB Over US 6, Clear Creek SH-9 Over Platte Gulch US-287 (Federal) Over BNFN at 69th Ave $12,154 US-36 Over Draw $3,379 US-85 Sand Creek $113 York St Over I-270 $17,380 $0 State $11,000 $4,154 $17,000 $54,773 $0 Local $0 $0 $0 $0 $0 $11,000 $4,154 $17,000 $54,773 $0 $113 Total Funding $0 $87,040 Cost (1,000s) $30,000 $874 Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future $0 $0 $0 $0 $0 State $8,080 $752,170 $0 $0 $0 Local $0 $0 $0 $0 $0 $8,080 $752,170 $0 $0 $0 Total Funding I-70 East Reconstruction Total Prior Funding FASTER Br. Enterprise Project Allocation Totals Federal FY16 $0 FY17 FY18 FY19 FY20-21 Future Funding $0 $0 $0 $0 $0 State $19,080 $756,324 $17,000 $54,773 $0 Local $0 $0 $0 $0 $0 $19,080 $756,324 $17,000 $54,773 $0 Total Future $0 Federal CDOT Region 1 FY20-21 $0 Amounts in $1,000s 2016-003 FY19 $0 Total Facility Name FY18 $0 $113 176 $0 Total Funding $847,290 $0 $760,250 Section 5337 State of Good Repair TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 1999-052 RTD FY19 FY18 FY20-21 Future $11,000 $11,000 $11,000 $22,000 State $0 $0 $0 $0 $0 Local $2,500 $2,500 $2,500 $2,500 $5,000 $13,500 $13,500 $13,500 $13,500 $27,000 Total Funding State of Good Repair Total Section 5337 State of Good Repair Project Allocation Totals FY17 $11,000 Prior Funding FY16 Federal $0 FY17 FY18 FY19 FY20-21 Future Funding $11,000 $11,000 $11,000 $11,000 $22,000 State $0 $0 $0 $0 $0 Local $2,500 $2,500 $2,500 $2,500 $5,000 $13,500 $13,500 $13,500 $13,500 $27,000 Total $0 177 $0 Total Funding $81,000 $0 $81,000 Faster Transit TIP-ID Sponsor Project Name Funding Amounts in $1,000s 2008-106 CDOT Region 4 Prior Funding FY16 FY17 FY18 FY19 FY20-21 Future Federal $0 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Funding Region 4 FASTER Transit Pool Total $5,374 178 $0 $5,374 Workforce Initiative Now TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 2012-068 RTD RTD Regional Workforce Initiative Now (WIN) Prior Funding Federal FY18 FY19 $0 $0 $0 State $0 $0 $0 $0 $0 Local $487 $0 $0 $0 $0 $974 $0 $0 $0 $0 FY16 $584 FY17 FY18 FY19 FY20-21 Future Funding $487 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $487 $0 $0 $0 $0 $974 $0 $0 $0 $0 Total $584 Future FY20-21 $0 Total Workforce Initiative Now Project Allocation Totals FY17 $487 179 $0 Total Funding $0 Total Funding $1,558 $1,558 Section 5339 TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 2012-108 RTD RTD Capital Improvements: Bus and Facilities Funding Prior Funding FY19 $10,743 State $0 $0 $0 $0 $0 Local $1,042 $1,053 $1,063 $1,074 $2,147 $6,251 $6,314 $6,377 $6,441 $12,890 $0 FY17 FY18 FY19 FY20-21 Future Funding $5,261 $5,314 $5,367 $10,743 State $0 $0 $0 $0 $0 Local $1,042 $1,053 $1,063 $1,074 $2,147 $6,251 $6,314 $6,377 $6,441 $12,890 $0 Future $5,367 $5,209 Total FY20-21 $5,314 FY16 Federal FY18 $5,261 Total Section 5339 Project Allocation Totals FY17 $5,209 180 $0 Total Funding $38,273 Total Funding $0 $38,273 RAMP TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 2012-109 CDOT Region 4 Future $0 State $3,723 $875 $0 $0 $0 Local $1,316 $219 $0 $0 $0 $5,039 $1,094 $0 $0 $0 Total Funding Region 4 RAMP Project Pool $8,513 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $0 $0 $0 $0 State $999 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $999 $0 $0 $0 $0 $0 Future Funding $14,646 Total Funding Region 1 RAMP Project Pool Total Amounts in $1,000s $2,745 Prior Funding Federal CDOT Region 4 FY20-21 $0 Federal 2016-055 FY19 $0 Amounts in $1,000s CDOT Region 1 FY18 $0 Total 2012-112 FY17 $0 I-25: 120th Ave to E-470 Managed Lanes FY16 FY17 FY18 FY19 FY20-21 Future $0 $0 $0 $0 $0 State $40,000 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $40,000 $0 $0 $0 $0 Total $0 181 $0 $3,744 Total Funding $0 $40,000 Amounts in $1,000s Prior Funding FY16 Federal 2016-059 CDOT Region 1 C-470 Managed Toll Express Lanes: Kipling to I-25 Prior Funding Federal FY18 FY19 $0 $0 State $20,000 $40,000 $40,000 $0 $0 Local $0 $0 $0 $0 $0 $20,000 $40,000 $40,000 $0 $0 FY16 $0 FY17 FY18 FY19 FY20-21 Future Funding $0 $0 $0 $0 State $64,722 $40,875 $40,000 $0 $0 Local $1,316 $219 $0 $0 $0 $66,038 $41,094 $40,000 $0 $0 $11,258 Future $0 $0 Total FY20-21 $0 Total RAMP Project Allocation Totals FY17 $0 182 $0 Total Funding $158,390 Total Funding $0 $100,000 Federal Emergency TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 2012-116 CDOT Region 4 Region 4 2013 Flood-Related Projects Pool Prior Funding Federal FY18 FY19 $0 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $37,603 $11,161 $2,444 $0 $0 $78,304 FY17 FY16 FY18 FY19 FY20-21 Future Funding $11,161 $2,444 $0 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $0 $0 $37,603 $11,161 $2,444 $0 $0 $78,304 Future $2,444 $37,603 Total FY20-21 $11,161 Total Federal Emergency Project Allocation Totals FY17 $37,603 183 $0 Total Funding $129,512 Total Funding $0 $129,512 Transportation Alternatives TIP-ID Sponsor Project Name Funding Amounts in $1,000s Prior Funding FY16 Federal 2016-006 Lakewood Multi-use path on the D10: Wadworth Blvd to Zephyr St and Kipling St to Oak St State $0 $0 $0 $0 $0 Local $80 $134 $266 $0 $0 $400 $670 $1,330 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $254 $0 $0 $0 State $0 $0 $0 $0 $0 Local $33 $64 $0 $0 $0 $165 $318 $0 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $0 $0 $999 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $250 $0 $0 $0 $0 $1,249 $0 $0 184 $0 $2,400 Total Funding $0 Future Federal Total Total Funding Future $132 Amounts in $1,000s East Lafayette Multimodal Path Connection: Commerce Ct to Lafayette Park-n-Ride Future $0 Total Lafayette FY20-21 $0 Federal 2016-029 FY19 $1,064 Amounts in $1,000s University of University of Colorado Boulder East Colorado-Boulder Campus Pedestrian Bridge & Trail FY18 $536 Total 2016-007 FY17 $320 $483 Total Funding $0 $1,249 Amounts in $1,000s 2016-030 Boulder County 71st St Multimodal Pathway Connection: Winchester to Idylwild Trail Prior Funding C-470 Multi-use Trail: Grade Separation at Yosemite St FY20-21 Future $860 $0 State $0 $0 $0 $0 $0 Local $0 $0 $0 $215 $0 $0 $0 $0 $1,075 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $0 $500 $1,500 $0 State $0 $0 $0 $0 $0 Local $300 $300 $350 $1,050 $0 $300 $300 $850 $2,550 $0 $0 Prior Funding Federal FY16 FY17 FY18 FY20-21 FY19 $539 $0 $0 $0 State $0 $0 $0 $0 $0 Local $13 $135 $0 $0 $0 $63 $674 $0 $0 $0 $0 185 $0 $1,075 Total Funding $0 Future $50 Total Total Funding Future Federal Amounts in $1,000s Jefferson County US-6 Shared-Use Path: Colfax Ave to Johnson Rd FY19 $0 Total 2016-032 FY18 $0 Amounts in $1,000s Douglas County FY17 $0 Total 2016-031 FY16 Federal $4,000 Total Funding $0 $737 Amounts in $1,000s Prior Funding FY16 Federal 2016-033 Superior Superior Trail: McCaslin BRT Station to Coal Creek State $0 $0 $0 $0 $0 Local $70 $80 $0 $0 $0 $350 $400 $0 $0 $0 $0 Prior Funding FY16 Williams Fork Trail Multi-use Path: 63rd St to Twin Lakes Rd FY17 FY18 FY19 FY20-21 $1,300 $1,250 $0 $0 State $0 $0 $0 $0 $0 Local $500 $350 $500 $0 $0 $2,000 $1,650 $1,750 $0 $0 $0 Prior Funding FY16 FY17 FY18 FY19 FY20-21 $0 $632 $0 $0 $0 State $0 $0 $0 $0 $0 Local $0 $158 $0 $0 $0 $0 $790 $0 $0 $0 $0 186 $0 $750 Total Funding $0 Future Federal Total Total Funding Future $1,500 Amounts in $1,000s Boulder County Future $0 Total 2016-052 FY20-21 $0 Federal High Line Canal Trail Underpass at Hampden and Colorado FY19 $0 Amounts in $1,000s Cherry Hills Village FY18 $320 Total 2016-038 FY17 $280 $5,400 Total Funding $0 $790 Amounts in $1,000s Prior Funding FY16 Federal 2016-053 Mead Future $0 State $0 $0 $0 $0 $0 Local $100 $0 $0 $0 $0 $500 $0 $0 $0 $0 Total Funding Mead School to School Trail Project $0 Prior Funding FY16 Boulder County Bus-then-Bike Shelters FY17 FY18 FY19 FY20-21 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $57 $0 $0 $0 $0 $283 $0 $0 $0 $0 $0 Amounts in $1,000s Prior Funding Federal FY16 FY17 FY18 FY19 $0 Future $226 Total CDOT FY20-21 $0 Federal 2016-060 FY19 $0 Amounts in $1,000s Boulder County FY18 $0 Total 2016-054 FY17 $400 FY20-21 Total Funding $0 Future $700 $0 $0 $0 $0 State $0 $0 $0 $0 $0 Local $175 $0 $0 $0 $0 $875 $0 $0 $0 $0 $500 $283 Total Funding I-70/Genesee Bike Path Total $88 187 $0 $963 Amounts in $1,000s Prior Funding FY16 Federal 2016-061 Lakewood Sheridan Blvd Sidewalks: W. 8th Ave to W. 10th Ave Prior Funding State $0 $0 $0 $0 $0 Local $100 $0 $0 $0 $0 $500 $0 $0 $0 $0 $500 Prior Funding FY16 FY17 FY18 FY19 $0 $0 $0 State $0 $0 $0 $0 $0 Local $100 $100 $0 $0 $0 $500 $500 $0 $0 $0 $0 FY17 FY18 FY19 FY20-21 Future Funding $3,981 $2,814 $3,359 $0 State $0 $0 $0 $0 $0 Local $1,528 $1,321 $1,116 $1,515 $0 $5,936 $5,302 $3,930 $4,874 $0 $588 Prior Funding Grand Total of Revenues FY16 FY17 FY18 FY19 FY20-21 Future Funding Federal $329,995 $336,995 $214,101 $151,023 $148,655 State $245,297 $945,327 $179,851 $144,160 $0 Local $485,670 $323,145 $118,446 $65,887 $30,334 $1,060,962 $1,605,467 $512,398 $361,070 $178,989 Total $5,713,132 188 $0 $301,484 Total Funding $0 Future Funding $400 $4,408 Total FY20-21 $400 FY16 Federal Future $0 Total Transportation Alternatives Project Allocation Totals FY20-21 $0 Federal Sheridan Blvd Sidewalks: Colfax Ave to 17th FY19 $0 Amounts in $1,000s Denver FY18 $0 Total 2016-062 FY17 $400 Total Funding $20,630 Total Funding $9,733,502 $1,000 Total Funding $0 $1,000 APPENDIX B Major Projects in the 2012-2017 Transportation Improvement Program Not Yet Completed and Rollover List 189 190 Major Projects with Completion Funds Obligated, but Construction Not Substantially Completed Before 2016-2021 TIP TIP ID 2001-214 Project Description Project Title C-470: Wadsworth to Santa Fe th Sponsor Roadway Resurfacing CDOT Region 1 2001-214 I-25: US-36 to 120 Managed Lanes Roadway Recon/Capacity CDOT Region 1 2001-214 I-70: Havana to I-225 Roadway Resurfacing CDOT Region 1 2001-214 I-76: Federal to I-70 Roadway Resurfacing CDOT Region 1 2001-214 Wadsworth: Parkhill to Florida Roadway Resurfacing CDOT Region 1 2001-214 SH-58: US-6 to I-70 Roadway Resurfacing CDOT Region 1 2001-214 US-6: Sheridan to Simms Roadway Resurfacing CDOT Region 1 Roadway Resurfacing CDOT Region 1 Roadway Resurfacing CDOT Region 1 th 2001-214 US-6: I-70 to I-76 and 60 2001-214 US-85: Blakeland to Crestline th 2007-029 120 Connection: Wadsworth to US-287 New Roadway Broomfield 2007-078 I-70 East: Smith and UPRR Bridge Bridge Replacement CDOT Region 1 2007-096 Federal: 92 Roadway Resurfacing CDOT Region 1 2007-095 SH-66: MP 39-43 Roadway Resurfacing CDOT Region 4 2007-096 I-70 East: Tower to Colfax Roadway Resurfacing CDOT Region 1 nd to 120 th th 2007-096 I-76: 96 to US-85 Roadway Resurfacing CDOT Region 1 2007-096 SH-86 (Founders Pkwy): MP 100.2-104.3 Roadway Resurfacing CDOT Region 1 2007-096 University: Arapahoe to Hampden Roadway Resurfacing CDOT Region 1 2007-171 US-6 Bridges Bridge Replacement CDOT Region 1 2008-078 I-270 Resurfacing Roadway Resurfacing CDOT Region 1 2008-078 SH-93 Shoulders: SH-72, SH-128 Roadway Operational CDOT Region 1 2008-078 SH-95 Intersection Improvements Roadway Operational CDOT Region 1 2008-104 County Rd (Design): Old Wadsworth @ US-36 Bridge Replacement CDOT Region 1 Bridge Replacement CDOT Region 1 th 2008-104 Federal at 69 2008-104 I-70 at Sand Creek Bridge Replacement CDOT Region 1 2008-104 I-70 East Preconstruction Activities Bridge Replacement CDOT Region 1 2008-104 I-76 at S. Platte Bridge Replacement CDOT Region 1 2008-104 I-76 at UPRR Bridge Replacement CDOT Region 1 2008-104 Peoria at I-76 Bridge Replacement CDOT Region 1 2008-104 Wadsworth at Bear Creek Bridge Replacement CDOT Region 1 2008-104 Wadsworth at US-36 Bridge Replacement CDOT Region 1 2008-104 SH-30: Havana at Cherry Creek Bridge Replacement CDOT Region 1 2008-104 SH-30: Havana at I-70 Bridge Replacement CDOT Region 1 2008-104 SH-40 at Sand Creek Bridge Replacement CDOT Region 1 th 2008-104 SH-44: 104 at Bull Seep Bridge Replacement CDOT Region 1 2008-104 SH-58 at Ford Bridge Replacement CDOT Region 1 2008-104 SH-88 at Cherry Creek Bridge Replacement CDOT Region 1 2008-104 Sheridan (Design) at UPRR Bridge Replacement CDOT Region 1 2008-104 US-6 (design) at Sheridan Bridge Replacement CDOT Region 1 th 2012-041 120 and Federal Operational Improvements Roadway Operational Westminster 2012-063 I-25 North PEL Action Items Roadway Operational CDOT Region 1 191 Major Projects with Completion Funds Obligated, but Construction Not Substantially Completed Before 2016-2021 TIP 2012-065 2012-072 2012-089 2012-110 2012-111 2012-113 I-70/Pecos Bridge Federal and 92 nd Operational Improvements Wadsworth: Highlands to 10 th th US-6/19 Grade Separation th Federal: 6 to Howard Widening nd SH-2: 72 to I-76 Widening and Devolution Bridge Replacement CDOT Region 1 Roadway Operational Federal Heights Roadway Capacity Lakewood Roadway Capacity CDOT Region 1 Roadway Capacity CDOT Region 1 Roadway Capacity CDOT Region 1 Major Projects Delayed; Major Elements Included in 2016-2021 TIP (including Rollover List) 2001-154 US-85: Cook Ranch to Meadows Widening Project Description Roadway Capacity 2005-072 US-6: Wadsworth Interchange Reconstruction Interchange Recon CDOT Region 1 2007-080 US-40 and Tollgate Creek Bridge Replacement Bridge Replacement CDOT Region 1 2007-095 SH-119: MP 59-64 Roadway Resurfacing CDOT Region 4 TIP ID Project Title th Sponsor CDOT Region 1 2012-036 2012-043 2012-073 Wadsworth: Highlands to 10 I-25/Arapahoe Interchange Reconstruction th North I-25 Managed Lanes: US-36 to 120 Roadway Capacity Interchange Recon Roadway Capacity Lakewood Arapahoe County CDOT Region 1 2012-096 I-25: Ridgegate to County Line Lane Balancing Roadway Capacity Douglas County Note: Major projects reported have a total cost greater than $5 million. Rollover list will be added at a later time. 192 APPENDIX C Lookup List of Projects By: 1. County 2. City 3. Project Type 193 194 2016-2021 TIP Projects by County County TIP ID Project Name 2016-012 Anschutz Medical Campus Shuttle 2016-019 Colfax 15L Transit Improvements: I-225 to I-25 2008-111 FasTracks Eagle P-3 Corridors (Gold and East Line) 2007-056 FasTracks I-225 LRT Corridor: Parker Rd to East Corridor Commuter Rail 2007-055 FasTracks North Metro: Denver Union Station to 72nd Ave 2007-050 FasTracks Northwest Rail Corridor 2016-044 Hwy 79 and Hwy 36 Grade Separation: FA and Design Study 2012-063 I-25 North PEL Action Items 2016-055 I-25: 120th Ave to E-470 Managed Lanes 2016-047 Industrial Area Transportation Study: I-25 to I-270 to 40th Ave/Smith Rd 2012-079 North Metro Rail 112th Ave Corridor Improvements 2012-080 North Metro Rail 72nd Ave and Colorado Blvd Station Sidewalks 2007-078 Region 1 Bridge On-System Pool 2008-103 Region 1 FASTER Bridge Enterprise Pool 2008-076 Region 1 FASTER Pool 2007-073 Region 1 Hazard Elimination Pool 2007-074 Region 1 Hot Spot Pool 2016-056 Region 1 ITS Pool 2012-112 Region 1 RAMP Project Pool 2016-057 Region 1 RPP Pool 2007-096 Region 1 Surface Treatment Pool 2007-075 Region 1 Traffic Signals Pool 2016-039 Route 73 Extension: Smith Rd Station to 60th Ave and Dahlia St 2016-010 RTD L Route Service Enhancement 2016-045 SH-7 BRT Study: Boulder to Brighton 2016-016 Toll Gate Creek Trail: Chambers Rd to Montview Blvd 2008-114 US-36: Boulder to I-25 Managed Lanes/BRT TIP ID Project Name 2016-046 Arapahoe Rd: I-25 to Parker Rd Next Steps Operations Study 2016-059 C-470 Managed Toll Express Lanes: Kipling to I-25 2016-019 Colfax 15L Transit Improvements: I-225 to I-25 2007-056 FasTracks I-225 LRT Corridor: Parker Rd to East Corridor Commuter Rail 2007-058 FasTracks Southwest Corridor Extension: Mineral Station to C-470 2016-040 Gun Club Rd and Quincy Ave Operational Improvements 2016-038 High Line Canal Trail Underpass 2016-024 Iliff Ave Operational Improvements: Parker Rd to Quebec St 2016-005 Metro Center Station Area Bike/Ped Connector Facility 2007-078 Region 1 Bridge On-System Pool 2008-103 Region 1 FASTER Bridge Enterprise Pool Adams County Arapahoe 195 2016-2021 TIP Projects by County County 2008-076 Region 1 FASTER Pool 2007-073 Region 1 Hazard Elimination Pool 2007-074 Region 1 Hot Spot Pool 2016-056 Region 1 ITS Pool 2012-112 Region 1 RAMP Project Pool 2016-057 Region 1 RPP Pool 2007-096 Region 1 Surface Treatment Pool 2007-075 Region 1 Traffic Signals Pool 2016-016 Toll Gate Creek Trail: Chambers Rd to Montview Blvd 2016-017 Westerly Creek Trail to Toll Gate Creek Trail Connector TIP ID Project Name 2016-035 30th St and Colorado Ave Bike/Ped Underpass 2016-030 71st St Multimodal Pathway Connection: Winchester to Idylwild Trail 2016-054 Boulder County Bus-then-Bike Shelters 2016-008 Boulder Slough Multiuse Path: 30th St to 3100 Pearl 2016-026 Broadway Reconstruction: Violet Ave to US-36 2016-029 East Lafayette Multimodal Path Connection: Commerce Ct to Lafayette Park-n-Ride 2016-048 Erie Pkwy Study: SH-287 to I-25 2016-011 FLEX Route Extension: Boulder to Longmont 2012-116 Region 4 2013 Flood-Related Projects Pool 2008-028 Region 4 Bridge Off-System Pool 2007-133 Region 4 Bridge On-System Pool 2008-077 Region 4 FASTER Pool 2008-106 Region 4 FASTER Transit Pool 2007-094 Region 4 Hazard Elimination Pool 2007-092 Region 4 Hot Spot Pool 2012-109 Region 4 RAMP Project Pool 2007-095 Region 4 Surface Treatment Pool 2007-091 Region 4 Traffic Signals Pool 2016-010 RTD L Route Service Enhancement 2016-015 RTD Route #324 Frequency Improvements 2016-050 SH 119 BRT NEPA Analysis: Boulder to Longmont 2012-051 SH-119: South of Hover Bike/Ped Underpass 2016-045 SH-7 BRT Study: Boulder to Brighton 2016-013 Superior Call-n-Ride 2016-033 Superior Trail: McCaslin BRT Station to Coal Creek 2016-034 Superior Trail: McCaslin BRT to Davidson Mesa Underpass 2016-007 University of Colorado Boulder East Campus Pedestrian Bridge & Trail Connection 2008-114 US-36: Boulder to I-25 Managed Lanes/BRT 2016-052 Williams Fork Trail Multi-use Path: 63rd St to Twin Lakes Rd Boulder 196 2016-2021 TIP Projects by County County TIP ID Project Name 2016-014 Broomfield Call-n-Ride 2016-055 I-25: 120th Ave to E-470 Managed Lanes 2007-078 Region 1 Bridge On-System Pool 2008-103 Region 1 FASTER Bridge Enterprise Pool 2008-076 Region 1 FASTER Pool 2007-073 Region 1 Hazard Elimination Pool 2007-074 Region 1 Hot Spot Pool 2016-056 Region 1 ITS Pool 2012-112 Region 1 RAMP Project Pool 2016-057 Region 1 RPP Pool 2007-096 Region 1 Surface Treatment Pool 2007-075 Region 1 Traffic Signals Pool 2016-010 RTD L Route Service Enhancement 2016-045 SH-7 BRT Study: Boulder to Brighton 2008-114 US-36: Boulder to I-25 Managed Lanes/BRT TIP ID Project Name 2016-028 16th St Mall Reconstruction: Arapahoe St to Lawrence St 2016-019 Colfax 15L Transit Improvements: I-225 to I-25 2007-053 FasTracks Central Corridor: 30th Ave & Downing St to 38th Ave & Blake St 2008-111 FasTracks Eagle P-3 Corridors (Gold and East Line) 2007-055 FasTracks North Metro: Denver Union Station to 72nd Ave 2007-050 FasTracks Northwest Rail Corridor 2016-038 High Line Canal Trail Underpass 2016-021 I-25 & Broadway Interchange Reconstruction 2007-158 I-25: Santa Fe Dr to Alameda Ave Interchange Improvements (Valley Hwy Phases I and II) 2016-003 I-70 East Reconstruction 2016-024 Iliff Ave Operational Improvements: Parker Rd to Quebec St 2016-047 Industrial Area Transportation Study: I-25 to I-270 to 40th Ave/Smith Rd 2016-022 Martin Luther King Jr. Blvd Extension: Havana St to Peoria St 2016-009 MetroRide Service Expansion: DUS to Civic Center 2016-023 Quebec St Operational Improvements: 13th Ave to 26th Ave 2007-078 Region 1 Bridge On-System Pool 2008-103 Region 1 FASTER Bridge Enterprise Pool 2008-076 Region 1 FASTER Pool 2007-073 Region 1 Hazard Elimination Pool 2007-074 Region 1 Hot Spot Pool 2016-056 Region 1 ITS Pool 2012-112 Region 1 RAMP Project Pool 2016-057 Region 1 RPP Pool Broomfield County Denver 197 2016-2021 TIP Projects by County County 2007-096 Region 1 Surface Treatment Pool 2007-075 Region 1 Traffic Signals Pool 2016-039 Route 73 Extension: Smith Rd Station to 60th Ave and Dahlia St 2016-010 RTD L Route Service Enhancement 2016-062 Sheridan Blvd Sidewalks: Colfax Ave to 17th 1999-052 State of Good Repair TIP ID Project Name 2016-059 C-470 Managed Toll Express Lanes: Kipling to I-25 2016-031 C-470 Multi-use Trail: Grade Separation at Yosemite St 2007-059 FasTracks Southeast Corridor Extension: Lincoln Ave to RidgeGate Pkwy 2007-058 FasTracks Southwest Corridor Extension: Mineral Station to C-470 2016-041 Founders Pkwy and Allen Way Intersection Improvements 2016-027 Meadows Pkwy Reconstruction: US-85 to Meadows Blvd 2016-036 Parker Rd Sidewalk Connection: Plaza Dr to Sulphur Gulch Trail 2007-078 Region 1 Bridge On-System Pool 2008-103 Region 1 FASTER Bridge Enterprise Pool 2008-076 Region 1 FASTER Pool 2007-073 Region 1 Hazard Elimination Pool 2007-074 Region 1 Hot Spot Pool 2016-056 Region 1 ITS Pool 2012-112 Region 1 RAMP Project Pool 2016-057 Region 1 RPP Pool 2007-096 Region 1 Surface Treatment Pool 2007-075 Region 1 Traffic Signals Pool 2016-043 RidgeGate Pkwy Widening: Havana St to Lone Tree City Limits 2016-042 US 85: Highlands Ranch Pkwy to Blakeland Dr Capacity Improvements 2001-154 US-85: Cook Ranch Rd to Meadows Pkwy Widening TIP ID Project Name 2008-111 FasTracks Eagle P-3 Corridors (Gold and East Line) 2007-050 FasTracks Northwest Rail Corridor 2016-060 I-70/Genesee Bike Path 2012-062 I-70/Kipling: NEPA Study 2016-049 Jeffco Bike Wayfinding Study 2016-006 Multi-use path on the D10: Wadworth Blvd to Zephyr St and Kipling St to Oak St 2016-025 Ralston Rd Reconstruction: Yukon St to Upham St 2007-078 Region 1 Bridge On-System Pool 2008-103 Region 1 FASTER Bridge Enterprise Pool 2008-076 Region 1 FASTER Pool 2007-073 Region 1 Hazard Elimination Pool 2007-074 Region 1 Hot Spot Pool Douglas County Jefferson 198 2016-2021 TIP Projects by County County 2016-056 Region 1 ITS Pool 2012-112 Region 1 RAMP Project Pool 2012-115 Region 1 Rockfall Mitigation 2016-057 Region 1 RPP Pool 2007-096 Region 1 Surface Treatment Pool 2007-075 Region 1 Traffic Signals Pool 2016-010 RTD L Route Service Enhancement 2016-061 Sheridan Blvd Sidewalks: W. 8th Ave to W. 10th Ave 2008-114 US-36: Boulder to I-25 Managed Lanes/BRT 2016-032 US-6 Shared-Use Path: Colfax Ave to Johnson Rd 2016-020 Wadsworth Blvd Widening: 35th Ave to 48th Ave 2016-037 Washington Ave Complete Streets TIP ID Project Name 2016-002 Air Quality Improvements Pool 2012-010 DRCOG Second Commitment to FasTracks Pool 2007-044 FasTracks Projects: DRCOG First Commitment Pool 2016-058 Ozone State Implementation Plan (SIP) Modeling Study 2016-051 Regional BRT Feasibility Study 2012-064 Regional TDM Program: Way to Go 1999-097 Regional Transportation Demand Management (TDM) Program Pool 2016-004 Regional Transportation Operations Pool 2012-108 RTD Capital Improvements: Bus and Facilities Funding 2007-169 RTD Enhancements - ADA/Ped/Bus Shelter 1997-084 RTD Preventive Maintenance: Transit Vehicle Overhaul and Maintenance 2012-068 RTD Regional Workforce Initiative Now (WIN) 2007-089 Station Area Master Plan/Urban Center Studies Pool TIP ID Project Name 2016-048 Erie Pkwy Study: SH-287 to I-25 2016-053 Mead School to School Trail Project 2008-081 North I-25: Front Range EIS 2012-116 Region 4 2013 Flood-Related Projects Pool 2008-028 Region 4 Bridge Off-System Pool 2007-133 Region 4 Bridge On-System Pool 2008-077 Region 4 FASTER Pool 2008-106 Region 4 FASTER Transit Pool 2007-094 Region 4 Hazard Elimination Pool 2007-092 Region 4 Hot Spot Pool 2012-109 Region 4 RAMP Project Pool 2007-095 Region 4 Surface Treatment Pool 2007-091 Region 4 Traffic Signals Pool Regional County Weld 199 2016-2021 TIP Projects by County 2016-045 SH-7 BRT Study: Boulder to Brighton 200 2016-2021 TIP Projects by City City TIPID Project Name 2008-111 FasTracks Eagle P-3 Corridors (Gold and East Line) 2016-025 Ralston Rd Reconstruction: Yukon St to Upham St 2016-012 Anschutz Medical Campus Shuttle 2016-046 Arapahoe Rd: I-25 to Parker Rd Next Steps Operations Study 2016-019 Colfax 15L Transit Improvements: I-225 to I-25 2008-111 FasTracks Eagle P-3 Corridors (Gold and East Line) 2007-056 FasTracks I-225 LRT Corridor: Parker Rd to East Corridor Commuter Rail 2016-040 Gun Club Rd and Quincy Ave Operational Improvements 2016-005 Metro Center Station Area Bike/Ped Connector Facility 2016-016 Toll Gate Creek Trail: Chambers Rd to Montview Blvd 2016-017 Westerly Creek Trail to Toll Gate Creek Trail Connector 2016-044 Hwy 79 and Hwy 36 Grade Separation: FA and Design Study 2016-035 30th St and Colorado Ave Bike/Ped Underpass 2016-030 71st St Multimodal Pathway Connection: Winchester to Idylwild Trail 2016-008 Boulder Slough Multiuse Path: 30th St to 3100 Pearl 2016-026 Broadway Reconstruction: Violet Ave to US-36 2016-011 FLEX Route Extension: Boulder to Longmont 2012-109 Region 4 RAMP Project Pool 2016-050 SH 119 BRT NEPA Analysis: Boulder to Longmont 2016-045 SH-7 BRT Study: Boulder to Brighton 2016-007 University of Colorado Boulder East Campus Pedestrian Bridge & Trail Connection 2016-052 Williams Fork Trail Multi-use Path: 63rd St to Twin Lakes Rd 2016-045 SH-7 BRT Study: Boulder to Brighton 2016-014 Broomfield Call-n-Ride 2016-055 I-25: 120th Ave to E-470 Managed Lanes 2016-010 RTD L Route Service Enhancement 2016-045 SH-7 BRT Study: Boulder to Brighton 2008-114 US-36: Boulder to I-25 Managed Lanes/BRT 2016-041 Founders Pkwy and Allen Way Intersection Improvements 2016-027 Meadows Pkwy Reconstruction: US-85 to Meadows Blvd 2001-154 US-85: Cook Ranch Rd to Meadows Pkwy Widening 2016-046 Arapahoe Rd: I-25 to Parker Rd Next Steps Operations Study City of Arvada City of Aurora City of Bennett City of Boulder City of Brighton City of Broomfield City of Castle Rock City of Centennial 201 2016-2021 TIP Projects by City City TIPID Project Name 2016-038 High Line Canal Trail Underpass 2007-055 FasTracks North Metro: Denver Union Station to 72nd Ave 2016-047 Industrial Area Transportation Study: I-25 to I-270 to 40th Ave/Smith Rd 2016-039 Route 73 Extension: Smith Rd Station to 60th Ave and Dahlia St 2016-028 16th St Mall Reconstruction: Arapahoe St to Lawrence St 2016-019 Colfax 15L Transit Improvements: I-225 to I-25 2007-053 FasTracks Central Corridor: 30th Ave & Downing St to 38th Ave & Blake St 2008-111 FasTracks Eagle P-3 Corridors (Gold and East Line) 2007-055 FasTracks North Metro: Denver Union Station to 72nd Ave 2007-050 FasTracks Northwest Rail Corridor 2016-038 High Line Canal Trail Underpass 2016-021 I-25 & Broadway Interchange Reconstruction 2007-158 I-25: Santa Fe Dr to Alameda Ave Interchange Improvements (Valley Hwy Phases I and II) 2016-003 I-70 East Reconstruction 2016-024 Iliff Ave Operational Improvements: Parker Rd to Quebec St 2016-047 Industrial Area Transportation Study: I-25 to I-270 to 40th Ave/Smith Rd 2016-022 Martin Luther King Jr. Blvd Extension: Havana St to Peoria St 2016-009 MetroRide Service Expansion: DUS to Civic Center 2016-023 Quebec St Operational Improvements: 13th Ave to 26th Ave 2016-039 Route 73 Extension: Smith Rd Station to 60th Ave and Dahlia St 2016-010 RTD L Route Service Enhancement 2016-062 Sheridan Blvd Sidewalks: Colfax Ave to 17th 1999-052 State of Good Repair 2016-048 Erie Pkwy Study: SH-287 to I-25 2016-010 RTD L Route Service Enhancement 2016-045 SH-7 BRT Study: Boulder to Brighton 2016-032 US-6 Shared-Use Path: Colfax Ave to Johnson Rd 2016-037 Washington Ave Complete Streets 2016-046 Arapahoe Rd: I-25 to Parker Rd Next Steps Operations Study 2016-029 East Lafayette Multimodal Path Connection: Commerce Ct to Lafayette Park-n-Ride 2016-010 RTD L Route Service Enhancement 2016-045 SH-7 BRT Study: Boulder to Brighton City of Cherry Hills Village City of Commerce City City of Denver City of Erie City of Golden City of Greenwood Village City of Lafayette 202 2016-2021 TIP Projects by City City TIPID Project Name 2016-006 Multi-use path on the D10: Wadworth Blvd to Zephyr St and Kipling St to Oak St 2016-061 Sheridan Blvd Sidewalks: W. 8th Ave to W. 10th Ave 2007-058 FasTracks Southwest Corridor Extension: Mineral Station to C-470 2001-154 US-85: Cook Ranch Rd to Meadows Pkwy Widening 2016-031 C-470 Multi-use Trail: Grade Separation at Yosemite St 2007-059 FasTracks Southeast Corridor Extension: Lincoln Ave to RidgeGate Pkwy 2016-043 RidgeGate Pkwy Widening: Havana St to Lone Tree City Limits 2016-011 FLEX Route Extension: Boulder to Longmont 2012-109 Region 4 RAMP Project Pool 2016-010 RTD L Route Service Enhancement 2016-015 RTD Route #324 Frequency Improvements 2016-050 SH 119 BRT NEPA Analysis: Boulder to Longmont 2012-051 SH-119: South of Hover Bike/Ped Underpass 2016-053 Mead School to School Trail Project 2012-079 North Metro Rail 112th Ave Corridor Improvements 2016-036 Parker Rd Sidewalk Connection: Plaza Dr to Sulphur Gulch Trail 2016-013 Superior Call-n-Ride 2016-033 Superior Trail: McCaslin BRT Station to Coal Creek 2016-034 Superior Trail: McCaslin BRT to Davidson Mesa Underpass 2016-055 I-25: 120th Ave to E-470 Managed Lanes 2016-045 SH-7 BRT Study: Boulder to Brighton 2007-050 FasTracks Northwest Rail Corridor 2016-055 I-25: 120th Ave to E-470 Managed Lanes 2016-010 RTD L Route Service Enhancement 2008-114 US-36: Boulder to I-25 Managed Lanes/BRT 2008-111 FasTracks Eagle P-3 Corridors (Gold and East Line) 2012-062 I-70/Kipling: NEPA Study 2016-020 Wadsworth Blvd Widening: 35th Ave to 48th Ave City of Lakewood City of Littleton City of Lone Tree City of Longmont City of Mead City of Northglenn City of Parker City of Superior City of Thornton City of Westminster City of Wheat Ridge 203 2016-2021 TIP Projects by Project Type Project Type TIP ID Project Name Air Quality Improvement Projects Project Type 2016-002 Air Quality Improvements Pool 2016-058 Ozone State Implementation Plan (SIP) Modeling Study TIP ID Project Name Bicycle and Pedestrian Projects (New) 2016-018 23rd Ave. Bike/Ped Path at Fitzsimons Station 2016-035 30th St and Colorado Ave Bike/Ped Underpass 2016-030 71st St Multimodal Pathway Connection: Winchester to Idylwild Trail 2016-054 Boulder County Bus-then-Bike Shelters 2016-008 Boulder Slough Multiuse Path: 30th St to 3100 Pearl 2016-031 C-470 Multi-use Trail: Grade Separation at Yosemite St 2016-029 East Lafayette Multimodal Path Connection: Commerce Ct to Lafayette Park-n-Ride 2016-038 High Line Canal Trail Underpass 2016-060 I-70/Genesee Bike Path 2016-053 Mead School to School Trail Project 2016-005 Metro Center Station Area Bike/Ped Connector Facility 2016-006 Multi-use path on the D10: Wadworth Blvd to Zephyr St and Kipling St to Oak St 2012-079 North Metro Rail 112th Ave Corridor Improvements 2012-080 North Metro Rail 72nd Ave and Colorado Blvd Station Sidewalks 2016-036 Parker Rd Sidewalk Connection: Plaza Dr to Sulphur Gulch Trail 2012-051 SH-119: South of Hover Bike/Ped Underpass 2016-062 Sheridan Blvd Sidewalks: Colfax Ave to 17th 2016-061 Sheridan Blvd Sidewalks: W. 8th Ave to W. 10th Ave 2016-033 Superior Trail: McCaslin BRT Station to Coal Creek 2016-034 Superior Trail: McCaslin BRT to Davidson Mesa Underpass 2016-016 Toll Gate Creek Trail: Chambers Rd to Montview Blvd 2016-007 University of Colorado Boulder East Campus Pedestrian Bridge & Trail Connection 2016-032 US-6 Shared-Use Path: Colfax Ave to Johnson Rd 2016-037 Washington Ave Complete Streets 2016-017 Westerly Creek Trail to Toll Gate Creek Trail Connector 2016-052 Williams Fork Trail Multi-use Path: 63rd St to Twin Lakes Rd 204 2016-2021 TIP Projects by Project Type Project Type TIP ID Project Name 2007-078 Region 1 Bridge On-System Pool 2008-103 Region 1 FASTER Bridge Enterprise Pool 2008-028 Region 4 Bridge Off-System Pool 2007-133 Region 4 Bridge On-System Pool TIP ID Project Name Bridge Project Type Bus Service Projects (Expanded) Project Type 2016-014 Broomfield Call-n-Ride 2016-011 FLEX Route Extension: Boulder to Longmont 2016-009 MetroRide Service Expansion: DUS to Civic Center 2016-039 Route 73 Extension: Smith Rd Station to 60th Ave and Dahlia St 2016-010 RTD L Route Service Enhancement 2016-015 RTD Route #324 Frequency Improvements TIP ID Project Name Bus Service Projects (New) Project Type 2016-012 Anschutz Medical Campus Shuttle 2016-013 Superior Call-n-Ride TIP ID Project Name 2016-056 Region 1 ITS Pool 2012-064 Regional TDM Program: Way to Go 1999-097 Regional Transportation Demand Management (TDM) Program Pool TIP ID Project Name Congestion Management Project Type Interchange Reconstruction Project Type 2007-158 I-25: Santa Fe Dr to Alameda Ave Interchange Improvements (Valley Hwy Phases I and II) TIP ID Project Name 2012-112 Region 1 RAMP Project Pool 2016-057 Region 1 RPP Pool 2012-109 Region 4 RAMP Project Pool Other 205 2016-2021 TIP Projects by Project Type Project Type TIP ID Project Name 2007-053 FasTracks Central Corridor: 30th Ave & Downing St to 38th Ave & Blake St 2008-111 FasTracks Eagle P-3 Corridors (Gold and East Line) 2007-056 FasTracks I-225 LRT Corridor: Parker Rd to East Corridor Commuter Rail 2007-055 FasTracks North Metro: Denver Union Station to 72nd Ave 2007-050 FasTracks Northwest Rail Corridor 2007-059 FasTracks Southeast Corridor Extension: Lincoln Ave to RidgeGate Pkwy 2007-058 FasTracks Southwest Corridor Extension: Mineral Station to C-470 2012-068 RTD Regional Workforce Initiative Now (WIN) TIP ID Project Name 2016-059 C-470 Managed Toll Express Lanes: Kipling to I-25 2016-021 I-25 & Broadway Interchange Reconstruction 2016-055 I-25: 120th Ave to E-470 Managed Lanes 2016-022 Martin Luther King Jr. Blvd Extension: Havana St to Peoria St 2016-043 RidgeGate Pkwy Widening: Havana St to Lone Tree City Limits 2016-042 US 85: Highlands Ranch Pkwy to Blakeland Dr Capacity Improvements 2008-114 US-36: Boulder to I-25 Managed Lanes/BRT 2001-154 US-85: Cook Ranch Rd to Meadows Pkwy Widening 2016-020 Wadsworth Blvd Widening: 35th Ave to 48th Ave TIP ID Project Name Rapid Transit Project Type Roadway Capacity Project Type Roadway Operational Improvements Project Type 2016-041 Founders Pkwy and Allen Way Intersection Improvements 2016-040 Gun Club Rd and Quincy Ave Operational Improvements 2012-063 I-25 North PEL Action Items 2016-024 Iliff Ave Operational Improvements: Parker Rd to Quebec St 2016-023 Quebec St Operational Improvements: 13th Ave to 26th Ave TIP ID Project Name 2016-028 16th St Mall Reconstruction: Arapahoe St to Lawrence St 2016-026 Broadway Reconstruction: Violet Ave to US-36 Roadway Reconstruction 206 2016-2021 TIP Projects by Project Type Project Type 2016-003 I-70 East Reconstruction 2016-027 Meadows Pkwy Reconstruction: US-85 to Meadows Blvd 2016-025 Ralston Rd Reconstruction: Yukon St to Upham St 2007-096 Region 1 Surface Treatment Pool 2012-116 Region 4 2013 Flood-Related Projects Pool 2007-095 Region 4 Surface Treatment Pool TIP ID Project Name 2016-046 Arapahoe Rd: I-25 to Parker Rd Next Steps Operations Study 2016-048 Erie Pkwy Study: SH-287 to I-25 2016-044 Hwy 79 and Hwy 36 Grade Separation: FA and Design Study 2012-062 I-70/Kipling: NEPA Study 2016-047 Industrial Area Transportation Study: I-25 to I-270 to 40th Ave/Smith Rd 2016-049 Jeffco Bike Wayfinding Study 2008-081 North I-25: Front Range EIS 2016-051 Regional BRT Feasibility Study 2016-050 SH 119 BRT NEPA Analysis: Boulder to Longmont 2016-045 SH-7 BRT Study: Boulder to Brighton TIP ID Project Name 2008-076 Region 1 FASTER Pool 2007-073 Region 1 Hazard Elimination Pool 2007-074 Region 1 Hot Spot Pool 2012-115 Region 1 Rockfall Mitigation 2007-075 Region 1 Traffic Signals Pool 2008-077 Region 4 FASTER Pool 2007-094 Region 4 Hazard Elimination Pool 2007-092 Region 4 Hot Spot Pool 2007-091 Region 4 Traffic Signals Pool TIP ID Project Name Roadway/Transit Studies Project Type Safety Project Type Station Area/Urban Center Studies 2007-089 Station Area Master Plan/Urban Center Studies Pool 207 2016-2021 TIP Projects by Project Type Project Type TIP ID Project Name Transit Operational Improvements Project Type 2012-010 DRCOG Second Commitment to FasTracks Pool 2007-044 FasTracks Projects: DRCOG First Commitment Pool 2008-106 Region 4 FASTER Transit Pool 1999-052 State of Good Repair TIP ID Project Name Transit Passenger Facilities Project Type 2016-019 Colfax 15L Transit Improvements: I-225 to I-25 2007-169 RTD Enhancements - ADA/Ped/Bus Shelter TIP ID Project Name 2012-108 RTD Capital Improvements: Bus and Facilities Funding 1997-084 RTD Preventive Maintenance: Transit Vehicle Overhaul and Maintenance Transit Vehicles 208 APPENDIX D Regionally Significant Projects Not Supported by Federal Funds 209 Locally funded regionally significant projects that are included in the 2015 and 2025 conformity networks (Appendix A of the Conformity document) are listed below for information purposes. These projects have not been adopted as part of this 2016-2021 TIP, no funding has been assigned, and they are not supported by federal transportation funds. An FHWA approval is required however for new interchange projects on the Interstate Highway System. Locally-Funded Capacity Projects – New Roads 2015-2024 48th Ave.: Picadilly Rd to Powhaton Rd 64th Ave.: Harvest Mile Rd to Powhaton Rd 64th Ave.: Powhaton Rd to Monaghan Rd 160th Ave: Lowell Blvd to Sheridan Pkwy Canyons Pkwy: Crowfoot Valley Rd to Hess Rd Central Park Blvd: 47th Ave to 56th Ave Chambers Rd.: Parker south Town Limit to Crowfoot Valley Chambers Rd: Crowfoot Valley Rd. to Hess Rd. Harvest Mile Rd: 6th Ave to I-70 Harvest Mile Rd: I-70 to 56th Ave Harvest Mile Rd: 56th Ave to 64th Ave Harvest Mile Rd: Mississippi Ave to Alameda Ave Jefferson Pkwy Initial Phase: SH-93 to SH-128 Picadilly Rd.: Jewell Ave to 6th Pkwy Picadilly Rd.: Colfax Ave to I-70 Picadilly Rd.: 56th Ave to 70th Ave./Aurora City Limits Picadilly Rd.: 70th Ave to 82nd Ave Quincy Ave: Irving St to Federal Blvd Stroh Rd: Chambers Rd to Crowfoot Valley Rd Tower Rd: 6th Ave. to Colfax Ave. Tower Rd/Buckley Rd: 105th Ave to 118th Ave 210 Locally-Funded Capacity Projects – Roadway Widening 2015-2024 6th Ave.: 6th Pkwy to Harvest Mile Rd 6th Ave/SH30: Tower Rd to 6th Pkwy 6th Ave: Airport Blvd to Tower Rd 6th Pkwy: E-470 to Gun Club Rd 17th Ave: Alpine St to Ute Creek Dr 56th Ave.: E-470 to Imboden Rd 56th Ave.: Pena Blvd to Tower Rd 56th Ave.: Dunkirk St. to Himalaya St. 56th Ave.: Himalaya Rd to Picadilly Rd 56th Ave.: Picadilly Rd to E-470 58th Ave.: Washington St to York St 64th Ave.: Denver/Aurora City Limit to Himalaya 64th Ave.: Himalaya Rd to Harvest Mile Rd 64th Ave.: Terry St to Kendrick Dr 64th Ave.: Tower Rd to Denver/Aurora City Limits 104th Ave.: US-85 to SH-2 144th Ave.: Washington St. to York St. 144th Ave.: York St to Colorado Blvd 144th Ave: US 287 to Zuni St. Alameda Pkwy: C-470 to Bear Creek Blvd Arapahoe Rd: Waco St to Himalaya St Broadway - Exposition Ave to Arizona Ave. Broncos Pkwy: Jordan Rd to Parker Rd Buckley Rd.: 118th Ave to Cameron Dr Buckley Rd.: 136th Ave to Bromley Ln Chambers Rd: Hess Rd. to Mainstreet Chambers Rd: Mainstreet to Lincoln Ave Crowfoot Valley Rd.: Chambers Rd to Stroh Rd E. Bromley Lane: SH-85 to Sable Blvd E. Bromley Lane: Tower Rd to I-76 Easter Ave: Havana St to Peoria St Green Valley Ranch Blvd: Chambers Rd to Telluride St. Green Valley Ranch Blvd: Telluride St. to Tower Rd. Green Valley Ranch Blvd: Pena Blvd to Chambers Rd Gun Club Rd: 1.5 miles s/o Quincy Ave to Quincy Ave. Hampden Ave: Picadilly Rd to Gun Club Rd Harvest Rd: Alameda Ave to 6th Ave Hess Rd.: Motsenbocker Rd to Nate Dr. Huron St: 150th Ave to 160th Ave Huron St: 160th Ave to SH-7 Jewell Ave: Himalaya Rd to E-470 Jewell Ave: E-470 to Gun Club Rd Jewell Ave: Gun Club Rd to Harvest Mile Rd Jordan Rd.: Bradbury Ranch Rd to Hess Rd Leon A. Wurl Pkwy: US-287 to 119th St. 211 Locally-Funded Capacity Projects – Roadway Widening Lincoln Ave: Keystone Blvd to Parker Rd Lincoln Ave: Peoria St to 1st Ave Nelson Rd: 75th St to Affolter Dr. Rd Pace St: 5th Ave to SH-66 Pecos St.: 52nd Ave. to I-76 Pena Blvd: Jackson Gap St to DIA Terminal Peoria St: E-470 to 0.75 mile south of Lincoln Ave. Picadilly Rd.: 6th Pkwy to Colfax Ave Picadilly Rd.: Smith Rd. to 48th Ave Picadilly Rd.: 48th Ave to 56th Ave Picadilly Rd.: I-70 to Smith Rd (realignment) Plum Creek Pkwy: Gilbert St to Ridge Rd Quebec St: 120th Ave to 128th Ave Quebec St: 132nd Ave to 160th Ave (SH-7) Quincy Ave.: Kipling St to Carr St Quincy Ave.: Plains Pkwy to Gun Club Rd Quincy Ave.: Simms St. to Kipling Pkwy Ridge Rd: Plum Creek Pkwy to SH-86 SH-30/Gun Club Rd: Mississippi Ave to Yale Ave SH-7: Boulder County Line to Sheridan Pkwy SH-7: Sheridan Pkwy to I-25 Sheridan Pkwy: Lowell Blvd to NW Pkwy Sheridan Pkwy: Northwest Pkwy to SH 7 Coachline Rd: Wolfensberger Rd to I-25 Stroh Rd: Crowfoot Valley to J. Morgan Blvd Tower Rd: 38th/40th Ave. to Green Valley Ranch Blvd. Tower Rd: 56th Ave to Pena Blvd Tower Rd: Colfax Ave to Smith Rd Tower Rd: Green Valley Ranch Blvd to 56th Ave Tower Rd: Pena Blvd to 105th Ave Washington St.: 144th Ave to 152nd Ave Washington St.: Elk Pl to 52nd Ave Washington St.-Phase IV: 52nd Ave. to 58th Ave. Washington St: 152nd Ave to 160th Ave York St.: 160th Ave (SH-7) to 168th Ave York St: E-470 to SH-7 212 Locally-Funded Interchanges 2015-2024 E-470: 48th Ave., New Interchange E-470: Potomac New Interchange Jefferson Pkwy: SH-72 New Interchange Jefferson Pkwy: Candelas Pkwy New Interchange Jefferson Pkwy: Indiana St. New Interchange I-25: Castlegate Dr., New Interchange I-70: 32nd Ave Interchange Reconstruction I-70: Harvest Rd. New Interchange I-70: Picadilly Rd New Interchange I-76: Bridge St. New Interchange SH-58: Cabela Drive, New Interchange US-86: North Meadows Dr., New Interchange 213 214 APPENDIX E Waiting List 215 216 Waiting List Protocol To be determined at a later date. 217 Table 4. Eligible Projects for Waiting List(s) for the 2016-2021 TIP (To be completed at a later date) Wait Sponsor List Order* COG-ID Project Title Project Type 218 Requested Federal $ ($000) Local $ ($000) APPENDIX F Governor’s Approval 219 220 221 DENVER REGIONAL COUNCIL OF GOVERNMENTS We make life better! 2016-2021 Transportation Improvement Program Denver Regional Council of Governments 1290 Broadway, Suite 700 Denver, CO 80203-5606 www.drcog.org - 303-455-1000
© Copyright 2026 Paperzz